    ROADS AND MARITIME SERVICES

    MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST 

    USE OF SPECIFICATIONS

    The documents listed in the following pages are policy documents within the meaning of the GovernmentInformation (Public Access) Act 2009 (NSW) (“GIPA Act”) and the documents are accordingly madeavailable pursuant to Section 6 of the GIPA Act.

    The QA Specifications (including D&C Specifications) were developed by Roads and Maritime Services(RMS) for use with roadworks and bridgeworks contracts let by RMS or local councils. RMS only usesthe QA Specifications in conjunction with its other standard form documents and under the supervision of professional civil engineers who are trained and experienced in roadworks and bridgeworks. RMS doesnot use the QA Specifications for any other purpose and does not consider them suitable for use for anyother purpose.

    Consistent with the GIPA Act, the purposes for which this document has been made available forinspection or purchase by you are:

    (i) to satisfy RMS's obligation under Section 6 of the GIPA Act to make its policy documentsavailable for inspection and purchase by members of the public

    (ii) to ensure that you, as a member of the public who may be affected by the operation of the

    documents, have access to the documents.

    If you use the documents for any purpose which is not consistent with the above (including, withoutlimitation, for carrying out any construction, engineering, maintenance or other work), you do so at yourown risk.

    These documents are current as at the date of this notice. However, you should be aware that RMSregularly reviews and updates its QA Specifications. You will not be notified of any update.

     No advisory or support services will be provided by RMS.

    Copyright in the listed documents belongs to RMS.

    ACCESS TO SPECIFICATIONS AND TEST METHODS PUBLISHED ON THE INTERNET

    RMS QA Specifications can be viewed and downloaded free of charge at:

    http://www.rms.nsw.gov.au/  

    Select “Business & Industry”, “Partners and Suppliers”, then “Specifications” and accept the disclaimer.

    To be able to read the documents, you need to have Adobe Acrobat software installed on your computerand your browser must support Javascript and accept cookies.

    Page 1 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    2/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

    Page 2 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    3/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

    GUIDES TO RMS QA SPECIFICATIONS

     NOTE: GUIDES TO RMS QA SPECIFICATIONS documents are for information only and are not RMS Specifications. 

    Document Referenced

    No. Edition/ Date Title Specifications Comments

    RMS…Revision(E.../R...)  (RMS…)

    CG21 E1/R0 Jan 00 Guide to RTA QA Specifications G21 andG22 - Occupational Health and Safety

    Withdrawn

     NG36 E4/R2 Feb 16 Guide to QA Specification G36- Environmental Protection

    G36 Refer to NSW GovtEMS Guidelines andISO 14001

     NG71 E1/R3 Oct 09 Guide to QA Specification G71- Construction Surveys

    G71 Refer to SurveyorGeneral’s Directions

     NB80 E2/R0 Nov 12 Guide to QA Specification B80- Concrete Work for Bridges

    B80

     NB200 E1/R1 Mar 10 Guide to QA Specification B200- Fabrication of Major Structural Steel

    Members

    B200

     NB204 E1/R1 Mar 10 Guide to QA Specification B204- Welding of Bridges and Other RoadStructures

    B204

     NQ3 E3/R7 May 12 Guide to QA Specification Q3- Quality Management System (Type 3)

    Q3 Refer to AS HB 90.3for further guidance

     NQ4 E2/R6 May 12 Guide to QA Specification Q4- Quality Management System (Type 4)

    Q4 Refer to AS HB 90.3for further guidance

     NQ6 E1/R7 May 12 Guide to QA Specification Q6- Quality Management System (Type 6)

    Q6 Refer to AS HB 90.3for further guidance

    CQ21 E1/R1 Aug 99 Guide to RTA Q21 - Guide for

    Contractors on Survey Procedures

    Replaced by NG71

     NR44 E2/R0 Apr 13 Guide to QA Specification R44- Earthworks

    R44

     NR82 E2/R0 Aug 12 Guide to QA Specification R82- Concrete Subbase

    R82 Price is for non-colourcopy

     NR83 E2/R0 Aug 12 Guide to QA Specifications R83 & R84- Concrete Base

    R83 Price is for non-colourcopy

    CR132 E1/R0 Jul 97 Guide to RTA QA Specification R132- Safety Barrier Systems

    Withdrawn

     NR93 E1/R0 Mar 12 Guide to Diamond Grinding of ConcretePavement

    R93

     NR106 E1/R1 May 12 Guide to QA Specification R106- Sprayed Bituminous Surfacing (withCutback Bitumen)

    R106

     NR107 E1/R1 May 12 Guide to QA Specification R107- Sprayed Bituminous Surfacing (withPolymer Modified Bitumen)

    R107

     NR271 E1/R0 Sep 11 Guide to Design of Noise Walls R271 Guide previously Guide Notes at front ofSpecification R271 

     N3252 E1/R0 Feb 10 Guide to the Selection of PolymerModified Binder

    3252

    Page 3 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    4/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

    LEGAL DOCUMENTS

     NOTE 1: The documents listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The documents listed in the “Discretionary” column must be reviewed for relevance to the proposed works, and

    relevant documents must be included in the Tender Documents. 

    Contract

    Document

    Referenced

    Documents Comments

    No. Edition/ Date Title (RMS…) [*Annexures to

    RMS…Revision(E.../R...) 

    Mandatory(NOTE 1) 

    Optional(NOTE 2) 

     be completed*]

    C1 E1/R8 Jul 03 Conditions of Contract forMajor Roadworks andBridgeworks

    Replaced by C2-GC21

    C2-GC21

    E2/R12 Sep 15 GC21 (Edition 2) RMS GeneralConditions of Contract

    [*ContractInformation*]

    C8-GC21

    E1/R7 Nov 11 GC21 (Edition 1) RTASubcontract

     No longer requiredwith GC21

    C12 E1/R30 Sep 15 Request for TendersMajor Roadworks andBridgeworks

    [*Clauses 1, 3, 5.1,6.10, Annex RFT2,RFT3, RFT4, RFT5*]

    C14 E2/R1 Nov 11 Schedule of EstimatedQuantities - Major Roadworksand Bridgeworks

    [*Schedule*]

    C15 E1/R1 Jun 02 Conditions of Single InvitationContract (Construction ofDevelopment Works)

    [*Contract Schedule*]

    Withdrawn

    C15-PAI

    E1/R3 Dec 12 Conditions of Single InvitationContract (Construction ofDevelopment Works)

    Version of C15 forapplying PrincipalArranged Insurance[*Contract Schedule*]

    Withdrawn

    C17 E2/R44 Jan 16 Tender FormMajor Roadworks andBridgeworks

    [*Schedule of Rates,Schedule of Prices*]

    C18 E2/R0 Jan 04 Schedule of RatesMajor Roadworks andBridgeworks

    Withdrawn andincorporated intoC17

    C41 E1/R33 Nov 15 Minor Physical Works andServices - Terms for ContractedWork

    C61 E1/R7 Nov 15 Major Supply Agreement

    (Infrastructure)

    [*Schedules 1, 2 & 3*]

    C62 E1/R5 Nov 15 Minor Supply Agreement(Infrastructure)

    [*Schedules 1, 2 & 3*]

    C63 E1/R3 Nov 15 Minor Supply Agreement (PanelContract) (Infrastructure)

    [*Schedules 1 & 2*]

    C65 E1/R11 Nov 15 Utility Works Contract [*Schedule 1*]

    C71 E2/R19 Apr 15 Professional Services Contract(Construction Industry)

    [*Schedule 4*]

    C72 E2/R15 Apr 14 Panel Deed for ProfessionalServices (Construction Industry)

    [*Schedule 1*]

    C73 E2/R9 Mar 13 Professional Services Contract(Construction Industry) Requestfor Tender

    [*Schedule B7*]

    Page 4 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    5/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The documents listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The documents listed in the “Discretionary” column must be reviewed for relevance to the proposed works, and

    relevant documents must be included in the Tender Documents. 

    Contract

    Document

    Referenced

    Documents Comments

    No. Edition/ Date Title (RMS…) [*Annexures to

    RMS…

    Revision

    (E.../R...) 

    Mandatory

    (NOTE 1) 

    Optional

    (NOTE 2) 

     be completed*]

    C74 E2/R8 Mar 13 PSC-CI Request for Proposal

    C75 E2/R6 Nov 12 PSC-CI Registration of Interest

    C91 E1/R24 Sep 15 Design and Construct ProjectDeed

    [*Schedules 1, 31, 43& 45*]

    C92 E1/R17 Sep 15 D&C Request for Tender [*Schedules A & B*]

    C93 E1/R17 Sep 15 D&C Registration of Interest [*Appendices 1, 2 &5*]

    Page 5 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    6/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

    GENERAL SPECIFICATIONS

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification Referenced Comments

    No. Edition/ Date Title Specifications  (RMS...)  [*Annexures to

    RMS...Revision(E.../R...) 

    Mandatory(NOTE 1) 

    Optional(NOTE 2) 

     be completed*]

    G1 E2/R0 Jul 05 Job Specific Requirements Template. Refer toEngineering ContractManual Section 2.3.

