Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones...

35
Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST +44 0 191 227 4746 [email protected] BE1170 Project, Programme and Portfolio Management: Project Governance

Transcript of Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones...

Page 1: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Robert C Moehler

School of the Built and Natural EnvironmentNorthumbria UniversityWynne Jones Building (106a)Ellison PlaceNewcastle upon Tyne NE1 8ST+44 0 191 227 [email protected]

BE1170 Project, Programme and Portfolio Management:

Project Governance

Page 2: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Association for Project Management (2012) APM Body of Knowledge 6th edn. Buckinghamshire: APM Publishing.

Aguilera, R. V., Williams, C. A., Conley, J. M. and Rupp, D. E. (2006) Corporate governance and social responsibility: a comparative analysis of the UK and the US. Corporate governance, 14(3), 147 – 158.

Bekker, M. C. and Steyn, H. (2008) The impact of project governance principles on project performance, PICMET Conference 2008, July 27-31. Cape Town: PICMET.

Bittner, E. and Gregorc, W. (2010) Experiencing Project Management. Erlangen: Siemens.

Bloomquest, T. and Müller, R. (2006) Middle Managers in Program and Portfolio Management: Practice, Roles and Responsibilities, Newton Square, PA: Project Management Institute.

BS 6079-1 (2002). Guide to Project Management. London, BSI.

Caporaso, J. A. and Wittenbrinck, J. (2006) The new modes of governance and political authority in Europe. Journal of European public policy, 13(4), 471 – 480.

Castells, M. (1996) The rise of the network society. Oxford: Blackwell.

Child, J. and Rodrigues, S. B. (2003) Corporate governance and new organizational forms: issues of double and multiple agency. Journal of management and governance, 7(4), 337 – 360.

Clegg, S.R., Pitsis, T.S., Rura-Polley, T. and Marosszeky, M. (2002) ‘Governmental matters: Designing an alliance culture of inter-organisational collaboration for managing projects’ Organisation Studies, 23(3): 317-37.

Flyvbjerg, B. (2011) ‘Over Budget, Over Time, Over and Over Again Managing Major Projects’, in Peter W. G. Morris, Jeffrey K. Pinto, and Jonas Söderlund (eds.) The Oxford Handbook of Project Management, Oxford: Oxford University Press.

HM Treasury (2003). The Green Book: Appraisal and Evaluation in Central Government, Treasury Guidance, London: TSO.

Helm, J. and Remington, K. (2005) ‘Effective Project Sponsorship: An Evaluation of the Role of the Executive Sponsor in Complex Infrastructure Projects by Senior Managers’, Project Management Journal, 36(3): 51-61.

Kaufmann, D. (2005) Myths and realities of governance and corruption. In: World Economic Forum Global competitiveness report 2005-2006. New York: Oxford University Press. pp. 81 – 95.

Klakegg, O.J., Williams, T., Magnussen, O.M. and Glasspool, H. (2008) ‘Governance frameworks for public project development and estimation’, Project Management Journal, 30/Supplement: S27-S42.

Readings for this Lecture

Page 3: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Miller, R. and Hobbs, B. (2005) ‘Governance regimes for large complex projects’, Project Management Journal, 36(3): 42-50.Müller, R. (2011) ‘Project Governance’, in Peter W. G. Morris, Jeffrey K. Pinto, and Jonas Söderlund (eds.) Oxford Handbook of

Project Management, Oxford: Oxford University Press.Mueller, R. (2009) Project Governance. Surrey: Gower Publishing.Müller, R. and Stawicki, J. (2007) ‘A framework for building successful project based organisations’, Project Perspectives, 29(1): 68-

71.Müller, R. and Turner, J.R. (2005) ‘The impact of principle-agent relationship and contract type communication between project

owner and manager’, International Journal of Project Management, 25(5): 398-403.Müller, R. and Turner, J.R. (2002) ‘A Model and Gap-Analysis of Buyer – Seller Communications in IT Projects’, in Proceedings of

the PM-Days Research Conference, November 27-28, 2002, Vienna, Austria. McWilliams, A., Siegel, D. S. and Wright, P. M. (2006) Corporate social responsibility: strategic implications. Journal of

management studies, 43(1), 1 – 18.OGC (2008) OCG governance, Office of Government Commerce, http://www.ogc.gov.uk accessed 12th March 2012Pinto, J.K., Slevin, D.P. And English, B. (2009) ‘Trust in projects: An empirical assessment of owner/contractor relationships’,

International Journal of Project Management, 27(6): 638-648.Pryke, S.D. (2005) ‘Towards a social network theory of project governance’, Construction Management and Economics, 23: 927-39. Pryke, S.D. and Pearson, S. (2006) ‘Project governance: Case studies on financial incentives’, Building Research and Information,

36(6): 534-45.Ruuska, I., Aholaa, T., Arttob, K., Locatellic, G. and Mancini, M. (2011) ‘A new governance approach for multi-firm projects:

Lessons from lkiluoto 3 and Flamanville 3 nuclear power plant projects’, International Journal of Project Management, 29: 647–660.

