Risk Assessment

2
FILM PRODUCTION RISK ASSESSMENT HAZARD IN WHICH SCENE IS THIS HAZARD PRESENT? PERSON WHO MAY BE HARMED PROPERTY THAT COULD BE DAMAGED RISK CONTROLS ALREADY IN PLACE RISK ASSESSMENT *See chart FURTHER ACTION TO BE TAKEN Electrical Equipment 1-10 Cast or Crew Ourselves Plug sockets far away from contact with water HIGH Wires to be taped down to the floor securely Trip hazards 1-10 Cast or Crew Ourselves None MODERATE Brightly coloured tape to be placed on any tripping hazard so they are easily seen Weather Changes 1-10 Cast or crew Ourselves / Production equipment Umbrellas are available. Moderate Indoor location as back up if weather does not go to plan. Risk Assessment Chart Hazard likelihood / Consequences RISK ASSESSMENT VERY LIKELY TO HAPPEN or SEVERE CONSEQUENCES (ie. Someone could get seriously hurt) EXTREME

Transcript of Risk Assessment

Page 1: Risk Assessment

FILM PRODUCTION RISK ASSESSMENT

HAZARD IN WHICH SCENE IS THIS HAZARD PRESENT?

PERSON WHO MAY BE HARMED

PROPERTY THAT COULD BE DAMAGED

RISK CONTROLS ALREADY IN PLACE

RISK ASSESSMENT*See chart

FURTHER ACTION TO BE TAKEN

Electrical Equipment

1-10 Cast or Crew Ourselves Plug sockets far away from contact

with water

HIGH Wires to be taped down to the floor

securelyTrip hazards 1-10 Cast or Crew Ourselves None MODERATE Brightly coloured

tape to be placed on any tripping

hazard so they are easily seen

Weather Changes 1-10 Cast or crew Ourselves / Production equipment

Umbrellas are available.

Moderate Indoor location as back up if weather does not go to plan.

Risk Assessment Chart

Hazard likelihood / Consequences RISK ASSESSMENTVERY LIKELY TO HAPPEN or SEVERE CONSEQUENCES (ie. Someone could get seriously hurt)

EXTREME

Could happen or mild consequences (i.e. someone could suffer a minor injury)

HIGH

Unlikely to happen or minor consequences (i.e. production could be slightly delayed)

MODERATE

Rarely happens and very insignificant consequences LOW