    G2-C2 E5/R13 Sep 15 General Requirements(Major Contracts)

    Q G71, R11,R23, R33,R37, R38,R44, R50,R55, R57,R58, R59,R63, R71,R73, R75,R82, R83,B80, 3051,3071, 3580 

    [*G2-C2/A*]Attach relevantDrawings[*G2-C2/E*]

    G2-C15 E2/R3 Jun 11 General Requirements(Single Invitation DevelopmentContract)

    Q [*G2-C15/A*]Attach relevantDrawings

    G2-C41 E2/R8 Nov 15 General Requirements(Minor Physical Works andServices)

    Q, G36 G71 [*G2-C41/A*]Attach relevantDrawings

    G4 E2/R0 Aug 15 Principal’s ProjectAccommodation

    Q, R178 [*G4/A*]

    G5 General MaintenanceRequirements

    Replaced by RMS M2

    G7 E1/R2 Oct 15 Utility Adjustment Q, G2, G10,G22, G36,G38, R44

    R11, R151,R155

    [*G7/A*]

    G10 E6/R0 Jun 15 Traffic Management Q R132, R141,R142, R143,R145

    [*G10/A*]Comply with the RMSTraffic Control atWork Sites Manual

    G11M See MaintenanceSpecifications list.

    G21 E4/R0 Nov 11 Occupational Health & Safety(Minor Works)

    Q Withdrawn; replaced by G22

    G22 E5/R4 Jul 14 Work Health & Safety(Construction and MaintenanceWorks)

    Q G10 [*G22/A*]

    G23 E1/R5 Sep 08 Occupational Health & SafetyConstruction (Non-Road andBridge) Works and Services

    Q Withdrawn; replaced by G22

    G24 E2/R1 Nov 12 Work Health & Safety (Non-construction Works)

    Q

    G34M Environmental Protection –

    Management Plan

    Withdrawn; replaced

     by G36

    Page 6 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    7/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification Referenced Comments

    No. Edition/ Date Title Specifications  (RMS...)  [*Annexures to

    RMS...Revision(E.../R...) 

    Mandatory(NOTE 1) 

    Optional(NOTE 2) 

     be completed*]

    G35 E3/R7 Jun 11 Environmental Protection(Management Plan)

    Q, G2 G38 or G39,G40, R178,R201

    Withdrawn; replaced by G36

    G36 E4/R4 Jan 16 Environmental Protection Q, G2, G38,G40

    R44, R178,R179, R201

    [*G36/A, G36/B,G36/E*]

    Complete clauses

    G38 E2/R2 Feb 15 Soil and Water Management Q, R44,R178

    G36, R11,R55, R63

    [*G38/A*]

    Complete clauses

    G39 E1/R2 Jul 11 Soil and Water Management(Erosion and Sediment ControlPlan)

    Q, G2 G36, R11,R178

    Withdrawn; replaced by G38

    G40 E1/R1 Aug 12 Clearing and Grubbing Q, G36,G38, R178

    R201  [*G40/A, G40/B*]

    G71 E1/R4 Jul 14 Construction Surveys Q, G22 G40, R44,B50, B51,B53, B54,B57, B58,B59, B61,B80, B110,B115, B150,B152, B153,B170, B260,B261, B264,

    B284

    [*G71/A*]

    G73 E2/R1 Aug 08 Detail Survey in CADD Format G24 [*G73/A, G73/H*]

    QUALITY MANAGEMENT SYSTEM SPECIFICATIONS

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced Comments No.  Edition/ Date Title Specifications  (RMS…) [*Annexures to

    RMS...

    Revision 

    (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    Q2 E1/R6 Nov 10 Quality Management System(Type 2)

    G2, G22,G36

    G71 [*Annexure Q/A*]Recommended for QA

    contracts

  • 8/18/2019 RMS Australian NSW QA Specifications List

    8/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced Comments No.  Edition/ Date Title Specifications  (RMS…) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    Q4 E2/R8 Sep 13 Quality Management System(Type 4)

    G2, G22,G36

    G71 [*Annexure Q/A*]Recommended forMajor Contracts $0.2 -$1.0m

    Q6 E1/R10 Sep 13 Quality Management System(Type 6)

    G2, G22,G36

    G71 [*Annexure Q/A*]Recommended for

    Major Contracts > $1.0m

    ROADWORKS SPECIFICATIONS

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    R11 E5/R1 Feb 16 Stormwater Drainage Q, R44, R53 G2, G38,B80, B115,R15, R16,R55, R63,R83, R84,R116, R119,R178, 3051,

    3204, 3552,3553

    [*R11/A*]

    R15 E4/R2 Jan 10 Kerbs and Gutters Q, R53,3204

    R16 E3/R1 Sep 10 Precast Reinforced ConcreteBox Culverts

    Q, R11, B80 [*R16/A*]

    R22 E5/R0 Jun 12 Corrugated Metal Structures Q, G2, R11,R44, R53

    G38 or G39,R63

    Withdrawn untilfurther notice

    R23 E4/R4 Jul 13 Plastic Flexible Pipes Q, R11 G2, G38,R44

    R24 E1/R0 Sep 09 Precast Concrete Arches Q, G40,

    B80, B115,B153, B345,R11, R44

    B58, B59,

    R33, R57,R58

    [*R24/A*]

    R31 E1/R0 Jun 09 Vertical Wick Drains Q G40, R44,R63

    [*R31/A*]

    R32 E3/R2 Mar 09 Subsurface Drainage - Materials R63, 3051,3211, 3552,3553, 3555,3556

    Withdrawn;incorporated into 3580

    R33 E4/R2 Sep 13 Trench Drains Q, R44, R63 R38, 3222,3552, 3553,

    3556, 3580

    Page 8 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    9/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    R37 E4/R2 Sep 13 Intra-pavement Drains Q, R44,R63, 3222,3555

    R33

    R38 E4/R2 Sep 13 Edge Drains Q, R44, R63 R33, 3222,3552, 3556

    R39 E2/R1 May 09 Drainage Mats R32, R63 Withdrawn

    R40 E1/R2 Jun 11 Horizontal Drains Q, G36, R63 [*R40/A*]

    R44 E5/R0 Aug 14 Earthworks Q, G36,G38, G40,G71, R178

    G10, R11,R33, R50,R58 or R59,R63, R67,R178, B30,3071

    [*R44/A*]

    R49 E3/R1 Feb 12 Construction of Verges Q [*R49/A*] Not required when R44

    is used  

    R50 E3/R3 Apr 11 Stabilisation of Earthworks Q, R44,3211

    3254 [*R50/A*]

    R53 E2/R2 Jun 13 Concrete (for General Use),Mortar and Grout

    Q, G2, 3211

    R55 E3/R1 Jul 09 Rock Filled Gabions andMattresses

    Q, R44, R63

    R56 E3/R4 Apr 12 Ground Anchors (Schedule ofRates)

    Q, G36,3211

    B114 [*R56/A*]

    R57 E2/R8 Feb 16 Design of Reinforced Soil Walls Q R58 or R59,R63, B80,B115, 2380

    [*R57/A*]

    R58 E3/R5 Jul 15 Construction of Reinforced SoilWalls (Contractor’s Design)

    Q, G40,G71, R44,R57, B80

    B115 The former R58 nowdivided into R58 andR59 

    R59 E3/R5 Jul 15 Construction of Reinforced SoilWalls (Principal’s Design)

    Q, G40,G71, R44,R57, B80

    B115 This R59 was previously part of R58, but now aseparate document

    R63 E4/R0 May 13 Geotextiles (Separation andFiltration)

    Q [*R63/A*]

    R64 E1/R3 Nov 12 Soil Nailing Q, R63,R68, 3211

    R40, B80,3557

    [*R64/A*]

    R67 E1/R1 Nov 10 High Strength GeosyntheticReinforcement

    Q, R44 [*R67/A*]

    R68 E1/R3 Jan 16 Shotcrete Work Without SteelFibres

    Q, G36,3211

    [*R68/A*]

    R71 E4/R1 Oct 13 Construction of Unbound andModified Pavement Course

    Q, G36,G38, G71,R178, 3051

    3211, R106,R107

    [*R71/A*]

    [*3051/A*]

    R73 E3/R0 Jun 15 Construction of Plant MixedHeavily Bound PavementCourse

    Q, G10,G36, G38,G71, R178,3051, 3211

    R106 orR107, R178

    [*R73/A*]

    [*3051/A*]

    Page 9 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    10/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    R75 E3/R0 Jun 15 Insitu Pavement StabilisationUsing Slow Setting Binders

    Q, G36,G38, G71,3051, 3211

    G10, R101,R106 orR107

    [*R75/A*][*3051/A*]

    R82 E3/R7 Oct 10 Lean-Mix Concrete Subbase Q, G2, G36,G71, 3211

    R83, R106,3151, 3253,3254

    [*3151/A*]

    R83 E3/R0 Nov 13 Concrete Pavement Base Q, G2, G36,G71, R15,R82, 3204,3211

    R53, R93,R106, R141,B204, 3051,3154, 3253,3254

    [*R83/A*]

    R84 E2/R8 Sep 10 Continuously ReinforcedConcrete Base

    Q, G2, G36,G71, R53,R82, 3204,3211

    R106, B204 Withdrawn; incorporatedinto R83

    R90 E1/R0 Jun 07 Roller Compacted ConcreteSubbase

    Q, 3221 R106, R111,3254

    [*R90/A*]

    R93 E1/R1 Mar 14 Diamond Grinding of ConcretePavement

    Q G36 [*R93/A*]

