RHINO CEMENT PRESENTATION MAY 2015

90
ARM CEMENT LTD | ARM LOCATIONS KENYA TANZANIA RWANDA RHINO CEMENT OFFICE & PLANT LOCATIONS Nairobi – Head Office Athi River – Cement Grinding Plant Mombasa – Branch Office Kaloleni – Integrated Cement Plant Tanga – Integrated Cement Plant Dar – Cement Grinding Plant Kigali – Cement Grinding Plant Kitui - Site for Kitui

Transcript of RHINO CEMENT PRESENTATION MAY 2015

Page 1: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

ARM LOCATIONS KENYA TANZANIA RWANDA

RHINO CEMENT OFFICE & PLANT LOCATIONS

Nairobi – Head Office

Athi River – Cement Grinding Plant

Mombasa – Branch Office

Kaloleni – Integrated Cement Plant

Tanga – Integrated Cement Plant

Dar – Cement Grinding Plant

Kigali – Cement Grinding Plant

Kitui - Site for new clinker plant

Kitui

Page 2: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

TRACK RECORD OF BUILDING WORLD CLASS CEMENT PLANTS TOTAL CLINKER BASED CAPACITY 2.5m TONS PER YEAR

• 1996 - 200 TPD Kaloleni, Kenya

• 2006 – 750 TPD clinker plant in Kaloleni

• 2008 – 1,500 TPD clinker capacity expansion, Kaloleni

• 2010 – 2,000 TPD grinding plant, Athi River, Kenya

• 2012- 2,500 TPD grinding plant Dar Es Salaam, Tanzania

• 2014- 4,000 TPD clinker plant, Tanga, TZ

Page 3: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 20140.0

2.0

4.0

6.0

8.0

10.0

12.0

2.0 2.42.6 2.8

3.2 3.53.9 4.3

4.95.5

6.17.0

7.6

9.29.9

11.0Per Capita Consumption1999 - 22 KG2014 - 88 KG

CAGR 12% per year since 1999

EAST AFRICA CONSUMPTION 1999 - 2013

All figures in ‘Million tons

MARKET GROWTH HAS BEEN ROBUST OF THE LAST 15 YEARS GROWING AT 2X PLUS GDP

GROWTH RATE

3

Page 4: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

TANZANIA

4EAST AFRICA PER CAPITA CEMENT CONSUMPTION HAS A LONG WAY TO GROW…..

