RFI - 781102-0000-40CI-0040 CANCEL
4
REQUEST FOR INFORMATION COMBINED CYCLE P OWER P LANT (CAPACITY 120 MW) PROJECT RFI No: 781102-0000-40CI -0040 Date: 13 March 2013 RFI Title: Wheel of Transformer s Attention: ABB Required by Date 18 March 2013 RFI Description: We have finished install wheel of Power Transformer since mid of February 2013, but refer to our observation, was found that wheel was installed with frame in rotated 180 degree different with drawing. Please clarify and approve about wheel was installed with frame in rotated 180 degree . Approved by ABB Originator: Winarko Date: 13 March 2013 Construction Manager: Matheus Maryono Date: 13 March 2013 Project Manager: Arief S. Date: 13 March 2013 KPI (Comment): Signed off KPI : Sign: Date:
description
technical query
Transcript of RFI - 781102-0000-40CI-0040 CANCEL
-
REQUEST FOR INFORMATION
COMBINED CYCLE POWER PLANT (CAPACITY 120 MW) PROJECT
RFI No: 781102-0000-40CI-0040 Date: 13 March 2013
RFI Title: Wheel of Transformers
Attention: ABB Required by Date 18 March 2013
RFI Description:
We have finished install wheel of Power Transformer since mid of February 2013, but refer to our observation, was
found that wheel was installed with frame in rotated 180 degree different with drawing.
Please clarify and approve about wheel was installed with frame in rotated 180 degree.
Approved by ABB
Originator: Winarko Date: 13 March 2013
Construction Manager: Matheus Maryono Date: 13 March 2013
Project Manager: Arief S. Date: 13 March 2013KPI (Comment):
Signedoff
KPI : Sign: Date: