Revitalization Activity Update · Comprehensive Plan was adopted in 2001. The Plan’s vision calls...

8
Office of Community Revitalization Fairfax County, VA Revitalization Activity Update October 2017

Transcript of Revitalization Activity Update · Comprehensive Plan was adopted in 2001. The Plan’s vision calls...

Page 1: Revitalization Activity Update · Comprehensive Plan was adopted in 2001. The Plan’s vision calls for transit-oriented development surrounding the Merrifield-Dunn Loring Metro Station

Office of Community RevitalizationFairfax County, VA

Revitalization Activity Update

October 2017

Page 2: Revitalization Activity Update · Comprehensive Plan was adopted in 2001. The Plan’s vision calls for transit-oriented development surrounding the Merrifield-Dunn Loring Metro Station

2

APARTMENTSTHE SHELBY

COURTSINTERIOR PARK/

RESERVEPARK

ParkingInternalized

ParkingInternalized

ParkingInternalized

ParkingInternalized

ParkingInternalized

PARKGATEWAY

STATION

BRT S

TATI

ON

POTE

NTIAL

RICH

MO

ND

HW

Y

RICHMOND HWY

FAIRVIEW DRPICKETT ST

FURMAN LN

S KINGS HWY

POAG ST

SCHOOL ST

N K

ING

S H

WY

JAMAICA DR

BELLEVIEW AVE

QU

AND

ER RD

PENN DAW CBC

3A

C O N C E P T P L A N

N

0 50’ 150’ 300’

BOARD21County of Fairfax, Virginia

MEETINGFAIRFAX COUNTY COMPREHENSIVE PLAN UPDATESEPTEMBER 16, 2017

TO REQUEST THIS INFORMATION IN AN ALTERNATE FORMAT, CALL THE PLANNING DIVISION, 703-324-1380 TTY 711 (VIRGINIA RELAY)

RICHMOND HWYRICHMOND HWY

SOUTH

GATE DR

BED

DO

O S

T

DAW

N D

R

BEAC

ON

HIL

L dr

SCH

OO

LEY

DR

MEM

ORI

AL S

T

MEM

ORIA

L ST

DONORA DR

LENCLAIR ST

TOWER DR

FRAN

KLIN ST

PICKETT ST

S KINGS HWY

GRO

VETON

ST

EAST

SID

E D

R

MULTI-USEPARK

MULTI-USEPARK

SURFACE PARKING

SURFACE PARKING

THE BEACON OF GROVETON

ACTIVATED WATER TOWER

Internalized

Parking

Internalized

Parking

Internalized

ParkingInternalized

Parking

Internalized

Parking Internalized

Parking

POTENTIAL

BRT STATION

C O N C E P T P L A N

STATION 3B

N 0 50’ 150’ 300’

BEACON GROVETON CBC

BOARD 29County of Fairfax, Virginia

MEETINGFAIRFAX COUNTY COMPREHENSIVE PLAN UPDATESEPTEMBER 16, 2017

TO REQUEST THIS INFORMATION IN AN ALTERNATE FORMAT, CALL THE PLANNING DIVISION, 703-324-1380 TTY 711 (VIRGINIA RELAY)

ARLING

TON

DR

WO

OD

LAWN

TRAIL

BOSW

ELL AVE

DAR

T D

R

LOCK

HEE

D B

LVD

BEEC

HCR

AFT

DR

FORDSON RD

LADSO

N LN

SHERWO

OD HALL LN

RICHMOND HWY

RICHMOND HWYRICHMOND HWY

NORTH HILL

HUNTLEY MEADOWS

GATEWAY PARK

INTERIOR PARK/COURTS

GREATER MORNING STAR APOSTOLIC CHURCH

BETHLEHEM BAPTIST CHURCH

WOODLAWNMETHODISTCHURCH

LEGACY PARK

LEGACY PARK

EXISTINGRESIDENTIAL

AMPHITHEATER/MULTIPURPOSE FIELD

MULTI-USEPARK

FOOTBALL/TRACK FIELD

BASEBALLFIELD

EXISTINGSUB-STATION

POTENTIAL BRT STATION

POTENTIAL BRT STATION

POTENTIAL BRT STATION

POTENTIAL BRT STATION

ALTERNATIVE CONCEPT

HYBLA VALLEY - GUM SPRINGS CBC

BOARD 35

STATION 3C

C O N C E P T P L A N

County of Fairfax, VirginiaMEETINGFAIRFAX COUNTY COMPREHENSIVE PLAN UPDATESEPTEMBER 16, 2017

