REQUEST FOR INFORMATION COMBINED CYCLE P OWER P LANT (CAPACITY 120 MW) PROJECT RFI No: 781102-0000-40CI -0040 Date: 13 March 2013 RFI Title: Wheel of Transformer s Attention: ABB Required by Date 18 March 2013 RFI Description: We have finished install wheel of Power Transformer since mid of February 2013, but refer to our observation, was found that wheel was installed with frame in rotated 180 degree different with drawing. Please clarify and approve about wheel was installed with frame in rotated 180 degree . Approved by ABB Originator: Winarko Date: 13 March 2013 Construction Manager: Matheus Maryono Date: 13 March 2013 Project Manager: Arief S. Date: 13 March 2013 KPI (Comment): Signed off KPI : Sign: Date:

description

technical query

Transcript of RFI - 781102-0000-40CI-0040 CANCEL

  • REQUEST FOR INFORMATION

    COMBINED CYCLE POWER PLANT (CAPACITY 120 MW) PROJECT

    RFI No: 781102-0000-40CI-0040 Date: 13 March 2013

    RFI Title: Wheel of Transformers

    Attention: ABB Required by Date 18 March 2013

    RFI Description:

    We have finished install wheel of Power Transformer since mid of February 2013, but refer to our observation, was

    found that wheel was installed with frame in rotated 180 degree different with drawing.

    Please clarify and approve about wheel was installed with frame in rotated 180 degree.

    Approved by ABB

    Originator: Winarko Date: 13 March 2013

    Construction Manager: Matheus Maryono Date: 13 March 2013

    Project Manager: Arief S. Date: 13 March 2013KPI (Comment):

    Signedoff

    KPI : Sign: Date: