rIntersection Addendum...Under no circumstances may this Report or any extract or summary thereof be...
Transcript of rIntersection Addendum...Under no circumstances may this Report or any extract or summary thereof be...
This document is issued for the party which commissioned it and for specific purposes connected with the above-captioned project
only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other
purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without
consent from us and from the party which commissioned it. This R eport has been prepar ed sol el y for use by the party which commissi oned it (the 'Client') in connection wi th the capti oned pr oject. It shoul d not be used for any other purpose. N o person other than the Client or any party who has expr essl y agreed terms of reli ance with us (the 'Recipi ent(s)') may r el y on the content, infor mation or any views expr essed in the R eport . This R eport is confi denti al and contains pr opri etary intell ectual pr operty and we accept no duty of car e, r esponsibility or li ability to any other recipi ent of this R eport . N o repr esentati on, warranty or undertaki ng, express or i mplied, is made and no responsi bility or liability is accepted by us to any party other than the Client or any Reci pient(s), as to the accuracy or completeness of the i nfor mati on contai ned i n this R eport . For the avoi dance of doubt thi s Report does not i n any way pur port to i nclude any legal, insurance or fi nanci al advice or opi nion.
We disclai m all and any liability whether arising i n tort, contr act or other wise which we might otherwise have to any party other than the Cli ent or the Reci pient(s), in respect of this Report, or any infor mation contained in it. We accept no responsi bility for any error or omissi on in the Report which is due to an error or omissi on in data, i nfor mation or statements supplied to us by other parti es i ncludi ng the Cli ent (the 'Data'). We have not independentl y verified the D ata or other wise exami ned i t to deter mi ne the accuracy, completeness, sufficiency for any purpose or feasi bility for any particular outcome incl uding fi nanci al. Forecasts presented i n this document were pr epared usi ng the Data and the Repor t is dependent or based on the D ata. Inevitabl y, some of the assumptions used to develop the for ecasts will not be realised and unantici pated events and circumstances may occur. C onsequentl y, we do not guarantee or warrant the conclusions contained in the R eport as ther e are li kel y to be differences between the forecas ts and the actual results and those dif fer ences may be material. While we consi der that the infor mation and opini ons given in this R eport are sound all parti es must rel y on their own skill and judgement when making use of it .
Infor mation and opi nions ar e current onl y as of the date of the Report and we accept no responsi bility for updati ng such infor mation or opi nion. It shoul d, therefor e, not be assumed that any such infor mati on or opi nion conti nues to be accurate subsequent to the date of the Repor t. U nder no circumstances may this Report or any extrac t or summar y thereof be used i n connecti on with any public or pri vate securities offeri ng incl udi ng any related memor andum or pr ospec tus for any securiti es offering or stock exchange listi ng or announcement.
By acceptance of this Repor t you agree to be bound by this disclai mer. This disclai mer and any issues, disputes or cl ai ms arising out of or in connection wi th it ( whether contractual or non-contractual i n natur e such as cl ai ms i n tort, from br each of statute or regul ati on or otherwise) shall be governed by, and constr ued i n accordance with, the laws of Engl and and Wales to th e exclusion of all conflict of l aws principles and r ules . All disputes or clai ms arising out of or r elati ng to this discl ai mer shall be subjec t to the excl usi ve jurisdicti on of the English and Welsh courts to which the parties irrevocabl y submit.
Project: BHP Potash Export Facility at Fraser Surrey Docks – Traffic Impact Study
Our reference: 387244-MMD-00-P0-MO-TE-0001 Your reference:
Prepared by: C. Au Date: 2018-07-13
Approved by: S. Riddick Checked by: A. Wells
Subject: Timberland Road & Westran Access Intersection
1 Introduction
BHP Billiton Canada Inc. (BHP) is currently permitting a proposed bulk potash export facility (the Project)
under the Vancouver Fraser Port Authority’s Project and Environmental Review (PER) process. A Traffic
Impact Assessment (387244-MMD-00-P0-RP-TE-0001) has been previouisly submitted in support of this
application.
The original Traffic Impact Assessment examined the following key intersections:
● Highway 17 NB Ramp and Tannery Rd;
● Highway 17 SB Ramp and Tannery Rd;
● Timberland Rd and Tannery Rd;
● Plywood Rd and Robson Rd; and
● Elevator Rd and Robson Rd.
The Timberland Road / TMS Ltd. Access / Westran Intermodal Ltd. Access intersection (indicated on Figure
1) had previously been omitted. This technical note acts as an addendum to the Traffic Impact Assessment
previously submitted to BHP to include the analysis for this study intersection. Additional traffic counts were
completed and the Synchro models adjusted to account for the additional intersection. Included in the
following sections are summaries of the turning movements and intersection conditions for the scenarios
previously assessed.