TO REQUEST THIS INFORMATION IN AN ALTERNATE FORMAT, CALL THE PLANNING DIVISION, 703-324-1380 TTY 711 (VIRGINIA RELAY)

SACRAMEN

TO D

R

COO

PER

RD

WO

OD

LAW

N C

T

RICHMOND HWYRICHMOND HWY

PASSIVE RECREATION / PARK

PASSIVE RECREATION / PARK

EXISTINGRESIDENTIAL

EXISTINGHOTEL

MULTIPURPOSE FIELD

POTENTIAL BRT STATION

BOARD 43

C O N C E P T P L A N

County of Fairfax, VirginiaMEETINGFAIRFAX COUNTY COMPREHENSIVE PLAN UPDATESEPTEMBER 16, 2017

STATION #TO REQUEST THIS INFORMATION IN AN ALTERNATE FORMAT, CALL THE

PLANNING DIVISION, 703-324-1380 TTY 711 (VIRGINIA RELAY)

Embark Richmond Highway is a multi-faceted project that includes widening of Route 1, planning for a Bus Rapid Transit (BRT) system that will connect the Huntington Metrorail station to the Richmond Highway Corridor, a Comprehensive Plan Amendment for areas around the BRT stations, and policy guidance for the eventual extension of Metrorail from Huntington to Hybla Valley.

Areas of study have included proposed land uses, results of an analysis of expected transportation impacts associated with the projected land uses, a proposed grid of streets to augment existing roadways, development of an enhanced parks and open space system, and concepts that depict the layout, size, height and mix of projected land uses in Penn Daw, Beacon/Groveton, Hybla Valley/Gum Springs and Woodlawn.

In May 2017, the county retained the consultant design services to develop an urban design framework vision for the corridor and to refine land use concepts for the areas in four of the CBCs in the corridor. The corridor-wide urban design framework was developed around the themes of ecology and legacy. The ecology theme is derived from the abundant streams and natural areas that bisect the corridor. The legacy theme is derived from the remarkable historical structures, buildings and neighborhoods that permeate the corridor and surrounding environs. The themes of ecology and legacy are reflected in each of the draft concept plans for the four areas in ways that are both distinct and similar.

Over the past year, an Embark Advisory Group has met monthly to provide staff with feedback and guidance on the vision for the future redevelopment of the Richmond Highway corridor. In addition, periodic community-wide meetings have been held to share information and receive community feedback. Public hearings at the Planning Commission and Board of Supervisors on the Comprehensive Plan Amendment are anticipated to occur in early 2018. For more information about the Embark Richmond Highway project, including details on the draft concept plans, please go to: http://www.fairfaxcounty.gov/dpz/embarkrichmondhwy

CONCEPTS PLANS FOR THE NEW VISION FOR RICHMOND HIGHWAY COME INTO FOCUS

Penn Daw CBC Concept Plan (Proposed) Beacon/Groveton CBC Concept Plan (Proposed)

Hybla Valley/Gum Springs CBC Concept Plan (Proposed) Woodlawn CBC Concept Plan (Proposed)

Page 3: Revitalization Activity Update · Comprehensive Plan was adopted in 2001. The Plan’s vision calls for transit-oriented development surrounding the Merrifield-Dunn Loring Metro Station

3

A new and innovative commuter parking garage is coming to downtown Springfield. In July 2017, the Board approved design plans for the six level, 1,100 space parking garage, to be located at 7033 Old Keene Mill Road. The ground floor is designed to accommodate special events, such as a farmer’s market, during off-peak hours. A 5,000 square foot portion of the upper deck will be a plaza that can be used for community events (see drawing). A 200-foot-long pedestrian bridge over Old Keene Mill Road will connect the garage to Springfield Plaza and nearby bus stops, and will function as a gateway to Springfield. Construction is expected to begin in the fall of 2019, with completion by early 2022.

