RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date:...

30
© Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com | Transforming Regulatory Processes

Transcript of RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date:...

Page 1: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Transforming  Regulatory  Processes

Page 2: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Transforming  Regulatory  Processes:  What  Needs  to  Change  and  How  to  Do  It  

2

Jim  ReillyDirector,  Product  StrategyVault  RegulatoryVeeva  Systems

Page 3: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

The  Need  to  Change§ Regulatory  is  at  the  tip  of  the  spear  of  realizing  market  potential  and  getting  therapies  to  patients

§ Opportunity  to  enhance  our  operations  through:§ Process  Adjustments§ Technology  Centralization§ Data  Consistency§ Focus  on  Operational  Learning

§ With  adjustments,  we  can  realize  the  vision  of  working  smarter,  not  harder

3

Page 4: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    | 4

Biggest  Pain  Points

Average  efficiency  of  integrated  RIM  processes

9% 6%Average  efficiency  of  manufacturing  

change  control  processes  

Source:  Steve  Gens  &  Associates,  Winter  Edition,  2015.  

Page 5: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Processes  and  Systems  are  Misaligned

5

Ø Process  made  complex  by  technologyØ Redundancy  of  information  

Ø Limited  connectivity  of  informationØ Difficult  to  report  on  progress

Page 6: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Common  Challenge:  No  Standardization  or  Tracking

Lack  of  Standardization

No  Central  Tracking

§ Multiple  systems  § Multiple  spreadsheets§ No  consistency  across  systems  or  spreadsheets

§ No  consistent  terminology  or  dictionary

§ No  consistency  of  what  to  capture§ No  consistent  ownership

Lack  of  Traceability

Lack  of  Metrics

§ No  holistic  view§ No  connections  between  documents  and  data

§ No  ability  to  assess  impact

§ Can’t  aggregate  or  compare  across  products  or  regions

§ No  input  to  process  improvements

6

Page 7: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

The  Result:  Data  Black  Hole

Lack  of  Visibility• No  data  summarization  or  reporting

Communication  Breakdowns• Lack  of  regional   info  sharing• Status/Progress  not  shared

Page 8: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Common  Challenge:  Manual  Processes

No  automation  /  facilitation• No  alerts,  parallel  reviews,  auto-­updates  on  state  change

Reliance  on  email  and  calls• Information  black  hole

Manual  plans• Struggle  to  keep  current

Single  point  of  contact• Human  foibles,  e.g.  delays  when  passing  along  correspondence

Page 9: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Ideal  State:  A  Holistic  View  with  Clear  Connections  

Application  Chronology  for  Restolar IND  0123456

Page 10: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Ideal  State:  Automation  to  Minimize  Errors  and  Effort

Application  Chronology  for  Restolar IND  0123456

Alert@

Page 11: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

How  does  it  look  at  your  company?

What  would  you  like  to  change?

A  pause  for  discussion…

Page 12: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

How  Do  We  Get  There?

Laying  a  Foundation

Getting  Started

Advanced  Capabilities

• Roles  &  responsibilities• Common  definitions• Common  systems

• Working  in  a  system• Clean  consistent  data• Automation

• Reporting• Metrics• Traceability

12

Page 13: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Lay  the  foundation:  Roles  &  Responsibilities

13

Owner

Project  Manager

Contributors

Partners

Page 14: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Lay  the  Foundation:  Common  Definitions

14

What constitutes a commitment?

What gets tracked?

Who manages which type?

What gets reported on?

Page 15: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Lay  the  Foundation:  Common  Systems

15

Headquarters

Affiliates

External  parties

Other  departmentsGlobal/central  use  of  

systems

Page 16: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Getting  Started:  Work  Within  a  System

16

Internally  Driven  Change

Externally  Driven  Change

New  ApplicationAnnual  reportLabel  changeShelf  life  extension

• Create  regulatory  events

• Define  related  activities• Assign  ownership

• Plan  submissions• Develop  deliverables

• Track  due  dates• Link  to  HA  correspondence

• Finalize  submissions• Report

Additional  information  requestIncremental  study  requestManufacturer  problems

Page 17: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

!

