Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 ·...

21
Risk Issue 3: Protection Systems Jessica Bian, Director of Performance Analysis, NERC Reliability Issues Steering Committee Meeting January 24, 2013

Transcript of Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 ·...

Page 1: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

Risk Issue 3 Protection Systems

Jessica Bian Director of Performance Analysis NERC Reliability Issues Steering Committee Meeting January 24 2013

2 RELIABILITY | ACCOUNTABILITY

Topics

bull Risk Measures

bull Supporting Data

bull Risk Analysis

Identifying patterns and risk issues

Reliability improving or deteriorating

Quantitatively improving reliability

bull Gaps and IncrementalNew Efforts

3 RELIABILITY | ACCOUNTABILITY

Risk Measures

4 RELIABILITY | ACCOUNTABILITY

Risk Measures

Event Driven Index (EDI)

Measures Risk from

Major System Events

Key Compliance Monitoring Index (KCMI) Measures Risks from Severe Impact Violations

Condition Driven Index (CDI)

Monitors Risk from

Key Reliability Metrics

Based on event severity risk index (SRI) values and turns into an availability index

Identify a subset of standards that have highest impact to reliability and create an index of standards compliance

Uses the roster of reliability

metrics developed by

RMWGPAS and approved by

OCPC

5 RELIABILITY | ACCOUNTABILITY

SRI and EDI

Likelihood

Impact

Avoid and

Mitigate

Learn and

Reduce

Accept

Reporting Threshold

Inverse CostBenefit

High Impact Low

Frequency (including

CIP)

Severity Risk Index (SRI) Curve

30

1060

SRI Component Weighting

Transmission Lines LostGeneration LostLoss of Load

6 RELIABILITY | ACCOUNTABILITY

Yearly SRI

NERC Annual Daily Severity Risk Index (SRI) Sorted Descending with Historic Benchmark Days

1029

22

827 427

98 828

630 44 711

428

7 RELIABILITY | ACCOUNTABILITY

Tiered Approach

View trends at httpwwwnerccompagephpcid=4|331

8 RELIABILITY | ACCOUNTABILITY

Reliability Metrics

ALR 1-3 Reserve Margin

ALR 1-4 BPS Transmission Related Events Resulting in Loss of Load

ALR 2-4 Disturbance Control Standard Failures (DCS Failures)

ALR 2-5 Disturbance Control Events Greater than Most Severe Single Contingency (MSSC)

ALR 3-5 IROLSOL Exceedance

ALR 4-1 Protection System Misoperations

ALR 6-1 Transmission Constraint Mitigation

ALR 6-2 Energy Emergency Alert 3 (EEA 3)

ALR 6-3 Energy Emergency Alert 2 (EEA 2)

9 RELIABILITY | ACCOUNTABILITY

Reliability Metrics (contrsquod)

ALR1-5 System Voltage Performance

ALR1-12 Interconnection Frequency Response

ALR2-3 UFLS and UVLS Usage

ALR6-11 Automatic AC Transmission Outages Initiated by Failed Protection System Equipment

ALR6-12 Automatic AC Transmission Outages Initiated by Human Error

ALR6-13 Automatic AC Transmission Outages Initiated by Failed AC Substation Equipment

ALR6-14 Automatic AC Circuit Outages Initiated by Failed AC Circuit Equipment

ALR 6-15 Element Availability Percentage

ALR 6-16 Transmission System Unavailability due to Automatic Outages

10 RELIABILITY | ACCOUNTABILITY

Supporting Data

11 RELIABILITY | ACCOUNTABILITY

Supporting Data

12 RELIABILITY | ACCOUNTABILITY

Risk Analysis

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 2: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

2 RELIABILITY | ACCOUNTABILITY

Topics

bull Risk Measures

bull Supporting Data

bull Risk Analysis

Identifying patterns and risk issues

Reliability improving or deteriorating

Quantitatively improving reliability

bull Gaps and IncrementalNew Efforts

3 RELIABILITY | ACCOUNTABILITY

Risk Measures

4 RELIABILITY | ACCOUNTABILITY

Risk Measures

Event Driven Index (EDI)

Measures Risk from

Major System Events

Key Compliance Monitoring Index (KCMI) Measures Risks from Severe Impact Violations

Condition Driven Index (CDI)

Monitors Risk from

Key Reliability Metrics

Based on event severity risk index (SRI) values and turns into an availability index

Identify a subset of standards that have highest impact to reliability and create an index of standards compliance