SPRINGFIELD COMMUTER PARKING FACILITY MOVES FORWARD

A NEW BRANDING IDENTITY FOR SPRINGFIELDA unique logo and graphic identity system is being developed to brand the Springfield Community Business Center (CBC). During the summer, OCR solicited input from residents and businesses through a community survey (circulated by the Springfield Civic Association and the Greater Springfield Chamber of Commerce). The results of the survey revealed that the Springfield area is perceived to be a convenient, modern and diverse community that is accessible to the entire region. OCR has contracted with a branding and digital marketing firm to develop an identity campaign for the Springfield CBC that builds upon that perception. The logo/identity system is intended to be used to brand Springfield in a manner that is adaptable to a variety of circumstances, including potential gateway signs, (such as on the new commuter parking garage pedestrian overpass pictured below), banners and fixtures. Community input will be solicited on the alternatives prior to an official launch later in 2017.

Commuter parking garage pedestrian overpass

IMPLEMENTATION PLAN UPDATE FOR MERRIFIELDMerrifield has undergone dramatic changes since the Comprehensive Plan was adopted in 2001. The Plan’s vision calls for transit-oriented development surrounding the Merrifield-Dunn Loring Metro Station and for a new mixed-use town center south of Lee Highway and west of Gallows Road. A significant portion of the Plan’s vision has been realized over the past 16 years. Mixed-use residential buildings have infilled around the Metro station, including the redevelopment of the WMATA property at the station. The development of the Mosaic District has achieved the vision of a town center for the area, with its mix of uses and network of new local streets, park spaces, and year-round activities.

An “Implementation Update” of the Merrifield Suburban Center portion of the Comprehensive Plan was adopted by the Board of Supervisors in October 2016. The Plan Amendment reflects the changes that have occurred to the built environment, removes plan options in already redeveloped areas, and will encourage development in underperforming areas by providing redevelopment guidance and highlighting where new growth is anticipated to occur.

Commuter parking garage plaza concept

Page 4: Revitalization Activity Update · Comprehensive Plan was adopted in 2001. The Plan’s vision calls for transit-oriented development surrounding the Merrifield-Dunn Loring Metro Station

4

IMPLEMENTATION OF REVITALIZATION STRATEGIES FROM ANNANDALE STUDY

In October 2016, OCR organized a pop-up park at the Taste of Annandale event, encouraging participants to relax in the temporary park’s greenery, enjoy the company of others, and experience first-hand how pop-up uses can contribute to a community.

This pop-up park aligned with the recommendations made in July 2016 by a group of real estate experts from the Urban Land Institute who engaged in a brief, intensive study that was focused on the core area of the Annandale Commercial Revitalization District (CRD). The recommendations included short-to-medium-term revitalization strategies to improve the appearance, economic vitality, awareness and promotion of Annandale.

In keeping with recommended shorter-term strategies, OCR, in partnership with the county’s Department of Transportation, has been exploring the potential for an “Open Street” event in Annandale. Open Streets are unique events designed to enliven and enhance a community’s sense of place and connection. Open Streets events happen across the U.S., and the world, from big cities to small towns. During such events, streets are temporarily closed to vehicles and opened for people to walk, bike, dance, play, socialize, experience, and envision the street in a different way. Staff has conducted research, pursued partnerships, and performed outreach to the Annandale community in preparation for a potential Open Streets event in 2018, that is envisioned as the prototype for similar events throughout the county.

OCR is also pursuing the creation of a temporary urban plaza or park on the front portion of the County-owned property located at 7200 Columbia Pike that is the site of the ACCA Child Development Center. A recently approved special exception amendment for the site included a development condition that would enable the future establishment of a pop-up plaza. Additional progress is anticipated in 2018.

Pop-up park at the Taste of Annandale County employees and participants enjoy the pop-up park

Example of an Open Streets community event in Atlanta, GA Example of a pop-up plaza in Milwaukee, WI

Page 5: Revitalization Activity Update · Comprehensive Plan was adopted in 2001. The Plan’s vision calls for transit-oriented development surrounding the Merrifield-Dunn Loring Metro Station

5

BC7RC ORGANIZATION GROWS

In 2016, OCR and the Bailey’s Crossroads Seven Corners Revitalization Corporation (BC7RC) undertook a strategic planning effort to examine BC7RC’s role in partnering with Fairfax County on the revitalization of Bailey’s Crossroads and Seven Corners. To assist in this effort, OCR hired an organizational consultant to review the group’s mission, objectives, structure, processes, and organizational priorities, and to produce a plan for strengthening the capacity of BC7RC in the short and mid-terms. OCR staff aided the effort by conducting a strategic visioning exercise with Board members, providing one-on-one outreach to the local business community, and by offering general restructuring support in the summer and fall of 2016.

As a result of the assessment and the efforts of BC7RC’s leadership, the organization welcomed seven new Board members in November 2016. BC7RC’s expanded resources have helped energize and focus the group on its mission. Key objectives are to provide input on development projects in the CRD, encourage beautification efforts across the CRD, and expand membership participation activities -- such as direct business outreach, an enhanced online presence, and hosting networking breakfasts. BC7RC’s top priority for the next year is to continue to strengthen its connection with residents and businesses in the larger community. The group’s website is www.baileyscrossroads.org

NEW DESIGN GUIDELINES FOR BAILEYS CROSSROADS/SEVEN CORNERSUrban Design Guidelines are an important tool for creating dynamic, and attractive places. They reinforce the placemaking concepts for an area that are contained in the Comprehensive Plan including streetscapes, public spaces, parks, and architecture. Urban Design Guidelines create expectations with regard to the design of pedestrian-friendly facilities, site development, building placement, quality of materials, and landscaping, lighting, and street furnishings.

OCR is in the process of creating design guidelines for Baileys Crossroads and Seven Corners, following approval of the recently adopted Plan amendment for Seven Corners. The Baileys Crossroads and Seven Corners Urban Design Guide-lines contain written and visual ideas about how sidewalks and landscape areas should be detailed, how buildings should be sited, and how innovative sustainable design practices can be used to help create a unique sense of place. Staff sought input and feedback from the public regarding the desired character for the area and developed recommendations to reflect community preferences. Property owners, developers, and planners can use this information to help guide the design of new buildings and public areas during the rezoning process and projects can be evaluated against them during the development process. It is anticipated that these Guidelines will be used as the basis upon which to update the Urban Design Guidelines in the County’s other revitalization areas.

IMAGINE ART HERE: SEVEN CORNERS

OCR has been working with the Arts Council of Fairfax County, and other community partners, to bring a temporary public art project to the heart of Seven Corners. The project will be installed in the spring of 2018 in the corner plaza of the Bank of America property at 6307 Arlington Boulevard and will remain in place for approximately six weeks. The installation, which is the first public art project in Seven Corners, will feature a daytime and night-time presence, provide an interactive component to engage the community, and collect participant input that will inform the County’s Master Arts Plan. A multi-disciplinary team of artists will refine the design concept and community engagement plan prior to installation.

Page 6: Revitalization Activity Update · Comprehensive Plan was adopted in 2001. The Plan’s vision calls for transit-oriented development surrounding the Merrifield-Dunn Loring Metro Station

6

IMPLEMENTING BUILDING REPURPOSING RECOMMENDATIONSOn October 18, 2016, the Board of Supervisors directed staff to implement the recommendations contained in the Office Building Repositioning and Repurposing: Workgroup Report. The OCR led study evaluates the impacts of the changing office market on existing office space, how the use of buildings changes over time, and what potential process and policy changes the County should consider to address the challenges and opportunities raised.

Staff has been implementing the report’s recommendations related to modifications to the Zoning Ordinance, changes to the land development process, modifications to land use planning policy, and enhanced outreach and information sharing.

