Roadmap to low and zero emissions for urban transport in Drammen 03.09.2019 Terje Sundfjord, Brakar

Transcript of Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the...

Page 1: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

Roadmap to low and zero emissions for urban transport in Drammen

03.09.2019

Terje Sundfjord, Brakar

Page 2: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

Electrification phase 1:

• Careful start in route 51

Drammen – Mjøndalen with

6 buses

• Testing of bus and

charging infrastructure

worked satisfactorily

• Full operation with 10 min

frequency in rush from

March

03.09.2019 Bunntekst 2

Page 3: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

Experience with the operation of the electric bus• 11,500 trips

• 185 000 km

• 99.9% of scheduled trips have been run (adjusted for other bus failures)

• 91% successful charging operations

• Energy consumption 1.45 kWh / km

• Choose partners who wants you to succeed

03.09.2019 Bunntekst 3

Page 4: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

Electrification phase 2:

• Replace old buses with

electric buses

• An application for the

reward scheme for public

transport has been sent- If granted at today's level we

can get up to 25 new electric

buses.

(Erna promise that at Fridays

pressconferanse)

03.09.2019 Bunntekst 4

Page 5: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

New charging stations

• Plans for most city lines to

have partial electrical

operation 2021

• 10-14 new charging stations- Status

- 8 (4) ready for construction

- Investment of NOK 74 million

• Support from Enova of NOK

30 million

03.09.2019 Bunntekst 5

Page 6: Roadmap to low and zero emissions for urban transport in ...Experience with the operation of the electric bus •11,500 trips •185 000 km •99.9% of scheduled trips have been run

•03.09.2019 Bunntekst 6

Electrification phase 3:

Zero emissions in new tender in Drammen from 2024