    Road Safety Audit Report

    7.1IntroductionA Road Safety Audit (RSA) is a formal safety performance examination of an existing or

    future road or intersection by an independent audit team. The RSA team considers the

    safety of all road users, qualitatively estimates and reports on road safety issues and

    opportunities for safety improvement. RSAs may be conducted practically at every stage

    in the lifecycle of a transportation facility. RSAs applied early in the planning and

    preliminary (functional) design of roads offer the greatest opportunity for beneficial

    influence. As a design progresses into detailed design and construction, changes that mayimprove safety performance typically become more difficult, costly, and time-consuming

    to implement.

    7.1.1 Pre-construction Phase Road Safety AuditsPre-construction RSAs are performed at those points in the project lifecycle before the

    construction of the facility begins. In this phase, changes may still be made with limited

    delay to the project and with less expense.

    7.1.2 Construction Phase Road Safety AuditsConstruction RSAs are generally performed during preparations for construction, during

    actual construction, and during the pre-opening period. In this phase, the audit team may

    actually view the project as-built, along with the final detailed plans, so that their review

    may be more comprehensive

    7.1.3 Post-construction Phase Road Safety AuditsRSAs of existing roads are conducted on a previously opened roadway or intersection.

    This type of RSA is somewhat different from those conducted during the pre-construction

    or construction phases. By performing a day and night review the audit team will be able

    to observe how road users are interacting with the road facility.

  • 7/29/2019 Road Safety Audit Campus Report

    2/7

    2

    7.2 Study AreaThe Road safety audit was conducted on road inside of COLLEGE campus. The road

    stretch is from Hostel 1 till Hostel 12 through Hostel 5. The survey was conducted on

    23-08-2013 during evening and night time. Map of Tanya showing study location is

    given in Figure 1 below.

    7.3ObjectiveThe objective of this experiment is to conduct a Road safety audit of the given study area

    during day and night time to find out the safety issues in the area.

    7.4ObservationDifferent factors reviewed during the Road safety audit are the condition of pavement,

    foot path, drainage, and absence of traffic signs, lighting systems and pedestrian crossings

    etc.

    7.4.1 Traffic SignsNo sign boards indicating speed limits and curves in many places along stretch.No information board in front of swimming pool.No information boards near the intersection (Campus hub & Front of Hostel 4) as

    shown in Figure 2

    7.4.2 IntersectionBoth intersections near hostel 4 and Campus hub do not have median, sign boards andproper road markings as shown in figure

  • 7/29/2019 Road Safety Audit Campus Report

    3/7

    3

    Figure 2: Intersection near campus Hub

    7.4.3 Pavement ConditionThe condition of pavement is good in stretch from Hostel 1 to Campus hubThe condition of pavement is bad from Hostel 5 to Hostel 12 with small pot holes,pavement edge break and abrasions as shown in figure 3.

    The shoulder portion is also damaged in this stretch7.4.4 Foot PathFoot path is present only in one side of the road in our study stretch.

  • 7/29/2019 Road Safety Audit Campus Report

    4/7

    4

    The condition of foot path is good in the stretch between Hostel 1 and campus hubexcept in one place near swimming pool where it is slightly damaged.

    The foot path in the stretch is good in most places except near hostel 9 where thecondition is bad as shown in figure 4.

    Figure 3: Pavement near Hostel 9

    Figure 4: Foot path near Hostel 9

  • 7/29/2019 Road Safety Audit Campus Report

    5/7

    5

    7.4.5 Lighting SystemThe lighting is good only near street lamps. Visibly is relatively poor in between

    any two existing street lights through the study area as shown in figure 5.

    Figure 5: Poor Lighting

    Figure 6: Pavement marking in bad condition

  • 7/29/2019 Road Safety Audit Campus Report

    6/7

    6

    7.4.6 Road MarkingsThe road markings were in good condition in stretch from Hostel 1 to Campus hub.Road markings near hostel 12 were not in good condition as shown in figure 6.7.4.7 DrainageOpen drains are found near the footpath in the stretch from hostel 1 to Campus hubThe camber provided was sufficient for drainage in the study stretch.Water logging was observed in the shoulder area at some places between Campus hub

    and hostel 12 as shown in figure 7

    Figure 7: Water Logging in shoulder area

    7.4.8 Pedestrian CrossingPedestrian crossings are not provided anywhere in study stretch7.4.9 ObstructionsThe tree in front of Tanya Hostel was protruding in the road and could affect

    heavy vehicles passing that way as shown in figure 8.

  • 7/29/2019 Road Safety Audit Campus Report

    7/7

    7

    Figure 8: Obstruction in front of Tanya Hostel

    7.5 Recommendation1)Sign boards indicating speed limit and curves needs to be installed at required places.2)Sign boards indicating direction of places needs to be installed in intersections.3)Foot path could be provided on both sides and damaged areas needs to be repaired.4)Frequency of street lights needs to be increased.5)Road markings wherever poor needs to be redrawn.6)Pedestrian crossing could be marked in at specific places where pedestrian crossing is

    high and speed breakers could be before it.

    7)Medians could be provided in intersections to streamline traffic.8)Obstruction to traffic like tree branches protruding over pavement could be removed.9)The pavement distresses like pot holes, pavement edge breaks and abrasions should be

    treated.