Right of Way Management

Basics and Beyond

Page 2: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

PresenterMonty Zimmerman

Developed byMonty Zimmerman

Right of Way Manager, City of Lenexa

Murv MoreheadRight of Way Coordinator, City of Overland

Park

Page 3: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

What is “Right of Way Management”?

ROW Management is best defined as “the ability of a municipality to

govern, regulate and/or control the activities occurring within its

property (ROW)”.

Page 4: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Learning Objectives

• Understanding BMP’s of ROW Management

• ROW management challenges• Functions of a ROW management

program• How to accomplish utility coordination• The importance of One Call • New construction techniques • Emerging Issues

Page 5: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

5

BMP’s for a ROW Management Program

ROW Management Ordinance Agency ROW Permit Requirements Permit Review Process Inspections Restoration of permitted project

Page 6: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Row Management Ordinance

• This is your enforcement mechanism• Sets forth regulations for access to the

right of way

• Outlines obligations of the city• Outlines obligations of ROW users• Outlines obligations to the public

6

Page 7: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

ROW Permit Requirements

• Current Franchise Agreement for service providers

• Completed permit application form including bonds & insurance

• Proposed work plan showing existing utilities• Traffic control plan (if needed)• Payment of all applicable permit fees

7

Page 8: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Permit Review Application should have:• Applicant’s name, address and phone

number• Start and completion dates • Project location and scope of project• One call ticket number• Facility owner information, contractor

information• Excavation information • Area in ROW where work will take place• Construction method (open cut, tunneling

or boring)

8

Page 9: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Inspection Process

• Inspect project periodically• Keep records of each visit • Monitor job site erosion/sediment

protection• Monitor compaction during backfill

operations• Monitor street/sidewalk repairs (if

applicable)• Monitor traffic control/work zone (if

applicable) 9

Page 10: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Restoration

• Restoration must be “as good or better” than original condition

• Pavement/sidewalk restoration should be done as soon as possible

• Green restoration should be done as planting season allows

• Make sure all restoration is in accordance with your technical specs

10

Page 11: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

ROW Management Challenges• Lack of resources• Resistance to comply with city ordinances• Time management• Coordinate additional utility installations

in existing ROW • Staying informed on the latest

construction trends in trenchless technology, (equipment, chemicals, fluids, tooling, locating technology and trends)

11

Page 12: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Potential Responsibilities of ROW Programs

• After hours emergency response• Liaison between agency, utility operators,

contractors and locators• Represent agency in regional/national ROW

related issues and become a damage prevention advocate

• Assist project managers with CIP design as it relates to utility and ROW issues

• Manage utility relocations for CIP projects

12

Page 13: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

13

Duties and Responsibilities City of Overland Park City of Leawood City of Shawnee Johnson County City of Lenexa

Manage ROW permit system yes yes yes yes

Field inspection yes yes yes yes

Investigate violations of ROW requirements yes yes yes yes

Coordinate w/ building inspectors regarding ROW issues yes

Ensure reqs for traffic control are meet for ROW permits yes yes

Coordinate and educate Utility Co. with city policies yes yes

Maintain city ROW ordinance yes yes

Serve as City rep in regional/national ROW activities yes yes yes

Adhere to saftey rules develop and follow safe work habits yes yes yes

Review construction plans for CIP projects yes

Manage utility relocations for CIP projects yes yes

Serve as damage prevention rep for city yes

Liase between City and Utilites yes

Other duties as required by supervisor yes yes yes yes

Ensure compliance with conditions in franchise agreements

Inform emergency services, of street closures yesInvestigate & respond to complaints from residents & businesses yes yes

Prepare and maintaing invoices for ROW work yes yes yes

Research ROW and easement information yes yes

Survey ROW boundries for utilities, contractors & homeowners yes

Street light & traffic signal operation yes

Assist on street light petitions yes

Provide locates for city owned streetlights and signals yes

Issue and inspect driveway, sidewalk and irrigation installs yes yes

Supervise other ROW employees yes yes

Respond to after hours Utility emergencies yes yes

Manage ROW and easement acquisitions for road projects yes

Write legal discriptions for land acquisitions yes

Provide data to appraisers to determine compensation for projects yes

Negotiate for property being conveyed yes

Coordinate field check meetings yes

Administer payments for reimbursable utility relocates yes

Orginize, plan & direct fence relocations yes

Page 14: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Utility Coordination

