ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL ASSESSMENT GUIDELINES Jan 2017 Now includes Ancillary Areas (Car Parks & Scenic Lookouts) (Further review to include pictures of each condition level as per recommendation in MAV Insurance RMP Guidance Document May 2016) (Review to include Risk assessment from RMP & review / remove tables in each asset section below in favour of general risk assessment and condition photos for each condition level) 1 Page 1 of 48 RMP 2017 Referral Document 11 | Road Maintenance Service Level Manual August 2016

Transcript of ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets...

Page 1: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

ROAD

MAINTENANCE

SERVICE LEVEL MANUAL

VISUAL ASSESSMENT GUIDELINES Jan 2017

Now includes Ancillary Areas (Car Parks & Scenic Lookouts) (Further review to include pictures of each condition level as per recommendation in MAV Insurance RMP Guidance Document May 2016)

(Review to include Risk assessment from RMP & review / remove tables in each asset section below in favour of general risk assessment and condition photos for each condition level)

1 Page 1 of 48 RMP 2017

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 2: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

This Page Left Intentionally Blank

2

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 2 of 48 RMP 2017

Page 3: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Maintenance Inspection Flow Chart

Proactive Inspections Customer Requests Head Office

Insurance Claims

As Per Council ‘Proactive Inspection Schedule’ in Road Management Plan

Where defect meets Council’s risk levels

Trained Council Officer undertakes

Inspections

Asset does not meet maintenance

risk level

Program to respond in line with Response times, based on risk assessment as per

Council’s Road Management Plan

As Per ‘Inspection Times’ in Maintenance Level of Service

Manual

Asset identified as inspected and closed

Depot Staff or Contractors undertake

remedial works

3

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 3 of 48 RMP 2017

Page 4: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

PROACTIVE INSPECTION SCHEDULES

CLASS SOUTH GIPPSLAND SHIRE COUNCIL CLASSIFICATION INSPECTION FREQUENCY

1 Connector Streets & Roads 2 Monthly

2 Access Streets & Roads 2 Monthly

3 Access Places 2 Monthly

4 Access Tracks 12 Monthly

FOOTPATH PROACTIVE INSPECTION SCHEDULE

CLASS / CODE SOUTH GIPPSLAND SHIRE COUNCIL CLASSIFICATION INSPECTION FREQUENCY

B Business/Commercial 1 Year

C Local Crossing/Collector 1 Year

G General Access 3 Years

ANCILLARY AREAS (Car Parks, Scenic Lookouts)

CLASS SOUTH GIPPSLAND SHIRE COUNCIL CLASSIFICATION INSPECTION FREQUENCY

CP Car Parks 4 Monthly

SL Scenic Lookouts 12 Monthly

4

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 4 of 48 RMP 2017

Page 5: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

BRIDGES AND MAJOR CULVERTS

BRIDGE INSPECTION LEVEL LEVEL DESCRIPTION INSPECTION FREQUENCY

Level 1

A routine maintenance inspection to check the general serviceability of the structure for obvious signs of defects which might affect the immediate safety of road users; and, to identify maintenance items that require immediate action or scheduled routine maintenance.

6 monthly

Level 2

A visual inspection of components to assess their condition; reporting condition and extent for each component; establishing an overall condition rating for the structure; identifying need for a detailed engineering investigation (Level 3) and/or other supplementary testing; a photographic record of the structure.

3 yearly

Level 3 A detailed engineering investigation generally including a field investigation and a theoretical / structural analysis, such as load carrying capacity.

Generally undertaken on recommendations from Level 2

inspections.

