ROAD
MAINTENANCE
SERVICE LEVEL MANUAL
VISUAL ASSESSMENT GUIDELINES Jan 2017
Now includes Ancillary Areas (Car Parks & Scenic Lookouts) (Further review to include pictures of each condition level as per recommendation in MAV Insurance RMP Guidance Document May 2016)
(Review to include Risk assessment from RMP & review / remove tables in each asset section below in favour of general risk assessment and condition photos for each condition level)
1 Page 1 of 48 RMP 2017
Referral Document 11 | Road Maintenance Service Level Manual August 2016
This Page Left Intentionally Blank
2
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 2 of 48 RMP 2017
Maintenance Inspection Flow Chart
Proactive Inspections Customer Requests Head Office
Insurance Claims
As Per Council ‘Proactive Inspection Schedule’ in Road Management Plan
Where defect meets Council’s risk levels
Trained Council Officer undertakes
Inspections
Asset does not meet maintenance
risk level
Program to respond in line with Response times, based on risk assessment as per
Council’s Road Management Plan
As Per ‘Inspection Times’ in Maintenance Level of Service
Manual
Asset identified as inspected and closed
Depot Staff or Contractors undertake
remedial works
3
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 3 of 48 RMP 2017
PROACTIVE INSPECTION SCHEDULES
CLASS SOUTH GIPPSLAND SHIRE COUNCIL CLASSIFICATION INSPECTION FREQUENCY
1 Connector Streets & Roads 2 Monthly
2 Access Streets & Roads 2 Monthly
3 Access Places 2 Monthly
4 Access Tracks 12 Monthly
FOOTPATH PROACTIVE INSPECTION SCHEDULE
CLASS / CODE SOUTH GIPPSLAND SHIRE COUNCIL CLASSIFICATION INSPECTION FREQUENCY
B Business/Commercial 1 Year
C Local Crossing/Collector 1 Year
G General Access 3 Years
ANCILLARY AREAS (Car Parks, Scenic Lookouts)
CLASS SOUTH GIPPSLAND SHIRE COUNCIL CLASSIFICATION INSPECTION FREQUENCY
CP Car Parks 4 Monthly
SL Scenic Lookouts 12 Monthly
4
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 4 of 48 RMP 2017
BRIDGES AND MAJOR CULVERTS
BRIDGE INSPECTION LEVEL LEVEL DESCRIPTION INSPECTION FREQUENCY
Level 1
A routine maintenance inspection to check the general serviceability of the structure for obvious signs of defects which might affect the immediate safety of road users; and, to identify maintenance items that require immediate action or scheduled routine maintenance.
6 monthly
Level 2
A visual inspection of components to assess their condition; reporting condition and extent for each component; establishing an overall condition rating for the structure; identifying need for a detailed engineering investigation (Level 3) and/or other supplementary testing; a photographic record of the structure.
3 yearly
Level 3 A detailed engineering investigation generally including a field investigation and a theoretical / structural analysis, such as load carrying capacity.
Generally undertaken on recommendations from Level 2
inspections.
Bridge condition inspection are conducted in accordance with the VicRoads Roads Structures Inspection Manual June 2014 TRIM ref D6974816
x
5
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 5 of 48 RMP 2017
PRIORITY RESPONSE TIMES
PRIORITY SCORE RESPONSE TIME
1 Take action to make safe within 24 hours. Repair on program
2 Take action to make safe within 7 Working Days. Repair on program
3 Repair on program
4 Repair on program
These above response times have been developed taking into consideration the Risk Assessment and Priority Response Matrix as detailed in Section 6.3 of Council’s current Road Management Plan. Each defect is assessed and prioritised in accordance with the Road Management Plan Risk Assessment and Priority Response Matrix. Council’s inspectors have been trained in identifying asset distress conditions as documented in this Manual and in prioritising the response time in accordance with the Road Management Plan Risk Assessment and Priority Response Matrix . This manual provides a visual assessment guide with examples of the range of distress / risk score conditions for the assets covered by the Road Management Plan. This pictorial guideline will assist road inspectors to achieve a consistent assessment of the Minimum Service Level targets contained in the Road Management Plan.
6
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 6 of 48 RMP 2017
UNSEALED ROADS (INCLUDES UNSEALED CAR PARKS & SCENIC LOOKOUT ACCESS ROADS)
7
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 7 of 48 RMP 2017
Unsealed Road Grading
Typical examples of unsealed road conditions requiring grading.
