Rig Stacking Strategies - Marine Money€¦ · Rig Stacking Strategies 6th Annual Offshore Finance...
Transcript of Rig Stacking Strategies - Marine Money€¦ · Rig Stacking Strategies 6th Annual Offshore Finance...
Rig Stacking Strategies 6th Annual Offshore Finance Forum
Houston - 7 April 2016
Chip Keener Integrated Rig Stacking Solutions LLC
www.keener-consulting.com 1
Industry Cycles The Risks Warm Stack vs Cold Stack The Cost of Responsibly Stacking
Rig Stacking Strategies
0
10
20
30
40
50
60
70
80
90
100
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Oil Price vs Industry Build
Jackup Floater $/bbl Inflation adjusted
3
1. Corrosion – hull, machinery, piping, electrical systems • VCI’s, dehumidification, cathodic protection
2. Mold – accommodations 3. Weather Events – particularly cyclonic storms 4. Certification – dates of reference
• IMO MODU Code / Flag State – keel laying • CLASS – shipyard contract … or reactivation
5. Control Systems – drilling, well control, vessel management, power management, dynamic positioning • 1000’s of parameters (software & several 100 PLC’s) • 3-6 months of commissioning with the OEM’s
Layup Risks – Startup Time / Asset Valuation
1. Documentation 2. Inventory & Capital Spares 3. System Commissioning & Validation 4. Infant Mortality
Added Burdens & Risks – New Construction
Warm Stacking correlates with a sustained crew component, and expectation of vessel readiness … though not always. Cold Stacking implies unmanning of a vessel, and presumption of neglect … though not necessarily.
Cold Stack vs Warm Stack
Responsible Stacking – Jackups
~ $600,000 Setup Cost (excludes ~ 4 wks crew participation) • Intake Survey, Dehumidification, VCI’s, Monitoring
Equipment, Accommodation Module
~ $4,800 Daily Run Cost • Labor (3 rotators), Generator, Fuel, R&M, Insurance,
Class - COC Compliance , Local Permits
Incremental Nested Jackups ~ $500,000 Setup Cost ~ $2,400 Daily Run Rate
~ $1,100,000 Setup Cost (excludes ~ 6 wks crew participation) • Intake Survey, Dehumidification, VCI’s, Monitoring
Equipment, Accommodation Module
~ $6,000 Daily Run Cost • Labor (4 rotators), Generator, Fuel, R&M, Insurance,
Class - COC Compliance , Local Permits
Incremental Unmanned Semis in Proximity ~ $1,200,000 Setup Cost (includes SOLUS boat & davit) ~ $3,000 Daily Run Rate
Responsible Stacking – Moored Semis
~ $1,800,000 Setup Cost (excludes ~ 6 wks crew participation) • Intake Survey, Dehumidification, VCI’s, Monitoring
Equipment, Accommodation Module
~ $20,000 Daily Run Cost • Labor (8 rotators), Generator, Fuel, R&M, Insurance,
Class - COC Compliance , Local Permits • ~ $3,500/day additional for tri-catenary moorings
Incremental Unmanned DP Rigs in Proximity
~ $2,000,000 Setup Cost (includes SOLUS boat & davit) ~ $7,500 Daily Run Rate (inclusive of tri-catenary moorings)
Responsible Stacking – DP Floaters
DP Floaters – Warm vs Cold Stack
Months
$’s millions
Assumptions – Cold Stacking $ 3,000,000 setup fee per rig (VCIs, dehumidification, monitoring, mooring) $ 3,500/day mooring rental per rig $ 1,800/day insurance per rig $ 18,000/day 8 man response team & services amortized across all the rigs
Assumptions – Warm Stacking $ 50,000/day per rig
$36.5
$20.6
$10.7
$14.0
10
Management & support services:
• project management & staffing • guidance in maintaining sensitive equipment
(e.g. volatile memory, software management) • counsel in the maintenance & suspension of
class & flag state certification • underwriter engagement on insurance risk • commissioning services on startup
Comprehensive Integrated Services
11
www.keener-consulting.com 12