Bridge condition inspection are conducted in accordance with the VicRoads Roads Structures Inspection Manual June 2014 TRIM ref D6974816

x

5

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 5 of 48 RMP 2017

Page 6: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

PRIORITY RESPONSE TIMES

PRIORITY SCORE RESPONSE TIME

1 Take action to make safe within 24 hours. Repair on program

2 Take action to make safe within 7 Working Days. Repair on program

3 Repair on program

4 Repair on program

These above response times have been developed taking into consideration the Risk Assessment and Priority Response Matrix as detailed in Section 6.3 of Council’s current Road Management Plan. Each defect is assessed and prioritised in accordance with the Road Management Plan Risk Assessment and Priority Response Matrix. Council’s inspectors have been trained in identifying asset distress conditions as documented in this Manual and in prioritising the response time in accordance with the Road Management Plan Risk Assessment and Priority Response Matrix . This manual provides a visual assessment guide with examples of the range of distress / risk score conditions for the assets covered by the Road Management Plan. This pictorial guideline will assist road inspectors to achieve a consistent assessment of the Minimum Service Level targets contained in the Road Management Plan.

6

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 6 of 48 RMP 2017

Page 7: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

UNSEALED ROADS (INCLUDES UNSEALED CAR PARKS & SCENIC LOOKOUT ACCESS ROADS)

7

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 7 of 48 RMP 2017

Page 8: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Unsealed Road Grading

Typical examples of unsealed road conditions requiring grading.

8

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 8 of 48 RMP 2017

Page 9: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

SEALED ROADS (INCLUDES SEALED CAR PARKS & SCENIC LOOKOUT ACCESS ROADS)

9

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 9 of 48 RMP 2017

Page 10: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Potholes

Description of Work Activity

Intervention Level

Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk Performance Indicator Targets

Surface patching of potholes in travel way using bituminous material to restore the riding surface to a smooth condition

Pothole Depth > 50mm in depth and/or diameter > 300mm

16830

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track NA NA NA NA NA NA

Note: Customer requests reported as a safety issue will be inspected within 1 day

10

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 10 of 48 RMP 2017

Page 11: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Pavement Failures

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk

Performance Indicator Targets

The treatment of small isolated failed pavement areas >1m2 and less than 500m2 within a road segment area or maximum 1,500m2 within a 1 kilometrr road, by replacement with new approved material or by improvement of existing material.

<80% of Average speed (See Operations Procedure 14).

16830

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place

5 Days 1 2 3 4 80%

Access Track

NA NA NA NA NA NA

Note: For affected areas >500m² or 1500m2 in a 1 kilometre section, refer to Depot Manager for inclusion in the capital works program.

11

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 11 of 48 RMP 2017

Page 12: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Pavement Failures Other

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk

Performance Indicator Targets

The treatment of small isolated failed areas up to 50m2 by replacement of relaying existing material or saw cutting existing defected areas.

Observed defects (such as dislodged pavers, displaced or spalled concrete)

16830

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track NA NA NA NA NA NA

Note: For affected areas >50m² refer to Depot Manager for inclusion in the capital works program.

12

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 12 of 48 RMP 2017

Page 13: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Edge Breaks & Edge Drop

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk Performance Indicator Targets

Repair broken edges of seal, to line and level, to maintain correct overall sealed width.

Likely to impede safe access to the shoulder. Loss of pavement width.

16830

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track NA NA NA NA NA NA

13

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 13 of 48 RMP 2017

Page 14: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Shoulder Drop Off

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk Medium Risk

Low Risk

Performance Indicator Targets

Reinstate shoulder to return the shape to design criteria

50mm over 50metres continuous

16830

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track NA NA NA NA NA NA

14

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 14 of 48 RMP 2017

Page 15: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

High Shoulders

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk Performance Indicator Targets

Reinstate shoulder to return the shape to design criteria

Is likely to cause ponding or preventing runoff. Is likely to impede safe access to shoulder

16830

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track NA NA NA NA NA NA

15

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 15 of 48 RMP 2017

Page 16: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

High Grass

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk Medium Risk

Low Risk Performance Indicator Targets

Control grass to service levels

300mm, 200mm during declared fire period ( Sealed roads) Grass cutting to maintain sight distance according to traffic type (unsealed roads)

17420

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track NA NA NA NA NA NA

16

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 16 of 48 RMP 2017

Page 17: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Table Drains and Kerb and Channel

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk Performance Indicator Targets

Cleaning, re-grading and minor reshaping of surface drains to maintain adequate drainage. Includes table drains, verge drains, storm water drains and out-fall drains.