Uses the roster of reliability

metrics developed by

RMWGPAS and approved by

OCPC

5 RELIABILITY | ACCOUNTABILITY

SRI and EDI

Likelihood

Impact

Avoid and

Mitigate

Learn and

Reduce

Accept

Reporting Threshold

Inverse CostBenefit

High Impact Low

Frequency (including

CIP)

Severity Risk Index (SRI) Curve

30

1060

SRI Component Weighting

Transmission Lines LostGeneration LostLoss of Load

6 RELIABILITY | ACCOUNTABILITY

Yearly SRI

NERC Annual Daily Severity Risk Index (SRI) Sorted Descending with Historic Benchmark Days

1029

22

827 427

98 828

630 44 711

428

7 RELIABILITY | ACCOUNTABILITY

Tiered Approach

View trends at httpwwwnerccompagephpcid=4|331

8 RELIABILITY | ACCOUNTABILITY

Reliability Metrics

ALR 1-3 Reserve Margin

ALR 1-4 BPS Transmission Related Events Resulting in Loss of Load

ALR 2-4 Disturbance Control Standard Failures (DCS Failures)

ALR 2-5 Disturbance Control Events Greater than Most Severe Single Contingency (MSSC)

ALR 3-5 IROLSOL Exceedance

ALR 4-1 Protection System Misoperations

ALR 6-1 Transmission Constraint Mitigation

ALR 6-2 Energy Emergency Alert 3 (EEA 3)

ALR 6-3 Energy Emergency Alert 2 (EEA 2)

9 RELIABILITY | ACCOUNTABILITY

Reliability Metrics (contrsquod)

ALR1-5 System Voltage Performance

ALR1-12 Interconnection Frequency Response

ALR2-3 UFLS and UVLS Usage

ALR6-11 Automatic AC Transmission Outages Initiated by Failed Protection System Equipment

ALR6-12 Automatic AC Transmission Outages Initiated by Human Error

ALR6-13 Automatic AC Transmission Outages Initiated by Failed AC Substation Equipment

ALR6-14 Automatic AC Circuit Outages Initiated by Failed AC Circuit Equipment

ALR 6-15 Element Availability Percentage

ALR 6-16 Transmission System Unavailability due to Automatic Outages

10 RELIABILITY | ACCOUNTABILITY

Supporting Data

11 RELIABILITY | ACCOUNTABILITY

Supporting Data

12 RELIABILITY | ACCOUNTABILITY

Risk Analysis

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 3: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

3 RELIABILITY | ACCOUNTABILITY

Risk Measures

4 RELIABILITY | ACCOUNTABILITY

Risk Measures

Event Driven Index (EDI)

Measures Risk from

Major System Events

Key Compliance Monitoring Index (KCMI) Measures Risks from Severe Impact Violations

Condition Driven Index (CDI)

Monitors Risk from

Key Reliability Metrics

Based on event severity risk index (SRI) values and turns into an availability index

Identify a subset of standards that have highest impact to reliability and create an index of standards compliance

Uses the roster of reliability

metrics developed by

RMWGPAS and approved by

OCPC

5 RELIABILITY | ACCOUNTABILITY

SRI and EDI

Likelihood

Impact

Avoid and

Mitigate

Learn and

Reduce

Accept

Reporting Threshold

Inverse CostBenefit

High Impact Low

Frequency (including

CIP)

Severity Risk Index (SRI) Curve

30

1060

SRI Component Weighting

Transmission Lines LostGeneration LostLoss of Load

6 RELIABILITY | ACCOUNTABILITY

Yearly SRI

NERC Annual Daily Severity Risk Index (SRI) Sorted Descending with Historic Benchmark Days

1029

22

827 427

98 828

630 44 711

428

7 RELIABILITY | ACCOUNTABILITY

Tiered Approach

View trends at httpwwwnerccompagephpcid=4|331

8 RELIABILITY | ACCOUNTABILITY

Reliability Metrics

ALR 1-3 Reserve Margin

ALR 1-4 BPS Transmission Related Events Resulting in Loss of Load

ALR 2-4 Disturbance Control Standard Failures (DCS Failures)

ALR 2-5 Disturbance Control Events Greater than Most Severe Single Contingency (MSSC)

ALR 3-5 IROLSOL Exceedance

ALR 4-1 Protection System Misoperations

ALR 6-1 Transmission Constraint Mitigation

ALR 6-2 Energy Emergency Alert 3 (EEA 3)

