RGUKT, Basar, Nirmal Dist.,Telangana – 504107 VOLUME – III...
Transcript of RGUKT, Basar, Nirmal Dist.,Telangana – 504107 VOLUME – III...
TENDER No: SRO/CON/ETS/017 dated 30.01.2019
FOR
e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft.
Apartment Blocks-1 No’s, Duplex House and Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
VOLUME – III
QUOTING SHEET &
PRICED BID
ENGINEERING PROJECTS (INDIA) LTD(A Government of India Enterprise)
Signature of the bidder with seal Page 1 of 1 EPI
In figures In words In
figures In words
1 Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and Storm water drains at IIIT Campus including civil, Electrical and PHE works
12.00 %
In Figures
RupeesIn Words
Rs.21,01,93,573.00 (Rupees Twenty One Crores OneLakhs Ninety Three Thousand FiveHundred and Seventy Three only)
SEAL & SIGNATURE OF BIDDER
Note : Price Quoted by the bidders are including of GST, Seigniorage charges and labour cess (1% of value of work done). GST as applicable shall be released on submission of documentary evidence of payment made towards GST.
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019QUOTING SHEET
SL. No. DESCRIPTIONEstimated Cost ( inclusive of all taxes and duties, including GST) (IN
Rs)
BIDDER'S PRICE AMOUNT IN Rs After adding percentage above
or at par or below% QUOTE ABOVE / AT PAR / BELOW
BIDDER'S FINANCIAL OFFER :
GST considered in above mentioned estimate cost =
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
1
Clearing and grubbing of land including uprooting wild vegetation,
grass, bushes, shrubs, saplings and trees of girth upto 300mm,
removal of stumps of such trees cut and disposal of unserviceable
materials and stacking of serviceable material to be used or
auctioned, upto a lead of 1000m including removal and disposal of
top organic soil not exceeding 150mm in thickness as per
technical specification Clause 201 MORD/MORTH
Sqm 7072.00 7.13 50,423.36
2
Earth work excavation for foundations and depositing on bank
for all lifts with an initial lead of 10m including all operational
,incidental, labour charges such as shoring, sheeting ,planking
,strutting etc complete for finished item. Including seignorage
excluding dewatering charges etc. as per SS-20B (APSS 308)
Cum 12006.05 95.90 11,51,380.20
3
Demolition including stacking of serviceable materials and
disposal of unserviceable materials within 100 metres lead-R.C.C
work
Cum 195.00 1982.90 3,86,665.50
4
Bored cast-in-situ M 25 grade Design mix RCC pile 600mm dia
using hydraulic piling rig with power unit and complete accessories
including shifting rig from from one bore location to another ; hire
and running charges of Bentonite pump , light crane for lowering
reinforcement cage ; loader 1 cum bucket capacity ; tipper 5.50
cum capacity for disposal of muck from pile bore hole to a
distance of 1 KM ; cost of Bentonite solution and temporary
casing of appropriate length for setting and removal of the same ;
including filling the bore with M 25 Design Mix ( mixing concrete in
Mechanical Weigh Batching units up to 15 cum/hr capacity ) using
20mm size (SS5) hard granite machine crushed graded metal
(Coarse aggregate) from approved quarry, using a minimum
quantity of 380 kgs. of cement per 1 cum of concrete including
cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of all
materials ,laying concrete, curing ,all incidental charges : labour
charges etc. complete but excluding cost of seigniorage charges,
reinforcement and fabrication charges as per drawing and
technical specifications as per IS - 2911 ( Part-I Section II ) -1979
for finished item of work. ( Length of Pile for payment shall be
measured up to bottom of Pile cap )
0.00
a)600mm dia RMT 1075.87 3862.69 41,55,732.98
b)450mm dia RMT 389.04 3120.67 12,14,065.46
5
Filling with Sand, including supply and delivery of good gravel for
filling, including cost of gravel, seinourage charges and
conveyance to site, filling charges, watering, tamping and
rammming and all labour charges and operational charges
complete as directed by the Departmental officers.
Cum 2194.66 1164.07 25,54,737.87
6
Plain Cement concrete in (1:4:8) prop. Using 40 mm HBG
metal including cost and conveyance of materials to site including
seignorage fee, Machine mixing, concrete laying tamping,
vibrating, watering curing and all labour charges, hire and
operational charges of machinery, water lead charges and
including bailing of water.etc. complete for finished item of work.
Cum 826.14 3973.22 32,82,435.97
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
Signature of the bidder with seal Page 1 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
7
Supply and placing of the Ready Mix (RMC) Design Mix
Concrete grade M25 as per IS 4926-2003 with minimum cement
content as per IS code 456-2000 using 20 mm graded metal, from
standard suppliers approved by the department including
centering,shuttering,pumping, laying concrete, vibrating, curing
etc. complete but excluding cots of steel and its fabrication
charges for finished item of work. Pilecap
Cum 935.60 7011.62 65,60,071.67
8
Construction of RR Masonary in C.M (1:6) prop. Using hard granite
stone including cost and conveyance of all materials like cement,
sand, water, Granite stone etc. including cost of seigniorage
charges on all materials, all taxes including labour for cutting
stones to required size and shape, mixing of cement mortar
construction, Scaffolding charges etc. complete for finished item of
work.
Cum 154.50 3928.87 6,07,010.42
9
Filling with Excavated Earth (Ordinary Soil) including cost and
conveyance of all labour charges etc., complete for finished item
of work.
Cum 2385.80 33.43 79,757.29
10
Filling with Gravel, including supply and delivery of good gravel
for filling, including cost of gravel, seinourage charges and
conveyance to site, filling charges, watering, tamping and
rammming and all labour charges and operational charges
complete as directed by the Departmental officers.
Cum 8213.03 461.22 37,88,013.70
11
Removal of unsuitable / Unserviceable soil including excavation,
loading and disposal upto 2000 m lead but excluding compaction
ground supporting embankment subgrade replacement by suitable
soil, which shall be paid separately as per Clause 303.5.2 as per
Technical Specification Clause 302.3.11 MORD / 301 MORTH
Cum 1065.00 44.90 47,818.50
12
Supply and placing of the Ready Mix (RMC) Design Mix
Concrete grade M25 as per IS 4926-2003 with minimum cement
content as per IS code 456-2000 using 20 mm graded metal, from
standard suppliers approved by the department including
centering, shuttering,pumping, laying concrete, vibrating, curing
etc. complete but excluding cots of steel and its fabrication
charges, for finished item of work.:Plinthbeam
Cum 92.27 9227.11 8,51,385.44
13
Providing Antitermite treatment as per IS 6315 (Part - 2) 2001 (Pre-
constructional chemical treatment measures) along the internal &
external vertical faces of the columns, plinth beams, basement
and top surface of the basement filling below flooring bed as per
the specified procedure conforming to IS 6315 (Part-2) 2001 and
other relevant approved specification duly using Chlorpyriphos/
Lindane emulsifiable concentrate 20% with 1% concentration @
7.5 Liters/ sqm of the vertical surface & @ 5.0 Liters/ sqm of the
horizontal surface of the substructure to a depth of 500 mm around
columns & 300 mm deep around plinth beams, basements & floor
filling area including excavation channel along the wall & rodding
etc & cost & conveyance of all materials to the site, cost of labour
for spraying, rodding etc complete for finished item of work as per
the approval of the Engineer-in-Charge
Sqm 2263.07 289.00 6,54,027.23
Signature of the bidder with seal Page 2 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
14
Supply and placing of the Ready Mix (RMC) Design Mix
Concrete grade M25 as per IS 4926-2003 with minimum cement
content as per IS code 456-2000 using 20 mm graded metal, from
standard suppliers approved by the department including ,
centering, shuttering, pumping, laying concrete, vibrating, curing
etc. complete but excluding cots of steel and its fabrication
charges for finished item of work.
