RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date:...
Transcript of RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date:...
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Transforming Regulatory Processes
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Transforming Regulatory Processes: What Needs to Change and How to Do It
2
Jim ReillyDirector, Product StrategyVault RegulatoryVeeva Systems
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
The Need to Change§ Regulatory is at the tip of the spear of realizing market potential and getting therapies to patients
§ Opportunity to enhance our operations through:§ Process Adjustments§ Technology Centralization§ Data Consistency§ Focus on Operational Learning
§ With adjustments, we can realize the vision of working smarter, not harder
3
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com | 4
Biggest Pain Points
Average efficiency of integrated RIM processes
9% 6%Average efficiency of manufacturing
change control processes
Source: Steve Gens & Associates, Winter Edition, 2015.
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Processes and Systems are Misaligned
5
Ø Process made complex by technologyØ Redundancy of information
Ø Limited connectivity of informationØ Difficult to report on progress
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Common Challenge: No Standardization or Tracking
Lack of Standardization
No Central Tracking
§ Multiple systems § Multiple spreadsheets§ No consistency across systems or spreadsheets
§ No consistent terminology or dictionary
§ No consistency of what to capture§ No consistent ownership
Lack of Traceability
Lack of Metrics
§ No holistic view§ No connections between documents and data
§ No ability to assess impact
§ Can’t aggregate or compare across products or regions
§ No input to process improvements
6
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
The Result: Data Black Hole
Lack of Visibility• No data summarization or reporting
Communication Breakdowns• Lack of regional info sharing• Status/Progress not shared
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Common Challenge: Manual Processes
No automation / facilitation• No alerts, parallel reviews, auto-updates on state change
Reliance on email and calls• Information black hole
Manual plans• Struggle to keep current
Single point of contact• Human foibles, e.g. delays when passing along correspondence
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Ideal State: A Holistic View with Clear Connections
Application Chronology for Restolar IND 0123456
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Ideal State: Automation to Minimize Errors and Effort
Application Chronology for Restolar IND 0123456
Alert@
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
How does it look at your company?
What would you like to change?
A pause for discussion…
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
How Do We Get There?
Laying a Foundation
Getting Started
Advanced Capabilities
• Roles & responsibilities• Common definitions• Common systems
• Working in a system• Clean consistent data• Automation
• Reporting• Metrics• Traceability
12
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Lay the foundation: Roles & Responsibilities
13
Owner
Project Manager
Contributors
Partners
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Lay the Foundation: Common Definitions
14
What constitutes a commitment?
What gets tracked?
Who manages which type?
What gets reported on?
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Lay the Foundation: Common Systems
15
Headquarters
Affiliates
External parties
Other departmentsGlobal/central use of
systems
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Getting Started: Work Within a System
16
Internally Driven Change
Externally Driven Change
New ApplicationAnnual reportLabel changeShelf life extension
• Create regulatory events
• Define related activities• Assign ownership
• Plan submissions• Develop deliverables
• Track due dates• Link to HA correspondence
• Finalize submissions• Report
Additional information requestIncremental study requestManufacturer problems
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
!
Getting Started: Automation
Calendaring Workflows Notifications
17
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Getting Started: Prioritize Clean and Consistent Data
Centralize or standardize data entry
Establish a governance process for dictionary management
Designate data owners responsible for quality
Usage of a standardized dictionary
• Product Information• Application• Submission
• Study Information• Manufacturer(s)• Vocabularies
18
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Advanced Capabilities: Reporting
Report across related elements for global registration insights
Allocate work to local teams and track
activities
Global Registration Status
Local Market Activities
Which are open, closed, have due date
approaching
Track within and across applications
CommitmentsCorrespondence
Capture expected activities, submissions, and commitments
Calendar
Content PlanProgress
Deliverable Status
Submissions
19
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Advanced Capabilities: MetricsDocument Status
Clinical Non Clinical Quality Regulatory
Record Count
Days until Planned Submission
Documents Approved This Month
192 days
23 documents
Overdue Approval Tasks Average Time to Approval
• Receipt dates• Due dates• Time to respond• Plan vs. actual• Region or area• Response targets
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Advanced Capabilities: Traceability
21
Creating relationships enables you to trace the impact of business changes.
PRODUCT
REGISTRATION
SUBMISSION(S)
APPLICATION(S)
CORRESPONDENCE
COMMITMENT(S)
EVENT(S)
CHANGE REQUESTS
ACTIVITIESDOCUMENT(S)
A Manufacturing Process Changed: Now What?
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Thank You
22
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Wrap-up
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
A Long List of What’s Wrong
24
Lack of standardizationLack of automationLack of central trackingLack of automated trackingLack of traceabilityLack of metricsLack of visibilityLack of communication
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Ideal State: A Holistic View with Automation
Application Chronology for Restolar IND 0123456
Alert@
25
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Solution
26
§ Approach Pharma with a manufacturing discipline§ Approach Reg Ops as a critical path activity, strategically
§ Address core Reg Ops document-centric processes to shorten time to market and improve quality
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
The Power of Metadata
27
Enabling Search & Filters
Driving content plans
Auto-Naming
Driving Reporting
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Have Process and Technology Sing
28
BINDERS TEMPLATES & DOCUMENT TEMPLATES
BINDER STRUCTURE& METADATA
PLANNED DOCUMENTS
VIEWABLE RENDITIONS
BINDER EXPORT FOR SUBMISSION VENDOR
Content Planning
Templates / Documents Initialized
Content Authoring and Review
Final Formatting (Limited)
Publishing, QC &
DispatchArchiveContent
Approval
RAPID ENHANCED CHECK OUT / IN VIA SUBMISSION BINDER*
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
How Do We Get There?
Laying a Foundation
Getting Started
Advanced Capabilities
• Roles & responsibilities• Common definitions• Common systems
• Working in a system• Clean consistent data• Automation
• Reporting• Metrics• Traceability
29
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com |
Thank You
30