8
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 8 of 48 RMP 2017
SEALED ROADS (INCLUDES SEALED CAR PARKS & SCENIC LOOKOUT ACCESS ROADS)
9
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 9 of 48 RMP 2017
Potholes
Description of Work Activity
Intervention Level
Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk Performance Indicator Targets
Surface patching of potholes in travel way using bituminous material to restore the riding surface to a smooth condition
Pothole Depth > 50mm in depth and/or diameter > 300mm
16830
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track NA NA NA NA NA NA
Note: Customer requests reported as a safety issue will be inspected within 1 day
10
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 10 of 48 RMP 2017
Pavement Failures
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk
Performance Indicator Targets
The treatment of small isolated failed pavement areas >1m2 and less than 500m2 within a road segment area or maximum 1,500m2 within a 1 kilometrr road, by replacement with new approved material or by improvement of existing material.
<80% of Average speed (See Operations Procedure 14).
16830
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place
5 Days 1 2 3 4 80%
Access Track
NA NA NA NA NA NA
Note: For affected areas >500m² or 1500m2 in a 1 kilometre section, refer to Depot Manager for inclusion in the capital works program.
11
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 11 of 48 RMP 2017
Pavement Failures Other
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk
Performance Indicator Targets
The treatment of small isolated failed areas up to 50m2 by replacement of relaying existing material or saw cutting existing defected areas.
Observed defects (such as dislodged pavers, displaced or spalled concrete)
16830
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track NA NA NA NA NA NA
Note: For affected areas >50m² refer to Depot Manager for inclusion in the capital works program.
12
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 12 of 48 RMP 2017
Edge Breaks & Edge Drop
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk Performance Indicator Targets
Repair broken edges of seal, to line and level, to maintain correct overall sealed width.
Likely to impede safe access to the shoulder. Loss of pavement width.
16830
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track NA NA NA NA NA NA
13
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 13 of 48 RMP 2017
Shoulder Drop Off
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk Medium Risk
Low Risk
Performance Indicator Targets
Reinstate shoulder to return the shape to design criteria
50mm over 50metres continuous
16830
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track NA NA NA NA NA NA
14
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 14 of 48 RMP 2017
High Shoulders
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk Performance Indicator Targets
Reinstate shoulder to return the shape to design criteria
Is likely to cause ponding or preventing runoff. Is likely to impede safe access to shoulder
16830
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track NA NA NA NA NA NA
15
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 15 of 48 RMP 2017
High Grass
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk Medium Risk
Low Risk Performance Indicator Targets
Control grass to service levels
300mm, 200mm during declared fire period ( Sealed roads) Grass cutting to maintain sight distance according to traffic type (unsealed roads)
17420
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track NA NA NA NA NA NA
16
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 16 of 48 RMP 2017
Table Drains and Kerb and Channel
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk Performance Indicator Targets
Cleaning, re-grading and minor reshaping of surface drains to maintain adequate drainage. Includes table drains, verge drains, storm water drains and out-fall drains.
Minimal Ponding in drains, Free flowing, no obvious pavement failure due to excess moisture, invert of drain min 400mm below crown for Connectors or 300mm for all other roads and streets
12960 14710
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place
5 Days 1 2 3 4 80%
Access Track
5 Days 2 3 4 4 80%
Note: For Access Tracks, intervention = Sufficient to allow pavement to dry out in dry weather
17
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 17 of 48 RMP 2017
UNSEALED ROADS (INCLUDES UNSEALED CAR PARKS & SCENIC LOOKOUT ACCESS ROADS)
18
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 18 of 48 RMP 2017
Unsealed Road Grading
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk
Performance Indicator Targets
Grading of unsealed roads to return the pavement shape to the standards set out it in grading work practice.
<80% of Average speed (See Operations Procedure 14). Access Place <70% of Average Speed. Except where moisture condition precludes activity
17390
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track 5 Days 2 3 4 4 80%
Note: Access Tracks, intervention = Dry Weather Access
19
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 19 of 48 RMP 2017
Unsealed Road Potholing
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk Performance Indicator Targets
Pothole patching in road surface using crushed rock or other appropriate material to restore the riding surface to an acceptable ride condition.
<80% of Average speed (See Operations Procedure 14).
16830
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track NA NA NA NA NA NA
20
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 20 of 48 RMP 2017
Unsealed Road Sheeting
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk Performance Indicator Targets
Resheeting of unsealed roads with FCR, or other appropriate materials.
Exposed sub-grade or excessive loose material that is likely to cause a loss of adhesion to the surface - <80% of average speed. Access Place <70% of average speed.