Minimal Ponding in drains, Free flowing, no obvious pavement failure due to excess moisture, invert of drain min 400mm below crown for Connectors or 300mm for all other roads and streets

12960 14710

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place

5 Days 1 2 3 4 80%

Access Track

5 Days 2 3 4 4 80%

Note: For Access Tracks, intervention = Sufficient to allow pavement to dry out in dry weather

17

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 17 of 48 RMP 2017

Page 18: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

UNSEALED ROADS (INCLUDES UNSEALED CAR PARKS & SCENIC LOOKOUT ACCESS ROADS)

18

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 18 of 48 RMP 2017

Page 19: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Unsealed Road Grading

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk

Performance Indicator Targets

Grading of unsealed roads to return the pavement shape to the standards set out it in grading work practice.

<80% of Average speed (See Operations Procedure 14). Access Place <70% of Average Speed. Except where moisture condition precludes activity

17390

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track 5 Days 2 3 4 4 80%

Note: Access Tracks, intervention = Dry Weather Access

19

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 19 of 48 RMP 2017

Page 20: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Unsealed Road Potholing

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk Performance Indicator Targets

Pothole patching in road surface using crushed rock or other appropriate material to restore the riding surface to an acceptable ride condition.

<80% of Average speed (See Operations Procedure 14).

16830

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track NA NA NA NA NA NA

20

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 20 of 48 RMP 2017

Page 21: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Unsealed Road Sheeting

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk Performance Indicator Targets

Resheeting of unsealed roads with FCR, or other appropriate materials.

Exposed sub-grade or excessive loose material that is likely to cause a loss of adhesion to the surface - <80% of average speed. Access Place <70% of average speed.

17390 16830

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track NA NA NA NA NA NA

21

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 21 of 48 RMP 2017

Page 22: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

ROADS SIGNS, LINES, GUIDEPOSTS, GUARDRAILS, FLORA AND FAUNA

22

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 22 of 48 RMP 2017

Page 23: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Signs Maintenance

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk Performance Indicator Targets

Repair or replace damaged Regulatory or Parking sign. (Road Furniture)

Illegible or misaligned or damaged.

17380

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track NA NA NA NA NA NA

23

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 23 of 48 RMP 2017

Page 24: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Signs Maintenance

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk Performance Indicator Targets

Repair or replace damaged Warning or Advisory sign. (Road Furniture)

Illegible or misaligned or damaged

17380

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track 5 Days 2 3 4 4 80%

24

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 24 of 48 RMP 2017

Page 25: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Line Marking

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk Performance Indicator Targets

Reinstatement of existing painted separation road markings. (Sealed Roads – Road Furniture)

Markings to be maintained when markings are less than 50% visible

17380

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place

5 Days 1 2 3 4 80%

Access Track

NA NA NA NA NA NA

25

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 25 of 48 RMP 2017

Page 26: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Statcon

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk Medium Risk

Low Risk

Performance Indicator Targets

Reinstatement of existing Statcon road markings. (Sealed Roads – Road Furniture)

Markings to be maintained when markings are less than 50% visible

17380

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place

5 Days 1 2 3 4 80%

Access Track

NA NA NA NA NA NA

26

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 26 of 48 RMP 2017

Page 27: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Carpark and Parking Bay Line Marking

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk

Performance Indicator Targets

Reinstatement of existing painted road markings. (Sealed Roads – Road Furniture)

Markings to be maintained when markings are less than 50% visible

17380

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place

5 Days 1 2 3 4 80%

Access Track

NA NA NA NA NA NA

27

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 27 of 48 RMP 2017

Page 28: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Reflective Road Pavement Markers

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk

Performance Indicator Targets

The replacement of missing or damaged RRPM's and worn out markings in critical areas including spotting out, on curves and barrier lines. (Sealed Roads – Road Furniture)

RRPM's shall be replaced when more than 30% of the RRPM's are missing or not reflecting on curves or barrier lines only. Markings shall be maintained when more than 30% of the marking is worn through on curves or barrier lines.