    R101 E3/R0 Apr 09 Cold Milling of Road PavementMaterials

    Q, G10 R116 [*R101/A*][*R101/E*]

    R103 E1/R2 Jun 09 High Pressure Waterblasting ofBituminous Seals

    Q, G10,R106 orR107

    [*R103/A*]

    R106 E4/R1 Oct 12 Sprayed Bituminous Surfacing(with Cutback Bitumen)

    Q, G10,3151, 3253,3258, 3259,3261

    B344 [*R106/A*]

    [*3151/A*]

    R107 E3/R1 Oct 12 Sprayed Bituminous Surfacing(with Polymer Modified Binder)

    Q, G10,3151, 3252,3268, 3269

    R106, B344,3253

    [*R107/A*][*3151/A*]

    R109 E2/R0 Mar 09 Bituminous Slurry Surfacing Q, G10,3211

    [*R109/A*]

    R110 E2/R2 Nov 13 Coloured Surface Coatings forBus Lanes and Cycleways

    Q, G10 [*R110/A*]

    R111 E2/R0 Aug 06 Sprayed Bituminous Surfacing(with Bitumen Emulsion)

    Q, G10,3151, 3254,3258

    3252 [*R111/A*]

    [*3151/A*]

    R112 E2/R0 Mar 09 Sprayed Bituminous Surfacing(for Enrichment &Rejuvenation)

    Q, G10 3253, 3254,3261

    [*R112/1*]

    R113 E2/R0 Mar 09 Sprayed Bituminous Surfacing(with Fibre Reinforcement)

    Q, G10,3151, 3252,3254, 3258

    [*R113/A*]

    R116 E8/R4 Jul 13 Heavy Duty Dense Graded

    Asphalt

    Q, G10,

    R101, 3152,3211, 3252or 3253

    3153, 3154 The former R116 now

    divided into R116 andR119 [*R116/A*] 

    Page 10 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    11/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    R117 E1/R1 Jul 13 Light Duty Dense GradedAsphalt

    Q, G10,3152, 3211,3252 or3253

    R101, 3153,3154

    [*R117/A*]

    R118 E1/R0 Jul 13 Crumb Rubber Asphalt Q, G10,G22, 3152,3211, 3253,3256, 3259

    R101, R116,R117, 3154,

    [*R118/A*] 

    R119 E1/R2 Jan 12 Open Graded Asphalt Q, G10,3152, 3211,3252, 3259,

    3269

    R101, R116 This R119 was previously part of R116, but now a separatedocument [*R119/A*] 

    R121 E3/R0 July 13 Stone Mastic Asphalt Q, G10,3152, 3211,3252

    R101. R116,3154, 3259or 3269

    [*R121/A*]For use in trials only

    R123 E2/R0 Nov 09 Thin Open Graded AsphaltSurfacing

    Q, G10,3211, 3252

    3269 [*R123/A*]For use in trials only

    R131 E4/R1 Apr 09 Guide Posts 3411 and/or3412

    G36

    R132 E3/R3 Feb 12 Safety Barrier Systems Q, G71 G10, G22,G36, R53,3204

    [*R132/A, -F, -/G, -/H*]

    R141 E7/R0 Feb 16 Pavement Marking Q, G10,3353

    R110, R142,3351, 3356,3357, 3359,3360

    [*R141/A*]Must NOT be used

    together with R145 

    R142 E4/R6 Jun 13 Retroreflective Raised PavementMarkers

    Q, 3354 G10

    R143 E5/R0 Mar 15 Signposting Q, G10,R53, B240,3400

    B80, B200,B204

    [*R145/A*]

    R145 E4/R0 Feb 16 Pavement Marking (PerformanceBased)

    Q, G10 R110, R142,3351

    [*R145/A*] Must NOT be used

    together with R141 R146 E2/R0 Jan 09 Pavement Marking Maintenance

    (Rural Regions)G10, R141 Withdrawn

    R151 E4/R1 Sep 13 Street Lighting Q, R53,3851

    R152 E3/R1 Jul 14 Roadside Emergency TelephonePillars

    [*R152/A*]

    R153 E1/R1 Oct 09 Tunnel and Underpass MainSwitchboard, DistributionBoards and Control Panels

    Q [*R153/A*]

    R154 E1/R1 Oct 09 Tunnel and Underpass Electrical

    Services Works

    Q [*R154/A*]

    Page 11 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    12/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    R155 E1/R3 Oct 13 Design and Construction ofUnderground Cableways

    Q, G2, G10,G22, G36,G38, G73,R11, R44

    3051, 3368,SI/TCS/8

    [*R155/A*]

    R156 E3/R1 Mar 12 Maintenance of Traffic Signals(Activity-Based)

    Q, G10,G22, G36,SI/TCS/8

    Withdrawn; replaced by R300 series

    R157 E3/R0 Mar 12 Maintenance of Traffic Signals(Performance-Based)

    Q,G10,G22, G36,SI/TCS/8

    Withdrawn; replaced by R300 series

    R158 E1/R3 Nov 13 Road Tunnel and Underpass

    Lighting

    Q [*R158/A*]

    R160 E1/R2 Feb 11 Closed Circuit TelevisionSystem for BroadbandConnection

    R155, TSI-SP-016,SI/TCS/8

    Withdrawn; replaced by TS106

    R161 E3/R2 Oct 03 Fencing Q G34M, G35,G36, R53

    Changed to R201

    R173 E2/R2 Aug 03 General Concrete Paving Q, R44,R53, 3204

    R178 E5/R4 Aug 08 Vegetation Q, 3254 R44 [*R178/A*]

    R179 E1/R2 Mar 15 Landscape Planting G22, G36,Q

    G10, R178 [*R179/A*]

    R201 E4/R5 Apr 13 Fencing Q, G22,G71

    G36, R44,R53, R131,R143, 3411,3412

    [*R201/A*]Previously released asR161

    R204 E1/R2 Jul 13 Property Adjustments Q, G36,G38, G71

    G1, G22,R11, R53,R71, R117,R173, R179,R201, B80,B341, 3211

    [*R204/A*]

    R271 E2/R4 Nov 15 Design and Construction of Noise Walls

    Q, G1, G2,G38, G71,

    G73, B30,R44

    G40, B50,B51, B53,

    B54, B57,B58/B59,B61, B220,B240, B241,B246, B349,

    2380

    Guide Notes previouslyat front of document now

    Specification Guide NR271 

    R272 E1/R0 May 14 Automatic Weather Stations Q [*R272/A*] 

    R300 E1/R3 Oct 14 ITS Maintenance Services –General Requirements

    R301, R302,R303, R304,R305, R306,R308, R311,R312, R313,R314, R315,R316, R317,R319, R320,R321, R322

    Page 12 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    13/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    R301 E1/R3 Oct 14 Maintenance of Traffic ControlSignals

    R302 E1/R2 Apr 14 Maintenance of VariableMessage Signs

    R305, TSI-SP-003,TSI-SP-008

    R303 E1/R2 Apr 14 Maintenance of Variable SpeedLimit Signs

    R305, R318,TSI-SP-003,TSI-SP-011

    R304 E1/R2 Apr 14 Maintenance of TrafficMonitoring Units

    R318, TSI-SP-003

    R305 E1/R2 Apr 14 Maintenance of Tidal Flow

    Systems

    R301, R302,

    R303, R320,TSC/4, TSI-SP-003,TSI-SP-008

    R306 E1/R2 Apr 14 Maintenance of Travel TimeInformation Systems

    R300, TSI-SP-008,TSI-SP-014,TSI-SP-016

    R308 E1/R2 Apr 14 Maintenance of Road WeatherInformation Systems

    R302, R303,R305, TSI-SP-003,

    TSI-SP-008R311 E1/R2 Apr 14 Maintenance of Over-SpeedDetection Systems

    R300, TSI-SP-008,TSI-SP-014,TSI-SP-016

    R312 E1/R2 Apr 14 Maintenance of Over-HeightDetection Systems

    R300, TSI-SP-008,TSI-SP-014,TSI-SP-016

    R313 E1/R2 Apr 14 Maintenance of VehicleDetection and ClassificationSystems

    R300, TSI-SP-008,TSI-SP-014,TSI-SP-016

    R314 E1/R2 Apr 14 Maintenance of Sydney CBDEmergency Warning Systems

    R300, TSI-SP-008,TSI-SP-014,TSI-SP-016

    R315 E1/R2 Apr 14 Maintenance of AdvanceWarning Systems

    R300, TSI-SP-008,TSI-SP-014,TSI-SP-016

    R316 E1/R2 Apr 14 Maintenance of Lane UseManagement Systems

    R300, TSI-SP-008,

    TSI-SP-014,TSI-SP-016

    Page 13 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    14/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    R317 E1/R2 Apr 14 Maintenance of CommunicationSystems

    TSI-SP-003,TSI-SP-016,TSI-SP-021,

    TSI-SP-022

    R319 E1/R2 Apr 14 Maintenance of EnforcementSystems

    TSI-SP-005,TSI-SP-014,TSI-SP-016,

    TSI-SP-019,TSI-SP-025,

    TSI-SP-026 

    R320 E1/R2 Apr 14 Maintenance of ChangeableMessage Signs

    R305, R318

    R321 E1/R2 Apr 14 Maintenance of Weigh-in-Motion Systems

    R300, TSI-SP-008,TSI-SP-014,TSI-SP-016

    R322 E1/R2 Apr 14 Maintenance of Closed CircuitTelevision Systems

    R300, TSI-SP-014,TSI-SP-016

    R421 E1/R0 Jul 10 Measurement of LongitudinalLine Marking by MobileRetroreflectometer

