ROAD - f.tlcollect.com · penske goodrich springs fabrication taylor coca-cola colorado springs...
Transcript of ROAD - f.tlcollect.com · penske goodrich springs fabrication taylor coca-cola colorado springs...
Z E P P E L I N2570
ROAD
SKY VIEW SPORTS COMPLEX
ACE
HONEYWELL
AMERICAN TIRE DISTRIBUTORS
FEDEX
PENSKE
GOODRICH
SPRINGS FABRICATION
TAYLOR
COCA-COLA
COLORADO SPRINGS AIRPORT
NOT TO SCALE
BRAD T. BIRD+1 719 471 [email protected]
JARED MAY+1 719 471 [email protected]
C O N TA C T S
© 2017 CBRE, Inc. All rights reserved. This information has been obtained from sources believed reliable, but has not been verified for accuracy or completeness. Any projections, opinions, or estimates are subject to uncertainty. The information may not represent the current or future performance of the property. You and your advisors should conduct a careful, independent investigation of the property and verify all information. Any reliance on this information is solely at your own risk. CBRE and the CBRE logo are service marks of CBRE, Inc. and/or its affiliated or related companies in the United States and other countries. All other marks displayed on this document are the property of their respective owners. Photos herein are the property of their respective owners and use of these images without the express written consent of the owner is prohibited. CBRE and the CBRE logo are service marks of CBRE, Inc. and/or its affiliated or related companies in the United States and other countries. All other marks displayed on this document are the property of their respective owners. PMStudio_June2017
83
83
NOT TO SCALE
83
25
25
25
70
70
70
67
67
COLORADOSPRINGS
PUEBLO
DENVER
US AIR FORCE
ACADEMY
CASTLE ROCK
Z E P P E L I N2570
ROAD
CORPORATE NEIGHBORS
DRIVE TIMES
DIA1 HR, 35 MIN
DENVER TECH CENTER
1 HR, 10 MIN
DOWNTOWN DENVER
1 HR, 25 MIN
COLORADO SPRINGS AIRPORT
5 MIN
PUEBLO40 MIN
DOWNTOWN COLORADO SPRINGS
15 MIN
Z E P P E L I N2570
ROAD
Z E P P E L I N2570
ROADC O L O R A D O S P R I N G S , C O 8 0 9 1 6
AVAILABLE FOR OCCUPANCY Q1 2018
BUILDING 131,040 SF
AVAILABLE 43,680 SF (DIVISIBLE)
Developed By:
INTERSTATE
25
INTERSTATE
25
N E W CO N ST R U C T I O N
JARED MAY+1 719 471 [email protected]
BRAD T. BIRD+1 719 471 [email protected]
C O N TA C T S
NOT TO SCALE
TOTAL SF: 131,040
AVAILABLE SF: 43,680
DELIVERY DATE: Q1 2018
ACRES: 9.6
CONSTRUCTION: Class A tilt-wall construction
FLOOR SLAB: 6” concrete floor slab
FIRE SUPPRESSION: ESFR
CLEAR HEIGHT: 30 FT.
SIGNAGE: Prominent, facing Powers Blvd.
INTERSTATE ACCESS: 4.5 Miles (8 minutes)
CBRE is pleased to present for lease the 43,680 SF spec suite at 2570 Zeppelin Road. This asset
is the premier tilt-up Class-A industrial building in Colorado Springs designed and built specifically
for warehouse and distribution users as a front park, rear load design with 30’ clear height, ESFR
fire suppression, abundant natural light via clerestory windows, and full-access routes for 53’ trailers.
This state-of-the art facility is under construction and will be delivered for occupancy in Q1 2018 and
will provide tenants with building signage facing Powers Boulevard. Turn-key tenant finishes can be
provided with office and restroom packages to tenant specifications.
BUILDING FEATURES
ZONING: PIP-2
DOCK DOORS:
(4) 9’ X 10’ w/ 35,000 lb leveler, foam dock seals, dock light, and clerestory glazing (expandable to 13)
DRIVE-IN: (2) 12’ x 14’ OHD
LIGHTING: T5
TRUCK APRON: 60’ concrete truck apron
TRUCK STORAGE: Up to 25 trailer spaces available
ELECTRIC: 800 Amp / 480 V / 3P / 4W
COLUMN SPACING: 50’x52’ typical, with 60’ speed bay at dock wall
AUTO PARKING: 96 stalls (expandable)
S I T E P L A N
E L E V AT I O N S2640 ZEPPELIN RD. PRELIMINARY SITE PLANDATE: 05/24/2017
NORTH
NOT TO SCALE
A B C ED
1 3 4 5 6 7 98 10 12 132 11
D AC BE
2640
13 12 11 10 9 8 123457 6
This conceptual design is based upon a preliminary review ofentitlement requirements and on unverified and possiblyincomplete site and/or building information, and is intendedmerely to assist in exploring how the project might be developed.
NORTH
SHEET
04.28.17
DEN16-0112-00AUTOFORCE
scheme: EE.1
1
0 8' 16' 32' 64'
1/16"=1'-0"
NORTH EXTERIOR ELEVATION 1
EAST EXTERIOR ELEVATION 2
SOUTH EXTERIOR ELEVATION 3
WEST EXTERIOR ELEVATION 4
AVA I L A B L E
A B C ED
1 3 4 5 6 7 98 10 12 132 11
D AC BE
2640
13 12 11 10 9 8 123457 6
This conceptual design is based upon a preliminary review ofentitlement requirements and on unverified and possiblyincomplete site and/or building information, and is intendedmerely to assist in exploring how the project might be developed.
NORTH
SHEET
04.28.17
DEN16-0112-00AUTOFORCE
scheme: EE.1
1
0 8' 16' 32' 64'
1/16"=1'-0"
NORTH EXTERIOR ELEVATION 1
EAST EXTERIOR ELEVATION 2
SOUTH EXTERIOR ELEVATION 3
WEST EXTERIOR ELEVATION 4
AVA I L A B L E
43,680
87,360