River Road Meeting 6-24-04
Transcript of River Road Meeting 6-24-04
River Road AreaRiver Road AreaSewer ImprovementsSewer Improvements
Neighborhood Advisory Committee
June 24, 2004
Today’s MeetingToday’s Meeting
• Program Overview – Video
• Role of the Committee
• Sanitary Sewer Overflows
• River Road Projects
• Next Meeting Date
Role of the CommitteeRole of the Committee
• Provide input and feedback
• Independent and objective review
• Serve for duration of projects
What You Can DoWhat You Can Do
• Listen to the presentations and issues that are presented to you
• Offer your honest opinions on the issue
• Work with us to help find constructive solutions
• Help educate others on the project
Sanitary Sewer OverflowsSanitary Sewer Overflows
• Nine Sanitary Sewer Overflows in Toledo• 4 in the River Road Area• 2 in the Parkside Area• 3 in Point Place
• Must be eliminated by November of 2006• Stiff penalties for missed deadlines
Past & Ongoing River Past & Ongoing River Road Area ProjectsRoad Area Projects• Sanitary sewer study – 2000/2001
• Storm sewer study – 2002/2003
• Sewer lining – 2002/ongoing
• Copland storm sewer – 2002
• Beverly/Medford storm sewer – 2004/ongoing
Proposed River Road Proposed River Road Area ProjectsArea Projects• Underground Equalization Basin – Brookford
Park
• Underground Pump Station – Brookford Park
• New Force Main Sewer – Brookford
• New Relief Sewer– Beverly and River Road
• Beverly Pump Station – West of Trail
River Road SSOsRiver Road SSOs
(insert map showing locations)
Project SchedulesProject Schedules
• Projects will be built concurrently
• Construction bids – October/November 2004
• Break Ground – Early 2005
• Completed by November 2006
Equalization BasinEqualization Basin
• Designed to eliminate need to discharge raw sewage into the Maumee River during heavy rains.
• Will hold wastewater at “peak” times when flow of waste exceeds sewer system capacity.
• When the rain lets up, wastewater in the basin sent to plant for treatment
Equalization BasinEqualization Basin
• Underground facility
• To be located at Brookford Park ball diamond site• Tanks from old Toledo Water Plant currently
located there
• 3 million gallon storage capacity
• 120 ft. x 240 ft.
• 17 ft. deep
Equalization BasinEqualization Basin
EQ Basin EQ Basin Issues & DiscussionIssues & Discussion• Construction
Access Road• From River Road
to site (between playgrounds)
• Reduces amount of construction equipment entering site from Brookford
• Could disrupt playground areas
Issues and DiscussionIssues and Discussion
• Baseball field• Will be lost for one season due to construction• Alternative options for replacement of the field
Brookford Park Brookford Park Pump StationPump Station• Located next to
Equalization Basin
• Bulk of facility underground
• Control panel above ground
• Will pump waste from River Road sewer to equalization basin
Beverly Pump StationBeverly Pump Station
• Underground – with control panel(s) above ground
• Will pump waste from Beverly sewer to new EQ basin
Force Main SewerForce Main Sewer
• New sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the Equalization Basin
• To be located on south side of Brookford
• Shouldn’t disturb street – except for crossings at OLPH and Island Avenue
• Traffic maintained• Will work with committee to minimize disruption
New Relief SewersNew Relief Sewers
• From River Road, Midland or Hemlock down River Road to Brookford
• New water line will be installed at same time• Should help resolve water pressure problems
• Preferred sewer location is in east lane of River Road
• Discussion
New Relief SewersNew Relief Sewers
• On Beverly from Brookford to Medford
• Both relief sewer lines should help alleviate basement flooding in area
Future MeetingsFuture Meetings
• Next meeting date?
• Best time and location?