Technical Note
Mott MacDonald 2 Timberland Road & Westran Access Intersection
BHP Potash Export Facility at Fraser Surrey Docks – Traffic Impact Study
Figure 1: Study Intersection
Timberland Rd is one of the main access roads into Fraser Surrey Docks and is a key trucking route. The
intersection is a four-way stop intersection without any signalling implemented. Access to the Westran
Intermodal and TMS Ltd is provided by the intersection. A north-south running railway line, owned and
operated by the Southern Railway of British Columbia (SRY) runs adjacent to Timberland Rd; the
intersection also serves as an at-grade crossing, protected only by road signage.
The turning movement lanes described in the following sections are illustrated below in Figure 2 for better
clarity.
Figure 2: Turning movements diagram
N
N
Mott MacDonald 3 Timberland Road & Westran Access Intersection
BHP Potash Export Facility at Fraser Surrey Docks – Traffic Impact Study
2 Existing Conditions
From the original study, the peak hours at the site were observed to be from 6:30AM to 7:30AM and
3:00PM to 4:00PM. An additional traffic count was completed at the Timberland Rd and Westran Access
intersection on Tuesday, June 26, 2018 during these two peak hours. The counts are summarized in Table
1 below, while the Turning Movements Counts Sheets are included in Appendix A.
Table 1: Surveyed Peak-hour Turning Movements at Study Intersection
Intersection Lane AM
All movements PM
All movements
Timberland Rd
/ TMS Ltd.
Access /
Westran
Intermodal Ltd.
Access
EBL 65 309
EBT n/a n/a
EBR n/a n/a
WBL n/a n/a
WBT 5 0
WBR 6 11
NBL n/a n/a
NBT 2 8
NBR n/a n/a
SBL 23 8
SBT 15 13
SBR 274 111
A key observation was noted by the traffic surveyor. Traffic users tended to not obey the road markings; in
particular, those engaging in the SBR movement were seen to proceed without decreasing in speed, let
alone slowing to a full stop.
The original traffic counts used to build the Synchro models were undertaken in August 2017 (14th to 20th).
In order to account for seasonal differences and yearly growth, the observed numbers were multiplied by a
factor to balance with the pre-existing Synchro model volumes. The balanced values entered into the model
along with the applied factor value are presented in Table 2. The Synchro layout for this scenario as well as
the future cases are included in Appendix B, and supersede the previous Synchro plots.
Table 2: Factored Turning Movements at Study Intersection
Intersection Lane AM
All movements PM
All movements
Timberland Rd
/ TMS Ltd.
Access /
Westran
Intermodal Ltd.
Access
Factor 0.8767 0.7988
EBL 57 247
EBT n/a n/a
EBR n/a n/a
WBL n/a n/a
Factor n/a n/a
WBT 5 0
Factor 0.8767 0.7988
WBR 5 9
NBL n/a n/a
NBT 2 6
NBR n/a n/a
Factor 1.0128 1.0985
SBL 23 9
SBT 15 14
SBR 278 122
Mott MacDonald 4 Timberland Road & Westran Access Intersection
BHP Potash Export Facility at Fraser Surrey Docks – Traffic Impact Study
With these inputs added into the Synchro model, the intersection conditions for the key and study
intersections are presented in Table 3 below. Similar to the original analysis, the intersection traffic
operations were summarized based on:
● Level of Service (LOS) values ranging from LOS A (no delays) to LOS F (fully saturated); and
● Average delays per movement.
The Synchro software program (Version 10.1) was utilised to calculate the LOS values and average delays.
Table 3: Existing Intersection Conditions
Intersection Control Type
AM Peak 6:30 – 7:30
PM Peak 3:00 – 4:00
LOS (Average Delay
in seconds)
LOS (Average Delay
in seconds)
Highway 17 NB Ramp / Tannery
Signalised B
(12.2) B
(10.7)
Highway 17 SB Ramp / Tannery
Signalised B
(15.0) B
(18.8)
Timberland / Tannery Signalised A
(9.3) A
(9.2)
Plywood / Robson Free / Yield A
(0.0) A
(2.6)
Elevator / Robson Free / Yield A
(0.0) A
(0.3)
Timberland / TMS/Intermodal
Stop A
(8.4) B
(9.1)
3 Opening Day Conditions (2023)
The opening day scenario includes the new Fraser Grain Terminals (FGT) facility and the expansion within
FSD for the new Coal Export Facility. Changes assumed for the traffic in the original analysis are carried
through the network and incorporated into the turning movements of the study intersection (Table 4).