A major recent accomplishment is the amendment to the Comprehensive Plan, 2016-CW-4CP, Office Building Repurposing, which establishes countywide policy guidance for the conversion of existing office buildings to uses not originally anticipated in the Comprehensive Plan, (i.e., building repurposing). The Plan Amendment provides parameters on what types of conversions may be appropriate, the locations where such conversions may be appropriate, how the impacts of conversions should be addressed, and the degree of flexibility that may accrue to such proposals during the development review process. The proposed Plan Amendment provides flexibility to address issues related to time-to-market and the length of the development process.

COMPREHENSIVE PROGRAM FOR ENHANCED CRD STREETSCAPE MAINTENANCE ENDORSEDOne of the original tenents of the commercial revitalization program was to foster distinctive places in each of the CRDs through the installation of specialized streetscape designs and materials. These specialized streetscapes were installed by the County in the Annandale, Baileys Crossroads, McLean and Springfield Community Business Centers using revitalization bond fund monies, and are maintained by the County through the General Fund based on a Board policy adopted in 1997.

Maintenance of these streetscapes is subject to funding availability. Over time, funding has not kept pace with needs, as a result of an expanded inventory as projects were completed, wear and tear as well as aging of the infrastructure, and rising costs. As a result, maintenance was deferred on a number of items.

To address this need, in October of 2016, the Board endorsed an enhanced maintenance program for the CRDs with the goal of maintaining and improving the streetscapes to community standards. Current program funding is $750,000 per year. The program is anticipated to ramp up funding and staffing over a 5 to 7 year period. In addition, some monies also are available for capital improvement projects through a Capital Sinking Fund. The greater funding and enhanced service level will improve the appearance and functionality of the CRDS, as well as foster greater economic vitality and reinvestment.

On November 11, 2016, the Board adopted a Plan Amendment that established a new 7.4 acre, high density residential node in the McLean Commercial Revitalization District (CRD). The Plan’s new recommendations are intended to further the county’s economic success strategy and the continued revitalization of the McLean CRD by increasing the planned intensity of properties along Beverly Road to a 3.0 FAR. As a result, properties in the McLean CRD are no longer subject to recent changes to the Code of Virginia that restrict the offering or acceptance of proffers related to new residential development.

PLANNING FOR THE FUTURE - MORE DENSITY RECOMMENDED FOR MCLEAN

Properties recommended for a 3.0 FAR in McLean

Page 7: Revitalization Activity Update · Comprehensive Plan was adopted in 2001. The Plan’s vision calls for transit-oriented development surrounding the Merrifield-Dunn Loring Metro Station

7

LAKE ANNE VILLAGE CENTER - BETTER THAN EVER

The Lake Anne Condominium Association (LARCA) and local merchants have made significant progress toward Lake Anne Village Center (LAVC) becoming a destination of locally owned small businesses, supported by activities and special events. Many of these actions are based on the OCR commissioned Lake Anne Village Center Commercial Reinvestment Plan, which provides short and long-term strategies to improve the vitality of the village center.

New events and festivals aimed at activating the LAVC have successfully introduced attendees to the unique Lake Anne merchants. A craft market was organized as a weekly companion event to the 20-year old Farmers Market. Entertainment events were expanded to include the Jazz & Blues Festival, the Roots Music Festival, a Chalk Festival, a Boos & Brews Halloween event, Jingle on Lake Anne holiday event, Freezin for a Reason, and Weekly Free Yoga on the Bricks.

Additionally, LARCA undertook a multi-prong approach to improving the visual environment by introducing “look & feel” improvements, including the incorporation of seasonal landscaping to add color and soften the environment, improving storefront signage by supporting graphic design services to individual businesses, adding brightly colored umbrellas to the dock area, placing casual seating around the plaza to encourage people to sit and stay, and re-creating Gonzola Fonseca’s “The Horse”-a sculpture that was part of the original the LAVC.

These revitalization efforts have been bolstered by new business investment in LAVC. The Lake Anne Brew House, Lake Anne Coffee House & Wine Bar, Kiln & Kustard and Nordic Knot have all opened in the past year. Meanwhile, many existing businesses have been sustained, including the Reston Used Book Shop (30 years), Small Change (35 years), Kalypso’s Sports Tavern (8 years), Café Montmartre (20 years), and Singh Thai restaurants (7 years).

The renewed vitality has contributed to the recognition of LAVC as an interesting destination for Reston and Fairfax County that compliments the fact that LAVC has long been known as an important place of architectural significance. In recognition of its revolutionary design and historic value, the LAVC was added to the National Park Service’s National Register of Historic Places on June 5, 2017. This latest recognition follows the action by the Commonwealth of Virginia, which listed the LAVC in the Virginia Landmarks Register in March 2017.

zMOD - ZONING ORDINANCE MODERNIZATION INITIATED

Fairfax County has launched an exciting new initiative related to its Zoning Ordinance. The county’s Zoning Ordinance will be 40 years old next year, and while the current Ordinance has guided growth for those decades, it contains redundancies, does not address current and future trends, is not easily adaptable to electronic formats, and is not easily used or understood by those who do not use it on a regular basis. As a result, a multi-departmental staff team, led by OCR, has initiated zMOD - a multi-year, multi-pronged project to modernize the ordinance. zMOD is integrating with, but not replacing, the Zoning Ordinance Amendment Work Program.

The major components of zMod are as follows:• With the assistance of consultant services, the Ordinance will be reformatted to address current structural

issues, including ease of navigation, use of easily understood language, and accessibility on a variety of platforms.

• A series of amendments that have county-wide implications will be prioritized. These include addressing the minor modifications to approved zoning provisions, signs, the PDH Districts, and restaurants.

• Process improvements related the processing of Zoning Ordinance Amendments and other zoning-related activities are being implemented, including providing “plain English” versions of proposed amendments for ease of understanding, and expanding community engagement opportunities.

LAVC Holiday Event

Page 8: Revitalization Activity Update · Comprehensive Plan was adopted in 2001. The Plan’s vision calls for transit-oriented development surrounding the Merrifield-Dunn Loring Metro Station

8

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL BTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTL BTL BTL BTL BTL BTL BTL BTLBTL

BTLBTL

BTLBTL

SKYPARK4 FLOORS

50' HT.

BUILDING S1RESIDENTIAL

270' (26 FLOORS)252,000 GSF

BUILDING S2RESIDENTIAL

270' (26 FLOORS)430,370 GSF

BUILDING S3OFFICE

225' (19 FLOORS)450,000 GSF

BTL

BTL

BTL

BTLBTLBTLBTLBTLBTLBTLBTL

BTLBTL

BTL

BTLBTL

BTL

SKYPARK3 FLOORS

33' HT.

PAR

KIN

G /

LOAD

ING

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL BTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTL BTL BTL BTL BTL BTL BTL BTLBTL

BTLBTL

BTLBTL

BTL

BTL

BTL

BTLBTLBTLBTLBTLBTLBTLBTL

BTLBTL

BTL

BTLBTL

BTL

20.0

'28

.0'

20.0

'

16.0'23.0'16.0'

65'±

90.0

20.0'

46.0'±

7.4'

54.0'±

21.6'

21.6'

21.6'

23.0'

24.2

'

26.1

'

32.0

32.0

53.0

45.0

24.0

'

24.0

'

52.0'±

36.0

8.0'±35.0'

59.0'

15.0

'

15.0

'

15.0

'15

.0'±

15.0'

28.0

'

28.6

'

24.0'

20.7

'

20.0

'28

.0'

65'±

110.

0'±

46.0'±

7.4'

54.0'±

21.6'

21.6'

21.6'

23.0'

24.2

'

26.1

'

32.0

32.0

53.0

45.0

24.0

'

24.0

'

52.0'±

36.0

8.0'±

12' TRAVEL

12' TRAVEL

11' T

RAV

EL11

' TR

AVEL

5' B

IKE

8' P

ARKI

NG

12' TRAVEL

12' TRAVEL

11.5

' TR

AVEL

11.5

' TR

AVEL

35.0'59.0'

15.0

'

15.0

'

15.0

15.0'

28.0

'

24.0'

20.7

'

20.0

'

20.0'

EXISTING SHAREDPARKING EASEMENT

D.B. 5641 PG. 933

EXISTING SHAREDPARKING EASEMENT

D.B. 5641 PG. 933

INTERIM VESPERTRAIL BY OTHERS

BUILDING S4LIMITS OF DOMINION

SPRING HILLSUBSTATION (BY OTHERS)

