Risk Management ProjectSurvey’s preliminary results
Face to face meeting MCOFE
Warsaw 28 May 2015
Fabrizio Rotundi
![Page 2: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/2.jpg)
Page 2
Nov ‘14 Dec ‘14
Mar ‘15
May ‘15
Sep ‘15
ANALYSIS DESIGN
QUALITY & REPLICATION
CRITERIA SETTING
RISK MANAGEMENT PRACTICE SURVEY
DATA ANALYSIS & COMPARISON
« BEST PRACTICE » PROCESSING
GUIDELINES MAKE UP
Template
Framework
Survey output
Benchmark analysis
Best practice
Guidelines
DEADLINE STEPS OUTPUTS
QU
ALIT
YR
EP
LIC
AB
ILIT
YA
NA
LYS
IS
Nov ‘15
Road map proposal for developing Risk Management among NSIs
![Page 3: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/3.jpg)
Page 3
Reading-key Criteria
Project’s subdivisions and links between output’s variables
3 READING-KEY CRITERIA
To analyse the experiences
2 PARAMETERS To elaborate the questionnaire
SEVERAL FACTORS describing each parameter To set the questions
![Page 4: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/4.jpg)
Page 4
Track 1 - Defining the Template’s Reading-Key Criteria
The Reading-Key Criteria are the lens to analyze the experiences through
2. The “Uncertainty experts” dimension refers to the actors, roles, organizational units or
structures to which the organization assigns the responsibility to conceptualize and
control uncertainty and, consequently, the responsibility for Risk Management.
3. The “Technologies” dimension reveals the extent to which the Risk Management
System becomes embedded or decupled in the organization and refers to the practices,
procedures and tools adopted by an organization to implement Risk Management.
1. The “Risk rationalities” dimension
reflects the main purpose which any
organization grounds its own risk
strategy on (i.e. compliance,
performance, company value, etc.).
The Template
![Page 5: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/5.jpg)
Page 5
Track 2 – Describing the Parameters which guide the Questionnaire
a) Level of effectiveness in context analysis and of consistency with identified risks
b) Cost planning levelc) Level of consistency with the statistics
production Quality modeld) Thoroughness level in implementing a
Risk Management practicee) Etc. etc.
Qualitya) Accordance level with international
standardsb) Financial sustainabilityc) Detection of key steps resulting from
a thorough and methodical application of Risk Management
d) Etc. etc.
Replication
Questionnaire
![Page 6: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/6.jpg)
Page 6
Integrated Common Framework
From the Model
General Overarching Processes
To the Standardized process
GSBPM 5.0
By the Tool
Risk Management System
The organisational Risk Management encourages practices based on the early planning of activities, anticipating possible obstacles in achieving objectives, instead of the logic of urgency.
![Page 7: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/7.jpg)
Page 7
Survey’s statistical analysis
Range of responses Sect. 1 Sect. 2 Sect. 3 Sect. 4 TOTAL
100% 14,7% 0,0% 0,0% 8,8% 0,0%
75% - 99,9% 52,9% 20,6% 2,9% 38,2% 29,4%
50% - 74,9% 0,0% 35,3% 35,3% 20,6% 38,2%
25% - 49,9% 0,0% 11,8% 29,4% 0,0% 0,0%
0,1% - 24,9% 32,4% 0,0% 2,9% 0,0% 32,4%
0% - 0,09% 0,0% 32,4% 29,4% 32,4% 0,0%
TOTAL 100,0% 100,0% 100,0% 100,0% 100,0%
Involved Institutes and Organizations 64
Respondents 34
Overall Redemption 53,1%
Anonymous 5
Double responses 2
Total of valid responses 29
Redemption of valid responses 45,3%
Countries recognizable 27
Redemption of countries recognizable 42,2%
![Page 8: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/8.jpg)
Page 8
Survey’s statistical analysis
![Page 9: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/9.jpg)
Page 9
Survey’s statistical analysis
![Page 10: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/10.jpg)
Page 10
Survey’s statistical analysis
![Page 11: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/11.jpg)
Page 11
Survey’s statistical analysis
![Page 12: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/12.jpg)
Page 12
Survey’s statistical analysis
![Page 13: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/13.jpg)
Page 13
Survey’s statistical analysis
![Page 14: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/14.jpg)
Page 14
Strategy
![Page 15: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/15.jpg)
Page 15
Experiences
![Page 16: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/16.jpg)
Page 16
Governance
![Page 17: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/17.jpg)
Page 17
Impacts on organization
![Page 18: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/18.jpg)
Page 18
Communication
![Page 19: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/19.jpg)
Page 19
Functions and Accountabilities
![Page 20: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/20.jpg)
Page 20
Stakeholders Involvement
![Page 21: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/21.jpg)
Page 21
Treatment and monitoring
![Page 22: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/22.jpg)
Page 22
Internal Environment
![Page 23: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/23.jpg)
Page 23
Growth and training
![Page 24: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/24.jpg)
Page 24
Mapping Organization
![Page 25: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/25.jpg)
Page 25
Resources
![Page 26: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/26.jpg)
Page 26
Example of conceptual map: Rationalities
![Page 27: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/27.jpg)
Page 27
Example of conceptual map: Uncertainty Experts
![Page 28: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/28.jpg)
Page 28
Example of conceptual map: Technologies
![Page 29: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/29.jpg)
Page 29
The expected outcomes
1. Building and sharing questionnaire (2nd half of February)
2. Survey (8th of April)
3. Collecting data (15th of May)
4. Data Analysis & Report processing (end of June 2015)
5. Program implementation case studies (max 3) analysis (July-Sept)
6. Development of guidelines (September)
7. Sharing of Guidelines final draft (End of October)
![Page 30: Risk Management Project Survey’s preliminary results Face to face meeting MCOFE Warsaw 28 May 2015 Fabrizio Rotundi.](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f2c5503460f94c46dfc/html5/thumbnails/30.jpg)
Page 30
Thank you for your attention !!!
Fabrizio ROTUNDI
Alessandro HINNA