a Columns : 0.00
1)ground floor : Cum 72.80 9056.92 6,59,343.78
2)First floor : Cum 71.22 9389.69 6,68,733.72
3)Second floor : Cum 65.57 9722.46 6,37,501.70
4)Third floor : Cum 65.57 10055.23 6,59,321.43
5)Fourth floor : Cum 65.57 10388.00 6,81,141.16
6)Fifth floor : Cum 65.57 10720.77 7,02,960.89
7)Terrace Floor Cum 18.66 11053.54 2,06,259.06
b Beams 0.00
1)ground floor : Cum 110.87 9585.49 10,62,743.28
2)First floor : Cum 111.17 9815.81 10,91,223.60
3)Second floor : Cum 101.92 10046.13 10,23,901.57
4)Third floor : Cum 101.92 10277.58 10,47,490.95
5)Fourth floor : Cum 101.92 10507.90 10,70,965.17
6)Fifth floor : Cum 101.92 10738.22 10,94,439.38
7)Terrace Floor Cum 26.23 10968.54 2,87,704.80
c 1)Grade slab/ Plinth Protection slab (100mm thickness) Sqm 1179.62 565.90 6,67,546.96
2)Grade slab(200mm thickness) Sqm 3754.80 1081.69 40,61,529.61
d slab-125mm thickness 0.00
1)ground floor : Sqm 962.22 1145.78 11,02,492.43
2)First floor : Sqm 925.62 1172.73 10,85,502.34
3)Second floor : Sqm 825.37 1198.53 9,89,230.71
4)Third floor : Sqm 825.37 1225.48 10,11,474.43
5)Fourth floor : Sqm 825.37 1251.28 10,32,768.97
6)Fifth floor : Sqm 869.05 1278.23 11,10,845.78
7)Terrace Floor Sqm 53.56 1304.03 69,843.85
e slab-150mm thickness 0.00
1)ground floor : Sqm 56.38 1274.73 71,869.28
2)First floor : Sqm 56.16 1302.29 73,136.61
3)Second floor : Sqm 56.16 1328.71 74,620.35
4)Third floor : Sqm 56.16 1356.27 76,168.12
5)Fourth floor : Sqm 56.16 1382.70 77,652.43
6)Fifth floor : Sqm 11.08 1410.26 15,625.68
7)Terrace Floor Sqm 108.12 1436.68 1,55,333.84
f Slab 175mm thick ground floor Sqm 20.25 1425.47 28,865.77
g 8)Slab 200mm thick Terrace floor Sqm 31.24 1721.30 53,773.41
h 1)R.C.C Wall(100mm thick)- Ground Floor Sqm 4172.00 3674.29 1,53,29,137.88
2)R.C.C Wall(230mm thick)- Ground Floor Sqm 38.85 4344.82 1,68,796.26
3)R.C.C Wall(200mm thick)- Second Floor Sqm 36.50 4557.84 1,66,361.16
4)R.C.C Wall(200mm thick)- Terrace Floor(Sixth Floor) Sqm 103.15 5292.22 5,45,892.49
i Stair Case
1)ground floor : Cum 10.45 9585.49 1,00,168.37
2)First floor : Cum 9.37 9815.81 91,974.14
3)Second floor : Cum 7.87 10046.13 79,063.04
4)Third floor : Cum 7.87 10277.58 80,884.55
5)Fourth floor : Cum 7.87 10507.90 82,697.17
6)Fifth floor : Cum 7.87 10738.22 84,509.79
j Lintels : 0.00 -
1)ground floor : Cum 12.71 9287.56 1,18,044.89
2)First floor : Cum 26.50 9549.89 2,53,072.09
3)Second floor : Cum 25.15 9812.22 2,46,777.33
4)Third floor : Cum 25.15 10073.41 2,53,346.26
5)Fourth floor : Cum 25.15 10335.74 2,59,943.86
6)Fifth floor : Cum 25.15 10598.06 2,66,541.21
7)Terrace Floor Cum 6.95 10860.39 75,479.71
Signature of the bidder with seal Page 3 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
k Sills/Chajja/Sunshade: 100mm thick 0.00 -
1)ground floor : Sqm 54.00 1048.65 56,627.10
2)First floor : Sqm 61.80 1078.38 66,643.88
3)Second floor : Sqm 60.50 1106.98 66,972.29
4)Third floor : Sqm 60.50 1136.72 68,771.56
5)Fourth floor : Sqm 60.50 1165.31 70,501.26
6)Fifth floor : Sqm 60.50 1195.05 72,300.53
7)Terrace Floor Sqm 13.00 1224.78 15,922.14
l Precast slabs-25mm thick 0.00 -
1)First floor : Sqm 170.18 654.47 1,11,377.70
2)Second floor : Sqm 160.18 677.81 1,08,571.61
3)Third floor : Sqm 145.18 702.28 1,01,957.01
4)Fourth floor : Sqm 145.18 725.62 1,05,345.51
5)Fifth floor : Sqm 145.18 750.10 1,08,899.52
15
FLYASH Brick masonry 29x22.5x14 cm for panel walls in
superstructure with CM (1:6) prop: (Cement : Screened sand)
from approved source having minimum crushing strength of 50
Kg/Sqcm. including cost and conveyance of all materials like
cement, screened sand, bricks, water etc., to site, including sales
& other taxes on all materials and such as labour charges, like
mixing cement mortar, scaffolding charges, constructing masonry,
lift charges, curing, etc.,and overheads & contractors profit
complete for finished item of work. (APSS No. 501 & 504).
0.00 -
a)ground floor : Cum 247.42 6144.12 15,20,178.17
b)First floor : Cum 244.19 6503.25 15,88,028.62
c)Second floor : Cum 226.72 6862.36 15,55,834.26
d)Third floor : Cum 215.65 7221.48 15,57,312.16
e)Fourth floor : Cum 215.65 7580.60 16,34,756.39
f)Fifth floor : Cum 215.65 7939.72 17,12,200.62
g)Terrace Floor Cum 137.17 8298.79 11,38,345.02
h)Ground floor upto 1.2M height Cum 480.00 5709.86 27,40,732.80
16
Reinforced FLYASH Brick Masonry 29x10x14cm for partition walls
(10.0 cm thick) in CM (1:6) prop. (Cement : Screened sand) from
approved source having minimum crushing strength of 50
Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third
layer with free ends of the reinforcement pegged into mortar joints
of main brick walls where applicable including cost and
conveyance of all materials like cement, steel, sand, bricks, water
etc., to site, including sales & other taxes on all materials, all
operational, incidental charges such as labour charges for mixing
cement mortar, scaffolding charges, constructing masonry, lift
charges, curing, etc., and overheads & contractors profit but
excluding cost of steel and its fabrication charges complete for
finished item of work. (APSS No. of 501 & 509)
a)First floor : Ten Sqm 84.95 7536.26 6,40,205.29
b)Second floor : Ten Sqm 79.61 8093.54 6,44,326.72
c)Third floor : Ten Sqm 73.96 8650.82 6,39,814.65
d)Fourth floor : Ten Sqm 73.96 9208.10 6,81,031.08
e)Fifth floor : Ten Sqm 73.96 9765.38 7,22,247.50
17
Providing & fixing of Rabbit wire mesh & nominal reinforcement
such as nails etc., as directed by Engineer-in-charge with dubara
sponge finishing, including cost & conveyance of all materials to
site, seigniorage charges, sales & other taxes on all materials,
operational & incidental, cost and conveyance of cement, wire
mesh, water to work site, centering, scaffolding and form work, lift
charges etc., complete for finished items of work , for finished item
of work. (APSS No.403 & 903)
Sqm 122.66 469.19 57,550.85
Signature of the bidder with seal Page 4 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
18
20mm thick plastering to masonry walls to external side with
16mm in C.M(1:6)prop.as Ist coat and 4mm in C.M(1:4)prop. as II
nd coat with dubara sponge finishing and curing etc., seignourage
and all operational incidental labour charges such as scaffolding
mixing mortar,curing etc.complete as per specification and
drawings for finished item of work.
-
a)Ground floor ; Sqm 1427.47 358.57 5,11,847.92
b)First floor : Sqm 1623.54 390.47 6,33,943.66
c)Second floor : Sqm 1738.20 422.36 7,34,146.15
d)Third floor : Sqm 1497.85 454.27 6,80,428.32
e)Fourth floor : Sqm 1497.85 486.16 7,28,194.76
f)Fifth floor : Sqm 1497.85 518.06 7,75,976.17
g)Terrace Floor Sqm 1728.64 549.96 9,50,682.85
h)Ground floor upto 1.2M height Sqm 0.00 362.40
19
Plastering with CM (1:5), 12 mm thick inside including cost and
conveyance of all materials and water to work site seigniorage and
all operational incidental, labour charges such as scaffolding,
mixing mortar lift charges curing etc., complete for finished item of
work.
-
a)Ground floor : Sqm 1834.19 134.58 2,46,845.29
b)First floor : Sqm 3438.87 162.76 5,59,710.48
c)Second floor : Sqm 3097.62 194.67 6,03,013.69
d)Third floor : Sqm 3097.62 226.56 7,01,796.79
e)Fourth floor : Sqm 3097.62 258.45 8,00,579.89
f)Fifth floor : Sqm 3097.62 290.35 8,99,393.97
g)Terrace Floor Sqm 309.68 322.26 99,797.48
20
Plastering with CM (1:5), 12 mm thick inside including cost and
conveyance of all materials and water to work site seigniorage and
all operational incidental, labour charges such as scaffolding,
mixing mortar lift charges curing etc., complete for finished item of
work. (for Ceiling)
-
a)Ground floor : Sqm 987.76 144.81 1,43,037.53
b)First floor : Sqm 960.00 173.00 1,66,080.00
c)Second floor : Sqm 869.05 208.40 1,81,110.02
d)Third floor : Sqm 869.05 243.80 2,11,874.39
e)Fourth floor : Sqm 869.05 279.19 2,42,630.07
f)Fifth floor : Sqm 869.05 314.59 2,73,394.44
g)Terrace Floor Sqm 143.94 349.78 50,347.33
21
Painting to walls with 2 coats (all colourse of acrylic exterior
emulsion paint or other equal and approved water proof cement
paint all to give an even shade after thourughly brushing the
surface to remove all dirt and remains of loose powdered
materials, complete for finished item of work as per SS 912 for
external walls. for all floors
Sqm 12370.74 184.58 22,83,391.19
22
Providing and applying Wall Putty to use surface (white / off
white) - of average 1.5 to 2 mm thickness over plastered surface to
prepare the surface even and smooth after thoroughly brushing the
surface to remove all dirt and remains of loose powdered
materials, applying emery paper, Sand the surface, clean & wipe
off loose dust, applying knifing paste filler by putty knife / muslin
pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper
for the surface preparation and applying two coats of Interior
Acrylic emulsion over primer over putty including cost,scaffolding
and conveyance of all materials to work site and all operational,
incidental, labour charges, over heads and contractors profit etc.,
complete for finished item of work in all floors for Internal walls For
all floors
Sqm 22800.98 304.02 69,31,953.94
PUtty- J.K.Wall Putty(White cement based)
Paints:Asian, Berger, Nerolac
Signature of the bidder with seal Page 5 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
23
White washing two coats with whiting of approved quality to give
an even shade after thoroughly brushing the surface to remove all
dirt and remains of loose powdered materials including cost and
conveyance of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work (to
ceilling) for all floors
Sqm 5250.49 34.47 1,80,984.39
24
Providing impervious coat to exposed RCC roof slab surface
with CM(1:3), 20mm thick with 1kg of water proof compound per
bag of cement laid over roof when it is green including cost of all
materials, seigniorage charges, excluding conveyance charges of
materials and including all operational, incidental and labour
charges for mixing mortar, laying, rendering smooth and thread
lining, curing, rounding off junctions of wall and slab etc,, complete
for finished item of work
-
a)First floor : Sqm 287.50 416.16 1,19,646.00
b)Second floor: Sqm 129.25 443.93 57,377.95
c)Third floor: Sqm 129.25 471.71 60,968.52
d)Fourth floor: Sqm 129.25 499.48 64,557.79
e)Fifth floor: Sqm 129.25 527.26 68,148.36
f)Terrace Floor Sqm 895.65 555.03 4,97,112.62
25
Providing and Fixing Pre painted Steel Sliding Windows / Doors - 3
track sliding window /doors shutter with mesh shutter – (2 - glass
shutters and 1 - mesh shutter) fabricated from Roll formed
sections made of galvanized Steel colour coated/powder coated
(Base Steel as per IS 513 ‘D’ quality,
galvanized as per IS 277 with zinc of 120 GM/Sq.mtr) with total
coated thickness of 0.58mm. Primer coat with epoxy primer of 5-7
microns thick, finish painted with a polyester paint of 12-16
microns thick and back coated with Alkyd backer of 5-7 microns or
powder coated with pure polyester powder up to 50- 60 microns
thick. Section for external frame should be of 44 x 107mm .Section
for glass shutter and mesh shutter in case of door should be of 35
x 67 mm Section for euro groove should be 25 x 31mm
(Aluminium/ Plastic) (in case of window sections should be 35 x 49
mm and 25 x 24 mm and 30 x 41 mm) and Lap Strip should be of
39 x 41mm (30 x 41 mm & Touch lock for window ) (Aluminium/
Plastic.
The doors/ windows should be panelled with 5mm thick plain float
glass. Corner bracket for internal and external frame made of
glass filled nylon. Gaskets are to be made of Ethyl Propylene
Diamine Monomer (EPDM).The sections are to be cut to length,
joined and assembled by means of corner
bracket. The above frames should be fixed to the
concrete/masonry walls by means of self expanding
brackets & screws including 10mm square guard
bars with 6” pitch (152.4mm) (in case of windows
only) and all Taxes complete for finished item of
work.
W1 Sqm 599.95 7726.96 46,35,751.02
Windows and Ventilators: NCL-Seccolor, NCL-Bison, NCL-Win tech
Signature of the bidder with seal Page 6 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
26
Providing and fixing of louvered Ventilators made of
pre-painted steel as per IS 513 of 0.80 mm thick
galvanized as per IS 277 with a polyester paint with
and fitted with 4 mm thick plain float glass including
fixing the frames in concrete/masonry wall by means
of self expanding screws, etc., complete for finished
item of work for (i) Single fixed Louvers Ventilator
size of 2’ 0” x 2’ 0” (609.6 x 609.6mm) outer frame
box section size of 80 x 45mm and (ii) Double fixed
Louvers ventilator Size of 4’ 0” x 2’ 0” (1219.2mm x
609.6mm) outer frame box section size of 80 x
45mm, vertical mullion section size of 80 x 60 mm
and (iii) Double fixed Louvers Ventilator size of 4’0”
x 3’0” (1219.2mm x 914.4mm) outer frame box
section size of 80 x 45mm , Vertical mullion section
size of 80 x 60 mm
-
V1 Sqm 143.97 4303.74 6,19,608.90
27
Flooring with soluble salt porcelain vitrified tiles screen
printed and polished of size 600 x 600 mm and thickness
between 8-10 mm 1st quality conforming to IS:13711,
IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in
all shades and designs set over base coat of CM (1:8) over
already laid CC bed / RCC Roof Slab, including neat cement slurry
of honey like consistency spread @ 3.3 kgs per sqm. & Jointed
with neat cement to full depth including cost of all materials like
cement, sand, and water and flooring stones etc., complete,
including seigniorage charges, labour charges for dressing of
flooring stones etc., complete for finished item of work, but
excluding the cost of conveyance of all materials.
