FILM PRODUCTION RISK ASSESSMENT
HAZARD IN WHICH SCENE IS THIS HAZARD PRESENT?
PERSON WHO MAY BE HARMED
PROPERTY THAT COULD BE DAMAGED
RISK CONTROLS ALREADY IN PLACE
RISK ASSESSMENT*See chart
FURTHER ACTION TO BE TAKEN
Electrical Equipment
1-10 Cast or Crew Ourselves Plug sockets far away from contact
with water
HIGH Wires to be taped down to the floor
securelyTrip hazards 1-10 Cast or Crew Ourselves None MODERATE Brightly coloured
tape to be placed on any tripping
hazard so they are easily seen
Weather Changes 1-10 Cast or crew Ourselves / Production equipment
Umbrellas are available.
Moderate Indoor location as back up if weather does not go to plan.
Risk Assessment Chart
Hazard likelihood / Consequences RISK ASSESSMENTVERY LIKELY TO HAPPEN or SEVERE CONSEQUENCES (ie. Someone could get seriously hurt)
EXTREME
Could happen or mild consequences (i.e. someone could suffer a minor injury)
HIGH
Unlikely to happen or minor consequences (i.e. production could be slightly delayed)
MODERATE
Rarely happens and very insignificant consequences LOW