Road Reconstruction and Drainage Works — Sections of ...

4
Road Reconstrucon and Drainage Works — Secons of Toogoom Road PROJECT SCOPE OF WORKS: The Project scope is as follows: Earthworks and excavaon; Tree removal (exisng vegetaon will be retained where possible); Stormwater drainage and cross-drainage; Driveway replacements; Pavement and bitumen surfacing; Linemarking and signage; PROJECT: This project provides for the reconstrucon of a 520m secon of Toogoom Road from 563 to 611 Toogoom Road. In addion to the road reconstrucon works, drainage works including the reformaon of table drains, will be undertaken on the eastern side of a 260m secon of Toogoom Road. The road reconstrucon and drainage works are being undertaken as a result of inspecons carried out as part of Councils ongoing asset inspecon program which idenfied that the road was showing signs of pavement failure and distress. PROJECT ESTIMATE: $1M Note: Project milestones are subject to weather and may change. The traffic management plan that will be put in place for the duraon of the construcon period will be developed prior to works commencing. September 2021 INDICATIVE PROJECT MILESTONES March 2021 Final Design Sept/Dec 2021 Construcon Period Jan 2022 Project Compleon

Transcript of Road Reconstruction and Drainage Works — Sections of ...

Page 1: Road Reconstruction and Drainage Works — Sections of ...

Road Reconstruction and Drainage Works — Sections of Toogoom Road

PROJECT SCOPE OF WORKS:

The Project scope is as follows:

• Earthworks and excavation;

• Tree removal (existing vegetation will be retained where possible);

• Stormwater drainage and cross-drainage;

• Driveway replacements;

• Pavement and bitumen surfacing;

• Linemarking and signage;

PROJECT:

This project provides for the reconstruction of a 520m section of Toogoom Road from 563 to 611 Toogoom Road. In addition to the road reconstruction works, drainage works including the reformation of table drains, will be undertaken on the eastern side of a 260m section of Toogoom Road.

The road reconstruction and drainage works are being undertaken as a result of inspections carried out as part of Council’s ongoing asset inspection program which identified that the road was showing signs of pavement failure and distress.

PROJECT ESTIMATE:

$1M

Note: Project milestones are subject to weather and may

change.

The traffic management plan that will be put in place for

the duration of the construction period will be developed

prior to works commencing.

September 2021

INDICATIVE PROJECT MILESTONES

March 2021 Final Design

Sept/Dec 2021 Construction Period

Jan 2022 Project Completion

Page 2: Road Reconstruction and Drainage Works — Sections of ...

Ro

ad R

eco

nst

ructi

on

an

d D

rain

age

Wo

rks

— S

ecti

on

of

Too

goo

m R

oad

Page 3: Road Reconstruction and Drainage Works — Sections of ...

Ro

ad R

eco

nst

ructi

on

an

d D

rain

age

Wo

rks

— S

ecti

on

of

Too

goo

m R

oad

Page 4: Road Reconstruction and Drainage Works — Sections of ...

Ro

ad R

eco

nst

ructi

on

an

d D

rain

age

Wo

rks

— S

ecti

on

of

Too

goo

m R

oad