Table 4: Opening Day Study Intersection Turning Movements
Intersection Lane AM
All movements PM
All movements
Timberland Rd / TMS Ltd. Access / Westran Intermodal Ltd. Access
EBL 63 262
EBT n/a n/a
EBR n/a n/a
WBL n/a n/a
WBT 5 0
WBR 5 9
NBL n/a n/a
NBT 2 6
NBR n/a n/a
SBL 23 9
SBT 15 14
SBR 296 131
Mott MacDonald 5 Timberland Road & Westran Access Intersection
BHP Potash Export Facility at Fraser Surrey Docks – Traffic Impact Study
The anticipated weekday AM and PM peak hour intersection conditions for the opening day at the key and
study intersection are presented in Table 5.
Table 5: Opening Day Intersection Conditions
Intersection Control Type
AM Peak 6:30 – 7:30
PM Peak 3:00 – 4:00
LOS (Average Delay
in seconds)
LOS (Average Delay
in seconds)
Highway 17 NB Ramp / Tannery
Signalised B
(13.6) B
(11.0)
Highway 17 SB Ramp / Tannery
Signalised B
(14.9) B
(18.9)
Timberland / Tannery Signalised A
(9.4) A
(9.3)
Plywood / Robson Free / Yield A
(0.0) A
(2.3)
Elevator / Robson Free / Yield A
(0.0) A
(0.3)
Timberland / TMS/Intermodal
Stop A
(8.6) A
(9.3)
4 Opening Day + Project Conditions
The assumed traffic changes for the additional road accesses for the Project are carried through the study
intersection. The resulting turning movements are presented in Table 6.
Table 6: Opening Day + Project Study Intersection Turning Movements
Intersection Lane AM
All movements PM
All movements
Timberland Rd / TMS Ltd. Access / Westran Intermodal Ltd. Access
EBL 73 283
EBT n/a n/a
EBR n/a n/a
WBL n/a n/a
WBT 5 0
WBR 5 9
NBL n/a n/a
NBT 2 6
NBR n/a n/a
SBL 23 9
SBT 15 14
SBR 314 138
The anticipated weekday AM and PM peak hour intersection conditions for the opening day with Project at
the key and study intersection are presented in Table 7.
Mott MacDonald 6 Timberland Road & Westran Access Intersection
BHP Potash Export Facility at Fraser Surrey Docks – Traffic Impact Study
Table 7: Opening Day + Project Intersection Conditions
Intersection Control Type
AM Peak 6:30 – 7:30
PM Peak 3:00 – 4:00
LOS (Average Delay
in seconds)
LOS (Average Delay
in seconds)
Highway 17 NB Ramp / Tannery
Signalised B
(13.9) B
(11.5)
Highway 17 SB Ramp / Tannery
Signalised B
(15.7) B
(18.8)
Timberland / Tannery Signalised A
(9.5) A
(9.4)
Plywood / Robson Free / Yield A
(0.0) A
(1.8)
Elevator / Robson Free / Yield A
(0.4) A
(2.3)
Timberland / TMS/Intermodal
Stop A
(8.8) A
(9.6)
5 Future Horizon Conditions (2030)
The future horizon anticipates full implementation of the proposed road network as presented by drawings
1856-001.01-Figure 1 and 40600-LO-DWG-00157-A. Table 8 summarizes the turning movements at the
intersection expected for the future horizon conditions.
Table 8: Future Horizon Study Intersection Turning Movements
Intersection Lane AM
All movements PM
All movements
Timberland Rd / TMS Ltd. Access / Westran Intermodal Ltd. Access
EBL 51 238
EBT n/a n/a
EBR n/a n/a
WBL n/a n/a
WBT 5 0
WBR 5 9
NBL n/a n/a
NBT 2 6
NBR n/a n/a
SBL 23 9
SBT 15 14
SBR 219 112
The anticipated weekday AM and PM peak hour intersection conditions for the future horizon at the key and
study intersection are presented in Table 9.
Mott MacDonald 7 Timberland Road & Westran Access Intersection
BHP Potash Export Facility at Fraser Surrey Docks – Traffic Impact Study
Table 9: Future Horizon Intersection Conditions
Intersection Control Type
AM Peak 6:30 – 7:30
PM Peak 3:00 – 4:00
LOS (Average Delay
in seconds)
LOS (Average Delay
in seconds)
Highway 17 NB Ramp / Tannery
Signalised B
(11.5) B
(10.7)
Highway 17 SB Ramp / Tannery
Signalised B
(15.5) B
(19.4)
Timberland / Tannery Signalised A
(9.0) A
(9.2)
Plywood / Robson / Hwy 17
Free / Yield A
(7.9) A
(8.1)
Elevator / Robson Free / Yield A
(0.0) A
(2.1)
Timberland / TMS/Intermodal
Stop A
(8.0) A
(8.9)
6 Future Horizon + Project Conditions
The redistribution and additional traffic assumed for the future horizon with Project conditions are applied to
study intersection and summarized in Table 10.
Table 10: Future Horizon + Project Study Intersection Turning Movements
Intersection Lane AM
All movements PM
All movements
Timberland Rd / TMS Ltd. Access / Westran Intermodal Ltd. Access
EBL 57 247
EBT n/a n/a
EBR n/a n/a
WBL n/a n/a
WBT 5 0
WBR 5 9
NBL n/a n/a
NBT 2 6
NBR n/a n/a
SBL 23 9
SBT 15 14
SBR 231 113
The anticipated weekday AM and PM peak hour intersection conditions for the future horizon with Project at
the key and study intersection are presented in Table 11.
Mott MacDonald 8 Timberland Road & Westran Access Intersection
BHP Potash Export Facility at Fraser Surrey Docks – Traffic Impact Study
Table 11: Future Horizon + Project Intersection Conditions
Intersection Control Type
AM Peak 6:30 – 7:30
PM Peak 3:00 – 4:00
LOS (Average Delay
in seconds)
LOS (Average Delay
in seconds)
Highway 17 NB Ramp / Tannery
Signalised B
(11.6) B
(10.8)
Highway 17 SB Ramp / Tannery
Signalised B
(16.3) B
(19.8)
Timberland / Tannery Signalised A
(9.0) A
(9.2)
Plywood / Robson / Hwy 17
Free / Yield A
(8.0) A
(8.4)
Elevator / Robson Free / Yield A
(0.0) A
(1.9)
Timberland / TMS/Intermodal
Stop A
(8.1) A
(9.1)
7 Conclusion
As concluded from the previous report, the Project generates minimal amount of additional traffic flowing
into the road network. As illustrated by the result tables for each scenario in this technical note:
● All intersections operate at adequate levels (LOS A or B) during both the AM and PM peak periods;
● No movements have been highlighted as a critical movement (LOS D or higher or a v/c ratio over 0.75);
and
● No changes to the LOS grades of any of the intersections.
As the expected conditions for the five previously studied intersections have had minimal or no change, the
recommendations provided at the end of the previously submitted report are retained.
Mott MacDonald 9 Timberland Road & Westran Access Intersection
BHP Potash Export Facility at Fraser Surrey Docks – Traffic Impact Study
Appendices
Mott MacDonald 10 Timberland Road & Westran Access Intersection
BHP Potash Export Facility at Fraser Surrey Docks – Traffic Impact Study
A. Intersection Turning Movement Counts
Timberland Y South of Pine Rd
Vehicle Classification SummaryProject: #5874: Mott MacDonald - Timberland Y Intersection Count
Municipality: Surrey
Weather: Clear
Passenger
Cars
Heavy
Vehicles (3 or
more axles)
Morning Volume 228 162 390
(06:30 - 07:30)% 58.5% 41.5% 100.0%
Volume
%
Afternoon Volume 315 145 460
(15:00 - 16:00)% 68.5% 31.5% 100.0%
Total Volume 543 307 850
(2 Hours)% 63.9% 36.1% 100.0%
Tuesday, June 26, 2018
Time PeriodEntering
Intersection
Vehicle Classification
Total
Timberland Y South of Pine Rd
Project: #5874: Mott MacDonald - Timberland Y Intersection Count Morning Peak PeriodMunicipality: Surrey
Weather: Clear
Vehicle Class: All Motorized Vehicles
Peak Hour Traffic by Movement to
31
2
73
TMS Ltd. Access
279 11
65 23
15
2
NORTH Approach SOUTH Approach WEST Approach EAST Approach PEDESTRIANS
left thru right left thru right left thru right left thru right N S W E
Peak Hour 23 15 274 2 65 5 6 0 0 10 0
PHF 0.44 0.54 0.74 0.25 0.71 0.63 0.50 0.00 0.00 0.83 0.00
Peak 15 X 4 52 28 372 8 92 8 12 0 0 12 0
Average Hour 23 15 274 2 65 5 6 0 0 10 0
Survey Total 23 15 274 2 65 5 6 0 0 10 0
6:30 2 5 64 2 11 1 0 0 0 2 0
6:45 13 7 72 0 12 1 1 0 0 3 0
7:00 7 1 45 0 23 2 2 0 0 3 0
7:15 1 2 93 0 19 1 3 0 0 2 0
Timberland Rd
Tuesday, June 26, 2018
Tim
ber
lan
d R
d
6
5
All Motorized Vehicles
15
0
7:30 AM6:30 AM
27
4
476
23
390
Wes
tran
Inte
rmo
dal
Ltd
. Acc
ess
0
390
106
119
80
10 0
Time
0.82
65
2
Total
Volumes
390
85
Timberland Y South of Pine Rd
Project: #5874: Mott MacDonald - Timberland Y Intersection Count Morning Peak PeriodMunicipality: Surrey
Weather: Clear
Vehicle Class: Passenger Cars
Peak Hour Traffic by Movement to
20
6
22
TMS Ltd. Access
180 0
22 15
11
0
NORTH Approach SOUTH Approach WEST Approach EAST Approach PEDESTRIANS
left thru right left thru right left thru right left thru right N S W E
Peak Hour 15 11 180 0 22 0 0
PHF 0.34 0.39 0.63 0.00 0.69 0.00 0.00
Peak 15 X 4 44 28 288 0 32 0 0
Average Hour 15 11 180 0 22 0 0
Survey Total 15 11 180 0 22 0 0
6:30 1 4 43 0 3 0 0
6:45 11 7 40 0 4 0 0
7:00 3 0 25 0 7 0 0
7:15 0 0 72 0 8 0 0
Tim
ber
lan
d R
d
0
Tuesday, June 26, 2018
7:30 AM6:30 AM
Timberland Rd
22
0
80
35
Wes
tran
Inte
rmo
dal
Ltd
. Acc
ess
Total
Volumes
320
Time
228
62
51
0.71
228
228
18
0
11
15
0Passenger Cars
Timberland Y South of Pine Rd
Project: #5874: Mott MacDonald - Timberland Y Intersection Count Morning Peak PeriodMunicipality: Surrey
Weather: Clear
Vehicle Class: Heavy Vehicles (3 or more axles)
Peak Hour Traffic by Movement to
10
6
51
TMS Ltd. Access
99 11
43 8
4 2
NORTH Approach SOUTH Approach WEST Approach EAST Approach PEDESTRIANS
left thru right left thru right left thru right left thru right N S W E
Peak Hour 8 4 94 2 43 5 6
PHF 0.50 0.50 0.73 0.25 0.67 0.63 0.50
Peak 15 X 4 16 8 128 8 64 8 12
Average Hour 8 4 94 2 43 5 6
Survey Total 8 4 94 2 43 5 6
6:30 1 1 21 2 8 1 0
6:45 2 0 32 0 8 1 1
7:00 4 1 20 0 16 2 2
7:15 1 2 21 0 11 1 3
Tuesday, June 26, 2018
Total
VolumesTime
6:30 AM
39
45
7:30 AM
44
43
162
162
5
6
180
2
Timberland Rd
94
4 8
Heavy Vehicles (3 or more axles)
Wes
tran
Inte
rmo
dal
Ltd
. Acc
ess
34
0.90
Tim
ber
lan
d R
d
162
Timberland Y South of Pine Rd
Project: #5874: Mott MacDonald - Timberland Y Intersection Count Morning Peak PeriodMunicipality: Surrey
Weather: Clear
Vehicle Class: Bicycles
Note:
Peak Hour Traffic by Movement to
0 0
TMS Ltd. Access
0 0
0 0
0 0
NORTH Approach SOUTH Approach WEST Approach EAST Approach BIKES in X-WALKS
left thru right left thru right left thru right left thru right N S W E
Peak Hour 0 0 0 0 0 0 0 0 0 0 0
PHF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Peak 15 X 4 0 0 0 0 0 0 0 0 0 0 0
Average Hour 0 0 0 0 0 0 0 0 0 0 0
Survey Total 0 0 0 0 0 0 0 0 0 0 0
6:30 0 0 0 0 0 0 0 0 0 0 0
6:45 0 0 0 0 0 0 0 0 0 0 0
7:00 0 0 0 0 0 0 0 0 0 0 0
7:15 0 0 0 0 0 0 0 0 0 0 0
0
Tuesday, June 26, 2018
0
Wes
tran
Inte
rmo
dal
Ltd
. Acc
ess
0
0
0
7:30 AM6:30 AM
