What is Rubblizing? The Process of Fracturing Pavement of Portland Cement

Concrete into Angular Pieces for Direct Overlay

Page 3: RMI DOT Presentation
Page 4: RMI DOT Presentation

Application of Recycling the Concrete Pavement (Rubblizing)

Environmentally Friendly Construction

Page 5: RMI DOT Presentation

5

1

4

3

2

PSI

Number of Years

Reflection: Evolution of the Deterioration

Quality of the Road

Page 6: RMI DOT Presentation

5

1

4

3

2

PSI

Number of Years

Quality of the Road

Rehabilition of Concrete Pavement

Page 7: RMI DOT Presentation

Rubblizing

Rehabilition of Concrete Pavement

Page 8: RMI DOT Presentation

Rubblizing

Rehabilition of Concrete Pavement

Page 9: RMI DOT Presentation

Rubblizing

Rehabilition of Concrete Pavement

Page 10: RMI DOT Presentation

Structural Design: Correlations

Structural Failure Reflective Cracking100

0

Prob

abili

tyof

Fail

ure

Low PCC Modulus HighSmall Nominal Fragment Size Large

Target Zone

Structural Failure Reflective Cracking100

0

Prob

abili

tyof

Fail

ure

Low PCC Modulus HighSmall Nominal Fragment Size Large

Target Zone1 to 8”

Page 11: RMI DOT Presentation

DESCRIPTION OF TECHNICAL RUBBLIZING

Page 12: RMI DOT Presentation

Description of Rubblizing Equipment

Pedestal / Shoe

Resonant Beam

Weight

Flotation Tires

MotorComputer Controls

Page 13: RMI DOT Presentation

Description of Resonant Beam

Frequency 44 Hz Amplitude 3/4”

Vibration TechnologyWeight

Page 14: RMI DOT Presentation

Vibration TechnologyWeight

Frequency 44 Hz Amplitude 3/4”

Description of Resonant Beam

Page 15: RMI DOT Presentation

Frequency 44 Hz Amplitude 3/4”

Vibration TechnologyWeight

Description of Resonant Beam

Page 16: RMI DOT Presentation

Operational Data of Equipment• Strikes PCC 44 Times per Second• 2,000 lbs. of Pressure Per Strike• Beam Weighs 4080 kg.• Raises 3/4” Per Strike• Machine Speed at Approx. 4-5 mph• Breaking Area is 10” Wide• Average Rubblized Per Day: 7,000 sq. yd

Page 17: RMI DOT Presentation

STRUCTURAL DESIGN

Page 18: RMI DOT Presentation

Structural Design: Methods AASHTO – Procedure Design (SN) Asphalt Institute – Series Manuals (MS) -17 NAPA – Series Information (IS) –117 Airfield Asphalt Pavement Technology Program - AAPTP

Page 19: RMI DOT Presentation

Structural Design: State Studies

Over 20 Studies from Multiple States support that rubblizing provides:

Long life for surfaces – 22+ yearsSmooth driving conditionsRubblization eliminates reflective cracking and dramatically reduces surface defects

Alabama

Michigan

Page 20: RMI DOT Presentation

Pavement after years of use and deterioration.

Expert analysis is required to insure that the cause of the failure of the pavement.

If the Damage does Not arise the Subgrade or Sub-Base Problems, Pavement is a Candidate for Rubblization.

If the Subgrade has Problems,

Rubblization will Not Eliminate the Issue.

Structural Design: Evaluation

Page 21: RMI DOT Presentation

Structural Design: Drainage

Proper Drainage System should be Installed or Repaired Prior to Rubblizing the Pavement.

Varying Methods of Drainage can be Used Depending on the Site.

Page 22: RMI DOT Presentation

Structural Design: Drainage

10 cm open-graded5 cm dense-graded

# 57 Stone

3 % Slope Outlet

Filter Fabric

Shoulder Area

Rubblized PCC

Base Course

Subgrade

Permeable Zone

Relief Cut @ 9-12 m.

Page 23: RMI DOT Presentation

The Modulus of the Rubblized Concrete depends on the Thickness, Subbase and Subgrade. Typically Rubblized Concrete is 2.5 Times Stronger than any Granular Material.

E1

E3 > E2

E4 > E3

Where E3 = f(E2)

Where E2 = f(E1)E2 > E1Subbase

Subgrade

Structural Design: Scope

Page 24: RMI DOT Presentation

Coefficient Structure (ai) vs. Modulus (Mr) AASHTO

Structural Design: Coorelations

Page 25: RMI DOT Presentation

CONSTRUCTION

PROCESS

Page 26: RMI DOT Presentation

Rubblizing ProcessThree Stages of Construction:

Rubblizing Rolling Asphalt Overlay

Page 27: RMI DOT Presentation

Prior to Rubblizing Process

Repair or Replace Drainage System

Remove any Asphalt Overlay Currently in Place

Page 28: RMI DOT Presentation

Resonant Rubblizing Capable of Rubblizaing up to 26 inches Ideal Distance Per Run - One Mile / One Lane Wide Speed of Resonant Machine 4 to 5 mph

Page 29: RMI DOT Presentation

Test Pit

Confirm Specification and Debonding

Page 30: RMI DOT Presentation

Wright Patterson

Page 31: RMI DOT Presentation

10 Ton High Frequency, Low Amplitude Steel Drum Roller (3 Passes) Only Equipment Necessary After Rubblization Not Recommended to Drive on Prior to Asphalt Overlay

Rolling

Page 32: RMI DOT Presentation

Asphalt Layer Leveling Course on First Lift with Ability to Open Traffic No Primer Required on Rubblized Layer Minimum of 5 inches of Asphalt Overlay

Page 33: RMI DOT Presentation

Next Day - Open Traffic

Page 34: RMI DOT Presentation

Recommended State Specification High Frequency Low Amplitude Resonant Breaker

Resonant Breaker shall apply 2,000 lbs of pressure per strike at 44 hertz

Removal of any Existing Asphalt Overlay

Majority of Particle Size of Less than 6 Inches

Maximum Particle Size of 8 Inches

10 Ton High Frequency - Low Amplitude Vibratory Roller

3 Passes with Maximum Speed of 6 Feet per Second

Minimum of 80% Debonding of Existing Steel Reinforcing

No Traffic on Rubblized Slab Until First Lift is Placed

Minimum of 5 inches of Hot Mix Asphalt Overlay

Page 35: RMI DOT Presentation

Results – 22 Year Road