4

Page 5: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

SETTING HIGHER

STANDARDS BUILDING

SOLID FOUNDATIONS

Page 6: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

Quality Management

Systems ISO 9001

ARM is the first cement company ISO 9001

certified cement company in East

Africa in 2000

Page 7: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

ARM is the first and only cement company

ISO 14001 certified cement company in East Africa in 2004

Environmental Management

System ISO 14001:2004

Page 8: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD | 8

KEBS TEST CERTIFICATE FOR RHINO CEM I52.5 GRADE CEMENT

Page 9: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

KEBS TEST CERTIFICATE FOR RHINO CEM I 42.5 GRADE CEMENT

9

Page 10: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

KEBS TEST CERTIFICATE FOR RHINO CEM II32.5 GRADE CEMENT

10

Page 11: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

RHINO CEMENT ULTRA HIGH STRENGTH 52.5 GRADE

CEMENT NOW MANUFACTURED BY ARM IN

KALOLENI AND IN DAR ES SALAAM

Page 12: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

RHINO CEMENT 32.5, 42.5 AND 52.5 GRADE CEMENTS

MANUFACTURED BY ARM IN

DAR ES SALAAMAND CERTIFIED BY TANZANIA BUREAU

OFSTANDARDS

Page 13: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

Page 14: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

Click icon to add picture

Page 15: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

Page 16: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

RHINO CEMENT 52.5 GRADE CEMENT FOR STANDARD GAUGE RAILWAY (SGR) PROJECT

Page 17: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

52.5 GRADE CEMENT FOR STANDARD GAUGE RAILWAY (SGR) PROJECT

52.5 GRADE CEMENT PARAMETERS

SGR SPECIFICATION FOR 52.5 GRADE

GB 175: TB10424-2010

CHINA ROAD & BRIDGE COCENTRAL LAB REPORT FOR RHINO CEMENT

RHINO CEMENT

CHEMICAL ANALYSIS    

Free Lime – CaO ≤ 1.0 % 0.39% YES SO3 ≤ 3.5 % 1.90% YES Cl ≤ 0.06 % 0.018% YES

Alkali Content ≤ 0.8 % 0.74% YES

Loss On Ignition ≤ 3.5 % 3.13% YES

PHYSICAL ANALYSIS

Specifc Surface Area 300 - 350 m2 / Kg 320 m2 / Kg YES

Setting time – Initial ≥ 45 Minutes 132 Minutes YES

Setting time – Final ≤ 600 Minutes 156 Minutes YES

3 - days break strength ≥ 4 Mpa 6.4 Mpa YES

3 - days compressive strength ≥ 23 Mpa 33 Mpa YES

28 - days break strength ≥ 7 Mpa 8.5 Mpa YES

28 - days compressive strength ≥ 52.5 Mpa 53.2 Mpa YES

Page 18: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

SOME PICTURES TO ILLUSTRATE

ARM’S EXPERIENCE IN CONCRETE USE

AND CONSTRUCTION

IN EAST AFRICA

Page 19: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

KALOLENI 1,500 TPD CLINKER PLANT

Page 20: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

ATHI RIVER 2,000 TPD CEMENT GRINDING PLANT

Page 21: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

DAR ES SALAAM 2,500 TPD CEMENT GRINDING PLANT

Page 22: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

TANGA 4,000 TPD CLINKER PLANT- The largest Single kiln plant in East Africa Region

22

Page 23: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

WORKS UNIT DAR TANGA Excavation M3    60,000     230,000Piling Nos          915                     -   

Concrete Foundation M3      7,000      10,000

Concrete Others M3    13,000      36,000

Structure; Fabrication Tons          980         6,000

Structure; Erection Tons          980        6,000

Power Cable Km            20            150Control Cable km            40            250

ARM CONSTRUCTION BACKGROUNDA SOLID CONCRETE EXPERIENCE!

Page 24: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |24

DAR CEMENT SILO 6M X 400MM CLASS 30 CONCRETE PILES

Page 25: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |25DAR CEMENT 18,000 TON

CAPACITY SILO FOUNDATION

Page 26: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |26

Page 27: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

RAW MATERIAL HOPPER BUILDING CONCRETE SUPPLIED BY ON SITE READY MIX BATCHING PLANT

Page 28: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |28

DAR ES SALAAM 2010

SILO SLIPFORM SILO

CONSTRUCTION AT RATE OF 2.4 METRES PER 24

HOURS

Page 29: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |29

TANGA PREHEATER TOWER FOUNDATION 7 M BELOW GROUND LEVEL CLASS 25

CONCRETE

Page 30: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

TANGA PREHEATER 2ND FLOOR, AND RAW MATERIAL 28,000 TON SILO READY WITH SLIP FORM JACKS

Page 31: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

DAR ES SALAAM 2010

SILO SLIPFORM SILO

CONSTRUCTION AT RATE OF 2.4

METRES PER 24 HOURS

COLUMNS RAISED ON PILE CAPS

AND MILL FOUNDATION

Page 32: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

KALOLENI RAW MATERIAL SILO AT 12 M HEIGHT SHOWING STEEL REINFOCING FOR INTERNAL BLENDING CONE

Page 33: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

MILL FOUNDATIONS FOR 150 TONNES PER HOUR MILL ATDAR ES SALAAM PLANT, TOTAL STATIC LOAD OF MILL 350 TONNES, WITH TWIN SYNCHROUNOUS MOTORS OF 2,200 KW EACH

33

Page 34: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |34

UNDERGROUND RAW MATERIL EXTRACTION TUNNELS

CONSTRUCTED WITH CLASS 30 WATER TIGHT CONCRETE

Page 35: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |35

DAR CEMENT GRINDING PLANT STRUCTURAAL STEEL WORKS

Page 36: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |36DAR 150 TPH CEMENT MILL

ERECTION

Page 37: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

60M X 4.5M DIAMETER KILN UNDER ERECTION AT TANGA

Page 38: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

TANGA ROTARY KILN ERECTION

38

Page 39: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

SETTING HIGHER

STANDARDS

WHAT IS CLINKER?WHY DIFFERENT GRADES

OF CEMENT?

Page 40: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

STRENGTH, DURABILITY AND CONSISTENCY OF CEMENT STARTS WITH CHEMISTRY…

40

ALITE C3S Tricalcium silicate

BELITE C2S Dicalcium silicate

C3A Tricalcium Aluminate

C4AF Tetracalcium Aluminoferrite

CaO Free lime

Microscopy of clinker

Page 41: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

ARM CLINKER AND CEMENT PRODUCTION

PLANTS

FULLY AUTOMATED

PROCESSCONTROL

FOR PRECISIONCHEMICAL

COMPOSITION AND

QUALITY CONTROL

Page 42: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

FULLY AUTOMATED PROCESS CONTROL

FULLY AUTOMATEDPROCESSCONTROL

Page 43: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

FROM RAW MATERIAL TO CEMENT COMPLETE PROCESS

QUALITY CONTROL AT EVERY STAGE

43

Purity of raw materials

Precision of raw material proportions

Homogenization of raw

materials

CONTROLLED chemical reaction to produce Clinker

high in C3S and C2S

CLINKER

Page 44: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

Cement strength N/mm2 is driven by the chemistry of clinker44

QUALITY OF CLINKERCLINKER

PARAMETER POOR AVERAGE GOOD EXCELLENTATTRIBUTE

OF PARAMETER

C3S %Tricalcium silicate

48 % 50 % 60 % 66 % High early strength & initial setting.

C2S % Dicalcium silicate

14 % 15 % 20 % 24 % Strength after 7 days.

C3A % Tricalcium Aluminate

15 % 10 % 7 % 6 % Responsible for heat of hydration

C4AF Tetracalcium Aluminoferrite

15% 12% 10% 4 % Contributes to colour & early strength

CaOFree lime

5 % 3% 2% 1% Responsible for expansion and cracking

Page 45: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

CLINKER

ADDITIVES

CEMENT

Page 46: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

100 80 60 40 20 00

20

40

60

80

100

CEM IV B – 45% CLINKER + SLAG

CEM II B – 65% CLINKER

CEM II A – 80% CLINKER

CEM I – 95% CLINKER

CLINKER CONTENT IN VARIOUS CEMENT TYPES AS PERKEBS EAS 18-1:2001

46

% ADDITIVE IN CEMENT

% CLINKER

IN CEMENT

Highest strength and durability

Page 47: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

BAG MARKING AND SPECIFICATION OF CEMENT GRADE

INK JET ONLINE PRINTING OF DATE OF MANUFACTURTE AND

BATCH NUMBER

TYPE OF CEMENT, GRADE OF CEMENT AND KEBS PERMIT

NUMBER

Page 48: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

NOT ALL ADDITIVES CONTRIBUTE TO CEMENT STRENGTH… 48

PARAMETER GBFS POZZOLANA LIMESTONE

Strength gain after 28 days Increases No effect × Reduces×Rate of Heat Hydration

Reduces Reduces No effect ×Density of the concrete mix Increases Reduces× Reduces×Rate of chloride diffusion Reduces No effect × No effect ×Alkali-Aggregate reaction Prevents No effect × No effect ×Water impermeability Increases No effect × Reduces×Reactivity with clinker Highly Reactive Poor × No effect ×

Page 49: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

Strength & grade of cement

Composition Application

Strength – 32.5 N/mm2Grade – CEM II B-P

Clinker – 72%Pozzolana – 25%Gypsum – 3%

Light structural work Class 15 to Class 25

Strength – 42.5 N/mm2Grade – CEM I

Clinker – 97 %Gypsum – 3%

Structural work Class 25 to Class 40

Strength – 52.5 N/mm2Grade – CEM I

Clinker – 97%Gypsum – 3 %(Using High Strength Clinker)

High Strength Concrete Class 40 to Class 60

Strength–42.5 - MarineGrade – CEM III

Clinker – 72%GBFS – 25%Gypsum – 3%

Aggressive environments, marine and water tight structuresClass 25 to Class 60

RHINO CEMENT GRADES AVAILABLE FOR ALL CONSTRUCTION SPECIFICATIONS

Page 50: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

SETTING HIGHER

STANDARDS

DO ALL CEMENTS GIVE HIGH STRENGTH CONCRETE?