17390 16830
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track NA NA NA NA NA NA
21
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 21 of 48 RMP 2017
ROADS SIGNS, LINES, GUIDEPOSTS, GUARDRAILS, FLORA AND FAUNA
22
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 22 of 48 RMP 2017
Signs Maintenance
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk Performance Indicator Targets
Repair or replace damaged Regulatory or Parking sign. (Road Furniture)
Illegible or misaligned or damaged.
17380
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track NA NA NA NA NA NA
23
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 23 of 48 RMP 2017
Signs Maintenance
�
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk Performance Indicator Targets
Repair or replace damaged Warning or Advisory sign. (Road Furniture)
Illegible or misaligned or damaged
17380
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track 5 Days 2 3 4 4 80%
24
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 24 of 48 RMP 2017
Line Marking
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk Performance Indicator Targets
Reinstatement of existing painted separation road markings. (Sealed Roads – Road Furniture)
Markings to be maintained when markings are less than 50% visible
17380
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place
5 Days 1 2 3 4 80%
Access Track
NA NA NA NA NA NA
25
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 25 of 48 RMP 2017
Statcon
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk Medium Risk
Low Risk
Performance Indicator Targets
Reinstatement of existing Statcon road markings. (Sealed Roads – Road Furniture)
Markings to be maintained when markings are less than 50% visible
17380
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place
5 Days 1 2 3 4 80%
Access Track
NA NA NA NA NA NA
26
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 26 of 48 RMP 2017
Carpark and Parking Bay Line Marking
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk
Performance Indicator Targets
Reinstatement of existing painted road markings. (Sealed Roads – Road Furniture)
Markings to be maintained when markings are less than 50% visible
17380
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place
5 Days 1 2 3 4 80%
Access Track
NA NA NA NA NA NA
27
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 27 of 48 RMP 2017
Reflective Road Pavement Markers
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk
Performance Indicator Targets
The replacement of missing or damaged RRPM's and worn out markings in critical areas including spotting out, on curves and barrier lines. (Sealed Roads – Road Furniture)
RRPM's shall be replaced when more than 30% of the RRPM's are missing or not reflecting on curves or barrier lines only. Markings shall be maintained when more than 30% of the marking is worn through on curves or barrier lines.
17380
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track NA NA NA NA NA NA
28
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 28 of 48 RMP 2017
Guardrails and Pedestrian Fencing
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk
Performance Indicator Targets
Remedial works to return guard rail (including pedestrian fencing & bridge rails) back to original condition. (Sealed Roads – Road Furniture)
Deformed sections, loose fittings, misaligned/damaged posts, damaged end units, overgrown with vegetation, defective delineation.
17380
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place
5 Days 1 2 3 4 80%
Access Track
NA NA NA NA NA NA
29
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 29 of 48 RMP 2017
Guideposts
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk
Performance Indicator Targets
Remedial works to replace the guide post. (Sealed Roads – Road Furniture)
Any missing or damaged guide post.
17380
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place
5 Days 1 2 3 4 80%
Access Track
NA NA NA NA NA NA
30
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 30 of 48 RMP 2017
Roadside Vegetation – Urban or Rural
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk
Performance Indicator Targets
Refer to Explanatory Notes in Council’s Road Management Plan.
Objective of vegetation control is to ensure a clear path for commercial traffic utilising the road pavement. To minimise site distance problems around corners and obstruction of signs.
17420
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track NA NA NA NA NA NA
31
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 31 of 48 RMP 2017
Debris / Animals
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk Medium Risk
Low Risk Performance Indicator Targets
Refer to Explanatory Notes in Council’s Road Management Plan.
When debris or animals observed.
17420
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track 5 Days 2 3 4 4 80%
32
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 32 of 48 RMP 2017
FOOTPATHS
33
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 33 of 48 RMP 2017
Footpaths / Bike Paths / Paved Islands
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk Medium Risk
Low Risk Performance Indicator Targets
Replacement, repair and/or regulation of damaged/settled areas.
Repair/replace areas where sunken, cracked, heaved etc when lips are > 15mm in pedestrian areas and > 30mm in non pedestrian areas.
16830
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place
5 Days 1 2 3 4 80%
Access Track
NA NA NA NA NA NA
34
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 34 of 48 RMP 2017
KERB AND CHANNEL
35
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 35 of 48 RMP 2017
Kerb and Channel
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk
Performance Indicator Targets
Replacement, repair and/or regulation of damaged/settled areas.
Repair/replace areas where sunken, cracked, heaved etc when lips are > 15mm in pedestrian areas and > 30mm in non pedestrian areas.
14710
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place
5 Days 1 2 3 4 80%
Access Track
NA NA NA NA NA NA
Note: If more than 100m of kerb and channel affected per street segment then refer to Capital Works Program.