• “Brownfield” is the most challenging, due to already congested ROW

• Highly congested ROW’s require plans showing SUE “level A” locations of existing utilities

• Foster cooperation among all utilities/service providers

• Develop utility relocation schedule • Mediate/resolve conflicts

14

Page 15: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Utility Coordination• “Greenfield” presents a different set of

challenges in that it requires extensive planning for utility placement

• Implementing use of utility corridors • Implementing use of shared trenches• Implementing use of joint trench concepts• Construction of duct banks

15

Page 16: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Importance of One Call• Contacting One Call is required by state

law and agency ordinance• Contacting One Call is the first step

toward preventing damages to existing utilities

• Notifies utility owners/operators of impending excavation

• Reduces or eliminates excavator liability in the event of a utility damage

16

Page 17: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

New Construction Techniques

• Trenchless technology• Inneream, Arrowbore , Pipe Bursting,

Slip Lining, Cured In Place Pipe……• SUE (subsurface utility engineering)• Vacuum Excavation• Keyhole method

17

Page 18: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Emerging Issues

• Sustainability• SUE (subsurface utility engineering)• One Call issues• Crossbores• Private utilities in the ROW• Web based ROW management tools

18

Page 19: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Sustainability

“Because of the finite nature of our ROW’s, we must embrace sustainable construction methods and techniques that will allow the needs of today to be met while at the same

time assuring that our most precious resource, our ROW, is available for

generations to come”.

19

Page 20: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Sustainability• Use of construction methods that reduce

open trenching thereby reducing restoration requirements

• Use of construction methods that reduce the overall carbon footprint of a project

• Use of construction methods that reduce impacts to traffic patterns

• How to get the message to engineers and project managers

• Costs?20

Page 21: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

SUE (Subsurface Utility Engineering)

• SUE is “an engineering process that utilizes new and existing technologies to accurately identify, characterize and map underground utilities early in the development of a project or in certain cases during construction”.

• How to put this discipline into use• How to get the message to engineers and

project managers• When should SUE be used and at what level• Costs 21

Page 22: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

One Call Issues

• Should everyone participate• Should everyone participate equally• Should members pay more to incorporate

new technology statewide• Should penalties for non compliance with

One Call laws be strictly enforced/increased• Should a utility owner be required to locate

their service lines

22

Page 23: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Crossbores

Defined as the “intersection of an existing underground utility or underground structure by a second utility resulting in direct contact between the transactions of the utilities that compromises the integrity of either utility or underground structure”.

• The most dangerous scenario is when a natural gas line intersects with a sanitary sewer lateral

23

Page 24: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Private Utilities in the ROW

• Do these utilities need to be a member of one call

• Should private facilities be allowed in public ROW

• What are the costs of not requiring private facilities to be members of one call

24

Page 25: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Web Based ROW Management Tools

Web based programs are designed to create streamlined solutions for planning, coordinating, permitting, analyzing, and communicating work in an agencies' right of way. It is designed to save time and money, and enable proactive management of utility projects, public works projects, permitting incidents, traffic and events.

25

Page 26: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Web Based ROW Management Tools

• Many providers – Envista, ROWAY, ROW Manager….

• Provides real time mapping using Google Maps

• 24/7 access from anywhere an internet connection is available

• Most providers use a hosted site platform• Cost is based on the number of permits and

agency generates per year• Programs have the ability to communicate

with other organizations that use the same product 26

Page 27: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

27

Page 28: Right of Way Management Basics and Beyond. Presenter Monty Zimmerman Developed by Monty Zimmerman Right of Way Manager, City of Lenexa Murv Morehead Right.

Questions?

28