Getting  Started:  Automation

Calendaring Workflows Notifications

17

Page 18: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Getting  Started:  Prioritize  Clean  and  Consistent  Data

Centralize  or  standardize  data  entry

Establish  a  governance  process  for  dictionary  management

Designate  data  owners  responsible  for  quality

Usage  of  a  standardized  dictionary

• Product  Information• Application• Submission

• Study  Information• Manufacturer(s)• Vocabularies

18

Page 19: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Advanced  Capabilities:  Reporting

Report  across  related  elements  for  global  registration  insights

Allocate  work  to  local  teams  and  track  

activities

Global  Registration  Status

Local  Market  Activities

Which  are  open,  closed,  have  due  date  

approaching

Track  within  and  across  applications

CommitmentsCorrespondence

Capture  expected  activities,  submissions,  and  commitments

Calendar

Content  PlanProgress

Deliverable  Status

Submissions

19

Page 20: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Advanced  Capabilities:  MetricsDocument  Status

Clinical Non  Clinical Quality Regulatory

Record  Count

Days  until  Planned  Submission

Documents  Approved  This  Month

192 days

23 documents

Overdue  Approval  Tasks Average  Time  to  Approval

• Receipt  dates• Due  dates• Time  to  respond• Plan  vs.  actual• Region  or  area• Response  targets

Page 21: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Advanced  Capabilities:  Traceability

21

Creating  relationships  enables  you  to  trace  the  impact  of  business  changes.

PRODUCT

REGISTRATION

SUBMISSION(S)

APPLICATION(S)

CORRESPONDENCE

COMMITMENT(S)

EVENT(S)

CHANGE  REQUESTS

ACTIVITIESDOCUMENT(S)

A  Manufacturing  Process  Changed:  Now  What?

Page 22: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Thank  You

22

Page 23: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Wrap-­up

Page 24: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

A  Long  List  of  What’s  Wrong

24

Lack  of  standardizationLack  of  automationLack  of  central  trackingLack  of  automated  trackingLack  of  traceabilityLack  of  metricsLack  of  visibilityLack  of  communication

Page 25: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Ideal  State:  A  Holistic  View  with  Automation  

Application  Chronology  for  Restolar IND  0123456

Alert@

25

Page 26: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Solution

26

§ Approach  Pharma  with  a  manufacturing  discipline§ Approach  Reg  Ops  as  a  critical  path  activity,  strategically

§ Address  core  Reg  Ops  document-­centric  processes  to  shorten  time  to  market  and  improve  quality

Page 27: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

The  Power  of  Metadata

27

Enabling  Search  &  Filters

Driving  content  plans

Auto-­Naming

Driving  Reporting

Page 28: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Have  Process  and  Technology  Sing

28

BINDERS  TEMPLATES  &  DOCUMENT  TEMPLATES

BINDER  STRUCTURE&  METADATA

PLANNED  DOCUMENTS

VIEWABLE  RENDITIONS

BINDER  EXPORT  FOR  SUBMISSION  VENDOR

Content  Planning

Templates  /  Documents  Initialized

Content  Authoring  and  Review

Final  Formatting  (Limited)

Publishing,  QC  &  

DispatchArchiveContent  

Approval

RAPID ENHANCED  CHECK  OUT  /  IN  VIA  SUBMISSION  BINDER*

Page 29: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

How  Do  We  Get  There?

Laying  a  Foundation

Getting  Started

Advanced  Capabilities

• Roles  &  responsibilities• Common  definitions• Common  systems

• Working  in  a  system• Clean  consistent  data• Automation

• Reporting• Metrics• Traceability

29

Page 30: RIM - Roundtable Presentations - 2016 · RIM - Roundtable Presentations - 2016 Created Date: 4/11/2016 11:38:20 PM ...

©  Copyright  2016  Veeva Systems  Inc.,  all  rights  reserved veeva.com    |

Thank  You

30