    Q R145 [*R421/A*]

    R422 E1/R2 Dec 13 Measurement of Roughness,

    Rutting and Texture by LaserProfilometer

    Q, G22 [*R422/A*]

    R423 E1/R1 Dec 13 Measurement of Surface Friction by Sideways-force CoefficientRoutine Investigation Machine(SCRIM)

    Q, G22 [*R423/A*]

    R424 E1/R1 Dec 13 Measurement of SurfaceCracking by Roadcrack

    Q, G10,G22

    [*R424/A*]

    R425 E1/R3 Dec 13 Measurement of Deflection byFalling Weight Deflectometer(FWD)

    Q, G22 [*R425/A*]

    Page 14 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    15/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

    BRIDGEWORKS SPECIFICATIONS

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments 

    No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    B30 E4/R0 Mar 15 Excavation and Backfill forBridgeworks

    Q, G22,G36, G38,G71,

    R44, R63,3552

    B50 E4/R0 Dec 13 Driven Reinforced ConcretePiles

    Q, G22,B80, B115

    B30, B204

    B51 E4/R0 Jan 14 Driven Prestressed ConcretePiles

    Q, G22,B80, B110

    B30, B204

    B53 E3/R0 Jan 14 Driven H-Section Steel Piles Q, G22,B204

    B30

    B54 E3/R0 Feb 14 Driven Tubular Steel Piles Q, G22,B80, B204 B30

    B57 E2/R2 Jan 10 Driven Cast-in-place ConcretePiles

    Q, G22,G36, B80

    B30

    B58 E5/R0 Feb 14 Bored Cast-in-place ReinforcedConcrete Piles (With PermanentCasing)

    Q, G22,G36, B80,B204

    B59 E5/R0 Feb 14 Bored Cast-in-place ReinforcedConcrete Piles (WithoutPermanent Casing)

    Q, G22,G36, B80,3211

    B63

    B61 E3/R0 Feb 14 Driven Composite Piles Q, G22,

    B80, B110,B204

    B30

    B63 E1/R1 Jan 10 Concrete Injected (CFA) Piling Q, G22, B80 [*B63/A*]

    B80 E6/R5 Jul 13 Concrete Work for Bridges Q, G36,G71, 3211

    B58, B59,B110 B115,B113, B170,B204, B240

    [*B80/A*]

    B82 E2/R4 Jan 16 Shotcrete Work Q, 3211,G36

    [*B82/A*] Not recommended forminor works

    B110 E3/R6 May 11 Supply of Pretensioned Precast

    Concrete Members

    Q, B80

    B113 E3/R5 May 11 Post-tensioning of Concrete Q, B80 B119

    B114 E3/R6 Apr 12 Ground Anchors (Lump Sum) Q, 3211,G36

    R56 [*B114/A*]

    B115 E2/R2 Dec 09 Precast Concrete Members (NotPretensioned)

    Q, B80

    B119 E1/R1 Nov 08 Approval of Post-tensioningSystems

    Q B113, B114,R56

    B150 E3/R2 Jun 05 Erection of Pretensioned PrecastConcrete Members

    Q G71

    B152 E3/R0 Dec 08 Incrementally Launched

    Prestressed Concrete Girders

    Q, B80,

    B113, B281

    [*B152A*]

    B153 E1/R4 Dec 09 Erection of Precast ConcreteMembers (Not Pretensioned)

    Q, B80,B115,

    G71, B284

    Page 15 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    16/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    B170 E4/R0 May 05 Supply and Installation of VoidFormers

    Q

    B200 E3/R1 Jun 11 Fabrication of Major SteelStructural Members

    Q, B204,B220

    B260 [*B200/A*]

    B202 E3/R0 Oct 08 Supply of Steel Bridge Girders by the Principal

    Q B200, B220

    B204 E2/R1 Feb 07 Welding of Bridges and OtherRoad Structures

    Q [*B204/A*]

    B220 E3/R4 Nov 13 Protective Treatment of BridgeSteelwork.

    Q, G22,3651

    B223, B240

    B223 E1/R4 Oct 12 Management of Lead,

    Chromium and Asbestos inBridge Maintenance Painting

    Q, G22

    B240 E5/R0 Jun 12 Supply of Bolts, Nuts, Screwsand Washers

    Q B241

    B241 E4/R3 Oct 13 Manufacture and Supply ofMinor Steel Items

    Q B220

    B242 E3/R0 Jun 09 Manufacture and Supply ofAluminium Barriers

    Q

    B245 E3/R1 Feb 12 Fabrication of AluminiumStructural Members

    Q B261

    B246 E3/R0 May 09 Manufacture and Supply of

    Minor Aluminium Items

    Q

    B260 E3/R0 Dec 08 Erection of Structural Steelwork Q B204

    B261 E3/R0 May 09 Erection of StructuralAluminium

    Q B240

    B264 E3/R1 Jun 09 Erection of Barrier Railings andMinor Components

    Q B345

    B280 E4/R1 Apr 12 Unreinforced ElastomericBearing Pads and Strips

    Q, B284

    B281 E4/R2 Apr 12 Laminated Elastomeric Bearings Q, B284

    B282 E4/R2 Apr 12 Pot Bearings – Structural Steel Q, B240,

    B284

    B310 [*B282/A*]

    B283 E4/R0 Oct 05 Pot Bearings – Stainless Steel Q, B240,B284

    B310

    B284 E2/R4 Sep 12 Installation of Bridge Bearings Q, G71, B80 B150, B241,B260

    B310 E5/R1 Apr 12 Compression Seal ExpansionJoints

    Q

    B312 E4/R2 Dec 13 Cold Applied Elastomeric JointSealants

    Q [*B312/A*]

    B313 Joint Sealing Compounds HotPoured Elastic Expansion Type

    Withdrawn

    B315 E4/R1 Apr 12 Elastomeric Strip SealExpansion Joints

    Q, B241 orB246

    Page 16 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    17/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    B316 E2/R1 Jun 05 Modular Bridge ExpansionJoints

    Q, B204,B220, B240,B282, B315

    [*B316/A*]

    B318 E2/R0 Aug 08 Bonded Metal-ElastomerExpansion Joints

    Q

    B319 E1/R0 Jun 08 Proprietary AluminiumExpansion Joints

    Q

    B341 E2/R0 Apr 12 Demolition of Existing Structure Q, G22,G36

    G71, B350,R44

    [*B341/A*]

    B343 E1/R0 Jun 14 Preformed and Liquid AppliedWaterproofing Membrane

    Systems

    Q, G22,G36, G38,

    B80

    R101

    B344 E2/R5 Jun 14 Sprayed BituminousWaterproofing Membranes

    Q, G22, G36,G38, R106 orR107, 3151,3252, 3268,3269

    3261 [*B344/A*]

    B345 E3/R2 Apr 12 Supply of Bridge Nameplates Q Standard Drawings to be included inSupplementaryDrawings.

    B349 E1/R0 Mar 12 Supply of Precast Concrete Noise Walls (Not Pretensioned)

    Q, B80,R271

    B59

    B350 E1/R0 Apr 09 Underwater Bridge Inspections Q2 [*B350/A*]

    B381 E1/R0 Nov 12 Design, Supply and Installationof Pedestrian Bridge Lifts

    Q, B80 G2 [*B381/A*]

    Page 17 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    18/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

    MATERIALS SPECIFICATIONS

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments 

    No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    3051 E6/R5 Nov 14 Granular Base and SubbaseMaterials for Surfaced RoadPavements

    Q R71, R73,R75, R76,3153, 3154

    [*3051/A*]

    3052 E4 Jun 98 Material to be Bound (MTBB)for Base and Sub-BaseMaterials for Surfaced RoadPavements

    R73 Withdrawn;incorporated into 3051

    3053 E3 Mar 98 Quicklime R50, R73,R75

    Withdrawn;incorporated into 3211

    3054 E4 Nov 98 Hydrated Lime R50, R73,R75, R116,R121, R123,3266

    Withdrawn;incorporated into 3211

    3061 E1/R4 Jul 08 Bound and Unbound Materialfor Pavement Repairs

    Q M250,M290

    Withdrawn;incorporated into R71

    3071 E1/R4 Apr 13 Selected Material for Formation Q [*3071/A*]

    3151 E10/R0 May 09 Cover Aggregate for SprayedBituminous Surfacing

    Q 3258, 3259,3268, 3269

    [*3151/A*]

    3152 E2/R3 Jul 15 Aggregates for Asphalt Q R121 [*3152/A*]

    3153 E1/R0 May 11 Reclaimed Asphalt PavementMaterial

    Q 3152

    3154 E1/R0 May 11 Granulated Glass Aggregate Q

    3201 E4/R1 Aug 15 Concrete Supply forMaintenance

    G36, Q,3211

    3202 E6/R0 Feb 09 Wax Emulsion Concrete CuringCompound

    3204 E3/R0 Feb 09 Preformed Joint Fillers forConcrete Road Pavements andStructures

    3211 E4/R8 Sep 15 Cements, Binders and Fillers B80, B82,R50, R53,R68, R71,

    R73, R75,R82, R83,R90, R116,R119, R121,R123, R132,3201, 3221,3222, 3266

    3221 E1/R1 Jan 09 Roller Compacted Concrete Q, 3211

    3222 E1/R1 May 11  No Fines Concrete (forSubsurface Drainage)

    Q, 3211

    3251 E8 Oct 01 Cutter and Flux Oils Withdrawn

    3252 E11/R0 Jun 14 Polymer Modified Binder forPavements

    Q 3256

    3253 E13/R1 Jun 14 Bitumen for Pavements Q

    Page 18 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    19/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    3254 E9/R0 May 09 Bitumen Emulsion Q3256 E6/R0 May 11 Comminuted Scrap Rubber Q

    3258 E8/R0 Jul 09 Aggregate Precoating Agent(for Bitumen)

    Q

    3259 E9/R0 Jul 09 Bitumen Adhesion Agent(for Bitumen)

    Q

    3261 E9/R0 Apr 09 Cutback Bitumen Q

    3263 E3/R0 Oct 01 Hot Poured Elastomeric JointSealant for Roads

    Q Reissued.

