RI Coal Data Collection System 2013 ESDM

download RI Coal Data Collection System 2013 ESDM

of 12

Transcript of RI Coal Data Collection System 2013 ESDM

  • 8/10/2019 RI Coal Data Collection System 2013 ESDM

    1/12

    DEPARTEMEN

    ESDM

    COAL DATA COLLECTION

    2, October 2013

    Jakarta

    Center for Data and Technology Information

    MINISTRY OF ENERGY AND MINERAL RESOURCES

  • 8/10/2019 RI Coal Data Collection System 2013 ESDM

    2/12

    DEPARTEMEN

    ESDM

    MINISTER EMR

    DIRECTORATE

    GENERAL OF

    OIL AND GAS

    DIRECTORATE

    GENERAL OF

    ELECTRICITY

    DIRECTORATE

    GENERAL

    OF MINERAL & COAL

    PUSDATIN

    SECRETARIAT

    GENERAL

    GEOLOGICAL

    SURVEY

    AGENCY

    R & DAGENCY

    EDUCATION

    &

    TRAINING

    AGENCY

    EXPERT ASSISTANT

    OF

    THE MINISTER

    INSPECTORAT

    GENERAL

    DIRECTORATE

    GENERAL OF

    RENEWABLE

    ENERGY

    PUSDATIN aims to manage all those data and information..

    MEMR STRUCTURE ORGANISATION

    http://c/Documents%20and%20Settings/TOSHIBA/My%20Documents/Struktur%20Organisasi%20DESDM%20english.ppthttp://c/Documents%20and%20Settings/TOSHIBA/My%20Documents/Struktur%20Organisasi%20DESDM%20english.ppthttp://c/Documents%20and%20Settings/TOSHIBA/My%20Documents/Struktur%20Organisasi%20DESDM%20english.ppthttp://c/Documents%20and%20Settings/TOSHIBA/My%20Documents/Struktur%20Organisasi%20DESDM%20english.ppthttp://c/Documents%20and%20Settings/TOSHIBA/My%20Documents/Struktur%20Organisasi%20DESDM%20english.ppt
  • 8/10/2019 RI Coal Data Collection System 2013 ESDM

    3/12

    DEPARTEMEN

    ESDM

    SOURCES ENERGY DATA

    PUSDATIN

    Dit. of

    Oil & Gas;

    BP/BPH

    Dit. of

    Mineral & Coal

    Dit. ofElectricity

    Dit. ofRenew.

    Energy

    PERTAMINA,

    PGN & Other Oiland Gas

    Company

    PLN, IPP &

    PPUPGI & Other

    RE Company

    PTBA,

    Other Coal

    Company

  • 8/10/2019 RI Coal Data Collection System 2013 ESDM

    4/12

    DEPARTEMEN

    ESDM

    PUSDATIN

    STATISTICS

    AGENCY

    MINISTRY

    OF TRADE

    MINISTRY OF

    INDUSTRYProvincial/Distric

    Mining

    Administration

    Other Source..

    BANK OF

    INDONESIA

  • 8/10/2019 RI Coal Data Collection System 2013 ESDM

    5/12

    DEPARTEMEN

    ESDM

    Coal Data Collection

    -Coal Contract of

    Work (CCoW)

    -State Owned

    (PT. Bukit Asam)

    - Mining BusinessLicence (MBL)

    DIRECTORATE

    GENERAL OF

    MINERAL & COAL

    PUSDATIN

    Regional MiningAdministration

    Mining Buisness

    Licence (MBL)

    data flow has been running

    data flow has not run

  • 8/10/2019 RI Coal Data Collection System 2013 ESDM

    6/12

    DEPARTEMEN

    ESDM

    SOURCES OF COAL DATA

    DATA Sources

    Resources and Reserve Geological Agency

    Production

    Direktorat General Mineral & Coal

    Regional Mining Administration

    Sales

    Direktorat General Mineral & Coal

    National Electricity Company (only for power plant)