ALR 6-3 Energy Emergency Alert 2 (EEA 2)

9 RELIABILITY | ACCOUNTABILITY

Reliability Metrics (contrsquod)

ALR1-5 System Voltage Performance

ALR1-12 Interconnection Frequency Response

ALR2-3 UFLS and UVLS Usage

ALR6-11 Automatic AC Transmission Outages Initiated by Failed Protection System Equipment

ALR6-12 Automatic AC Transmission Outages Initiated by Human Error

ALR6-13 Automatic AC Transmission Outages Initiated by Failed AC Substation Equipment

ALR6-14 Automatic AC Circuit Outages Initiated by Failed AC Circuit Equipment

ALR 6-15 Element Availability Percentage

ALR 6-16 Transmission System Unavailability due to Automatic Outages

10 RELIABILITY | ACCOUNTABILITY

Supporting Data

11 RELIABILITY | ACCOUNTABILITY

Supporting Data

12 RELIABILITY | ACCOUNTABILITY

Risk Analysis

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 4: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

4 RELIABILITY | ACCOUNTABILITY

Risk Measures

Event Driven Index (EDI)

Measures Risk from

Major System Events

Key Compliance Monitoring Index (KCMI) Measures Risks from Severe Impact Violations

Condition Driven Index (CDI)

Monitors Risk from

Key Reliability Metrics

Based on event severity risk index (SRI) values and turns into an availability index

Identify a subset of standards that have highest impact to reliability and create an index of standards compliance

Uses the roster of reliability

metrics developed by

RMWGPAS and approved by

OCPC

5 RELIABILITY | ACCOUNTABILITY

SRI and EDI

Likelihood

Impact

Avoid and

Mitigate

Learn and

Reduce

Accept

Reporting Threshold

Inverse CostBenefit

High Impact Low

Frequency (including

CIP)

Severity Risk Index (SRI) Curve

30

1060

SRI Component Weighting

Transmission Lines LostGeneration LostLoss of Load

6 RELIABILITY | ACCOUNTABILITY

Yearly SRI

NERC Annual Daily Severity Risk Index (SRI) Sorted Descending with Historic Benchmark Days

1029

22

827 427

98 828

630 44 711

428

7 RELIABILITY | ACCOUNTABILITY

Tiered Approach

View trends at httpwwwnerccompagephpcid=4|331

8 RELIABILITY | ACCOUNTABILITY

Reliability Metrics

ALR 1-3 Reserve Margin

ALR 1-4 BPS Transmission Related Events Resulting in Loss of Load

ALR 2-4 Disturbance Control Standard Failures (DCS Failures)

ALR 2-5 Disturbance Control Events Greater than Most Severe Single Contingency (MSSC)

ALR 3-5 IROLSOL Exceedance

ALR 4-1 Protection System Misoperations

ALR 6-1 Transmission Constraint Mitigation

ALR 6-2 Energy Emergency Alert 3 (EEA 3)

ALR 6-3 Energy Emergency Alert 2 (EEA 2)

9 RELIABILITY | ACCOUNTABILITY

Reliability Metrics (contrsquod)

ALR1-5 System Voltage Performance

ALR1-12 Interconnection Frequency Response

ALR2-3 UFLS and UVLS Usage

ALR6-11 Automatic AC Transmission Outages Initiated by Failed Protection System Equipment

ALR6-12 Automatic AC Transmission Outages Initiated by Human Error

ALR6-13 Automatic AC Transmission Outages Initiated by Failed AC Substation Equipment

ALR6-14 Automatic AC Circuit Outages Initiated by Failed AC Circuit Equipment

ALR 6-15 Element Availability Percentage

ALR 6-16 Transmission System Unavailability due to Automatic Outages

10 RELIABILITY | ACCOUNTABILITY

Supporting Data

11 RELIABILITY | ACCOUNTABILITY

Supporting Data

12 RELIABILITY | ACCOUNTABILITY

Risk Analysis

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 5: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

5 RELIABILITY | ACCOUNTABILITY

SRI and EDI

Likelihood

Impact

Avoid and

Mitigate

Learn and

Reduce

Accept

Reporting Threshold

Inverse CostBenefit

High Impact Low

Frequency (including

CIP)

Severity Risk Index (SRI) Curve

30

1060

SRI Component Weighting

Transmission Lines LostGeneration LostLoss of Load

6 RELIABILITY | ACCOUNTABILITY

Yearly SRI

NERC Annual Daily Severity Risk Index (SRI) Sorted Descending with Historic Benchmark Days