-
a)Ground floor : Sqm 145.08 1021.84 1,48,248.55
b)First floor : Sqm 964.07 1052.78 10,14,953.61
c)Second floor : Sqm 868.42 1083.71 9,41,115.44
d)Third floor : Sqm 868.42 1114.65 9,67,984.35
e)Fourth floor : Sqm 868.42 1145.59 9,94,853.27
f)Fifth floor : Sqm 868.42 1176.53 10,21,722.18
28
Granite stone tiles16-18 mm thick (mirror polished of all
shades) -other than black and regular colours as approved by
engineer- in - charge of length not less than 2.43 ts set over base
coat of cement mortor (1:8)
-
a)Ground floor : Sqm 119.81 3924.52 4,70,196.74
b)First floor : Sqm 96.80 3981.72 3,85,430.50
c)Second floor : Sqm 96.80 4038.93 3,90,968.42
d)Third floor : Sqm 96.80 4096.13 3,96,505.38
e)Fourth floor : Sqm 96.80 4153.34 4,02,043.31
f)Fifth floor : Sqm 96.80 4210.54 4,07,580.27
Tiles:Kajaria, H & R Johnson,SOMANY
Signature of the bidder with seal Page 7 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
29
Providing skirting to internal walls to 15 cm height/risers of
steps with soluble salt porcelain vitrified tiles screenprinted
and polished of size 600 x 600 mm and thickness between 8-
10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630
(Parts 1 to 15) of any colour and finish in all shades and
designs set over base coat of CM (1:5) 12 mm thick with cement
slurry of honey like consistency spread at t he rate of 3.30 kgs per
sqm and jointed with white cement paste mixed with pigment of
matching shade to full depth, including cost of all materials like
Shahabad stone, cement, sand and water etc., complete including
seigniorage charges, etc., complete for finished item of work, but
excluding the cost of conveyance of all materials
a)First floor Sqm 155.10 1060.24 1,64,443.22
b)Second Floor Sqm 153.77 1091.18 1,67,790.75
c)Third Floor Sqm 141.45 1122.12 1,58,723.87
d)Fourth Floor Sqm 141.45 1153.06 1,63,100.34
e)Fifth Floor Sqm 141.45 1184.00 1,67,476.80
30
Flooring with Non-skid red or white full body Ceramic floor
tiles of size 300 x 300 mm and thickness between 7-8 mm 1st
quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to
15) of any colour and finish in all shades and designs set over
base coat of cement mortar (1:8), 12 mm thick over CC bed
already laid or RCC roof slab, including neat cement slurry of
honey like consistency spread @ 3.3.kgs per sqm & jointed neatly
with white cement paste to full depth mixed with pigment of
matching shade, including cost and conveyance of all materials
like cement, sand water and tiles etc., complete, including
seigniorage charges, etc., complete for finished item of work.
-
a)First floor Sqm 129.75 890.52 1,15,544.97
b)Second Floor Sqm 127.05 921.46 1,17,071.49
c)Third Floor Sqm 117.25 952.40 1,11,668.90
d)Fourth Floor Sqm 117.25 983.34 1,15,296.62
e)Fifth Floor Sqm 117.25 1014.28 1,18,924.33
31
Providing and laying cinder concrete cinder mix (1; 15) prop. Using
12.5mm nominal size cinder laid in layers and completed as
directed for filling sunken floors including cost and conveyance of
all meterials, water to work site, complete for finished item of work.
Cum 141.72 2329.39 3,30,121.15
32
Dadooing to walls with first quality glazed red or white full
body ceramic wall tiles of size 200 x 300 mm thickness 6 mm
1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1
to 15) of any colour and finish in all shades and designs set
over base coat of C.M(1:3)prop. 12mm thick and neat grey cement
slurryof honey like consistency spread at the rate of 3.3Kg of
cement per sqm and jointed with neat white cement paste at 0.20
kg per sqm mixed with pigment of matching shade to match the
shade of tiles including cost and conveyance of all materials labour
charges,water to work site,seigniorage and all operational
.incidental ,mixing mortor ,fixing in position ,lift charges,curing,
VAT etc., complete as per SS or as directed by the departmental
authorities for finished item of work.
-
a)First floor Sqm 455.94 894.95 4,08,043.50
Signature of the bidder with seal Page 8 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
b)Second Floor Sqm 453.94 902.70 4,09,771.64
c)Third Floor Sqm 427.44 910.44 3,89,158.47
d)Fourth Floor Sqm 427.44 918.19 3,92,471.13
e)Fifth Floor Sqm 427.44 925.94 3,95,783.79
33
Supplying and fixing of stainless steel railing of grade SS 304
of one meter height consisting of vertical posts 50 mm dia-6 no's
for every 4.6Meters embedbed in treads and landing of staircase,
hand rail 50 mm dia pipe with 2 Nos intermidiate 25 mm dia pipes
parallel to railing including 50gms of SScaps fixing, welding to
balusters as per design with hand brushing, including cost and
coveyance of materials labour charges etc complete for finished
item of work.
RMT 160.84 3712.62 5,97,137.80
34
Providing Thermo Mechanically Treated (TMT) (Fe 500 grade
as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lap-splicing with binding
wire of 18 SWG, forming grills for reinforcement work as per
approved designs and drawings, including cost and conveyance of
steel bars, including all wastages such as overlaps, couplings,
chairs, spacer bars including cost and conveyance of binding wire,
cover blocks and all incidental, operational, labour charges such
as cutting, bending, placing in position, tying including sales and
other taxes on all materials etc. ,and overheads & contractors
profit complete for finished item of work.( APSS No.126)
Make:TATA,SAIL,VSP,JINDAL
-
a)Ground floor : MT 312.85 67435.78 2,10,97,283.77
b)First floor : MT 56.09 68532.17 38,43,969.42
c)Second floor : MT 42.34 69628.55 29,48,072.81
d)Third floor : MT 39.14 70724.94 27,68,174.15
e)Fourth floor : MT 40.76 71821.32 29,27,437.00
f)Fifth floor : MT 39.40 72917.71 28,72,957.77
g)Terrace Floor MT 15.70 74014.09 11,62,021.21
35
Providing Mild steel structural steel Angles, Channels & I Sections
of all sizes as per IS-1161, Labour charges for fabricating all heavy
steel works like Trusses, Stanchions, Heavy beams and Girders
including cost of welding rods, power charges,etc complete in
positions For all floors complete
MT 24.90 86519.84 21,54,344.02
Signature of the bidder with seal Page 9 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
36
Supply and fixing doors as per drawings with medium teak wood
frame of section 100mm x 75 mm and Flush door shutters, solid
bond wood block board type with teak veneer on one face and
commercial ply on another face (lipping): 35 mm thick conforming
to IS:2202 including cost and conveyance to site of teak wood
frame, beading for wall and frame joints, flush shutter including
supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm
x 5mm including cost of ISI marked Aluminium fixtures of 3 Nos.
butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm
and 1 no of 200mm long, 1 No. tower bolt (IS:204) of 200 mm x
10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 1 No.
door stopper and 1 No. rubber bush including fixing the fixtures to
door with required number of screws, bolt and nuts and as per
drawing including labour charges for fixing the frame in position,
fixing the 35 mm flush door shutter of one side Teak veneer and
other sde commercial ply as per IS 2202 to the frame etc,applying
the bituminous paint and wood polish to the door one side and
other side enamel paint as per direction of Engineer in charge
including overheads & contractors profit complete for finished item
of work as per APSS 1001 & 1002 (The vertical frame of door shall
be embedded in flooring for a depth of not less than 10 mm) and
as per drawing (1000mm x 2100mm)
No's 78.00 11721.31 9,14,262.18
37
Supply and fixing doors as per drawings with medium teak wood
frame of section 100mm x 75 mm and Flush door shutters, solid
bond wood block board type with teak veneer on one face and
commercial ply on another face (lipping): 30 mm thick conforming
to IS:2202 including cost and conveyance to site of teak wood
frame, beading for wall and frame joints, flush shutter including
supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm
x 5mm including cost of ISI marked Aluminium fixtures of 3 Nos.
butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm,
1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top, 2 Nos.
150 mm long handles (IS:208), 1 No. door stopper and 1 No.
rubber bush including fixing the fixtures to door with required
number of screws, bolt and nuts including labour charges including
fixing of 30 mm thick flush door shutter with commercial ply with
veneer french polishing on front side and synthetic enamel paint
on back side including fixing the frame in position, fixing the
shutter to the frame etc, including overheads & contractors profit
complete for finished item of work as per APSS 1001 & 1002 (The
vertical frame of door shall be embedded in flooring for a depth of
not less than 10 mm) (900mm x 2100mm)
No's 160.00 9001.43 14,40,228.80
Signature of the bidder with seal Page 10 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
38
Supply and fixing doors as per drawings with medium teak wood
frame of section 100mm x 75 mm and Flush door shutters, solid
bond wood block board type and commercial ply on another face
(lipping): 30 mm thick conforming to IS:2202 including cost and
conveyance to site of teak wood frame, beading for wall and
frame joints, flush shutter including supply and fixing 6 Nos. of MS
Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI
marked Aluminium fixtures of 3 Nos. of butt hinges (IS:205)
150mm long, 1 No. of aldrop (IS:2681) 200mm long, 1 No. of
tower bolt (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. of 150
mm long handles (IS:208), including fixing the fixtures to door
with required number of screws, bolt and nuts including labour
charges and also fixing of 30 mm thick flush door shutter with
synthetic enamel paint on both sides of frame including fixing the
frame in position, fixing the shutter to the frame etc, including
overheads & contractors profit complete for finished item of work
as per APSS 1001 & 1002 (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm) (750mm
x 2100mm) all as per drawing.
No's 206.00 8170.72 16,83,168.32
39
Plain Cement concrete in (1:5:10) prop. Using 40 mm HBG metal
including cost and conveyance of materials to site including
seignorage fee, Machine mixing, concrete laying tamping,
vibrating, CENTRING,watering curing and all labour charges, hire
and operational charges of machinery, water lead charges and
including bailing of water.etc. complete for finished item of work.
For DUMMY COLUMNS
a)Second Floor 1.50 7283.62 10,925.43
b)Sixth Floor-Terrace Cum 19.63 8539.30 1,67,626.46
40
Plain Cement concrete in (1:2.5:5) prop. Using 20 to 12 mm
HBG metal including cost and conveyance of materials to site
including seignorage fee, Machine mixing, concrete laying
tamping, vibrating, watering curing and all labour charges, hire and
operational charges of machinery, water lead charges and
including bailing of water.etc. complete for finished item of work.
For Terrace slab and corners of papapet walls.
a)Second Floor 1.00 5404.09 5,404.09
b)Sixth Floor-Terrace Cum 4.75 5854.46 27,808.69
41
Supplying precast terrazzo chequered tiles conforming to IS:
13801 using marble aggregates of size 10 mm , sand, marble
powder, white cement etc., with terrazzo topping not less than
6mm of tiles overall size not less than 20 mm thick of any coloured
shades set over base coat of cement mortar (1:6) 12 mm thick
over CC bed already laid or RCC roof slab, including near cement
slurry of honey like consistency spread @ 3.3.kgs per sqm &
jointed with neat cement to full depth mixed with pigment of
matching shade including cost of all materials like cement, sand
water and tiles etc., complete, including seigniorage charges,
complete for finished item of work.
Sqm 1019.79 702.28 7,16,178.12
42
Painting Red oxide with two coats with synthetic enamel
paint of approved quality colour and grade-I having VOC (Volatile
Organic Compound ) content less than 50 grams/ liter.over a
primary coat to new welded surface including cost of primary coat
and cost and conveyance of all materials ,labourcharges etc.as
per SS and directed by the departmental authorities for finished
item of work.
Sqm 1091.30 133.66 1,45,863.16
CEMENT CONRETE FLOOR TILES (PLAIN & CHEQUERED) - Super Decorative,Aditya Designer, Maha Bhima
Signature of the bidder with seal Page 11 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
Supplying, installation, testing & commissioning of 408 Kgs ( 6
persons ) capacity lift (Elevator) of with machine room type
elevator design conforming to latest lift act and modern lift with
microprocesor including AC-VVVF controller in the existing lift well
/ shaft having minimum speed 0.63 m/sec with a total travel of
22.4 mtrs(Approx) , Gorund Floor plus 5 levels and servicing 6
stops on the same side.The lift shall be of excellent quality and
shall have push buttons, intelligent group controls , floor
announcement system, Geared traction and other features as per
detailed Technical specifications attached. All the lift equipments,
i/c car, car doors self- levelling devices, control devices, indicators,
landing doors, indicators, buffer ropes safety devices i/c all wiring
connection, interconnection and all connected equipments shall be
as per detailed specifications
3.00 1400000.00
The rate shall include approval / obtaining completion certificate
from the electrical / lift inspectorate of Government of Telangana
for installation and commissioning of lifts before handing over the
lifts to Client. The hooks provision based on lift vendors
requirement will be arranged by the Client through the Civil vendor.
The rates are also inclusive of following
a) Electrical works such as laisoning , cabling , lighting , earthing
and temporay electrical arrange to lift works etc.
b) civil works such as bulk head light fixing , all pocket cuttings,
chippings, socket fixing, beams, MS structural works required on
account of additional head room height etc.
c)The rates are inclusive of cleaning debris, disposal of debris due
to lift works, accommodation fee and other insidential charges .
The lift vendor should carry out the lift installation works as per the
final shaft dimensions made available at site and if any civil
rectifications are to be carried out,the same should be carried out
by Lift contractor at no extra cost to Client.
Note: Vendors should give options for car Interiors. The final
choice should as per Client's requirement.Before quoting the rates
, bidders should peruse the Technical specifications and quote the
rates. Make:Johnson,Schindler,Otis
Sub total -- A 17,06,88,869.15
Electrical Items
PVC Conduit-ISI mark, Make:Sudhakar/Modi/Goldmedal -
1
Supply and Fixing of 20mm outer dia heavy grade, FRLS with
IS:9537 part 3 regid PVC pipe concealed in wall with all required
accessories including masonary work for light, fan , common and
separate plug point including all labour charges etc., complete.
RM 172.50 69.48 11,985.30
2
Supply and Fixing of 25mm outer dia Medium grade, FRLS with
IS:9537 part 3 regid PVC pipe concealed in Roof Slabs with all
required accessories including masonary work and labour charges
etc., complete.
RM 10352.50
61.53
6,36,989.33
3
Supply and Fixing of 25mm outer dia Medium grade, FRLS with
IS:9537 part 3 regid PVC pipe surface with all required
accessories fixing on chromium plated metallic base saddles
including masonary work and all labour charges etc., complete
RM 165.58 69.61 11,526.02
42 Each 42,00,000.00
Signature of the bidder with seal Page 12 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
4
Supply and Fixing of 25mm outer dia Medium grade, FRLS with
IS:9537 part 3 regid PVC pipe concealed in wall with all required
accessories including masonary work for light, fan , common and
separate plug point including all labour charges etc., complete.
RM 4358.25 76.71 3,34,321.36
5
Supply and Laying of P.V.C casing and caping of makes Sudhakar
/ Maco Plast / Avon Plast / Modi (ISI MARK) with double locking
arrangments with groover trunking of size not below 12.5mm
height 25mm size with all accessories, duly sealed at points and
erected on Wall / Ceiling including cost of all materials and labour
charges complete.
