RHM - ADAMS MISSION CHURCH BUILDING PROJECT

AFM Folweni Manase Branch

Page 3: RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.

Phase I Erecting the steel structure with roof and isolated ceiling.

Page 4: RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.

The vacant site in Manase (Adams Mission)

Page 5: RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.

The Team from Gauteng arrivesThe off loading begins

Page 6: RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.

Like puzzle pieces... The components of the structure is laid out

Page 7: RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.

The first sections are made to stand

Page 8: RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.

Making great progress. The roof about 80% completed!

Page 9: RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.

Now for the last finishing touches

Page 10: RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.

The view from inside

Page 11: RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.

Phase II

Adding the side pannels (shade netting) During the next two weeks we will be preparing the

temporary side pannels made of sheet netting. These pannels will be added on all sides of the structure and will basically work like window blinds.

Page 12: RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.

Phase III

Floor slab

The local church will start raising funds to pour the floor slab. In the meanwhile the ground will just be levelled completely and compacted. This will allow them to use the church even without the cement floor being in place.

Page 13: RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.

Phase IVBuilding the permanent outer walls. The last phase will

be the building of permanent outer walls. Funds will be raised to buy building blocks for this purpose

Page 14: RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.

A vision of the future