![Page 1: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/1.jpg)
Rhode Island UST Program
Implementing ERP Using
Tablet PC Technology
RI Department of Environmental RI Department of Environmental ManagementManagement
www.dem.ri.govwww.dem.ri.gov
![Page 2: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/2.jpg)
TOPICS
• RI UST ERP
• DATABASE DEVELOPMENT
• UST INSPECTION WORK FLOW
• STATISTICAL ANALYSIS
![Page 3: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/3.jpg)
TOPICS
• RI UST ERP
![Page 4: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/4.jpg)
RI UST ERP
• EPA Technical Assistance Contract
• 6 Stakeholder meetings - Spring/Summer 2003
• Completed Work Book and Check List
• 100 Baseline Inspections - Summer 2004
• Regulatory Change Making ERP Mandatory - Late Fall 2004
• Self-Certifications Sent January 2005
![Page 5: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/5.jpg)
RI UST ERP (con’t)
• Certifications due June 31, 2005
• 461 Certifications received
• Warning Letters sent to non-responders
• 607/664 Certifications Received (91%)
• 526 Deficiency Letters Issued
• 761 RTCs received as of July 1, 2005
![Page 6: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/6.jpg)
TOPICS
• RI UST ERP
• DATABASE DEVELOPMENT
![Page 7: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/7.jpg)
Project Overview Project Management Methodology
• Analysis• Design• Development• Deliverables• Extranet• Quality Assurance• Training / Documentation• Issue Tracking
![Page 8: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/8.jpg)
Mobile Inspection Solution Process
SchedulingPre-
InspectionInspection
Post-Inspection
Purpose
Outputs
Actions
Value
Designate facilities for inspection and assign to staff
Scheduled (“tagged”) facilities
Entry and management of complaints and inspections
Collect all available facility data (permits, violations, etc.)
A strategy for the inspection
Auto-Transfer of all available info, including GIS maps, and attachments for an inspection
Reduces the time required for research; ensures comprehensive data for all inspectors,
Assess facility compliance with environmental regs
Inspection summary report and a list of violations
Record data into consistent forms and checklists with validation logic. Print Copy
Ensures consistency and complete inspections; data provides foundation for analytics and automated post-inspection activities
Bring facilities into compliance with environmental regs
Compliance docs… and a cleaner environment!
Data transfer to Central Database. Finalization of Investigation compliance docs
Provides managerial review; efficiently generates docs; ensures visibility and performance of inspection follow-up
Provides visibility, thereby reducing risk of missing inspections;
![Page 9: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/9.jpg)
TOPICS
• RI UST ERP
• DATABASE DEVELOPMENT
• UST INSPECTION WORKFLOW
![Page 10: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/10.jpg)
Application Support Site – Step 1
Document Repository on DEM Intranet holds Inspections and supporting documentation for each facility.
![Page 11: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/11.jpg)
Department builds “target list” from repository of available facilities.
![Page 12: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/12.jpg)
Building Target List (Continued)
![Page 13: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/13.jpg)
Inspectors choose which inspections to view in detail.
Inspectors create local list by selection from central list
Tablet
![Page 14: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/14.jpg)
Each facility record includes current, as well as past inspection records, supporting documentation and reference materials as selected by the department.Multiple inspection forms and types can be supported with the same system.
![Page 15: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/15.jpg)
Inspection Forms are pre-populated with data from the supporting department information systems.
![Page 16: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/16.jpg)
Tablet Drawing Capabilities
![Page 17: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/17.jpg)
When complete the inspector makes a recommendation,
adds comments and checks the inspection
into the central repository.
![Page 18: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/18.jpg)
Supervisors come back to the intranet
and review inspector’s
recommendations, then make final
approvals.
![Page 19: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/19.jpg)
TOPICS
• RI UST ERP
• DATABASE DEVELOPMENT
• UST INSPECTION WORK FLOW
• STATISTICAL ANALYSIS
![Page 20: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/20.jpg)
Report Selection ScreenThe screen below is the entrypoint for the reporting process, enabling a user to select the desired report:
![Page 21: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/21.jpg)
![Page 22: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/22.jpg)
1.Report 1: Fisher’s Exact Test ResultsThis report determines the fisher exact test results for the difference in compliance proportions of the identified Environmental Business Practice Indicators (EBPIs).
![Page 23: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/23.jpg)
Report 2: Bonferroni ReportThis report applies the Bonferroni Correction to the Fisher Exact
Results
![Page 24: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/24.jpg)
Report 3: Confidence Interval ReportThis report gives upper and lower confidence intervals (at 95%) to the
percent change in compliance to each indicator
![Page 25: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/25.jpg)
Report 4: Return to Compliance ReportThis report gives a count of the number of return to compliance plans
submitted for a given EBPI and date range.
![Page 26: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/26.jpg)
EBPI Category
EBPI Identifier
Financial Responsibility FR.1
Tank Corrosion Protection B.1
Tank Corrosion Protection B.6
Tank Corrosion Protection B.10
Tank Corrosion Protection B.11
Tank Corrosion Protection B.13
Tank Corrosion Protection B.16
Tank Corrosion Protection B.17
Tank Corrosion Protection B.20
Tank Corrosion Protection B.21
Tank Corrosion Protection B.24
Tank Corrosion Protection B.25
Tank Leak Detection C.1
Tank Leak Detection C.6
Tank Leak Detection C.7
Tank Leak Detection C.10
Tank Leak Detection C.11
Tank Leak Detection C.12
Tank Leak Detection C.13
Tank Leak Detection C.14
Tank Leak Detection C.18
Tank Leak Detection C.19
Tank Leak Detection C.20
EBPIsThe following table represents the EBPIs that will be available in the 4
reports described above:
![Page 27: Rhode Island UST Program Implementing ERP Using Tablet PC Technology RI Department of Environmental Management .](https://reader036.fdocuments.in/reader036/viewer/2022062321/56649e025503460f94aec3d4/html5/thumbnails/27.jpg)
MORE INFORMATION
• Microsoft Case Studyhttp://www.microsoft.com/resources/casestudies/CaseStudy.asp?CaseStudyID=16986
• Tellus Report on MA DEP Website• http://www.mass.gov/dep/erp/erprepts.htm
• RI Website - Auto Body Statistical Analysis Report
http://www.dem.ri.gov/programs/benviron/assist/abdycert/abdycert.htm
http://www.dem.ri.gov/programs/benviron/assist/usterp/index.htm