    3266 E5/R0 Sep 09 Coldmix Asphalt Q, 3253 3211, 3254,3259, 3261

    [*3266/A*]

    Refers tospecifications RMS3211, 3253, 3254,3259, 3261

    3268 E5/R0 Jul 09 Aggregate Precoating Agent (forPolymer Modified Binder)

    Q

    3269 E5/R0 Jul 09 Bitumen Adhesion Agent (forPolymer Modified Binder)

    Q

    3351 E4/R0 Jul 09 Road Marking Paint

    3352 E2/R0 Jul 09 Fluorescent Plastic TrafficCones

    3353 E7/R1 Jul 09Glass Beads (for Application toRoad Marking Materials)

    3354 E5/R0 Apr 09 Adhesives for Raised PavementMarker Installation

    3356 E3/R0 May 10 Waterborne Road Marking Paint

    3357 E3/R2 Nov 10 Thermoplastic Road MarkingMaterial

    3358 E2 Apr 97 Aerosol Roadmarking Paint Withdrawn

    3359 E3/R0 Apr 09 Profile Thermoplastic RoadMarking Material

    3360 E3/R0 Jul 09 Two Part Cold Applied Road

    Marking Material

    3353,

    TTT-0373368 E2/R2 Jul 09 Skid Resistant Friction Coating

    for Temporary Steel Road PlatesQ

    3385 E3/R0 Apr 09 Barrier Boards

    3400 E8/R3 Mar 15 Manufacture and Delivery ofRoad Signs

    Q

    3411 E2/R0 Apr 09 Supply of Guide Posts (Timber) R131

    3412 E2/R1 Nov 13 Supply of Guide Posts (Non-Timber)

    3421 E3/R0 Dec 13 Illuminated Flashing “StopChildren Crossing” Bat

    3552 E3/R0 Apr 11 Subsurface Drainage Pipe(Corrugated Perforated and Non-perforated Plastic)

    Q

    Page 19 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    20/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    3553 E3/R0 Apr 11 Seamless Tubular Filter Fabric Q3555 E4/R0 Apr 11 Subsurface Drainage Pipe

    (Slotted and Unslotted Fibre-reinforced Concrete)

    Q

    3556 E3/R1 Nov 12 Rigid Strip Filter Drains Q 3552

    3557 E1/R0 Oct 12 Flexible Strip Filter Drains Q, R63

    3580 E1/R0 Apr 11 Aggregate Filter Materials forSubsurface Drainage

    Q

    3651 E1/R1 May 09 Paints and Thinners forSteelwork

    3851 E4/R0 Dec 12 Steel Tapered Lighting Columns Q, B240

    Page 20 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    21/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

    MAINTENANCE CONTRACT DOCUMENTS, GUIDES AND SPECIFICATIONS

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments 

    No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    G10M E5/R0 Nov 15 Traffic Management [*G10M/A*]

    G11M E1/R0 Aug 08 Road Occupancy Provisions Withdrawn

    G21M E1/R1 Dec 08 Occupational Health and Safety Withdrawn; replaced by G22

    G34M E1/R1 Sep 08 Environmental Protection – Management Plan

    Withdrawn; replaced by G36

    Q4M E3/R0 Jun 08 Quality Management System(Type 4)

    [*Q/A*]

    M1 E5/R1 Jun 11 General Network Management

    Requirements

    [*Tables within

    clauses and M1/A*]M2 E2/R3 Sep 08 RMS QA Specification M2

    Annexures

    M3 E1/R0 Dec 13 Routine Services Q, G22,G36

    B204, B220,B223, B240,B345, M211,M212, M213,M214, M215,M220, M231,M232, M240,M250, M258,M290, M321,

    M620, M757,M769, M772,M783, M788,R11, R15,R33, R38,R44, R53,R55, R93,R101, R103,R110, R131,R132, R141,R142, R143,R145, R161,R173, R178,

    R201, R271

    [*M3/A*]

    M20 E1/R2 May 11 Maintenance Intervention &Investigatory Requirements(Pavement)

    Withdrawn; replaced by M3

    M30 E1/R1 Aug 08 Maintenance Intervention &Investigatory Requirements(Corridor)

    Withdrawn; replaced by M3

    M40 E1/R1 Jul 08 Maintenance Intervention &Investigatory Requirements(Operating Assets)

    Withdrawn; replaced by M3

    M50 E1/R1 Aug 08 Maintenance Intervention &

    Investigatory Requirements(Drainage)

    Withdrawn; replaced

     by M3

    Page 21 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    22/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    M60 E1/R1 Aug 08 Maintenance Intervention &Investigatory Requirements(Traffic Facilities)

    Withdrawn; replaced by M3

    M200 E1/R0 Aug 08 Maintenance RectificationRequirements (Pavement)

    Withdrawn; replaced by M3

    M208 E1/R0 May 08 Road Openings and Restoration(Low Risk)

    Q M209

    M209 E2/R0 Feb 13 Road Openings and Restoration Q R116, 3061,3201, 3204,3254, 3368,3580, M250,

    M270

    M211 E3/R0 Apr 13 Crack Sealing BituminousSurfaces

    Q, G10,3252, 3254

    3263 [*M211/A*]Formerly M210

    M212 E3/R0 Apr 13 Routing and Sealing of Cracks(Concrete Pavement)

    Q, G10,G36, M215,3204

    3263 [*M212/A*]Formerly M215

    M213 E3/R0 Feb 13 Cross Stitching of Cracks andJoints (Concrete Pavement)

    Q, G10,G36

    [*M213/A*]Formerly M230

    M214 E3/R0 Apr 13 Repair of Joint Seals inConcrete Pavement

    Q, G10M,G22, G36,3204

    3263 [*M214/A*]Formerly M220

    M215 E3/R0 Apr 13 Repair of Surface Spalls inConcrete Pavement

    Q, G10M,G22, G36

    [*M215/A*]Formerly M224

    M220 E3/R0 Feb 13 Formation Grading of UnsealedRoads

    Q, G22,G36, M3

    [*M220/A*]Formerly M280

    M231 E4/R0 Aug 15 Pressure Grouting for SlabJacking/Stabilisation

    Q, G10,G36, 3211

    [*M231/A*]Formerly M235

    M232 E3/R0 Aug 15 Injected Expanding Foam SlabJacking/Stabilisation

    Q, G10,G36, M258

    [*M232/A*]Formerly M238

    M240 E3/R0 Feb 13 Shoulder Grading Q, G22,G36, M1,M3, R44

    R11, R106,R107, R111

    [*M240/A*]Formerly M525

    M244 E2/R0 Jul 08 Earthworks for Road Rebuilding 3071R11, R22,R33, R50,R58, R178,

    3556, B30 

    Formerly M324,Withdrawn

    M250 E2/R0 Feb 13 Heavy Patching(Flexible Pavement)

    3061 M210, R33,R37, R38,R63, R106,R111, R116,R121, R131,R141, R142,R143, R146

    [*M250/A*]

    M258 E3/R1 Oct 13 Slab Replacement(Concrete Pavement)

    3201 R115, R121,R141, R142,

    R146, 3204

    [*M258/A*]Formerly M270

    Page 22 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    23/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    M290 E3/R0 Feb 13 Pavement Rebuilding(Bound and Unbound Material)

    R71 R33, R37,R38, R63,R106, R111,R131, R141,R142, R143,R146

    [*M290/A*]Wording of titlechanged

    M300 E1/R0 Aug 08 Maintenance RectificationRequirements (Corridor)

    Withdrawn; replaced by M3

    M321 E2/R0 Jul 08 Landscape Maintenance G36, M1 [*M321/A*]Formerly M317

    M322 E2/R0 Jul 08 Landscape Restoration M321 [*M322/A*]Formerly M318

    M400 E1/R0 Aug 08 Maintenance RectificationRequirements (OperatingAssets)

    Withdrawn; replaced by M3

    M430 E4/R0 Jul 08 Ferry Operation G34-F,Q6-F,G24-F

    Formerly M496

    M500 E1/R0 Aug 08 Maintenance RectificationRequirements (Drainage)

    Withdrawn; replaced by M3

    M600 E1/R0 Aug 08 Maintenance RectificationRequirements (TrafficFacilities)

    Withdrawn; replaced by M3

    M620 E1/R0 Jul 08 Maintenance of Road SafetyBarrier Systems

    G1, G10M,G22, M1,R53, 3201

    G71, R132,3204

    M700 E1/R1 Feb 09 Bridge and Tunnel - Routineand Minor Rehabilitation

    Withdrawn; replaced by M3

    M752 E1/R0 Feb 14 Timber Truss Repairs –Temporary Support & MinorDesign

    Q, G10, G22,G36, G71,M756, M757

    B204, B220,TRTM 0006-SPN

    [*M752/A*]

    M757 E1/R0 Dec 08 Timber Truss Repairs –Construction

    Q, G10, G22,G36, M743,M752, M756

    G71, 2380,B200, B204,B223, B240,

    B241,

    [*M757/A*]

    M769 E1/R0 Nov 12 Concrete Bridge Repairs -Construction

    Q, G22,G71, B80

    B204, B341,R68

    [*M769/A*]

    M772 E1/R0 Nov 12 Concrete Bridge Repairs -Investigation

    Q, G22,G71

    [*M772/A*]

    M773 E1/R0 Nov 12 Concrete Bridge Repairs -Design

    Q, G71, B80 B110, B113,B115, B204,R68

    [*M773/A*]

    M782 E1/R0 May 13 Bridge Bearing Repairs - Design G22, G71,Q, B284

    G11M,B280, B281,B282, B283,

    2243, 2244

    [*M782/A*]

    Page 23 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    24/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification  Referenced  Comments No.  Edition/ Date Title  Specifications  (RMS...) [*Annexures to

    RMS...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    M783 E1/R0 May 13 Bridge Bearing Repairs -Construction

    G22, G71,Q, B220,B240, B241,M782

    [*M783/A*]

    M787 E1/R0 May 13 Bridge Deck Joint Repairs –Design

    G22, G71,Q

    G11M,B310, B312,B315, B316,B318, B319

    [*M787/A*]

    M788 E1/R0 May 13 Bridge Deck Joint Repairs –Construction

    G2, G22,G71, Q,B80, B240,

    B241, M787

    M783 [*M788/A*]

    Page 24 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    25/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

    TRAFFIC SYSTEM SPECIFICATIONS

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. 

    Specification Referenced Comments

    No. Edition/ Date Title Specifications  (RMS...)  [*Annexures to

    RMS...Revision(E.../R...) 

    Mandatory(NOTE 1) 

    Optional(NOTE 2) 

     be completed*]

    TS020 E1/R2 Jul 14 ITS Communications System Q, G10,G22, R155

    TSI-SP-012,TSI-SP-016

    [*TS020/A*]

    TS104 E1/R2 Jul 14 ITS Vehicle Detection Site Q, G10,G22, R155

    SI/TCS/8,TSI-SP-012,TSI-SP-016,TSI-SP-038

    [*TS104/A*]

    TS105 E1/R3 Jul 14 ITS Electronic Message SignSite

    Q, G10,G22, R155

    SI/TCS/8,TSI-SP-003,TSI-SP-008,TSI-SP-011,TSI-SP-012,TSI-SP-016

    [*TS105/A*]

    TS106 E1/R3 Nov 14 ITS Video Surveillance CameraSite

    Q, G10,G22, R155

    SI/TCS/8,TSI-SP-012,TSI-SP-016

    [*TS106/A*]

    TS107 E1/R2 Jul 14 ITS Emergency Telephone Site Q, G10,G22, R152,R155

    SI/TCS/8,TSI-SP-012,TSI-SP-016,TSI-SP-040

    [*TS107/A*]

    TS200 E1/R5 Aug 15 Register of ITS Field Equipment Q TS201

    TS201 E1/R0 Mar 15 Approval of ITS FieldEquipment

    Q, TS200

    TS914 E1/R1 Dec 14 OMCS Requirements –Electrical Power Supply andDistribution

    R151, R153,R154, R155,R158, TS915,TS931,TS932,TS933,TSI-SP-017

    [*TS914/A*]

    TS915 E1/R1 Dec 14 OMCS Requirements –Motorway NetworkCommunications System

    Q, R155 TS911,TS912,TS913,TS914,TS916,TSI-SP-012,

    TSI-SP-016

    [*TS915/A*]

    TS917 E2/R0 Jun 14 C2C Interface Requirements forMotorways

    Q [*TS917/A*]

    Page 25 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    26/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

    D&C GENERAL AND QUALITY SYSTEM SPECIFICATIONS

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. NOTE 3: The specifications listed below are Design & Construct (D&C) specifications. For ordinary QA specifications,

    refer to earlier pages. 

    Specification  Refer’d Specifications Comments 

    No.  Edition/ Date Title  (RMS D&C...) [*Annexures toRMS

    D&C...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    G4 E2/R0 Aug 15 RMS Site Facilities Q6, G22 R178 [*G4/A*]

    G7 E1/R1 Oct 15 Services Works (UtilityAdjustment)

    Q6, G10,G22, G36,G38, R44

    R11, R151,R155,SI/TCS/8

    G10 E2/R0 Jun 15 Traffic Management Q6 R132 R142,R143, R145

    [*G10/A*]Comply with the RMSTraffic Control atWork Sites Manual

    G22 E2/R2 Jun 13 Work Health & Safety(Construction Works)

    Q6 G10 [*G22/A*]

    G36 E2/R4 Feb 16 Environmental Protection Q6, G38,R44

    G40, R178,R179, R201

    [*G36/A, G36/E*],Complete Clauses

    G38 E2/R1 Feb 15 Soil and Water Management Q6, G36,R44

    R11, B30,R55, R63,R178

    [*G38/A*], CompleteClauses

    G40 E1/R0 Jun 11 Clearing and Grubbing Q6, G36,G38, R178

    R201 [*G40/A*], CompleteClauses

    G71 E1/R1 Jul 14 Construction Surveys G22, Q6 R44, B50,B51, B53,

    B54, B57,B58, B59,B61, B80,B110, B115,B150, B152,B153, B170,B260, B261,B264, B284

    Q6 E1/R1 Sep 13 Quality Management System(Type 6)

    G22, G36 G71 [*Q/A*], For all D&Ccontracts

    Page 26 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    27/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

    D&C ROADWORKS SPECIFICATIONS

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. NOTE 3: The specifications listed below are Design & Construct (D&C) specifications. For ordinary QA specifications,

    refer to earlier pages. 

    Specification  Refer’d Specifications Comments 

    No.  Edition/ Date Title  (RMS D&C...) [*Annexures toRMS

    D&C...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    R11 E3/R1 Feb 16 Stormwater Drainage Q6, R44,R53, R63

    B80, B115,R15, R16,R55, R83,R116, R119,R178, 3051,3204, 3552,3553

    R15 E1/R0 Jun 11 Kerbs and Gutters Q6, R53,3204

    R16 E1/R0 Jun 11 Precast Reinforced ConcreteBox Culverts

    Q6, B80,R11

    R23 E1/R1 Jul 13 Plastic Flexible Pipes Q6, R11 R44

    R24 E1/R0 Jun 11 Precast Concrete Arches Q6, G40,B80, B115,B153, B345,R11, R44

    B58, B59,R33, R57,R58

    [*R24/A*]

    R31 E1/R0 Jun 11 Vertical Wick Drains Q6, R44 R63 [*R31/A*]

    R33 E1/R1 Sep 13 Trench Drains Q6, R44,R63, 3552

    R38, 3222,3553, 3556,3580

    R37 E1/R1 Sep 13 Intra-pavement Drains Q6, R44,R63, 3222,3555

    R33

    R38 E1/R1 Sep 13 Edge Drains Q6, R33,R44, 3552,3556

    R63, 3222

    R40 E1/R0 Jun 11 Horizontal Drains G36, Q6,R63

    R44 E3/R0 Mar 15 Earthworks Q6, G10,G36, G38,G40, G71

    B30, R11,R33, R50,R58, R63,

    R67, R178,3071

    [*R44/A*]

    R50 E1/R0 Jun 11 Stabilisation of Earthworks Q6, R44 3211, 3254

    R53 E1/R2 Jun 13 Concrete (for general use),Mortar and Grout

    Q6, 3211

    R55 E1/R0 Jun 11 Rock Filled Gabions andMattresses

    Q6, R44,R63

    R57 E1/R3 Jul 15 Design of Reinforced Soil Walls Q6 B80, B115,R58, R63,2380

    [*R57/A*]

    R58 E1/R3 Aug 15 Construction of Reinforced Soil

    Walls (Contractor’s Design)

    Q6, G40,

    G71, R44,R57, B80,B115

    Page 27 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    28/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. NOTE 3: The specifications listed below are Design & Construct (D&C) specifications. For ordinary QA specifications,

    refer to earlier pages. 