Shenhar, A., Dvir, D., Milosevic, D., Mulenburg, J., Patanakul, P., Reilly, R., Ryan, M., Sage, A., Sauser, B.,Srivannaboon, S., Stefanovic, J. and Thamhain, H. (2005) ‘Toward a NASA-specific project management framework’ Engineering Management Journal, 17(4): 8.

Stoker, G. (1998) 'Governance as theory: five propositions', International Social Science Journal, 50 (155), pp. 17 - 28.Shankman, N. A. (1999) Reframing the debate between agency and stakeholder theories of the firm. Journal of business ethics, 19,

319 – 334.

Readings for this Lecture

Page 4: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Warning

Controversial

No sales pitch

Page 5: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Objective

To understand– What is the purpose of project governance?– How do you actually implement it?– What value does it bring and how do we prove

it?

Page 6: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Most organisations don’t do it “I don’t care what the report says, I don’t care

you’re going to deliver late, with less functionality. Because that’s not going to happen. You will be on time, and it will work. Now stop wasting your time in my office and go make it happen.”

12 months later the project is canned after being £45m over budget. £165m spent. Zero benefits. The implementation partner was kicked out. The senior exec kept their job, no questions asked.

Page 7: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Most organisations don’t do it

“This project is pushed for time. The deadline is very tight. The team is a little smaller than ideal so we’re going to have to work efficiently and hard. But if we pull together we can deliver this.”

The project delivers 35% late (compared to baseline estimate). Attrition rate of 25% of team members.

Page 8: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Most organisations don’t do it

And 101 other examples– A business case that doesn’t add up– Undefined requirements (or requirements not signed off)– Poor management around stage boundaries– Technically unfeasible projects– A large change programme in an organisation that doesn’t know how to change– Doing too many projects but start another one– No match to organisation strategic direction– Incapable delivery team– No cohesion or understanding on benefits expected– Huge risks not mitigated or understood prior to project kick off

Page 9: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Post report: 8 Causes of Project Failure

1.1. Lack of a clear link between the project and the organisation’s key Lack of a clear link between the project and the organisation’s key strategic priorities, including agreed measures of success.strategic priorities, including agreed measures of success.

2.2. Lack of clear senior management and ministerial ownership and Lack of clear senior management and ministerial ownership and leadership leadership

3.3. Lack of effective engagement with Stakeholders Lack of effective engagement with Stakeholders 4.4. Lack of skills and proven approach to project management and risk Lack of skills and proven approach to project management and risk

management.management.5.5. Lack of understanding of and contact with the supply industry at Lack of understanding of and contact with the supply industry at

senior levels within the organisation.senior levels within the organisation.6.6. Evaluation of proposals driven by initial price rather than long-term Evaluation of proposals driven by initial price rather than long-term

value for money (especially securing the delivery of business value for money (especially securing the delivery of business benefits).benefits).

7.7. Too little attention to breaking development and implementation into Too little attention to breaking development and implementation into manageable steps.manageable steps.

8.8. Inadequate resources and skill to deliver the total delivery portfolio.Inadequate resources and skill to deliver the total delivery portfolio.

Page 10: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Which are Associated with Governance?

1.1. Lack of a clear link between the project and the organisation’s key Lack of a clear link between the project and the organisation’s key strategic priorities, including agreed measures of success.strategic priorities, including agreed measures of success.

2.2. Lack of clear senior management and ministerial ownership and Lack of clear senior management and ministerial ownership and leadership leadership

3.3. Lack of effective engagement with StakeholdersLack of effective engagement with Stakeholders 4.4. Lack of skills and proven approach to project management and risk Lack of skills and proven approach to project management and risk

management.management.5.5. Lack of understanding of and contact with the supply industry at Lack of understanding of and contact with the supply industry at

senior levels within the organisation.senior levels within the organisation.6.6. Evaluation of proposals driven by initial price rather than long-term Evaluation of proposals driven by initial price rather than long-term

value for money (especially securing the delivery of business value for money (especially securing the delivery of business benefits).benefits).

7.7. Too little attention to breaking development and implementation into Too little attention to breaking development and implementation into manageable steps.manageable steps.

8.8. Inadequate resources and skill to deliver the total delivery portfolio.Inadequate resources and skill to deliver the total delivery portfolio.

Page 11: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Those that say they do it… don’t

Warren Buffet…

Page 12: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Those that do do it, do it wrong

We’re going to follow a strict methodology here…– We’re going to do it my way

I’d like your buy in on this…– I want someone else to blame when this thing bombs

We want you to be the executive champion on this project– I want to be able to blame you for my mistakes

There are larger issues at stake– I’ve made up my mind so don’t bother me with the facts

Page 13: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Health Warning

Most organisations are not ready to accept ‘proper’ project governance

Page 14: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

What is Governance?

No-one can agree

APM – 11 facets of project governance.APM – 11 facets of project governance.

Human Systems – 8 principles of governanceHuman Systems – 8 principles of governance

TotallyOptimisedProjects – 26 areas of project governanceTotallyOptimisedProjects – 26 areas of project governance

ITGovernance.co.uk – ITGovernance.co.uk – 6 areas of governance6 areas of governance

HM Treasury – The 7 HM Treasury – The 7 aims of project aims of project

governancegovernance

Page 15: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

APM recognised 11 principles have been identified for governance of project management. 1. The board has overall responsibility for governance of project management.

2. The roles, responsibilities and performance criteria for the governance of project management are clearly defined.

3. Disciplined governance arrangements, supported by appropriate methods and controls, are applied throughout the project life cycle.

4. A coherent and supportive relationship is demonstrated between the overall business strategy and the project portfolio.

5. All projects have an approved plan containing authorisation points at which the business case is reviewed and approved. Decisions made at authorisation points are recorded and communicated.

6. Members of delegated authorisation bodies have sufficient representation, competence, authority and resources to enable them to make appropriate decisions.

7. The project business case is supported by relevant and realistic information that provides a reliable basis for making authorisation decisions.

8. The board or its delegated agents decide when independent scrutiny of projects and project management systems is required, and implement such scrutiny accordingly.

9. There are clearly defined criteria for reporting project status and for the escalation of risks and issues to the levels required by the organisation.

10. The organisation fosters a culture of improvement and of frank internal disclosure of project information.

11. Project stakeholders are engaged at a level that is commensurate with their importance to the organisation and in a manner that fosters trust.

Principles of Governance of PM

Page 16: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Governance of project management

OrganisationOrganisation

CorporateCorporateGovernanceGovernance

Project Project ManagementManagement

GoPMGoPM

APM (2005) Directing Change: A Guide to governance APM (2005) Directing Change: A Guide to governance

of project management of project management

Page 17: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Governance of project management

Corporate Governance Activities Corporate Governance Activities

Project Management ActivitiesProject Management Activities

Project Management Project Management EffectivenessEffectiveness

P. SponsorshipP. Sponsorship

Portfolio Direction Portfolio Direction

DisclosureDisclosurereportingreporting

APM (2006, 2012)APM (2006, 2012)

Page 18: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

What is Governance?

No-one can agreeAnd it doesn’t really matter!

Page 19: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

“...concerned with creating the conditions for ordered rule and collective action...” (Stoker, 1998)

“...a set of management systems, rules, protocols, relationships and structures that provide a framework within which decisions can be reached for project development and implementation” (Bekker and Steyn, 2008)

“...synonymous with good and transparent management of firms and institutions”(Müller, 2009)

Project Governance

Page 20: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

“Contemporary governance is grounded in Foucault’s (1926-1984) philosophy of Neo-liberalism, in which

individuals are not directly “steered” by their supervisors but through subtle forces

in the society (or company, or organisation) in which they live (or work for)... develop a

strategy for creating a domain whereby individuals are responsible and engage in

‘self-care’”

Origin

Page 21: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Project governance is not:– Project Control as a mechanism within the

confines of Planning and Execution of the Project (Initiate, Plan, Execute and Close) – managing in a project;

Instead project governance relates to:

– External Environment it provides the context in which the project is activated and realised – to

work on or for projects.

Origin

Page 22: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Objectives of Governance Let’s instead focus on what we want governance to

achieve.

– Stop things going wrong– Deliver the right benefits– Avoid non-value adding projects– Make sure the right ‘big’ decisions are made

If projects matter, project governance matters

Page 23: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

1. Governance is about rules – self imposed – Government imposed – Peer/Profession imposed

2. Formal – Informal3. Behaviour4. Ethics5. Rules of engagement

Governing

Page 24: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

The roles in Governance

Long term viewBe negative not positiveWork out which 30% of what you’re doing

is wrong

Page 25: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Where does governance come from?

• Rooted in Aims/Mission of business and the business plan?

• Corporate governance • Direction, Administration & Control of

Companies• The Processes, customs, policies & laws

affecting these

Page 26: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Who sits in the Governance board?

Keep it smallKeep it seniorNO(!) project stakeholders

Page 27: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

ImplementationWhat then are the key groups involved?:

• Board of Directors: Strategic value of projects(Policy formation – Who to be involved – Resources);

•Project Sponsor: Crucial role [Helm and Remington, 2005; Müller and Turner, 2002] (Senior in organisation – Networking abilities – Confident – Charisma – Objective);

•Steering group: Principle institution (Authority – Linkage role – Governance infrastructure/framework)

•Stakeholders: ‘...all those who have a stake in the [project];...something to gain or lose through actions of [the project]’ (Müller, 2009). Narrow staff/suppliers Wider communities/industry.

Page 28: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Implementation What questions should you ask and what answers should you

expect that indicates all is well?– Remember your objectives!

– Is this project benefit still worthwhile to achieve?– Are we going to achieve it?– Do we have confidence? If not, what are we going to do about it?– How does this project compare to our lessons learnt?– What’s the plan B?– What are we doing about the key risks?

Page 29: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Implementation

Honesty– Publish the decisions made and reasons why– Open these up to scrutiny– Publish the data that informed the decisions

Page 30: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

30 of 14

GENERIC PROJECT GOVERNANCE MODELS

Authors Levels of analysis

Bloomquest & Müller (2006) TCE, Gov. of multi-project organisations

Müller (2009) TCE, Agency theory, Organisational gov. paradigms

Pinto et al. (2009) Role of trust in projects & their governance (gov.)

PROJECT SPECIFIC GOVERNANCE MODELS

Authors Project type Levels of analysis

Winch (1989, 2001) Construction TCEClegg et. al. (2002) TCE, Governmentality

Pryke (2005)Construction TCE, Relationships & incentives Pryke & Pearson (2006) using SNA

Miller & Hobbs (2005) Lrge. Capital Criteria for set up governance regime

Klakegg et al. (2008) Lrge. Public Governance approach.

Ruuska et al. (2011) Energy con. Governance self-regulation, Increased external engagement

Shenhar et al. (2005) NASA Cat. & risk profile for selection of contracts

Turner & Müller (2004) IT Agency theory, Collaboration & struc. in Müller & Turner (2005) project governance

Page 31: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Implementation of governanceImplementation of governance

Step 1 2 3

What can be doneEducation

Methodology use and basic training

CertificationAdvanced training

and InternalCertification

What should bedone

ManagementDemand (external)

SteeringCommittees

ProjectManagementOffice (PMO/

PSO/ PO)

Benchmarking

What is doneEconomic pressure Audits / reviews Mentor programs Maturity Model

Müller and Stawicki (2007: 70)Müller and Stawicki (2007: 70)

Page 32: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Summary

Define objectives of governance Set 1 or 2 things to focus on Define the governance team

– Keep it small– Keep it senior

Have a list of questions Publish the decisions and the data to support them Measure the value delivered

Page 33: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Thank you very much, indeed!

Robert Moehler

School of the Built and Natural Environment, Wynne Jones Centre room 106a

Northumbria University, Newcastle upon Tyne

Email: [email protected]

Questions and Answers

Page 34: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Governance has become an important topic of conversation in recent years because of what we have previously discussed. But what is it? Have a look at Peter Eigen's TED Talk and think about the why and how! (http://www.ted.com/talks/peter_eigen_how_to_expose_the_corrupt.html )

Culture: "nobody has time for an entire generation any more“ We live in a fast-paced environment; the modern human is impatient. This fact also changed his expectations towards culture. Peter Sloterdijk lets us know why we pack culture into projects that are the essence of landscape, regional and city planning. Return on investment - fast results. Greed is no longer the determining factor within the banking and finance system only, says Peter Sloterdijk when asked by 2010LAB.tv. Even in cultural politics, the return has become the determining factor. "The essence of cultural politics is impatience", explains the cultural scientist. The ramifications shall become visible as fast as possible - the economy as role model: "capitalism is nothing but the acceleration process for cultural projects", reports Sloterdijk. Is it just the impatience of politics or maybe even our own that promotes such mentality? Do we want to wait 25 years until the next generation change takes place or rather 3 months? At last, Peter Sloterdijk named the inhibition the highest utopia of democracy. "What happens if the "inhibitors" and the "accelerators" meet? Our society is experiencing change - we are in the middle of it and we have a say in where the journey shall take us. (http://www.labkultur.tv/en/video/peter-sloterdijk-nobody-has-time-entire-generation-any-more)

Governance

Page 35: Robert C Moehler School of the Built and Natural Environment Northumbria University Wynne Jones Building (106a) Ellison Place Newcastle upon Tyne NE1 8ST.

Please watch: http://www.ted.com/index.php/talks/clay_shirky_on_institutions_versus_collaboration.html

Clay Shirky shows how closed groups and companies will give way to networks where small contributors have big roles and fluid cooperation replaces rigid planning.

Consider: Is Shirky’s hypothesis applicable to the organisation of projects?

New technologies enabling loose collaboration — and taking advantage of “spare” brainpower — will change the way society works.

Homework: