RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall...

43
RICHARD WERNSING PSE&G

Transcript of RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall...

Page 1: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

RICHARDWERNSING

PSE&G

Page 2: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

POR QUE GESTÃO

DE ATIVOS

É IMPORTANTE?

Page 3: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Page 4: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

• Utility Overview

– New Jersey Based

– Total Assets ~ $17 Billion

– Total Revenue ~ $8

Billion

• Service Territory

– 323 Municipalities

– 70% of New Jersey’s

population

– 2.2 million Electric

customers

– 1.7 million Gas

customers

– 2,600 Square Miles

New York City

Philadelphia

Page 5: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based
Page 6: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

DATA

DATA

DATA

DATA

Page 7: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

$ (

$ M

illio

n)

Years

Substation O&M Savings

0

1

2

3

4

5

6

7

8

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Maintenance Efficencies Failure Avoidance Short term Opportunites

Short Term Opportunities

Maintenance Efficiencies

Failure Avoidance

Page 8: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

• Diagnostic/InspectionCollect and

Centralize Data

• InformationTransform data into Actionable

Condition Based Maintenance

SAIFI Optimization

Criticality

Drive Results

Data Collection

Analysis & Reporting

Drive Results

Raw data

Measurement

points

Notifications

Work Orders

Feedback

Page 9: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

People

CGI CAD System

Shared ServerScheduling

Dispatching

SAPJob Creation

Financials

Materials Mgt

Asset registry

OSIAsset Management

Historical Data

and

Analysis

EquipmentInformation

Condition Based Maintenance

Wireless Network

Inspection DataDiagnostic Data

Jobs CreationMaterial

Time Sheets Job Completion

+ Process

Service Assurance (Outage Management)

Work Management (Crew Management)

Wireless Communications

Graphic Information (AM/FM)

Decision Support (Data driven decisions)

+ Systems

Page 10: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

OMS

GIS

Transformer Loads Gas Analysis

SAP Asset Registry

Pole Top Solar

Distribution SCADA

Transmission SCADA Electrical TestsAsset Inspections

Page 11: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Assessing Asset Condition

CircuitsSAIFI

UndergroundNetworkReliability

SubstationReliability

PoorestPerformingDevices (PPD)

Advanced Loop Scheme (ALS)

VisibilityMonitoring

Dynamic Transformer MonitoringTransformersBreakers/Relays

Page 12: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based
Page 13: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based
Page 14: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

These annual expenditures protect $20.5 B of inside plant assets and

full benefits after approximately five years.

Note:

Illustration depicts overall

changes in maintenance

investment strategy.

Preventive

Maintenance

Corrective

Maintenance

Capital Rep.

Calendar Based

Preventive

Maintenance

Corrective

Maintenance

Failures

Condition Based

Preventive

Maintenance

Historical Today

Failures

Capital Rep

10-20% Overall Reduction

Page 15: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Assessing Asset Condition

CircuitsSAIFI

UndergroundNetworkReliability

SubstationReliability

PoorestPerformingDevices (PPD)

Advanced Loop Scheme (ALS)

VisibilityMonitoring

Dynamic Transformer MonitoringTransformersBreakers/Relays

Page 16: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

TieFdr #1 Fdr #1

COR 8023 COR 8032

Existing Configuration

Page 17: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

451S

451S

651R 651R 651R 651R 651R

651R

651R651R651R651R

COR 8023

COR 8032

R FR

1

R

tie

FR

2

FR

3

FR

4

FR

5

FR

1

FR

2

FR

3

FR

4

Fiber

Optic

Cable

Page 18: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Innovations Current System Modernized Grid

Customer Segmentation

Average 1500

customers Impacted

per outage

Average 500

Customers Impacted per outage

Single Phase Tripping Not Implemented

Average 1500

customers Impacted per outage

Average 167 single

phase customers impacted per outage

Make Before Break Momentary Interruption 30-60 seconds

No Momentary Interruptions

Page 19: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Options Cost

Traditional ApproachTrim tree’s, replace equipment $6 - 12 M per loop

Smart Grid TechnologyLimit risk, add communications (fiber), and leverage technology

$2 - 4 M per loop

Both options produce similar SAIFI results for the first year

Page 20: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

OpportunityRising SAIFI Trends are not adequately

being addressed with

current Asset Management

Programs

SolutionLeverage

opportunitiesto improve toolsfor investment prioritization

BarriersCulture Change

System upgradesDedicated personnel

Securing funding

OutcomeA device based

program that has optimized

SAIFI reduction and spend

…will mitigate rising electric distribution SAIFI trends.

Page 21: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Targeting extended customers interrupted, a two part asset evaluation algorithm was

developed, modeled after our current inside plant CMMS system structure.