Crosswalk bike volumes shown are cyclists who rode their bike across the crosswalk and are not included in the pedestrian volume totals
0
0.00
0
Total
Volumes
Bicycles
0 0
0
0
Timberland Rd
0
0
0
0
Time
0
0
Tim
ber
lan
d R
d
0
0
Timberland Y South of Pine Rd
Project: #5874: Mott MacDonald - Timberland Y Intersection Count Afternoon Peak PeriodMunicipality: Surrey
Weather: Clear
Vehicle Class: All Motorized Vehicles
Peak Hour Traffic by Movement to
13
2
32
8
TMS Ltd. Access
111 11
309 8
13
8
NORTH Approach SOUTH Approach WEST Approach EAST Approach PEDESTRIANS
left thru right left thru right left thru right left thru right N S W E
Peak Hour 8 13 111 8 309 0 11 0 0 1 0
PHF 0.50 0.65 0.52 0.50 0.68 0.00 0.55 0.00 0.00 0.25 0.00
Peak 15 X 4 16 20 212 16 456 0 20 0 0 4 0
Average Hour 8 13 111 8 309 0 11 0 0 1 0
Survey Total 8 13 111 8 309 0 11 0 0 1 0
15:00 3 4 23 2 114 0 2 0 0 0 0
15:15 1 5 17 4 79 0 5 0 0 0 0
15:30 4 2 18 2 66 0 3 0 0 1 0
15:45 0 2 53 0 50 0 1 0 0 0 0
148
111
106
Total
Volumes
460
Timberland Rd
1 0
Time
309
8
Tuesday, June 26, 2018
95
Tim
ber
lan
d R
d
0.78
592
460
0
460
4:00 PM3:00 PM
13
11
1
8
11
Wes
tran
Inte
rmo
dal
Ltd
. Acc
ess
0
0
All Motorized Vehicles
Timberland Y South of Pine Rd
Project: #5874: Mott MacDonald - Timberland Y Intersection Count Afternoon Peak PeriodMunicipality: Surrey
Weather: Clear
Vehicle Class: Passenger Cars
Peak Hour Traffic by Movement to
95
22
0
TMS Ltd. Access
90 10
207 3
2 3
NORTH Approach SOUTH Approach WEST Approach EAST Approach PEDESTRIANS
left thru right left thru right left thru right left thru right N S W E
Peak Hour 3 2 90 3 207 0 10
PHF 0.38 0.50 0.49 0.38 0.66 0.00 0.50
Peak 15 X 4 8 4 184 8 316 0 20
Average Hour 3 2 90 3 207 0 10
Survey Total 3 2 90 3 207 0 10
15:00 1 1 17 1 79 0 2
15:15 0 1 14 0 56 0 5
15:30 2 0 13 2 44 0 3
15:45 0 0 46 0 28 0 0
3
207
Timberland Rd
Tim
ber
lan
d R
d
315
315
Passenger Cars
Wes
tran
Inte
rmo
dal
Ltd
. Acc
ess
90
2
315
3:00 PM
74
4:00 PM
0
64
76
101
0.78
404
Tuesday, June 26, 2018
Total
VolumesTime
10
3
Timberland Y South of Pine Rd
Project: #5874: Mott MacDonald - Timberland Y Intersection Count Afternoon Peak PeriodMunicipality: Surrey
Weather: Clear
Vehicle Class: Heavy Vehicles (3 or more axles)
Peak Hour Traffic by Movement to
37
10
8
TMS Ltd. Access
21 1
102 5
11
5
NORTH Approach SOUTH Approach WEST Approach EAST Approach PEDESTRIANS
left thru right left thru right left thru right left thru right N S W E
Peak Hour 5 11 21 5 102 0 1
PHF 0.63 0.69 0.75 0.31 0.73 0.00 0.25
Peak 15 X 4 8 16 28 16 140 0 4
Average Hour 5 11 21 5 102 0 1
Survey Total 5 11 21 5 102 0 1
15:00 2 3 6 1 35 0 0
15:15 1 4 3 4 23 0 0
15:30 2 2 5 0 22 0 0
15:45 0 2 7 0 22 0 1
5
102
Timberland Rd
Tim
ber
lan
d R
d
145
145
Heavy Vehicles (3 or more axles)
Wes
tran
Inte
rmo
dal
Ltd
. Acc
ess
21
11
145
3:00 PM
32
4:00 PM
0
31
35
47
0.77
188
Tuesday, June 26, 2018
Total
VolumesTime
1
5
Timberland Y South of Pine Rd
Project: #5874: Mott MacDonald - Timberland Y Intersection Count Afternoon Peak PeriodMunicipality: Surrey
Weather: Clear
Vehicle Class: Bicycles
Note:
Peak Hour Traffic by Movement to
1 0
TMS Ltd. Access
1 0
0 0
0 0
NORTH Approach SOUTH Approach WEST Approach EAST Approach BIKES in X-WALKS
left thru right left thru right left thru right left thru right N S W E
Peak Hour 0 0 1 0 0 0 0 0 0 0 0
PHF 0.00 0.00 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Peak 15 X 4 0 0 4 0 0 0 0 0 0 0 0
Average Hour 0 0 1 0 0 0 0 0 0 0 0
Survey Total 0 0 1 0 0 0 0 0 0 0 0
15:00 0 0 0 0 0 0 0 0 0 0 0
15:15 0 0 0 0 0 0 0 0 0 0 0
15:30 0 0 0 0 0 0 0 0 0 0 0
15:45 0 0 1 0 0 0 0 0 0 0 0
0
0
Timberland Rd
0 0
Tim
ber
lan
d R
d
1
1
Bicycles
Wes
tran
Inte
rmo
dal
Ltd
. Acc
ess
0
0
1 0
1
3:00 PM
1
4:00 PM
0
0
0
0
0.25
4
Tuesday, June 26, 2018
Total
VolumesTime
Crosswalk bike volumes shown are cyclists who rode their bike across the crosswalk and are not included in the pedestrian volume totals
0
0
Mott MacDonald 11 Timberland Road & Westran Access Intersection
BHP Potash Export Facility at Fraser Surrey Docks – Traffic Impact Study
B. Synchro Plots
Base AM.syn
07/09/2018
Tann
ery
Rd
811
145
14389200
16238
103 A
Ave
0
13020
26770
29
2060
Container Traffic 00
T MS Acce ss
5 5Westran Access 2
2315278
57
Timberland Rd
Robson Rd
Robso
n Rd
029
2083
00Robson Rd
29 Robson Rd103103
Plywood Rd00
T annery Rd
631323
10318015
112
0
250806 SFPR
1900184
SFPR
Pine
Rd
34 01 8
3
Timberland Rd 5581
Tannery Rd
9627136Pi
ne R
d
3 001 1
0 0
Elevator Rd
0 2063
Alaska Way00
Ele vato r Rd 00
Gunderson Rd 029
Robson Rd200
E lev
ator
Rd
00
SFPR 870432
SFPR
1925752
Base PM.syn
07/09/2018
T ann
ery
Rd
363 8 5
10970584
60488
103A
Ave
0
30010
12980
165
6015
Container Traffic 280
TMS Access
0 9Westran Access 6
914122
247
Timberland Rd
Robson Rd
Robso
n Rd
0101
733
50 Robson Rd0
106 Robson Rd
4020
Plywood Rd 590
T annery Rd
240232
20515534
310
3
2152200 SFPR
846261
SFPR
Pine
Rd
38 01 5
8
Timberland Rd 9250
3 Tannery Rd
1479842P
i ne
Rd
3 809
0 0
Elevator Rd
0 7 26
Alaska Way00
El evator Rd
50
Gunderson Rd0
101Robson Rd
70 E
leva
tor R
d
00
SFPR 2238763
SFPR
954344
2023 without project AM.syn
07/09/2018
Tann
ery
Rd
817
145
14989200
18240
103 A
Ave
0
13080
26790
29
2240
Container Traffic 00
T MS
Acce
ss5 5Westran Access 2
2315296
63
Timberland Rd
Robson Rd
Robso
n Rd
023
2083
00 29 Robson Rd121103
Plywood Rd00
Robson Rd23 Robson Rd10318
New Developm
ent60
T annery Rd
631335
10318615
512
2
252806 SFPR
1900190
SFPR
Pine
Rd
34 01 8
3
Timberland Rd 5641
Tannery Rd
9628936Pi
ne R
d
3 001 1
0 0
Elevator Rd
0 2063
Alaska Way00
Ele vato r Rd
00
Gunderson Rd 023
Robson Rd200
E lev
ator
Rd
00
SFPR 870438
SFPR
1925754
2023 without project PM.syn
07/09/2018
T ann
ery
Rd
366 8 5
11270584
65493
103A
Ave
0
30040
13030
180
6915
Container Traffic 280
TMS Access
0 9Westran Access 6
914131
262
Timberland Rd
Robson Rd
Robso
n Rd
0101
733
50 121 Robson Rd4920
Plywood Rd590
Robson Rd 106 Robson Rd
409
New Developm
ent150
T annery Rd
240238
20515835
310
8
2202200 SFPR
846264
SFPR
Pine
Rd
38 01 5
8
Timberland Rd 9265
3 Tannery Rd
14710742P
i ne
Rd
3 809
0 0
Elevator Rd
0 7 26
Alaska Way00
El evator Rd
500
Gunderson Rd0
101 Robson Rd
70 E
leva
tor R
d
00
SFPR 2238766
SFPR
954349
2023 with project AM.syn
07/09/2018
Tann
ery
Rd
824
145
15589200
21243
103 A
Ave
0
13140
26830
47
131103
P lywood Rd
00
T MS Acce ss
5 5
Westran Access 2
2315314
73
4710
Timberland Rd
234
10
Robson Rd
Robso
n Rd
035
1796
60Robson Rd 0
41Robson Rd
11318
Ne w De vel op m
e nt60
T annery Rd
631348
10319316
112
6
255806 SFPR
1900197
SFPR
Pine
Rd
34 01 8
3Timberland Rd5741
Tannery Rd
9630936Pi
ne R
d
3 001 1
0 0
Elevator Rd
0 1779
Alaska Way00
Ele vato r Rd
60
Gunderson Rd 035
Robson Rd170
E lev
ator
Rd
00
SFPR 870444
SFPR
1925758
2023 with project PM.syn
07/09/2018
T ann
ery
Rd
378 8 5
12370584
72500
103A
Ave
0
30150
13100
201
7420
Plywood Rd 590
TMS Access
0 9Westran Access 6
914138
283
26038
Timberland Rd
9425
Robson Rd
Robson R
d
0127
857
590Robson Rd 0
186Robson Rd
659
New
Developme nt
150
T annery Rd
240261
20517036
711
5
2272200 SFPR
846276
SFPR
Pine
Rd
38 01 5
8Timberland Rd9286
3
Tannery Rd
14714242P
i ne
Rd
3 809
0 0
Elevator Rd
0 8 49
Alaska Way00
El evator Rd 590
Gunderson Rd 0127
Robson Rd
80 E
leva
tor R
d
00
SFPR 2238777
SFPR
954356
2028 without project AM.syn
07/09/2018
Tann
ery
Rd
817
145
7289200
18240
103 A
Ave
0
12310
2667
TMS Access
5 5Westran Access 2
2315219
51
310
Timberland Rd
161
Robs
on R
d
0 0 00290
5111418
600
T annery Rd
631258
10318615
511
0
252806 SFPR
1900190
SFPR
Pine
Rd
34 01 8
3Timberland Rd 5521
Tannery Rd
9621236Pi
ne R
d
3 001 1
Elevator Rd
Gunderson Rd
Elev
ator
Rd
123177
2667 SFPR870361
SFPR
1925742
1308
266718
029
53610
0
0 5512
10
Robson Rd412829
21014
00
4318
0000
2028 without project PM.syn
07/09/2018
Tann
ery
Rd
366 8 5
9370584
65493
103 A
Ave
0
29850
1279
T MS Acce ss
0 9
Westran Access 6
914112
238
1860
Timberland Rd
78
Robs
on R
d
0 0 300144
0
105391500
T annery Rd
240219
20515835
384
2202200 SFPR
846264
SFPR
Pine
Rd
38 01 5
8Timberland Rd 9241
3
Tannery Rd
1478842Pi
ne R
d
3 809
Elevator Rd
Gunderson Rd
Elev
ator
Rd
298519
1279 SFPR 2238747
SFPR
954325
3004
127946
0101
1835430
114 4
Robson Rd65715
6151320
3 184
296
00043
2028 with project AM.syn
07/09/2018
T ann
ery
Rd
823
145
7289200
21243
103A
Ave
0
12310
2669
5 52
2315231
57Timberland Rd
Robs
on R
d
0 0 00350
5110318
600
T annery Rd
631264
10319216
111
2
255806 SFPR
1900196
SFPR
Pine
Rd
34 01 8
3Timberland Rd 5601
Tannery Rd
9622436P
i ne
Rd
3 001 1
Elevator Rd
Gunderson Rd
Ele
v ato
r Rd
123183
2669 SFPR870361
SFPR
1925744
1314
266924
035
44590
0
5713
13
Robson Rd810957
28130
436
4415
0000
2028 with project PM.syn
07/09/2018
T ann
ery
Rd
368 8 5
8970584
72500
103A
Ave
0
29810
1280
TMS A
cces s
0 9
Westran Access 6
914113
253Timberland Rd
Robs
on R
d
0 0 300170
0
105491500
T annery Rd
240217
21116136
785
2272200 SFPR
846273
SFPR
Pine
Rd
38 01 5
8Timberland Rd 9256
3
Tannery Rd
1478942P
i ne
Rd
3 809
Elevator Rd
Gunderson Rd
Ele
v ato
r Rd
298125
1280 SFPR 2238743
SFPR
954326
3006
128064
0127
2034430
114 10
Robson Rd155434
7166420
4 978
277
00043