RIBBON DEVELOPMENT
-
Upload
sarvajanik-college-of-engimeering-amp-technology-surat -
Category
Education
-
view
2.796 -
download
6
description
Transcript of RIBBON DEVELOPMENT
![Page 1: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/1.jpg)
1
RIBBON DEVELOPMENT
SARVAJANIK COLLEGE OF ENGINEERING
& TECHNOLOGY, SURAT
URBAN
HOUSING
Presented by: 1. Manoj Patel Guided by: Prof. Himanshu Padhya
![Page 2: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/2.jpg)
2
CONTENTS
1. Growth of towns by flow type2. Ribbon development 3. Disadvantages of ribbon development4. Case highways design note 4/015. Advertising on roads and ribbon development act 21 of 19406. Some images of ribbon development7. References
![Page 3: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/3.jpg)
3
GROWTH OF TOWNS
ACCORDING TO ORIGIN
NATURAL GROWTH
CONCENTRIC SPREAD
RIBBON DEVELOPME
NT
SATELLITE GROWTH
SCATTERDE GROWTH
PLANNED GROWTH
ACCORDING TO
DIRECTION
HORIZONTAL GROWTH
VERTICAL GROWTH
GROWTH OF TOWNS BY FLOW TYPE
![Page 4: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/4.jpg)
4
Ribbon developmentIt has been observed that because of improvement of road surface and growth of motor traffic, it is the natural tendency of everyone to build as near as possible to the main road.
The building activity therefore expands in a natural way along the side of main road and long fingers or ribbons of houses, factories, shops, etc.
![Page 5: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/5.jpg)
5
Disadvantages of ribbon development
1. As the houses extend in a long strip, there is increase in cost of various basic utility services such as water supply, electricity, postal deliveries, telephone, etc. It thus results into wastage of available resources.
2. the development of ribbons causes to loose and to scatter the community so that there is lack of social life.
3. the future improvement becomes costly and difficult, if not impossible.
4. the houses face heavy traffic associated with noise, dust and undesirable smells.
5. the interior portion is left undeveloped which results in the wastage of valuable land.
![Page 6: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/6.jpg)
6
6. There are chances of traffic accidents and traffic delays because of the presence of pedestrians on the main road.
7. The ribbon development is purely an urban formation which is aesthetical faulty.
8. The ribbon development spoils the countryside and if it is carried to the extreme, it would make it non-visible as least to the road user.
9. The through traffic of main road is considerably affected by the local traffic.
10. The traffic capacity and efficiency of main road are reduced.
![Page 7: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/7.jpg)
7
The problem of ribbon development is very complex involving socio-economic, political, technical and legal measures for its solution. it requires a co-operative efforts by legislators, town planners, traffic department, judiciary, adjacent land owners and last but not the least, the road users themselves.
Case highways design note 4/01
![Page 8: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/8.jpg)
8
In many developing countries, lack of planning controls
have allowed roadside development to become a major
problem, from individual sellers of market produce
scattered along a highway to the many kilometres of ribbon
(linear) development that can be seen in a number of
countries.
![Page 9: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/9.jpg)
9
In the UK it has been accepted for more than 50 years (when the 1936 Restriction of Ribbon Development Act was introduced) that if trunk roads are to perform satisfactorily as channels for longer distance traffic, the number of connections for vehicular access must be limited.
The impact of ribbon development on through traffic can be minimized by restricted or controlled planning of residential and commercial property along the route.
![Page 10: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/10.jpg)
10
When not possible
Where this is not possible to control ribbon development, the introduction of traffic calming techniques to improve driver behaviour and thereby protect the most vulnerable road users is desirable
![Page 11: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/11.jpg)
11
Some Images Of Ribbon Developments
![Page 12: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/12.jpg)
12
Early to mid 20th century ribbon development between Hatfield Woodhouse and Hatfield
![Page 13: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/13.jpg)
13Ribbon development Belgium
![Page 14: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/14.jpg)
14
Mountain Hare Character Area Industrial Settlement Of Isolated Roads And Ribbon Development
![Page 15: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/15.jpg)
15Ribbon Development Near Ahmadabad Or Sanand
![Page 16: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/16.jpg)
16Ribbon Development Near Ahmadabad
![Page 17: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/17.jpg)
17
conclusionIn India there is not mostly ribbon development is seen because the starting of road touch or highway touch construction cover the whole area that’s why that does not come under the ribbon development
When benefits of different places are same that not increase the ribbon development but when there is no other option that directly support the ribbon development
IRC-SP-15-1996 - Ribbon Development Along Highways give specification to ribbon development in India
![Page 18: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/18.jpg)
18
References
• S.C. RANGWALA, K.S. RANGWALA, P.S. RANGWALA. CHAROTAR PUBLISHING HOUSE PVT. LTD.
• Case Highways Design note 4/01 Roadside, Village and Ribbon Development- the Department for International Development
• ADVERTISING ON ROADS AND RIBBON DEVELOPMENT ACT 21 OF 1940 (Signed by the Governor-General in Afrikaans)
• Google Images For Ribbon Development
![Page 19: RIBBON DEVELOPMENT](https://reader034.fdocuments.in/reader034/viewer/2022052322/5575e0efd8b42af74e8b45bc/html5/thumbnails/19.jpg)
19
THANK
YOU