    Export

    Direktorat General Mineral & Coal

    Directorate Export, Statistic Agency

    Bank of Indonesia

    Ministry of Trade

    Import

    Directorate of Impor, Statistic AgencyBank of Indonesia

    Ministry of Trade

  • 8/10/2019 RI Coal Data Collection System 2013 ESDM

    7/12

    DEPARTEMEN

    ESDM CURRENT CONDITION

    1. Different Data Between Institution

    Year Statistic Agency MEMR (Handbook of EEI)

    2007 188 663 068 216.946.699

    2008 178 930 188 240.249.968

    2009 228 806 887 256.181.000

    2010 325 325 793 275.164.196

    2011 415 765 068 353.270.937

    Production of Coal

    YearDirectorate General

    of Mineral and CoalMinistry of Trade Statistic Agency Bank of Indonesia

    2005 110.789.700 129.044.089 129.044.089 124.008.630

    2006 143.632.865 183.917.234 183.917.234 190.883.000

    2007 163.000.000 195.785.823 195.785.823 205.895.000

    2008 191.430.218 200.965.578 200.965.578 196.272.000

    2009 198.366.000 234.119.653 234.119.653 232.121.000

    2010 208.000.000 291.061.823 291.061.823 286.856.000

    2011 272.671.351 323.434.548 323.434.548 348.055.000

    2012 347.504.497 347.504.497 385.421.000

    Export of Coal

  • 8/10/2019 RI Coal Data Collection System 2013 ESDM

    8/12

    DEPARTEMEN

    ESDM

    CURRENT CONDITIONcontinue.....

    2. Coal data in Pusdatin not cover data from

    Regional

    Type Company Total Company Share Production

    CCoW 32

    + 85 %Stated Owend 1

    Mining Buisness Licence

    Permit from Central Goverment

    9

    Mining Buisness Licence

    Permit from Regional Goverment + 10.000 +15 %

  • 8/10/2019 RI Coal Data Collection System 2013 ESDM

    9/12

    DEPARTEMEN

    ESDM

    CURRENT CONDITION continue.....3. Not available coal production data based on calories

    YearProduction

    TotalSteam Coal Antracite

    2000 77.014.956 25.229 77.040.185

    2001 92.499.653 40.807 92.540.460

    2002 103.286.403 42.690 103.329.093

    2003 114.274.048 3.952 114.278.000

    2010 275.164.196 0 275.164.196

    2011 353.270.937 0 353.270.937

    HS Year 2006 2007 2008 2009 2010

    2701110000 Anthracite 729.936 900.437 1.019.453 687.947 456.387

    2701121000Bituminous coal: coking

    coal100.488.659 88.450.941 84.652.013 81.568.823 85.653.768

    2701129000Bituminous coal: other

    than coking coal37.935.382 57.191.108 50.457.935 74.942.586 93.528.230

    2701190000 Other coal 44.763.255 49.243.336 64.836.175 76.920.296 111.423.436

    TOTAL 183.917.232 195.785.823 195.785.823 234.119.653 234.119.653

    but export data avaliable on HS code...

  • 8/10/2019 RI Coal Data Collection System 2013 ESDM

    10/12

    DEPARTEMEN

    ESDM

    CURRENT CONDITION continue.....

    Not yet available database system in almostsources data

    Data collection is voluntary basis, not yet

    available regulations which is manage datacollection to Pusdatin

    The limitations of the human resources who

    understand of energy statistics

  • 8/10/2019 RI Coal Data Collection System 2013 ESDM

    11/12

    DEPARTEMEN

    ESDM

    FUTURE DEVELOPMENT

    Increase coordination with source data including

    regional goverment to improve quality of data

    Development database system which can be

    use for all Pusdatin staff

    Prepare regulation for collecting energy data

    Needs capacity building

  • 8/10/2019 RI Coal Data Collection System 2013 ESDM

    12/12

    DEPARTEMEN

    ESDM