    Specification  Refer’d Specifications Comments No.  Edition/ Date Title  (RMS D&C...) [*Annexures to

    RMSD&C... Revision (E.../R...) Mandatory (NOTE 1)  Optional (NOTE 2)   be completed*]

    R63 E2/R0 May 13 Geotextiles (Separation andFiltration)

    Q6

    R64 E1/R1 Nov 12 Soil Nailing Q6, R63,R68, B80,3211

    R40, 3556

    R67 E1/R1 Oct 12 High Strength GeosyntheticReinforcement

    Q6, R44 [*R67/A*]

    R68 E1/R2 Feb 16 Shotcrete Work without SteelFibres

    Q6, G36,3211

    [*R68/A*]

    R71 E1/R2 Jan 14 Construction of Unbound andModified Pavement Course

    Q6, G36,G38, G71,R178, 3051,3211

    R106 orR107

    R73 E2/R0 Aug 15 Construction of Plant MixedHeavily Bound PavementCourse

    Q6, G10,G36, G38,G71, 3051,3211

    R106 orR107, R178

    R75 E2/R0 Aug 15 Insitu Pavement Stabilisationusing Slow Setting Binders

    Q6, G10,G36, G38,G71, R101,3051, 3211

    R106 orR107, R178

    R82 E1/R0 Jun 11 Lean-Mix Concrete Subbase Q6, G36,G71, R83,3211

    R106, 3151,3253, 3254

    [*3151/A*]

    R83 E2/R0 Nov 13 Concrete Pavement Base Q6, G36,G71, R53,R82, 3051,3204, 3211

    R93, R106,B204, 3154,3253, 3254

    R84 E1/R0 Jul 11 Continuously ReinforcedConcrete Base

    Withdrawn;incorporated into R83.

    R90 E1/R0 Jul 11 Roller Compacted ConcreteSubbase

    Q6, 3221 R106, R111,3254

    [*R90/A*]

    R93 E1/R0 Mar 14 Diamond Grinding of ConcretePavement

    Q6, G36 [*R93/A*]

    R101 E1/R0 Jul 11 Cold Milling of Road PavementMaterials

    Q6, G10 R116

    R106 E1/R0 Jul 11 Sprayed Bituminous Surfacing(with Cutback Bitumen)

    Q6, G10,3151, 3253,3258, 3259,3261,

    [*3151/A*]

    R107 E1/R0 Jul 11 Sprayed Bituminous Surfacing(with Polymer Modified Binder)

    Q6, G10,3151, 3252,3268, 3269

    R106, 3253 [*3151/A*]

    R109 E1/R0 Jul 11 Bituminous Slurry Surfacing Q6, G10 3211

    R110 E1/R0 Nov 13 Coloured Surface Coatings forBus Lanes and Cycleways

    Q6, G10,G36

    Page 28 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    29/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. NOTE 3: The specifications listed below are Design & Construct (D&C) specifications. For ordinary QA specifications,

    refer to earlier pages. 

    Specification  Refer’d Specifications Comments No.  Edition/ Date Title  (RMS D&C...) [*Annexures to

    RMSD&C... Revision (E.../R...) Mandatory (NOTE 1)  Optional (NOTE 2)   be completed*]

    R111 E1/R0 Jul 11 Sprayed Bituminous Surfacing(with Bitumen Emulsion)

    Q6, G10,3151, 3254,3258

    3252 [*3151/A*]

    R116 E1/R2 Jul 13 Heavy Duty Dense GradedAsphalt

    Q6, G10,3152, 3153,3154, 3211,3252, 3253

    R101

    R117 E1/R0 Jul 13 Light Duty Dense GradedAsphalt

    Q6, G10,3152, 3153,3211, 3252,3253

    R101, 3154

    R118 E1/R0 Jul 13 Crumb Rubber Asphalt Q6, G10,G22, 3152,3211, 3253,3256, 3259

    R101, R116,R117, 3154

    R119 E1/R0 Jul 11 Open Graded Asphalt Q6, G10,3152, 3211,3252, 3259,3269

    R101, R116 [*R119/A*]

    R121 E2/R0 Jul 13 Stone Mastic Asphalt Q6, G10,3152, 3211,

    3252

    R101, R116,3154, 3259

    or 3269

    For use in trials only

    R131 E1/R0 Jul 11 Guide Posts G36, 3411and/or 3412

    R132 E1/R1 Jul 12 Safety Barrier Systems Q6, G10,G22, G36,G71, R53,3204

    R142 E1/R2 Jun 13 Retroreflective RaisedPavement Markers

    Q6, G10,3354

    R143 E2/R0 Mar 15 Signposting Q6, G10,R53, B240,

    3400

    B80, B200,B204

    R145 E3/R0 Feb 16 Pavement Marking(Performance Based)

    Q6, G10 R110, R142

    R151 E2/R1 Sep 13 Street Lighting Q6, R53,3851

    R152 E1/R1 Jul 14 Roadside Emergency TelephonePillars

    R153 E1/R0 Sep 13 Tunnel and Underpass MainSwitchboard, DistributionBoards and Control Panels

    Q6

    R154 E1/R0 Jul 11 Tunnel and Underpass Electrical

    Services Works

    Q6 [*R154/A*]

    Page 29 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    30/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. NOTE 3: The specifications listed below are Design & Construct (D&C) specifications. For ordinary QA specifications,

    refer to earlier pages. 

    Specification  Refer’d Specifications Comments No.  Edition/ Date Title  (RMS D&C...) [*Annexures to

    RMSD&C... Revision (E.../R...) Mandatory (NOTE 1)  Optional (NOTE 2)   be completed*]

    R155 E1/R0 Oct 13 Design and Construction ofUnderground Cableways

    G36, G38,G73, Q6,R44

    R11, 3051

    R158 E1/R1 Nov 13 Road Tunnel and UnderpassLighting

    Q6

    R160 E1/R0 Oct 13 Closed Circuit TelevisionSystem for BroadbandConnection

    R155, TSI-SP-016,SI/TCS/8

    Withdrawn

    R173 E1/R0 Jul 11 General Concrete Paving Q6, R44,

    R53, 3204R178 E1/R0 Jul 11 Vegetation Q6, R44,

    3254R179

    R179 E1/R1 Mar 15 Landscape Planting Q6, G22,G36

    G10, R178 [*R179/A*]

    R201 E1/R2 Apr 13 Fencing Q6, G22,G71, G36,R44

    R53, R131,R143, 3411,3412

    [*R201/A*]

    R204 E1/R0 Jul 15 Property Adjustments Q6, G22,G36, G38,G71,

    R11, R44,R53, R71,R117, R173,B30, B80,

    B341, 3211

    R271 E2/R2 Nov 13 Design and Construction of Noise Walls

    Q6, G38,G71, G73,R44

    B30, B50,B51, B53,B54, B57,B58, B59,B61, B220,B240, B241,B246, B349,2380

    R272 E1/R0 Jul 14 Automatic Weather Stations Q6

    Page 30 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    31/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

    D&C BRIDGEWORKS SPECIFICATIONS

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. NOTE 3: The specifications listed below are Design & Construct (D&C) specifications. For ordinary QA specifications,

    refer to earlier pages.

    Specification  Refer’d Specifications Comments 

    No.  Edition/ Date Title  (RMS D&C...) [*Annexures toRMS

    D&C...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    B30 E2/R0 Apr 15 Excavation and Backfill forBridgeworks

    G22, G36,G38, G71,Q6, R44

    R63, 3552

    B50 E2/R0 Dec 13 Driven Reinforced ConcretePiles

    Q6, B80,B115, B204,G22

    B30

    B51 E2/R0 Jan 14 Driven Prestressed ConcretePiles

    Q6, B80,B110, B204,

    G22

    B30

    B53 E2/R0 Jan 14 Driven H-Section Steel Piles Q6, B204,G22

    B30

    B54 E2/R0 Feb 14 Driven Tubular Steel Piles Q6, B80,B204, G22

    B30

    B57 E1/R0 May 11 Driven Cast-in-place ConcretePiles

    Q6, B80,G22

    B30

    B58 E2/R0 Mar 14 Bored Cast-in-place ReinforcedConcrete Piles (With PermanentCasing)

    Q6, B80,B204, G22,G36

    B59 E2/R0 Mar 14 Bored Cast-in-place Reinforced

    Concrete Piles (WithoutPermanent Casing)

    Q6, B80,

    G22, G36,3211

    B63

    B61 E2/R0 Mar 14 Driven Composite Piles Q6, B80,B110, B204,G22

    B30

    B63 E1/R0 May 11 Concrete Injected (CFA) Piling Q6, B80,G22

    B80 E2/R4 Jul 13 Concrete Work for Bridges Q6, G36,G71, B204,3211

    B58, B59,B110, B113,B115, B170,B240, B312

    [*B80/A*]

    B82 E1/R2 Feb 16 Shotcrete Work G36, Q6,3211

    [*B82/A*]

    B110 E1/R0 Jun 11 Supply of Pretensioned PrecastConcrete Members

    Q6, B80

    B113 E1/R0 Jun 11 Post-Tensioning of Concrete Q6, B80 B119

    B114 E1/R1 Apr 12 Ground Anchors G36, Q6,3211

    B115 E1/R0 Jun 11 Precast Concrete Members(Not Pretensioned)

    Q6, B80

    B150 E1/R0 Jun 11 Erection of Pretensioned PrecastConcrete Members

    Q6, G71,B110

    B152 E1/R0 Jun 15 Incrementally LaunchedPrestressed Concrete Girders

    Q6, B80,B113, B281

    [*B152/A*]

    Page 31 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    32/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. NOTE 3: The specifications listed below are Design & Construct (D&C) specifications. For ordinary QA specifications,

    refer to earlier pages.