1029

22

827 427

98 828

630 44 711

428

7 RELIABILITY | ACCOUNTABILITY

Tiered Approach

View trends at httpwwwnerccompagephpcid=4|331

8 RELIABILITY | ACCOUNTABILITY

Reliability Metrics

ALR 1-3 Reserve Margin

ALR 1-4 BPS Transmission Related Events Resulting in Loss of Load

ALR 2-4 Disturbance Control Standard Failures (DCS Failures)

ALR 2-5 Disturbance Control Events Greater than Most Severe Single Contingency (MSSC)

ALR 3-5 IROLSOL Exceedance

ALR 4-1 Protection System Misoperations

ALR 6-1 Transmission Constraint Mitigation

ALR 6-2 Energy Emergency Alert 3 (EEA 3)

ALR 6-3 Energy Emergency Alert 2 (EEA 2)

9 RELIABILITY | ACCOUNTABILITY

Reliability Metrics (contrsquod)

ALR1-5 System Voltage Performance

ALR1-12 Interconnection Frequency Response

ALR2-3 UFLS and UVLS Usage

ALR6-11 Automatic AC Transmission Outages Initiated by Failed Protection System Equipment

ALR6-12 Automatic AC Transmission Outages Initiated by Human Error

ALR6-13 Automatic AC Transmission Outages Initiated by Failed AC Substation Equipment

ALR6-14 Automatic AC Circuit Outages Initiated by Failed AC Circuit Equipment

ALR 6-15 Element Availability Percentage

ALR 6-16 Transmission System Unavailability due to Automatic Outages

10 RELIABILITY | ACCOUNTABILITY

Supporting Data

11 RELIABILITY | ACCOUNTABILITY

Supporting Data

12 RELIABILITY | ACCOUNTABILITY

Risk Analysis

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 6: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

6 RELIABILITY | ACCOUNTABILITY

Yearly SRI

NERC Annual Daily Severity Risk Index (SRI) Sorted Descending with Historic Benchmark Days

1029

22

827 427

98 828

630 44 711

428

7 RELIABILITY | ACCOUNTABILITY

Tiered Approach

View trends at httpwwwnerccompagephpcid=4|331

8 RELIABILITY | ACCOUNTABILITY

Reliability Metrics

ALR 1-3 Reserve Margin

ALR 1-4 BPS Transmission Related Events Resulting in Loss of Load

ALR 2-4 Disturbance Control Standard Failures (DCS Failures)

ALR 2-5 Disturbance Control Events Greater than Most Severe Single Contingency (MSSC)

ALR 3-5 IROLSOL Exceedance

ALR 4-1 Protection System Misoperations

ALR 6-1 Transmission Constraint Mitigation

ALR 6-2 Energy Emergency Alert 3 (EEA 3)

ALR 6-3 Energy Emergency Alert 2 (EEA 2)

9 RELIABILITY | ACCOUNTABILITY

Reliability Metrics (contrsquod)

ALR1-5 System Voltage Performance

ALR1-12 Interconnection Frequency Response

ALR2-3 UFLS and UVLS Usage

ALR6-11 Automatic AC Transmission Outages Initiated by Failed Protection System Equipment

ALR6-12 Automatic AC Transmission Outages Initiated by Human Error

ALR6-13 Automatic AC Transmission Outages Initiated by Failed AC Substation Equipment

ALR6-14 Automatic AC Circuit Outages Initiated by Failed AC Circuit Equipment

ALR 6-15 Element Availability Percentage

ALR 6-16 Transmission System Unavailability due to Automatic Outages

10 RELIABILITY | ACCOUNTABILITY

Supporting Data

11 RELIABILITY | ACCOUNTABILITY

Supporting Data

12 RELIABILITY | ACCOUNTABILITY

Risk Analysis

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 7: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

7 RELIABILITY | ACCOUNTABILITY

Tiered Approach

View trends at httpwwwnerccompagephpcid=4|331

8 RELIABILITY | ACCOUNTABILITY

Reliability Metrics

ALR 1-3 Reserve Margin

ALR 1-4 BPS Transmission Related Events Resulting in Loss of Load

ALR 2-4 Disturbance Control Standard Failures (DCS Failures)

ALR 2-5 Disturbance Control Events Greater than Most Severe Single Contingency (MSSC)

ALR 3-5 IROLSOL Exceedance

ALR 4-1 Protection System Misoperations

ALR 6-1 Transmission Constraint Mitigation

ALR 6-2 Energy Emergency Alert 3 (EEA 3)