RM 70.00 54.08 3,785.60
Point Wiring: Copper Wire Make:Finolex/Havells, Modular
switch:Legrand Myrius/Cabtree Verona/GM Four-Five Ceiling
Rose Make:Gold Medal Olive/ Million Zoom
-
6
Wiring with 2 runs of 14/0.3mm (1.5 Sqmm) FRLS/HFFR PVC
insulated 1100V grade as per IS:694/1990 specification for Copper
cable in existing pipe with 6A / 10A 1 Way 1 Module Modular
Switch control with 6 Module Hot Dip Galvanized modular type
Metal Box covered with 6 Modular Cover Frame, 3 Plate Jumbo
Ceiling Rose including all labour charges etc., complete for light,
bell, fan and exhaust fan points in Non-Residential Buildings.
Point 1133.00 584.79 6,62,567.07
7
Wiring with 2 runs of 14/0.3mm (1.5 Sqmm) FRLS/HFFR PVC
insulated 1100V grade as per IS:694/1990 specification for Copper
cable in existing pipe with 6A / 10A 1way/2way 1 Module Modular
Switch control with three way Jumbo Ceiling Rose including all
labour charges etc., complete for above 15 feet and staircase
points .
Point 680.00
877.19
5,96,489.20
Circuit Wiring: Make:Finolex/ Havells -
8
Supply and run of 1 of 14/0.3mm (1.5 Sqmm) FRLS/HFFR PVC
insulated 1100V grade as per IS:694/1990 specification for Copper
cable in existing pipe for earth continuity including all labour
charges etc., complete.
RM 1235.00 24.43 30,171.05
9
Supply and run of 3 of 36/0.3mm ( 2.5 sq mm ) FRLS/HFFR PVC
insulated flexible copper cable and earthing in existing pipe for
power points including all labour charges etc.,complete.
RM 5435.12
102.71
5,58,241.18
10
Supply and run of 3 of 56/0.3mm ( 4 sq mm ) FRLS/HFFR PVC
insulated flexible copper cable earthing in existing pipe for power
points including all labour charges etc.,complete.
RM 4422.40
151.88
6,71,674.11
11
Supply and run of 4 of 85/0.3mm ( 6 sq mm ) FRLS/HFFR PVC
insulated flexible copper cable and 4 sqmm wire for earthing in
existing pipe for power points including all labour charges
etc.,complete.
RM 3790.25
342.16
12,96,871.94
Socket and switch make: Legrand Myrius/Cabtree Verona/GM
Four-Five-
12
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket
with shutter with 6A / 10A 1 Way 1 Module Modular Switch control
on a Common switch board with with 3 Module Hot Dip
Galvanized Modular Metal Box covered with 3 Modular Cover
Frame with earth continuity including wire leads, earth connections
along with all labour charges etc., complete.
Each 420.00 381.72 1,60,322.40
13
Supply and Fixing of 20A 2 Module Modular Socket with shutter
and 16A / 20A 1 Way 1 Module Modular Switch with indicator duly
recessed in wall with 3 Module Hot Dip Galvanized Modular Metal
Box size covered with 3 Modular Cover Frame including earth
connections and all labour charges etc., complete.[ Power plug ]
Each 312.00 533.99 1,66,604.88
Signature of the bidder with seal Page 13 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
14
Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket
with shutter-2 Nos and 6A / 10A 1 Way 1 Module Modular Switch
controls-2Nos duly recessed in wall with 6 Module Hot Dip
Galvanized Modular Metal Box size covered with 6 Modular Cover
Frame including earth connections and all labour charges etc.,
complete.[ For computer switch board].
Each 126.00 711.23 89,614.98
Networking -
15
Supply and fixing of Modular co-Axial socket type TV Antenna
outlet on 2 moduler hot dip galvanized metal box and 2 modular
cover frame including giving connections, cost of all accessories
and labour charges etc. Complete. make: Legrand Myrius/Cabtree
Verona/GM Four-Five
Nos 63.00 251.07 15,817.41
16
Supply and fixing of Cat 6 RJ-45 information outlets including duel
face plate on 2 moduler hot dip galvanized metal box including
giving connections, cost of all accessories and labour charges etc.
Complete. I/O & duel face plate make: Legrand/Molex
Each 63.00 473.75 29,846.25
17
Supply and run of LAN Cable cat - 6 UTP cable in existing PVC
conduit including cost and conveyance of all materials and labour
charges etc., complete.
Makes:Molex / Legrand.
RM 4565.00
31.64
1,44,436.60
18
Supply and fixing of 24 Port patch panels including giving
connections cost of all accessories and all labour charges etc.,
complete. Makes:Molex / Legrand.
Each 4.00
6630.89
26,523.56
19
Supply and fixing of 24 Port manageble switches including giving
connections cost of all accessories and all labour charges etc.,
complete.
Makes : CISCO / Net Gear
Each 4.00
6833.12
27,332.48
20
Supply and fixing of 6U floor mounting net work rack with power
spike including all accessories and giving all connections, labour
charges etc., complete.
Makes : HCL / Vall.
Each 4.00
5102.47
20,409.88
Fixtures LED Make:Philips/Crompton/Havells -
21
Supply and transportation of 20W, 2000 lumens, T8,1200mm
length LED retro tube light,wide operating voltage with double side
connection, PF≥0.9, Surge protection: > 2KV, THD<15%, with
inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by
the department and as per IS specifications, minimum CRI≥80,.etc
complete with 5 years warranty.
Nos 472.00
1163.42
5,49,134.24
22
Fixing of 20W/18W/36W/45W/70W led tube light luminaire on wall
/ Ceiling with / TW /PVC round blocks with all accessories
including giving connections and all labour charges etc., complete.
Nos 472.00
122.70
57,914.40
23
Supply and fixing of Electronic musical bell on 150 x 200 mm
(6"x8") decolam block including giving connections cost of all
accessories and all labour charges etc., complete. Make:GM/Gold
Medal
Each 61.00
359.34
21,919.74
24
Supply and fixing of batten holder / slanting holder with 3W LED
lamp in lieu of ceiling rose of light point complete with all
connections and all labour charges without bulb (for new
installation).
Nos 124.00 212.46 26,345.04
Fan Makes : Crompton/Bajaj -
25
Supply of 48" (1200mm) 5 star rated Sweep ISI mark
Ceiling Fan as per IS 374 - 1979 and, with double ball
bearings but without Regulator.
Nos 250.00
1892.25
4,73,062.50
Signature of the bidder with seal Page 14 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
26
Supply of 1 Module Modular type Electronic step type Fan
Regulator with 1 or 2 Module Hot Dip Galvanized Modular Metal
Box covered with 2 modular cover frame etc., complete. make:
Legrand Myrius/Cabtree Verona/GM Four-Five
Nos 250.00 494.23 1,23,557.50
27
Labour charges for Fixing of Ceiling fan and regulator including
transportation and giving connections with twin core wire etc.,
complete.
Nos 250.00
144.01
36,002.50
28Supply and fixing of Fan hook box with dummy cover etc.
complete for finished item of workEach 250.00
105.6626,415.00
Exhaust fan Makes : Crompton / Havells Ventil Air-DB -
29
Supply of 9" (225mm) Light duty exhaust fan with
wire guard etc complete etc., complete.
Makes : Crompton / Havells Ventil
Air-DB / Orient hill air.
Nos 183.00
1341.44
2,45,483.52
30
Labour charges for fixing of Exhaust fan in wall with necessary
connections and masonary work of making hole, finishing etc.,
complete
Nos 183.00
531.72
97,304.76
Distribution Board Make:Legrand / Schneider/L&T, Isolator
and MCB Makes : Legrand-DX3 / Schneider-Acti9 / L&T Exora.-
31
Supply and fixing of 12 Way SPN DB with IP 43 Protection as per
IS:13032 concealed in wall and suitable for singile phase 10 Nos
S.P out goings and for 1No Incommer including internal
connection and labour charges for flush mounting etc., complete.
Incommer: 32A DP Isolator-1No.
Outgoing: 10kA-6-32A SP MCBs - 10 Nos
Nos 6.00
5535.75
33,214.50
32
Supply and fixing of 4 Way TPN DB Horizontal with IP 43
Protection as per IS:13032 concealed in wall and suitable for 12
Nos S.P.out goings and for 1 No 4 pole Incommer including
internal connection and labour charges for flush mounting etc.,
complete.Incommer: 40A FP Isolator-1No.