17380

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track NA NA NA NA NA NA

28

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 28 of 48 RMP 2017

Page 29: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Guardrails and Pedestrian Fencing

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk

Performance Indicator Targets

Remedial works to return guard rail (including pedestrian fencing & bridge rails) back to original condition. (Sealed Roads – Road Furniture)

Deformed sections, loose fittings, misaligned/damaged posts, damaged end units, overgrown with vegetation, defective delineation.

17380

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place

5 Days 1 2 3 4 80%

Access Track

NA NA NA NA NA NA

29

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 29 of 48 RMP 2017

Page 30: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Guideposts

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk

Performance Indicator Targets

Remedial works to replace the guide post. (Sealed Roads – Road Furniture)

Any missing or damaged guide post.

17380

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place

5 Days 1 2 3 4 80%

Access Track

NA NA NA NA NA NA

30

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 30 of 48 RMP 2017

Page 31: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Roadside Vegetation – Urban or Rural

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk

Performance Indicator Targets

Refer to Explanatory Notes in Council’s Road Management Plan.

Objective of vegetation control is to ensure a clear path for commercial traffic utilising the road pavement. To minimise site distance problems around corners and obstruction of signs.

17420

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track NA NA NA NA NA NA

31

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 31 of 48 RMP 2017

Page 32: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Debris / Animals

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk Medium Risk

Low Risk Performance Indicator Targets

Refer to Explanatory Notes in Council’s Road Management Plan.

When debris or animals observed.

17420

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track 5 Days 2 3 4 4 80%

32

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 32 of 48 RMP 2017

Page 33: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

FOOTPATHS

33

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 33 of 48 RMP 2017

Page 34: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Footpaths / Bike Paths / Paved Islands

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk Medium Risk

Low Risk Performance Indicator Targets

Replacement, repair and/or regulation of damaged/settled areas.

Repair/replace areas where sunken, cracked, heaved etc when lips are > 15mm in pedestrian areas and > 30mm in non pedestrian areas.

16830

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place

5 Days 1 2 3 4 80%

Access Track

NA NA NA NA NA NA

34

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 34 of 48 RMP 2017

Page 35: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

KERB AND CHANNEL

35

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 35 of 48 RMP 2017

Page 36: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Kerb and Channel

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk

Performance Indicator Targets

Replacement, repair and/or regulation of damaged/settled areas.

Repair/replace areas where sunken, cracked, heaved etc when lips are > 15mm in pedestrian areas and > 30mm in non pedestrian areas.

14710

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place

5 Days 1 2 3 4 80%

Access Track

NA NA NA NA NA NA

Note: If more than 100m of kerb and channel affected per street segment then refer to Capital Works Program.

36

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 36 of 48 RMP 2017

Page 37: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

ROAD DRAINAGE

37

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 37 of 48 RMP 2017

Page 38: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Culverts

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk Performance Indicator Targets

Replacement, repair of culvert.

60% of full bore capacity

19140

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place

5 Days 1 2 3 4 80%

Access Track

5 Days 2 3 4 4 80%

Note: Access Tracks, intervention = Sufficient to allow pavement to dry out in dry weather

38

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 38 of 48 RMP 2017

Page 39: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Pits

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk Performance Indicator Targets

Removal of debris / obstruction.

Entry Clear. 19140

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place

5 Days 1 2 3 4 80%

Access Track

NA NA NA NA NA NA

39

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 39 of 48 RMP 2017

Page 40: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Outfalls

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk Medium Risk

Low Risk Performance Indicator Targets

Removal of debris / obstruction or repair as required.

Adequate functions - water not backing up into culvert.