    Specification  Refer’d Specifications Comments No.  Edition/ Date Title  (RMS D&C...) [*Annexures to

    RMSD&C... Revision (E.../R...) Mandatory (NOTE 1)  Optional (NOTE 2)   be completed*]

    B153 E1/R0 Jun 11 Erection of Precast ConcreteMembers (Not Pretensioned)

    Q6, G71,B80, B115,B284

    B150, R132

    B170 E1/R0 Jun 11 Supply and Installation of VoidFormers

    Q6

    B200 E1/R0 Jun 11 Fabrication of Major SteelStructural Members

    Q6, B204,B220

    B260

    B204 E1/R0 Jun 11 Welding of Bridges and OtherRoad Structures

    Q6

    B220 E1/R2 Nov 13 Protective Treatment of BridgeSteelwork.

    Q6, G22,3651

    B223, B240

    B240 E2/R0 Aug 12 Supply of Bolts, Nuts, Screwsand Washers

    Q6, B241 [*B240/A*]

    B241 E1/R3 Oct 13 Manufacture and Supply ofMinor Steel Items

    Q6 B220

    B242 E1/R0 Jun 11 Manufacture and Supply ofAluminium Barriers

    Q6

    B245 E1/R0 Jun 11 Fabrication of AluminiumStructural Members

    Q6 B261 [*B245/A*]

    B246 E1/R0 Jun 11 Manufacture and Supply of

    Minor Aluminium Items

    Q6

    B260 E1/R0 Jun 11 Erection of Structural Steelwork Q6, B204

    B261 E1/R0 Jun 11 Erection of StructuralAluminium

    Q6, B240

    B264 E1/R0 Jun 11 Erection of Barrier Railings andMinor Components

    Q6, B345

    B280 E1/R1 Jul 12 Unreinforced ElastomericBearing Pads and Strips

    Q6, B284

    B281 E1/R1 Jul 12 Laminated Elastomeric Bearings Q6, B284

    B282 E1/R1 Jul 12 Pot Bearings – Structural Steel Q6, B240,B284, B310

    [*B282/A*]

    B283 E1/R0 Jun 11 Pot Bearings – Stainless Steel Q6, B240,B284, B310

    B284 E1/R1 Sep 12 Installation of Bridge Bearings Q6, G71 B80, B150,B241, B260

    B310 E1/R1 Jul 12 Compression Seal ExpansionJoints

    Q6

    B312 E1/R2 Dec 13 Cold Applied Elastomeric JointSealants

    Q6

    B315 E1/R1 Jul 12 Elastomeric Strip SealExpansion Joints

    Q6, B241 orB246

    B316 E1/R0 Jun 11 Modular Bridge ExpansionJoints Q6, B204,B220, B240,B282, B315

    [*B316/A*]

    Page 32 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    33/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. NOTE 3: The specifications listed below are Design & Construct (D&C) specifications. For ordinary QA specifications,

    refer to earlier pages.

    Specification  Refer’d Specifications Comments No.  Edition/ Date Title  (RMS D&C...) [*Annexures to

    RMSD&C... Revision (E.../R...) Mandatory (NOTE 1)  Optional (NOTE 2)   be completed*]

    B318 E1/R0 Jun 11 Bonded Metal-ElastomerExpansion Joints

    Q6

    B319 E1/R0 Jun 11 Proprietary AluminiumExpansion Joints

    Q6

    B343 E1/R0 Jul 14 Preformed and Liquid AppliedWaterproofing MembraneSystems

    Q6, G22,G36, G38,B80

    R101

    B344 E1/R2 Jul 14 Sprayed BituminousWaterproofing Membranes

    Q6, G22,G36, G38,R106 or

    R107, 3151,3261

    3252, 3253,3268, 3269

    B345 E1/R1 Jul 12 Supply of Bridge Nameplates Q6

    B349 E1/R0 Jul 12 Supply of Precast Concrete Noise Walls (Not Pretensioned)

    Q6, B80 B59, R271

    Page 33 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    34/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

    D&C MATERIALS SPECIFICATIONS

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. NOTE 3: The specifications listed below are Design & Construct (D&C) specifications. For ordinary QA specifications,

    refer to earlier pages. 

    Specification  Refer’d Specifications Comments 

    No.  Edition/ Date Title  (RMS D&C...) [*Annexures toRMS

    D&C...Revision (E.../R...)

    Mandatory (NOTE 1) 

    Optional (NOTE 2) 

     be completed*]

    3051 E1/R2 Nov 14 Granular Base And SubbaseMaterials for Surfaced RoadPavements

    Q6 R71, R73,R75, R76,3153, 3154

    [*3051/A*]

    3071 E1/R2 May 13 Selected Material for Formation Q6 [*3071/A*]

    3151 E1/R0 Jun 11 Cover Aggregate for SprayedBituminous Surfacing

    Q6 3258, 3259,3268, 3269

    [*3151/A*]

    3152 E1/R3 Jul 15 Aggregates for Asphalt Q6 R121 [*3152/A*]

    3153 E1/R0 Jun 11 Reclaimed Asphalt PavementMaterial

    Q6 3152

    3154 E1/R0 Jun 11 Granulated Glass Aggregate Q6

    3202 E1/R0 Jun 11 Wax Emulsion Concrete CuringCompound

    3204 E1/R0 Jun 11 Preformed Joint Fillers forConcrete Road Pavements andStructures

    3211 E1/R4 Sep 15 Cements, Binders and Fillers B80, B82,R50, R53,R68, R71,R73, R75,

    R82, R83,R90, R116,R119, R121,R123, R132,3221, 3222,3266

    3221 E1/R0 Jun 11 Roller Compacted Concrete Q6, 3211

    3222 E1/R0 Jun 11  No Fines Concrete (forSubsurface Drainage)

    Q6, 3211

    3252 E2/R0 Jul 14 Polymer Modified Binder forPavements

    Q6 3256

    3253 E2/R1 Jul 14 Bitumen for Pavements Q6

    3254 E1/R0 Jun 11 Bitumen Emulsion Q6

    3256 E1/R0 Jun 11 Comminuted Scrap Rubber Q6

    3258 E1/R0 Jun 11 Aggregate Precoating Agent(for Bitumen)

    Q6

    3259 E1/R0 Jun 11 Bitumen Adhesion Agent(for Bitumen)

    Q6

    3261 E1/R0 Jun 11 Cutback Bitumen Q6

    3263 E1/R0 Oct 13 Hot Poured Elastomeric JointSealant for Roads

    Q6

    3268 E1/R0 Jun 11 Aggregate Precoating Agent (for

    Polymer Modified Binder)

    Q6

    3269 E1/R0 Jun 11 Bitumen Adhesion Agent (forPolymer Modified Binder)

    Q6

    Page 34 of 35  ROADS AND MARITIME SERVICES 25 February 2016

  • 8/18/2019 RMS Australian NSW QA Specifications List

    35/35

    RMS MODEL CONTRACT DOCUMENTS AND SPECIFICATIONS LIST

     NOTE 1: The specifications listed in the “Mandatory” column must be included in the Tender Documents. NOTE 2: The specifications listed in the “Optional” column must be reviewed for relevance to the proposed works, and

    relevant specifications must be included in the Tender Documents. NOTE 3: The specifications listed below are Design & Construct (D&C) specifications. For ordinary QA specifications,

    refer to earlier pages. 

    Specification  Refer’d Specifications Comments No.  Edition/ Date Title  (RMS D&C...) [*Annexures to

    RMSD&C... Revision (E.../R...) Mandatory (NOTE 1)  Optional (NOTE 2)   be completed*]

    3351 E1/R0 Jun 11 Road Marking Paint

    3352 E1/R0 Jun 11 Fluorescent Plastic TrafficCones

    3353 E1/R0 Jun 11 Glass Beads (for Application toRoad Marking Materials)

    3354 E1/R0 Jun 11 Adhesives for Raised PavementMarker Installation

    3357 E1/R0 Jun 11 Thermoplastic Road MarkingMaterial

    3359 E1/R0 Jun 11 Profile Thermoplastic RoadMarking Material

    3360 E1/R0 Jun 11 Two Part Cold Applied RoadMarking Material

    3353,TTT-037

    3385 E1/R0 Jun 11 Barrier Boards

    3400 E2/R2 Mar 15 Manufacture and Delivery ofRoad Signs

    Q6

    3411 E1/R0 Jun 11 Supply of Guide Posts (Timber) R131

    3412 E1/R0 Jun 11 Supply of Guide Posts (Non-Timber)

    3552 E1/R0 Jun 11 Subsurface Drainage Pipe

    (Corrugated Perforated and Non-Perforated Plastic)

    Q6

    3553 E1/R0 Jun 11 Seamless Tubular Filter Fabric Q6

    3555 E1/R0 Jun 11 Subsurface Drainage Pipe(Slotted and Unslotted Fibre-Reinforced Concrete)

    Q6

    3556 E1/R1 Nov 12 Rigid Strip Filter Drains Q6 3552

    3557 E1/R0 Nov 12 Flexible Strip Filter Drains Q6, R63

    3580 E1/R0 Jun 11 Aggregate Filter Materials forSubsurface Drainage

    Q6

    3651 E1/R0 Jun 11 Paints and Thinners forSteelwork

    3851 E2/R1 Jan 13 Steel Tapered Lighting Columns Q6, B240