CEMENT GRADES32.5, 42.5, 52.5 N/mm2

FOR CONCRETE CLASS C20 TO C60

Page 51: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

CONCRETE MIX DESIGN AND INDEPENDENT TESTING

Page 52: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

QUANTITY OF CEMENT REQUIRED IN CONCRETE DECREASES WITH HIGHER GRADE OF CEMENT

32.5 42.5 52.5200

250

300

350

400

450

500

CLASS - 35 390 KG

350 KG

390 KG

340 KG

300 KG

CLASS - 25

KGS / M3

GRADE OF CEMENT USED

Page 53: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

20

25

30

35

40

21

2830

3335

38N/M3

Class 50 with 52.5

Class 45 with 42.5

Class 40 with 42.5

Class 25With 32.5 TYPICAL DESIGN

Class 35 with 42.5

7 DAY STRENGTH OF VARIOUS CONCRETE CLASSES WITH RHINO CEMENT

HIGHER STRENGTH WITH RHINO CEMENT ALLOWS FASTER STRIPPING, FASTER CONSTRUCTION, AT LOWER COST

MOST HIGH RISE CONSTRUCTION IN

KENYA DESIGNED WITH CLASS 25 CONCRETE WITH 7 DAY STREGTH

OF 18 N/M3

Class 30 with 42.5

Page 54: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

SETTING HIGHER

STANDARDS

USING HIGH STRENGTH CONCRETE

FOR LEANER STRUCTURESMORE USABLE SPACE

AND COST SAVINGS

Page 55: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

USING CLASS 35 INSTEAD OF CLASS 25 CONCRETE RESULTED IN A SAVINGS OF 20% IN ARM’S TANGA

CEMENT PLANT PREHEATER TOWER

TALLEST STRUCTURE IN EAST AFRICA AT 131M UNTIL JULY 2014

Concrete M25 Concrete M35Concrete 6897 M3 5134 M3

Steel (Fe 415) 830 Tons 620 Tons

Savings in overall cost ~ 20%Additional benefits

• Increase in floor space ~ 15%• Reduction in column size ~ 15%

Page 56: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

CEMENT PLANT PREHEATER TOWER

DESIGNED WITH HIGH STRENGTH CONCRETE

LEANER STRUCTURE, LESS CONCRETE VOLUME, LOWER

SHUTTERING REQUIREMENT,

LOWER CONSTRUCTION TIME, AND MORE

AVAILABLE FUNCTIONAL SPACE

Page 57: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

NAIROBI NEEDS MORE USABLE SPACE IN COMMERCIAL BUILDING DESIGNS

Page 58: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

NAIROBI’S STANDARD 6M X 6M GRID CAN BE IMPROVED WITH HIGHER STRENGTH

CONCRETE

Page 59: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

FOR EXAMPLE: 14 FLOOR APARTMENT BUILDINGS IN KILELESHWA WITH SLIMMER COLUMNS USING CLASS 35

CONCRETE MADE WITH RHINO CEMENT

59

Page 60: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

HOW MUCH CONCRETE PER METER OF USABLE SPACE

Concrete Usage Index (CUI)

is an indicator of the amount of concrete

required to construct a superstructure which

includes structural and non-structural elements. CUI is defined as volume

of concrete in cubic meters to cast a square

meter of constructed floor area.

Page 61: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

61

CLASS OF CONCRETE

CONSIDER CLASS 25 AS BASE AND ALL PARAMETERS ASSUMED UNCHANGED

SAVING IN % ON THE M3 REDUCTION OF CONCRETE VOLUME AGAINST BASE

C25 100 % N/A

C30 92 % 8 %

C35 87 % 13 %

C40 83 % 17 %

C45 78 % 22 %

C50 73 % 27 %

REDUCTION IN CONCRETE VOLUME WITH INCREASE IN CONCRETE GRADE WITH PRO-RATA REDUCTION IN STEEL

Page 62: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

High strength concretes are enabling taller, lighter and more cost-effective high-rise construction

“Using high-strength concrete means that the column size is reduced and therefore, the amount of concrete, reinforcement and formwork required is consequently reduced. In simple terms,

the use of high-strength concrete provides one of the most economical ways to carry vertical loads to a building’s foundation. It also provides

performance benefits of early high-strength, volume stability and extended life cycle.

High-strength concrete can also be used to reduce slab depths and, therefore, a building’s overall height. This can result in significant cost

savings whilst slimmer high-strength concrete columns can increase the overall net area; again, more for less”

Jenny Burridge Head of structural Engineering at The Concrete Centre UK.

Page 63: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

The economic benefits of using high-strength concrete for high-rise buildings are based on the

straight forward premise of ‘more for less’.

Page 64: RHINO CEMENT PRESENTATION MAY 2015

MADRID TOWERS / SPAIN

Variation of the concrete grade along the hight of the tower and typical cross-section of the columns

Torre Espacio:Confinement with reinforcement at the intersection between slabs and columns with different concrete grades

Page 65: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

CONCRETE COLUMNS SIZES ARE NO LONGER A CONSTRAINT

Just a few decades ago, many designers believed that concrete was inappropriate for tall buildings, since the then lower strength mixes available would require column sizes of prohibitive proportions.

These excessive column sizes would interfere with floor layouts and monopolize valuable leasable space.

Now, with higher strengths more widely available, column sizes can be reduced and often remain constant for a building’s full height, with the concrete strength decreasing at higher levels of the structure.

Page 66: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

“Durability and economical long-term maintenance have become goals along with economical construction. For example, stronger HPC materials allow for longer spans and fewer piers in initial construction, and they also enhance durability to extend the useful life of the structure and reduce the ongoing costs of maintenance”

FEDERAL HIGHWAY ADMINISTRATION - USA

Page 67: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

RHINO CEMENT IN ACTION

SOME PICTURES TO ILLUSTRATE

CONCRETE USE AND CONSTRUCTION IN

EAST AFRICA

Page 68: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

RHINO CEMENT USED ON THIKA ROAD PROJECT BY MOTORWAYS CONSTRUCTION - INFRASTRUCTURE PROJECTS NOW USING HIGH

STRENGTH CONCRETE FOR BRIDHES WITH WIDE SPAN AND SPEEDY CONSTUCTION

Page 69: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

FINISHED OVERPASS BRIDGE ON 8 LANE THIKA ROAD HIGHWAY

Page 70: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

HIGH QUALITY AND PRECISION IN-SITU CONCRETE CASTING WITH RHINO CEMENT 42.5 FOR LARGE INFRASTRUCTURE PROJECT

Page 71: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

HIGH QUALITY AND PRECISION INSITU CONCRETE CASTING WITH RHINO CEMENT 42.5 FOR LARGE INFRASTRUCTURE PROJECT

Page 72: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

EXAMPLE OF HIGH QUALITY PRECAST CONCRETE PRODUCTS MADE WITH RHINO CEMENT 42.5 - FINISH IS SUPERIOR WITH SMOOTH AND CLEAN EDGES

Page 73: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

QUALITY OF CONCRETE FINISH IS SUPERIOR WITH SMOOTH AND CLEAN EDGES, AND AESTHETICALLY SIPERIOR DUE TO STRENGTH

CONCRETE

Page 74: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

UPANGA UNION COMPLEX, DAR ES SALAAM

Page 75: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

GROUP SIX PROJECT-OYSTERBAY, DAR ES SALAAM

Page 76: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

MATHRADAS RESIDENTIAL COMPLEX, DAR ES SALAAM

Page 77: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

GIOJECT-TEMEKE

Page 78: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

KAYTA TOWER-MOROCCO, DAR ES SALAAM

Page 79: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

ULTIMATE RESIDENTIAL SUITE, DAR ES SALAAM

Page 80: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

USE RHINO CEMENT FOR

STRONGER STRUCTURES LEANER COLUMNS

MORE USABLE SPACE AND

COST SAVINGS

Page 81: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

USE RHINO CEMENT FOR

STRONGER STRUCTURES LEANER COLUMNS

MORE USABLE SPACE AND

COST SAVINGS

Page 82: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

ARM CEMENT LTDTHE COMPANY ON THE MOVE

82

Page 83: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD | 83

KENYA PORT AUTHORITY - APPROVAL LETTER FOR ARM CEMENT

Page 84: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

MAJOR PROJECTS USING ARM CEMENT - INFRASTRUCTURE

PROJECT NAME DESCRIPTION LOCATION STATUS CONTRACTOR

KPA OFFICE BUILDING

KENYA PORT AUTHORITY - COMMERCIAL

MOMBASA COMPLETE GOLDEN CARA CONSTRUCTION

KALOLENI KILIFI ROAD

ROAD PROJECT MOMBASA ON GOING MULJI DEVRAJ BROTHERS LTD

LUNGA LUNGA ROAD PROJECT

ROAD PROJECT MOMBASA COMPLETE NJUCA CONSOLIDATED

AFRICA INTERNATIONAL UNIVERSITY

UNIVERSITY MOMBASA ON GOING KENTURK CONSTRUCTION

KWALE SUGAR INDUSTRIAL MOMBASA COMPLETE EPCO BUILDERS

KPA CONCRETE WORKS

PORT PROJECT MOMBASA COMPLETE GATEWAY INNOVATION

MAZERAS KALOLENI ROAD PROJECT

ROAD PROJECT MOMBASA COMPLETE S.S. MEHTA & SONS LTD.

JOMO KEYATTA UNIVERSITY

UNIVERSITY MOMBASA COMPLETE MULJI DEVRAJ BROTHERS LTD.

NYALI ROAD, DRAINAGE AND PAVEMENTS

ROAD PROJECT MOMBASA ON GOING NJUCA CONSOLIDATED

RONAL NGALA UNIVERSITY

UNIVERSITY MOMBASA ON GOING MULJI DEVRAJ BROTHERS LTD

84

Page 85: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

MAJOR PROJECTS USING ARM CEMENT - COMMERCIAL

PROJECT NAME DESCRIPTION LOCATION STATUS CONTRACTOR

LIKONI TOWERS 4 BLOCKS x 10 FLOOR REIDENTIAL

MOMBASA COMPLETE GOKH CONSTRUCTION

OCEAN 7 APARTMENTS

7 BLOCK X 23 FLOOR RESIDENTIAL

KIKAMBALA ON GOING MULJI DEVRAJ BROTHERS LTD

SEA VIEW PEARL APARTMENTS

8 FLOOR RESIDENTIAL

MOMBASA COMPLETE SEA VIEW APARTMENT

JAFFREY SPORTS CLUB

14 FLOOR COMMERCIAL

MOMBASA ON GOING MULJI DEVRAJ BROTHERS LTD

GRAIN BULK COMMERCIAL BUILDING

8 FLOOR COMMERCIAL BUILDING

MOMBASA COMPLETE MULJI DEVRAJ BROTHERS LTD

NYALI COMPLEX 14 FLOOR COMMERCIAL BUILDING

MOMBASA ON GOING PIRCON LTD

CASTLE BREEZE APARTMENT

12 FLOOR MOMBASA COMPLETE DEMON CONSTRUCTION

ROYAL COURT HOTEL

HOTEL KILIFI COMPLETE S.S.MEHTA & SONS LTD

NAIVAS MALL 9 FLOOR COMMERCIAL

MOMBASA COMPLETE COAST BUILDINGS LTD

RIGHT ADDRESS APARTMENT

5 BLOCKS X 10 FLOOR RESIDENTIAL

MOMBASA COMPLETE MULJI DEVRAJ BROTHERS LTD

85

Page 86: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

MAJOR PROJECTS USING ARM CEMENT - INFRASTRUCTURE

PROJECT NAME DESCRIPTION LOCATION STATUS CONTRACTOR

KAHARATI ROAD PROJECT KAHARATI COMPLETE G. ISSAIAS & CO.

MWEIGA ROAD PROJECT NYERI COMPLETE G. ISSAIAS & CO.

LIMBURU NDUMBERI ROAD PROJECT KIAMBU COMPLETE S.S. MEHTA & SONS

GIAKANJA, TETU / IHITHE

ROAD PROJECT NYERI COMPLETE INTEX CONSTRUCTION

ENA ISHIARA ROAD PROJECT ISHIARA COMPLETE INTEX CONSTRUCTION

MERILLE – MARSABIT

ROAD PROJECT MARSABIT ON GOING GULSAN INSAAT

KISUMU, NDORI ROAD PROJECT KISUMU COMPLETE AEGIS CONSTRUCTION

HOMABAY, MBITA ROAD PROJECT MBITA COMPLETE PUT SARAJEVO

WEBUYE, MALABA ROAD PROJECT MALABA COMPLETE MALTAURO CONSTRUCTION

86

Page 87: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

MAJOR PROJECTS USING ARM CEMENT - INFRASTRUCTURE

PROJECT NAME DESCRIPTION LOCATION STATUS CONTRACTOR

STANDARD GAUGE RAILWAY

RAILWAY PROJECT NAIROBI, EMALI, MTITO ANDEI, MARIAKANI, MIRITINI

ON GOING CHINA ROAD & BRIDGES CO.

RAILWAY QUARTERS RAILWAY PROJECT NAIROBI ON GOING VEE VEE ENTERPRISES

TULLOW OIL EXPLORATION

OIL EXPLORATION TURKANA ON GOING MOTORWAYS CONSTRUCTION

OLKARIA GROTHERMAL

GEOTHERMAL NAIVASHA ON GOING CIVICON

OLKARIA STEAM POWER GEN.

GEOTHERMAL NAIVASHA COMPLETE S.S. MEHTA & SONS

KISSI AWENDO TRANSMISSION

POWER TRANSMISSION

KISSI ON GOING TATA PROJECTS

KINDORUMA-MWINGI-GARISSA TRANS. LINE & SUB-STATION

POWER TRANSMISSION

MWINGI ON GOING ELE MECH

87

Page 88: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

MAJOR PROJECTS USING ARM CEMENT - INFRASTRUCTURE

PROJECT NAME DESCRIPTION LOCATION STATUS CONTRACTOR

NAROK – WATER TANK PROJECT

OVER HEAD WATER TANK

NAROK ON GOING KONOIKE CONSTRUCTION

MASAI UNIVERSITY UNIVERSITY NAROK ON GOING VEE VEE ENTERPRISES

KENYA POLYTECHNICUNIVERSITY NAIROBI ON GOING VEE VEE

ENTERPRISES

STRTHMORE UNIVERSITY

UNIVERSITY NAIROBI ON GOING QUEST WORKS

AL JAMIA UNIVERSITY

UNIVERSITY NAIROBI ON GOING DAWAT – E – HADIYAH

KENYATTA UNIVERSITY

UNIVERSITY NAIROBI ON GOING NANCHANG FOREIGN

RIOSIR ROAD PROJECT RONGO COMPLETE KAY CONSTRUCTION

88

Page 89: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

MAJOR PROJECTS USING ARM CEMENT - COMMERCIAL

PROJECT NAME DESCRIPTION LOCATION STATUS CONTRACTOR

SIFA TOWERS 11 FLOOR COMMERCIAL.

NAIROBI COMPLETE SUPER BARGAIN

WESTLANDS OFFICES

7 FLOOR COMMERCIAL

NAIROBI COMPLETE SUPER BARGAIN

KINGS – PRISM TOWERS

33 FLOOR COMMERCIAL

NAIROBI ON GOING SUPER BARGAIN

KINGS – THE DESTINATION

19 FLOOR COMMERCIAL

NAIROBI ON GOING SUPER BARGAING

FALCON TOWERS 14 FLOOR RESIDENTIAL

NAIROBI COMPLETE ECONOBUILT LTD.

TENTY ONE ON THIRD

4 BLOCK X 6 FLOOR RESI

NAIROBI COMPLETE ECONOBULIT LTD.

TRIDENT GRAND 2 BLOCK X 14 FLOOR RESIDENTIAL

NAIROBI ON GOING COSMOCARE

89

Page 90: RHINO CEMENT PRESENTATION MAY 2015

ARM CEMENT LTD |

MAJOR PROJECTS USING ARM CEMENT - COMMERCIAL

PROJECT NAME DESCRIPTION LOCATION STATUS CONTRACTOR

KRISHNA ESTATE 3 BLOCK X 11 FLOOR RESIDT.

NAIROBI COMPLETE MEERA CONSTRUCTION

RUNDA PARADISE ESTAT

RESIDENTIAL UNITS NAIROBI ON GOING NANCHANG FOREIGN

CEYTUN RESIDENTIAL COMPLEX

3 BLOCK X 13 FLOOR RESIDENTAIL

NAIFOBI ON GOING MOTORWAYS CONSTRUCTION

ADMINISTRATIVE POLICE TRAINING CENTRE

TRAINING CENTRE BARRACKS

NAIROBI ON GOING VEE VEE ENTERPRISES

RIVERS TOWERS RESIDENTIAL TOWER

NAIROBI COMPLETE SUPER BARGAIN

MUTHAMA HEIGHTS RESIDENTIAL TOWER

NAIROBI COMPLETE SUPER BARGAIN

SIMBA COLT COMMERCIAL NAIROBI COMPLETE VAKKEP BUILDING CONTRACTORS

90