Frequency

• Number of occurrences

30%

CustomersInterrupted

• Number of customer interruptions

60%

Remediation Complexity

• Variance of cause codes

10%

I. Incident Evaluator Algorithm:

Device Health Score provides the basis for an initial prioritization of potential projects, subject to further field inspections and cost estimates as described below.

SAIFI Yieldon Investment

(Yield Score)Remediation Cost Estimate

SAIFI Benefit Validation

• Scope of work assessment by field engineering /

asset management

– SAIFI benefit validation

– Remediation cost estimates

II. Field Inspection, SAIFI validation and Cost Estimates:

Scope of work assessment in field provides basis for cost estimate and validation of SAIFI benefit.

Benefits and costs form basis for SAIFI Investment Yield calculation and final prioritization of projects.

Page 22: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Inc

rem

en

tal S

AIF

I B

en

efi

t

Incremental SAIFI Benefit vs. Cumulative Cost

0.00

0.05

0.10

0.15

0.20

0.25

0.30

$- $20.0 $40.0 $60.0 $80.0 $100.0 $120.0 $140.0

Cost in $Millions

Inc

rem

en

tal

SA

IFI

Be

ne

fit

Reliability Base Spend plus Incremental Device Approach Spend ($M)

SAIFI Benefit attained from Incremental Spend

Page 23: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

0

0.02

0.04

0.06

0.08

0.1

0.12

0.14

0.16

1 6 11 16 21 26 31 36 41 46 51 56 61 66 71 76 81 86 91 96 101 106 111 116 121 126

Prioritized Remediation Projects

Yie

ld (

SA

IFI/$

Millio

n In

ve

ste

d

= Metro

= Central = Palisades

= SouthernSAIFI Yield (SAIFI Benefit/ $ Invested)

Page 24: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Assessing Asset Condition

CircuitsSAIFI

UndergroundNetworkReliability

SubstationReliability

PoorestPerformingDevices (PPD)

Advanced Loop Scheme (ALS)

VisibilityMonitoring

Dynamic Transformer MonitoringTransformersBreakers/Relays

Page 25: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based
Page 26: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based
Page 27: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

••

••

––

Page 28: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Page 29: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Page 30: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Lifecycle

Analysis

PipesSplicesPumping

PlantsTerminatorsCable

Page 31: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Lifecycle

Analysis

ConductorTowerHardware

Page 32: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

CMMS PI ServerHDW

Metro

CentralPalisades

Southern

ESOC

OMS

GIS

Asset Mgr’s Engineers/Planners DERC

Advanced

Applications

The overall initiative focuses on utilizing, improving and augmenting the overall capabilities of the Transmission Operation System while incorporating new technology, methodology, recognizing and capitalizing on business drivers and opportunities along the way.

Page 33: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Page 34: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Page 35: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Build a Fiber Network Reliable communications network

Bergen

Athenia

Belleville

West Orange

Lake Nelson

Aldene

Lakeside

South Orange

Cook Rd.

Montclair

Hawthorne

East Rutherford

Roseland

Jefferson

Branchburg

Somerville

Kingsland

Central

Control

When it breaks we know who will fix it.

Page 36: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Smart Network Management

needs dataDispatch

LineRelays

Transformer Monitoring

Non-Operational Data SDAMS

Operational DataSCADA

Bus Relays

Station

Fiber Network

PI Historian

Transformer Relays

Station Comm BUS

DataConcentrator

Page 37: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Promoting easy flow of information for better business decisions

Asset

Management

Planning &

Analysis

Field

Mobility

Operational

Awareness

Collect, organize

& exchange data

Transform data

Into actionable

information

Get the information

where it is most

needed

Foster a culture

That disseminates

knowledge

The Future is ….Storm Damage Assessment – decision support systems

(GIS) Graphic Information System Upgrade

(OMS) Replace Outage Management System

(ADMS) Replace Distribution Management Systems

(EMS) Replace Energy Management System

Asset Risk Management (Operational Awareness)

Page 38: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Page 39: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

Current Future

Distribution Investments

Low High

A proactive risk based asset management strategy results in overall operational awareness.

Reactive

Safety concerns

Decreased reliability

Failure based strategy

Replace/Maintain assets upon failure

High O&M costs

Proactive

Improved reliability

Risk based strategy

Optimize based on targeted condition

Reduced O&M costs

Regulatory credibility

Page 40: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based
Page 41: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based
Page 42: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based

#OSIsoftLATAM

#OSIsoftLRC

Page 43: RICHARD WERNSING - Microsoft · A proactive risk based asset management strategy results in overall operational awareness. Reactive Safety concerns Decreased reliability Failure based