Outgoing: 10kA-6-32A SP MCBs - 12 Nos
Nos 62.00
7697.84
4,77,266.08
33
Supply and fixing Distribution board with 20A SP Plug and Socket
with SS enclosure concealed in wall with 20A 10KA SP MCB,
C/D Curve ISI Mark including internal connection and labour
charges for surface / flush mounting etc., complete .
Nos 124.00 2069.36 2,56,600.64
LT PANELS -
Signature of the bidder with seal Page 15 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
34
Main LT Panel Board:
Fabrication ,Transportation , Supply, Installation, Testing and
Commissioning of suitable size , plinth mounting indoor type LT
Distribution panel of 14 guage CRCA sheet with the following
incorporated in the panel for Distributing the power supply .(The
working drawings for panel board should be got approved by the
Department before fabrication of Panel).
Main incoming: 125A 4 Pole MCCB, Adjustable, Confirms to
IS/IEC 60947-2 having Breaking Capacity 25kA with thermal
magnetic release Panel Mounted of makes L&T / Schneider /
Hager -1No. 125A Alluminium Bus bar
(25mmx6mmxSuitable lenght) - 4nos -Main
Sleaves tape for bus bar R Y B N-required length
Insulators for busbar fixing (panel type)-8 Nos
Phase indicator lamps - 1set (L&T make)
Extended earth terminals - 2nos with 25X6 mm G.I Strip - 2.0 Mtrs
Current Transformer- 230/5A - 3 NosKAPPA make
Voltmeter(0-500V) - Digital type ( conzerv/HPL Make)
Ammeter (0-500A) - Digital type ( conzerv/HPL Make)
supply of HRC Fuse links 2A - 3 Nos
SET 3.00 167845.00 5,03,535.00
Outgoing :1) 63A, TP, 10kA , MCB -22 No. Legrand/Schneider
make. 3 phase energy meter:22 no's of
Make:CONZERVE/HPL/HAVELLS
The panel Size approx:1.6X2.1X0.40 mtrs
The above Panel shall be cleaned with 7 tank process and
painting with one coat of red oxide and two coats of powder
coated light grey as per IS 631 of (5) etc complete and provided
suitable base channel of 75X40mm size etc., complete as directed
by the Engineer- in - Charge.
-
Cables: Makes : Torrent / Universal/KEI -
35
Supply of 25 Sqmm 3.5 Core XLPE insulated, 1100V
grade armoured alluminium cable as per specification
confirming to IS:7098 (Part - I).
RM 250.00
209.05
52,262.50
36
Supply of 150 Sqmm 3.5 Core XLPE insulated, 1100V
grade armoured alluminium cable as per specification
confirming to IS:7098 (Part - I).RM 750.00
770.31
5,77,732.50
37
Supply of 120 Sqmm 3.5 Core XLPE insulated, 1100V
grade armoured alluminium cable as per specification
confirming to IS:7098 (Part - I).RM 75.00
676.01
50,700.75
Glands -
38
Supply and Fixing of Single compression brass cable glands for
3.5 core XLPE armoured cable for 25 Sqmm with brass washers
and crimping type aluminium lugs confirming to I.S specifications
for cable of 25 Sq.mm including nuts and bolts with connections.
SET 2.00 276.58 553.16
39
Supply and Fixing of Single compression brass cable glands for
3.5 core XLPE armoured cable for 150 Sqmm with brass washers
and crimping type aluminium lugs confirming to I.S specifications
for cable of 150 Sq.mm including nuts and bolts with connections.
SET 6.00 632.31 3,793.86
40
Supply and Fixing of Single compression brass cable glands for
3.5 core XLPE armoured cable for 120 Sqmm with brass washers
and crimping type aluminium lugs confirming to I.S specifications
for cable of 120 Sq.mm including nuts and bolts with connections.
SET 6.00 540.69 3,244.14
Signature of the bidder with seal Page 16 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
41
Providing independent earthing for Important equipment with
40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I
pipe of 0.3mtr. long connected with reducer providing G.I funnel
with mesh enclosed in brick masonry (CM 1:3) Chamber of
400mmx 400m x 400mm with suitable cast iron cover duly
providing staggered holes filling with salt and charcoal from the
bottom of the pipe giving earth connection from electrode through
G.I strip of 25 x 6mm x 200mm length with all accessories and
labour charges complete, as per IS specifications 732/1982 (Part
II)
Each 8.00 4238.81 33,910.48
42Supply and Run of 25mm x 6mm G.I Strip including cost of all
accessories and labour charges etc., complete.RM 190.00
103.1419,596.60
43Supply and Run of No.8 SWG G.I wire including cost of all
accessories and labour charges etc., complete.RM 340.00
16.985,773.20
44
Earth work excavation of Trench in hard ground soil, laying of U.G
cables from 70 sqmm to 400 Sq,mm on sand cushion covering the
cable with bricks and back filling of Trench duly providing route
indicator embedded in C.C including cost and conveyance of
materials and labour charges etc., complete.
RM 800.00 359.21 2,87,368.00
Sub total -- B 94,58,221.20
Sanitary Items -
1
Supply, Installation and commissioning approved make floor
mounted Close Coupled wash down EWC conforming to IS:2556
(Part 8)-2004 suit with 'P' or 'S' trap with dual flush porcelain
cistern fixed on wash down EWC with all internal parts of dual
flush cistern, ultra solid seat cover of approved make with rubber
buffer and cap & 15 mm angle stop cock & 450 mm long PVC inter
connection pipe wall flanges all of approved make etc. complete
for finished item of work in all respects: White Colour
Make:Neycer/Parryware/Jaquar/CERA/Hindustan Sanitaryware
Each 64.00 9073.29 5,80,690.56
2
Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI
marked conforming to IS:2556-Part-3-1981 with "P" or "S" trap
Hindware/ Parryware/ Neycer - ISI Mark: 580 mm x 440 mm
including Brick masonry seat for Orissa pan/ Indian W.C. using
2nd class bricks as per standard practice, PVC low level system
with internal components & short bend: 10 Litres capacity Single
Flush, 15 mm PVC connection with brass union nut C.P coated
and 15mm CP finish brass stop valve. Complete for finished item
of work. Make:Neycer/Parryware/Jaquar/CERA/Hindustan
Sanitaryware
Each 62.00 3779.97 2,34,358.14
3
Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st
quality conforming to IS:2556-Part-4:1972 with waste fittings like
rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel
pipe thread conforming to IS:2963-1979 and fitted with 15 mm
nominal bore Chromium Plated Pillar Tap of 1st quality Indian
make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete
with standard CI brackets including wooden block: 550x400mm -
Single C.P. Pillar cock Make: Neycer /Parryware /Jaquar
/CERA/Hindustan Sanitaryware
-
a)550x400mm - Single C.P. Pillar cock Each 124.00 1669.00 2,06,956.00
b)450x300mm - Single C.P. Pillar cock Each 62.00 1452.00 90,024.00
4
S&F of 15 mm brass body CP finish bib tap of not less than 300
grams weight screw type (full turn) with internal / external threaded
connection conforming to IS 8931 including cost & conveyance of
all materials, labour charges for finished item of work complete for
all floors. Make:Seiko/CERA/Senior
Each 249.00 253.36 63,086.64
Signature of the bidder with seal Page 17 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
5
Providing & fixing PVC/ SWR pipes conforming to IS 13592:1992
including necessary specials,jointing with adhesives ,fixing vertical
pipes over wooden battens including cost and conveyance of all
materials at site complete for finished item of work.
-
a)75 mm dia. @ 4 Kg/sq.cm Rmt 1619.72 95.44 1,54,586.08
b)110 mm dia. @ 4 Kg/sq.cm Rmt 550.65 181.41 99,893.42
6
Supply & fixing SWG 150x100mm gully trap of 1st class as per
IS -651 & 4127 with CI grating and constructing brick masonry in
CM 1:6 prop. Intermediate chamber and fitted with 30.48x28.86cm
CI frame and hinged coverfor finished item of work
Each 63.00 703.28 44,306.64
7
Constructing 904.0 mm (3’0”) dia solid block masonry
inspection chamber as per IS - 4111: Part-1:1986 with cement
mortar (1:6) prop using fly-ash blocks of 225 mm thick from
approved source having a minimum crushing strength of 10
N/sq.mm including plastering with cement mortar 1:3 prop; ½”
thick both inside and outside fitted with 20” dia RCC manhole
covers and frames including excavating pits up to a depth of 904
mm (3'-0") in all sorts of soils (excluding rock) and laying cement
concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and
P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials
like cement, sand, bricks, water etc., to site, cost of seigniorage
charges on all materials and all incidental and operational, labour
charges like mixing cement mortar, constructing masonry, lift
charges, curing etc., complete for finished item of work as per
Standard specification with RCC cover 22" dia with nominal
reinforcement 3" thick and hooks for lifting etc., for finished the
item of work.
Each 54.00 8337.07 4,50,201.78
8
Providing & fixing Bronze Ball valve with SS ball an SS spindle
as per IS Class - 1, Indian make heavy type including cost &
conveyance of all material to work spot and all labour charges
including fixing in position for finished item of work. Make:Zoloto/R-
Brand
-
a)20 mm NB size Each 17.00 310.17 5,272.89
b)25 mm NB size Each 14.00 436.28 6,107.92
c)40 mm NB size Each 7.00 1064.57 7,451.99
d)50 mm NB size Each 13.00 1599.70 20,796.10
e)15 mm NB size Each 121.00 213.60 25,845.60
9
Supplying, laying, jointing and testing SWG SP-1 pipes of ISI
make conforming to ISI 651 & 4127 with airtight cement joints in
CM 1.5:1 prop. Including excavation of trenches and socket pits in
any soil (except rock requiring blasting) up to 1524 mm(3'0") depth
and refilling with watering and tamping for finished item of work
-
a)101.6mm Rmt 322.00 480.59 1,54,749.98
b)152.4mm Rmt 805.25 715.77 5,76,373.79
10Supply and fixing S&F CP finish brass soap dish for finished item
of workEach 124.00
583.9872,413.52
11
Supply and fixing of toilet paper holder Jaquar make queen
series: with 10 years warranty: Chrome plated complete for
finished item of work
Each 124.00
899.83
1,11,578.92
12
Supply and fixing 25mm dia & 609.6mm long aluminium anodized
towel rod with brackets and aluminium screws etc,. Complete the
finished item of work.
Each 124.00
169.29
20,991.96
Signature of the bidder with seal Page 18 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
13
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) -
SDR-13.5 pipes, having thermal stability for hot & cold water
supply, including all CPVC plain & brass threaded fittings i/c fixing
the pipe with clamps at 1.00 m spacing. This includes jointing of
pipes & fittings, with one step CPVC solvent cement and the cost
ofcutting chases and making good the same including testing of
joints complete as per direction ofEngineer-in-Charge.Concealed
work, including cutting chases and making good the wall etc
Make:Ashirvad, Prince, Astral
-
a)15.90mm OD Rmt 85.25 194.05 16,542.76
b)22.20mm OD Rmt 2100.50 216.55 4,54,863.28
c)28.60mm OD Rmt 150.00 275.29 41,293.50
d)34.90mm OD Rmt 150.00 362.77 54,415.50
-
14
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC)
pipes-SDR-13.5, having thermal stability for hot & cold water
supply, including all CPVC plain & brass threaded fittings including
fixing the pipe with clamps at1.00 m spacing. This includes jointing
of pipes & fittings with one step CPVC solvent cement and
testingof joints complete as per direction of Engineer-in-
Charge.Internal work - Exposed on wall Make:Ashirvad, Prince,
Astral
-
a)15.90mm OD RMT 60.00 159.97 9,598.20
b)22.20mm OD RMT 60.00 182.47 10,948.20
c)28.60mm OD RMT 72.50 241.20 17,487.00
d)34.90mm OD RMT 778.00 328.69 2,55,720.82
e)41.30mm OD RMT 142.50 408.67 58,235.48
f)54.00mm OD RMT 1001.57 596.14 5,97,075.94
-
15
Supply and fixing 4" (101.6mm) multi floor trap with Jali-
PVC/SWR pipe fittings of standard make of ISI Brand inculding
fixing in CM1:3 prop and cost and conveyance of all materials at
site complete for finished item of work
Each 368.00 162.47 59,788.96
16Supplying and fixing TV shape mirror with plastic frame size 609.6
mm x 457 .2 mm for finished item of workEach 186.00
529.4598,477.70
17
Manufacture, Supply, & Delivery of HDPE Pipes PE-100
conforming to IS 4984 - 1995 including laying,jointing and
transportation to any where in T.G, including excise duty, sale tax
and specials etc., complete.(supply upto 90 mm diain coil & above
90 mm diastraight length in 6 m.) 6.0 kg/Sqcm
-
a)63mm dia Rmt 340.00 178.41 60,659.40
b)75mm dia Rmt 575.00 237.64 1,36,643.00
18
Providing & Placing on Terrace (at all floor levels) polyethylene
water storage tank with Double layer approved brand &
manufacture with cover and suitable locking arrangement &
making necessary holes for inlet & outlets and over flow pipes but
without fittings & base support for tanks for finished item of
work.Make-Sintex
Litre 7000.00 7.95 55,650.00
19
Supply and fixing Bronze Gate/ Globe valve as per IS - 778 Class -
I, Indian make heavy type - 65 mm NB Size for finished item of
work.Make:Zoloto/R-Brand
-
a)65mm NB Size Each 7.00 5903.44 41,324.08
b)80mm NB Size Each 7.00 8750.63 61,254.41
20
Supply and fixing of Stainless steel 4" dia round Grating with frame
for nahany or floor trap cover with holes including fittings, etc. For
complete the item of work.
Each 124.00
65.90
8,171.60
Signature of the bidder with seal Page 19 of 20 EPI
ENGINEERING PROJECTS (INDIA) LTD
(A Government of India Enterprise)
Name of the Project:-e-Tender for Construction of 1000Sft. Apartment Blocks-2 No’s, 800Sft. Apartment Blocks-1 No’s, Duplex House and
Storm water drains at IIIT Campus, RGUKT, Basar, Nirmal Dist.,Telangana – 504107
Priced Bill Of Quantities
NIT NO.: SRO/CON/ETS/017 DATED 30.01.2019
Sl. No Description of Work UOM QtyRate
(Rs)
Amount
(Rs.)
21
Supply and fixing CP finish brass bottle trap 250 mm long with wall
connection pipe & wall Flange etc., complete the finished item of
work
Each 124.00
979.36
1,21,440.64
22Supplying & fixing stainless steel sink size 20" x18" x 8 "
(508x457.2x203.2mm) 1 mm thick with accessories. Make:NiralaEach 62.00
5053.60
3,13,323.20
23
S&F of 15 mm premium variety Chromium plated finish brass body
wall mixer with hand shower with a provision for over head shower
with 115 mm long bend pipe on upper side, connecting legs & wall
flanges conforming to IS 8931 with 10 years warranty Jaquar/
Hindware/ Parryware
Each 124.00 3760.66 4,66,321.84
Sub total -- C 58,64,921.43
Total Amount ( A +B+C) I 18,60,12,011.78
Provision for GST 12% II 2,23,21,441.41
Provision for Labour Cess 1% II 18,60,120.12
Total Gross Amount (I+II+III) 21,01,93,573.31
Total Gross Amount Round off 21,01,93,573.00
Note:
The estimated rates are prepared from TS SoR 2017-18
Signature of the bidder with seal Page 20 of 20 EPI