ALR 6-3 Energy Emergency Alert 2 (EEA 2)

9 RELIABILITY | ACCOUNTABILITY

Reliability Metrics (contrsquod)

ALR1-5 System Voltage Performance

ALR1-12 Interconnection Frequency Response

ALR2-3 UFLS and UVLS Usage

ALR6-11 Automatic AC Transmission Outages Initiated by Failed Protection System Equipment

ALR6-12 Automatic AC Transmission Outages Initiated by Human Error

ALR6-13 Automatic AC Transmission Outages Initiated by Failed AC Substation Equipment

ALR6-14 Automatic AC Circuit Outages Initiated by Failed AC Circuit Equipment

ALR 6-15 Element Availability Percentage

ALR 6-16 Transmission System Unavailability due to Automatic Outages

10 RELIABILITY | ACCOUNTABILITY

Supporting Data

11 RELIABILITY | ACCOUNTABILITY

Supporting Data

12 RELIABILITY | ACCOUNTABILITY

Risk Analysis

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 8: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

8 RELIABILITY | ACCOUNTABILITY

Reliability Metrics

ALR 1-3 Reserve Margin

ALR 1-4 BPS Transmission Related Events Resulting in Loss of Load

ALR 2-4 Disturbance Control Standard Failures (DCS Failures)

ALR 2-5 Disturbance Control Events Greater than Most Severe Single Contingency (MSSC)

ALR 3-5 IROLSOL Exceedance

ALR 4-1 Protection System Misoperations

ALR 6-1 Transmission Constraint Mitigation

ALR 6-2 Energy Emergency Alert 3 (EEA 3)

ALR 6-3 Energy Emergency Alert 2 (EEA 2)

9 RELIABILITY | ACCOUNTABILITY

Reliability Metrics (contrsquod)

ALR1-5 System Voltage Performance

ALR1-12 Interconnection Frequency Response

ALR2-3 UFLS and UVLS Usage

ALR6-11 Automatic AC Transmission Outages Initiated by Failed Protection System Equipment

ALR6-12 Automatic AC Transmission Outages Initiated by Human Error

ALR6-13 Automatic AC Transmission Outages Initiated by Failed AC Substation Equipment

ALR6-14 Automatic AC Circuit Outages Initiated by Failed AC Circuit Equipment

ALR 6-15 Element Availability Percentage

ALR 6-16 Transmission System Unavailability due to Automatic Outages

10 RELIABILITY | ACCOUNTABILITY

Supporting Data

11 RELIABILITY | ACCOUNTABILITY

Supporting Data

12 RELIABILITY | ACCOUNTABILITY

Risk Analysis

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 9: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

9 RELIABILITY | ACCOUNTABILITY

Reliability Metrics (contrsquod)

ALR1-5 System Voltage Performance

ALR1-12 Interconnection Frequency Response

ALR2-3 UFLS and UVLS Usage

ALR6-11 Automatic AC Transmission Outages Initiated by Failed Protection System Equipment

ALR6-12 Automatic AC Transmission Outages Initiated by Human Error

ALR6-13 Automatic AC Transmission Outages Initiated by Failed AC Substation Equipment

ALR6-14 Automatic AC Circuit Outages Initiated by Failed AC Circuit Equipment

ALR 6-15 Element Availability Percentage

ALR 6-16 Transmission System Unavailability due to Automatic Outages

10 RELIABILITY | ACCOUNTABILITY

Supporting Data

11 RELIABILITY | ACCOUNTABILITY

Supporting Data

12 RELIABILITY | ACCOUNTABILITY

Risk Analysis

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 10: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

10 RELIABILITY | ACCOUNTABILITY

Supporting Data

11 RELIABILITY | ACCOUNTABILITY

Supporting Data

12 RELIABILITY | ACCOUNTABILITY

Risk Analysis

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 11: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

11 RELIABILITY | ACCOUNTABILITY

Supporting Data

12 RELIABILITY | ACCOUNTABILITY

Risk Analysis

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 12: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

12 RELIABILITY | ACCOUNTABILITY

Risk Analysis

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 13: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

13 RELIABILITY | ACCOUNTABILITY

Study 1 Risk Patterns

Weather excluding lightning 17

Unknown 14

Lightning 12

Human Error 11

Failed AC Substation and Circuit Equipment

20

Failed Protection System Equipment

8

Power System Condition 4

Foreign Interference 4

Other 4 Biggest contributor to transmission severity - Failed AC Substation Equip - Statistically significant and positively correlated

