3m
3.5m
3m
0.5m
410.000
420.000
430.000
440.000
450.000
460.000
470.000
480.000
490.000
500.000
510.000
520.000
530.000
540.000
550.000
New pedestrian refuge, old
pedestrian refuge to be
removed at start of works to
provide construction space.
New pedestrian refuge, old pedestrian
refuge to be removed at start of works
to provide construction space.
New bus stop safe haven
platform to SD04-023
New 3.5m wideshared use cycleway
New 3.5m wide cycleway shared use
3.13m
2.95m
3.13m
3.13m
3.21m
2.83m
L
P
R
S
R
S
R
S
T
2
5
T
2
6
T
2
7
T
3
9
T
4
0
5.2
6m
6.21m
3.7m
4.52m
3.51m
550.000
560.000
570.000
580.000
590.000
600.000
610.000
620.000
630.000
640.000
650.000
660.000
670.000
680.000
690.000
New carraigeway widening into existing
footway. Utilities to be diverted, refer to
2700 series drawings. New raised table.
New pedestrian refuge with
4m wide crossing point.
New 2m long full height
bus boarder 180mm high.
New cycleway wider at this
point to provide visibility.
New pedestrian refuge, old pedestrian
refuge to be removed at start of works
to provide construction space.
New bus stop safe haven
platform to SD04-023
New wide cycleway. Cycleway to be
constructed with a widened taper,
New kerbs and
topsoil at new level.
New kerbs and
topsoil at new level
New raised table
New kerbs and
topsoil at new level.
3.46m
3.65m
L
P
R
S
R
S
R
S
R
S
R
S
R
S
R
S
R
S
R
S
Cycleway Construction
Carriageway construction
Driveway Crossover Construction
Tactile Paving
Grass verge
KEY
BCC Standard Bus Stop Safe
Haven Detail to SD-004-023D
Tree soil areas
Raised table surfacing
Raised table and new
carriageway construction
Carriageway
Resurfacing
Footway construction
Existing gully to be adjusted
New Gully
New concrete post and chainlink fence
New guard rail (Visirail type)
Cycle tactile paving
New corduroy tactile paving (buff)
B L
OTSIR
LC
CYTI
O U NCI
Rev. Date Description By
Project
Title
Client
Drawn by
Date Drawn
Scale
Checked by
Date Issued
Issued byStatus
Project Number
-Drawing
-Revision
PO Box 3176, Bristol. BS3 9FS
CITY DESIGNENGINEERING
DESIGN
TENDER
A4174 Airport RoadLGF/Challenge PedestrianCycling Scheme 2018
General Arrangement
Sheet 2 of 5
Sustainable TransportTransport - GROWTH AND REGENERATIONSK
MRB
July 18
1:200 @ A1
JG
Aug 18
JDS
E17037-02 T0122 A
A 24/01/19 Scheme extents revised JDS