19140

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track

NA NA NA NA NA NA

40

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 40 of 48 RMP 2017

Page 41: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

BRIDGES AND MAJOR CULVERTS

41

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 41 of 48 RMP 2017

Page 42: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

General Maintenance and Cleaning (Level 1 inspection)

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk Medium Risk

Low Risk

Performance Indicator Targets

The repair, cleaning and maintenance of decks, joints, footings, abutments and wingwalls.

Clearing and Cleaning - When any accumulation of material causes inconvenience or danger for the bridge user. - When any accumulation of material observed to cause interruption to the escape of drainage water.

11890

(bridges) 12740

(culverts)

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track 5 Days 2 3 4 4 80%

42

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 42 of 48 RMP 2017

Page 43: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Running Surface / Deck Repair / Scupper clearing

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk

Medium Risk

Low Risk Performance Indicator Targets

The repair of the timber bridge deck.

When the area of a timber deck is defective.

11890

(bridges) 12740

(culverts)

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track 5 Days 2 3 4 4 80%

Clearing of blocked drainage scuppers

Drainage Scuppers are blocked

11890

(bridges) 12740

(culverts)

Connector Streets & Roads

5 Days 1 1 2 3 80%

Access Streets & Roads

5 Days 1 2 3 4 80%

Access Place 5 Days 1 2 3 4 80%

Access Track 5 Days 2 3 4 4 80%

Drainage Scupper

through kerb

43

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 43 of 48 RMP 2017

Page 44: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

EMERGENCY WORKS

44

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 44 of 48 RMP 2017

Page 45: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Emergency Works

Description of Work Activity

Intervention Level Response Time

Activity/s Hierarchy Reactive Inspection Time*

Extreme Risk

High Risk Medium Risk

Low Risk Performance Indicator Targets

As required. Attendance or action required ASA Practical of call or detection to make safe only any damage that is a hazard to traffic.

13190

Connector Streets & Roads

NA 1 1 1 1 100%

Access Streets & Roads

NA 1 1 1 1 100%

Access Place NA 1 1 1 1 100%

Access Track NA 1 1 1 1 100%

45

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 45 of 48 RMP 2017

Page 46: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

COST CENTRE & ACTIVITY CODES

46

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 46 of 48 RMP 2017

Page 47: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Cost Centre (to be

updated to new CC’s)

CC Description (to be updated to new CC’s)

Activity Code (to

be updated to new CC’s)

Activity Description

45110

Periodic Drainage Maintenance

17550 Rural Drains

45330 Footpaths 11010 General 19030 Tree Maintenance - Programmed 16830 Pavement

45340 Gravel Roads 11010 General 12960 Drainage 18290 Stormwater 17380 Road Furniture 14710 Kerb & Channel 17390 Road Grading 16830 Pavement 17420 Roadside Vegetation

6030 Structures Maintenance 11010 General 11970 Bus Shelters 13280 Fire Plugs 17010 Port Welshpool Boating Facility 16690 Other Boating Facilities 14010 Guardrails 11890 Bridges 12740 Culverts

45360 Sealed Roads 11010 General 13190 Emergency Management (Response)

47

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 47 of 48 RMP 2017

Page 48: ROAD MAINTENANCE SERVICE LEVEL MANUAL VISUAL … · Road Management Plan Where defect meets Council’s risk levels Trained Council Officer undertakes Inspections Asset does not meet

Cost Centre (to be

updated to new CC’s)

CC Description (to be updated to new CC’s)

Activity Code (to

be updated to new CC’s)

Activity Description

19150 Urban Fire Hazard Slashing 17550 Rural Drains 12960 Drainage 18290 Stormwater 17380 Road Furniture 14710 Kerb & Channel 17390 Road Grading 11720 Blocked Drains 18640 Sweeping 17420 Roadside Vegetation

45370 Underground Stormwater

11010 General

12960 Drainage 18290 Stormwater 17420 Roadside Vegetation

48

Referral Document 11 | Road Maintenance Service Level Manual August 2016

Page 48 of 48 RMP 2017