36
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 36 of 48 RMP 2017
ROAD DRAINAGE
37
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 37 of 48 RMP 2017
Culverts
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk Performance Indicator Targets
Replacement, repair of culvert.
60% of full bore capacity
19140
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place
5 Days 1 2 3 4 80%
Access Track
5 Days 2 3 4 4 80%
Note: Access Tracks, intervention = Sufficient to allow pavement to dry out in dry weather
38
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 38 of 48 RMP 2017
Pits
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk Performance Indicator Targets
Removal of debris / obstruction.
Entry Clear. 19140
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place
5 Days 1 2 3 4 80%
Access Track
NA NA NA NA NA NA
39
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 39 of 48 RMP 2017
Outfalls
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk Medium Risk
Low Risk Performance Indicator Targets
Removal of debris / obstruction or repair as required.
Adequate functions - water not backing up into culvert.
19140
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track
NA NA NA NA NA NA
40
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 40 of 48 RMP 2017
BRIDGES AND MAJOR CULVERTS
41
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 41 of 48 RMP 2017
General Maintenance and Cleaning (Level 1 inspection)
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk Medium Risk
Low Risk
Performance Indicator Targets
The repair, cleaning and maintenance of decks, joints, footings, abutments and wingwalls.
Clearing and Cleaning - When any accumulation of material causes inconvenience or danger for the bridge user. - When any accumulation of material observed to cause interruption to the escape of drainage water.
11890
(bridges) 12740
(culverts)
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track 5 Days 2 3 4 4 80%
42
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 42 of 48 RMP 2017
Running Surface / Deck Repair / Scupper clearing
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk
Medium Risk
Low Risk Performance Indicator Targets
The repair of the timber bridge deck.
When the area of a timber deck is defective.
11890
(bridges) 12740
(culverts)
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track 5 Days 2 3 4 4 80%
Clearing of blocked drainage scuppers
Drainage Scuppers are blocked
11890
(bridges) 12740
(culverts)
Connector Streets & Roads
5 Days 1 1 2 3 80%
Access Streets & Roads
5 Days 1 2 3 4 80%
Access Place 5 Days 1 2 3 4 80%
Access Track 5 Days 2 3 4 4 80%
Drainage Scupper
through kerb
43
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 43 of 48 RMP 2017
EMERGENCY WORKS
44
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 44 of 48 RMP 2017
Emergency Works
Description of Work Activity
Intervention Level Response Time
Activity/s Hierarchy Reactive Inspection Time*
Extreme Risk
High Risk Medium Risk
Low Risk Performance Indicator Targets
As required. Attendance or action required ASA Practical of call or detection to make safe only any damage that is a hazard to traffic.
13190
Connector Streets & Roads
NA 1 1 1 1 100%
Access Streets & Roads
NA 1 1 1 1 100%
Access Place NA 1 1 1 1 100%
Access Track NA 1 1 1 1 100%
45
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 45 of 48 RMP 2017
COST CENTRE & ACTIVITY CODES
46
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 46 of 48 RMP 2017
Cost Centre (to be
updated to new CC’s)
CC Description (to be updated to new CC’s)
Activity Code (to
be updated to new CC’s)
Activity Description
45110
Periodic Drainage Maintenance
17550 Rural Drains
45330 Footpaths 11010 General 19030 Tree Maintenance - Programmed 16830 Pavement
45340 Gravel Roads 11010 General 12960 Drainage 18290 Stormwater 17380 Road Furniture 14710 Kerb & Channel 17390 Road Grading 16830 Pavement 17420 Roadside Vegetation
6030 Structures Maintenance 11010 General 11970 Bus Shelters 13280 Fire Plugs 17010 Port Welshpool Boating Facility 16690 Other Boating Facilities 14010 Guardrails 11890 Bridges 12740 Culverts
45360 Sealed Roads 11010 General 13190 Emergency Management (Response)
47
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 47 of 48 RMP 2017
Cost Centre (to be
updated to new CC’s)
CC Description (to be updated to new CC’s)
Activity Code (to
be updated to new CC’s)
Activity Description
19150 Urban Fire Hazard Slashing 17550 Rural Drains 12960 Drainage 18290 Stormwater 17380 Road Furniture 14710 Kerb & Channel 17390 Road Grading 11720 Blocked Drains 18640 Sweeping 17420 Roadside Vegetation
45370 Underground Stormwater
11010 General
12960 Drainage 18290 Stormwater 17420 Roadside Vegetation
48
Referral Document 11 | Road Maintenance Service Level Manual August 2016
Page 48 of 48 RMP 2017