AC Circuit Sustained Automatic Outages by Initiating Cause Code

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 14: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

14 RELIABILITY | ACCOUNTABILITY

Metric - BPS Transmission Related Events Resulting in Loss of Load

Transmission Related Events Resulting in Load Loss (2011)

Date Generation Loss (MW)

Transmission Loss

Load Loss

(MW)

Equipment Failure

Protection System

Misoperation

Human Error

1132011 0 3 lines 135

3272011 260 13 lines 295

4252011 0 5 lines

1 transformer 140

5102011 300 10 lines 462

662011 106 4 lines 450

6302011 1 3 transformers 797

7132011 599

14 lines 1 back to back

converter 2 transformers

665

7222011 0 1 line 206

982011 6981 32 lines

4 transformers 7835

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 15: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

15 RELIABILITY | ACCOUNTABILITY

Study 2 PRC-005 Effect

Violations

Misops

T Outages

Investigations

Is PRC-005 responsive to

control reliability risks

1331 entities 95 had no violations

2230 misops in 2011

Companies with more misoperations tend to have more failed protection system equipment outages

There is no statistically significant correlation between the number of violations and the number of misoperations

4 violations

359 outages

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 16: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

16 RELIABILITY | ACCOUNTABILITY

Current Efforts

Expert Review

bull PCrsquos Protection System Misoperations Task Force (PSMTF) started in March 2012 to review bull Regional data prior to January 1 2011 bull NERC data from January 1 2011 through March 31 2012

bull Developed a draft report for approval at March 2013 PC meeting bull General observations and conclusions bull Preliminary recommendations

Reporting Enhancements

bull Collecting the total number of operations beginning 4Q2012 bull ALR4-1 is a performance metric or misoperations as a ratio

of total protection system operations bull Coordinating reporting enhancements with the Project 2010-

05 SDT (PRC-003 and PRC-004)

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 17: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

17 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Common Patterns and Gaps

As bull Incorrect Settings ndash Protective Function This sub-cause represents 306 (67) of the 458 misoperations

related to settings

These misoperations are engineering errors in general protection applications and are common to all relay technologies

bull More than 24 of the records Either categorized incorrectly or had insufficient information to

identify a sub-cause or root cause

bull Evaluate whether adding sub-cause codes to the reporting

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 18: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

18 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

Tracking and Potential Solutions

As bull Measure ndash ALR4-1 Misoperation Rate

bull Benchmark ndash Average rate reduction over time 20 rate reduction in 2 years

bull Information Sharing ndash Highlight success stories

bull Targeted training on protective function settings bull Work with Regional Entities and subject matter experts

bull Revise PRC-005 to a results-based standard Establish a performance requirement

oUse a 90 quantile

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 19: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

19 RELIABILITY | ACCOUNTABILITY RELIABILITY | ACCOUNTABILITY

New Risk Issue and Effort

As bull AC Substation Equipment Failure High Priority Issue

Biggest contributor to severity risk index

Statistically significant and positively correlated

bull Measure ndash ALR6-11 bull Automatic AC Transmission Outages initiated by

Failed AC Substation Equipment

bull Add sub-cause codes to the reporting bull Identify common patterns

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 20: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

20 RELIABILITY | ACCOUNTABILITY

Questions and Answers

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005
Page 21: Risk Issue 3: Protection Systems - NERC Highlights and Minutes/Item... · 2013-05-15 · Coordinating reporting enhancements with the Project 2010-05 SDT (PRC-003 and PRC-004) ...

21 RELIABILITY | ACCOUNTABILITY

Standard PRC-005

bull Title ndash

Transmission and Generation Protection System Maintenance and Testing

bull Purpose ndash To ensure all transmission and generation

Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested

  • Slide Number 1
  • Topics
  • Slide Number 3
  • Risk Measures
  • SRI and EDI
  • Yearly SRI
  • Tiered Approach
  • Reliability Metrics
  • Reliability Metrics (contrsquod)
  • Slide Number 10
  • Supporting Data
  • Slide Number 12
  • Study 1 Risk Patterns
  • Metric - BPS Transmission Related Events Resulting in Loss of Load
  • Study 2 PRC-005 Effect
  • Current Efforts
  • Common Patterns and Gaps
  • Tracking and Potential Solutions
  • New Risk Issue and Effort
  • Slide Number 20
  • Standard PRC-005