DOMINION SERVICEPRIVATE ACCESS

DRIVE

PROPOSED CURBTO TIE INTO EXISTING

PROPOSED CURBTO TIE INTO EXISTING

EXISTING CURBTO REMAIN

PROPOSED CURBTO TIE INTO EXISTING

12,826 SF OR 0.29444 ACTO BE DEDICATED FORSUBSTATION PURPOSES

FUTURE BOONEBOULEVARD EXTENSION

(BY OTHERS)

2 STORY PARKINGGARAGE BELOW GRADE

PROPOSED INTERIM WALL2'-3' HEIGHT ALONG

PROPERTY LINE

PENTHOUSE

PENTHOUSE FUTURE BOONE

BOULEVARD

BY OTHERS

INTERIM VESPERTRAIL BY OTHERS

BOONE BLVD. STREETDEDICATION TO PROPERTY LINE

PEN

THO

USE

EXISTINGSPACES

ENCUMBEREDBY THE

SUBSTATION TOBE RELOCATED

TRAVEL AISLE TO REMAIN INPLACE WHILE THE SHARED

PARKIKNG EASEMENT EXISTS

16.0'23.0'16.0'APPROX. LOC.UNDERGROUNDTRANSFORMERVAULTS

245'±

240'

±

195'±

187'

±

165'±

20.0

'26

.0'

65'±

110.

0'±

46.0'±

9.4'

54.0'±

21.6'

21.6'

21.6'

23.0'

24.2

'

26.1

'

32.0

32.0

53.0

45.0

24.0

'

24.0

'

52.0'±

36.0

8.0'±

BOONE BOULEVARD(PUBLIC AVENUE)

INTERIM TWO LANE SECTION

SPR

ING

HIL

L R

OAD

RO

UTE

#68

470

' R/W

(PU

BLIC

AVE

NU

E)

11' TRAVEL

11' TRAVEL

11' T

RAV

EL11

' TR

AVEL

5' B

IKE

8' P

ARKI

NG

11' TRAVEL

11' TRAVEL

BOONE BOULEVARD

(PUBLIC AVENUE)

INTERIM TWO LANE SECTION

11.5

' TR

AVEL

11.5

' TR

AVEL

35.0'59.0'

15.0

'

15.0

'

15.0

15.0'

26.0

'

24.0'

20.7

'

20.0

'

20.0'

EXISTING SHAREDPARKING EASEMENT

D.B. 5641 PG. 933

EXISTING SHAREDPARKING EASEMENT

D.B. 5641 PG. 933

INTERIM VESPERTRAIL BY OTHERS

BUILDING S4LIMITS OF DOMINION

SPRING HILLSUBSTATION (BY OTHERS)

DOMINION SERVICEPRIVATE ACCESS

DRIVE

TO TIE INTO EXISTING

EXISTING CURBTO REMAIN

PROPOSED CURBTO TIE INTO

EXISTING

12,826 SF OR 0.29444 ACTO BE DEDICATED FORSUBSTATION PURPOSES

FUTURE BOONEBOULEVARD EXTENSION

(BY OTHERS)

2 STORY PARKINGGARAGE BELOW GRADE

PROPOSED INTERIM WALL2'-3' HEIGHT ALONG

PROPERTY LINE

PENTHOUSE

PENTHOUSE FUTURE BOONE

BOULEVARD

BY OTHERS

INTERIM VESPERTRAIL BY OTHERS

BOONE BLVD. STREETDEDICATION TO PROPERTY LINE

PEN

THO

USE

EXISTINGSPACES

ENCUMBEREDBY THE

SUBSTATION TOBE RELOCATED

TRAVEL AISLE TO REMAIN INPLACE WHILE THE SHARED

PARKIKNG EASEMENT EXISTS

16.0'23.0'16.0'APPROX. LOC.UNDERGROUNDTRANSFORMERVAULTS

245'±

240'

±

195'±

187'

±

165'±

SER

VIC

E AL

LEY

(PR

IVAT

E)

INTE

RIM

RO

ADW

AY

ULT

IMAT

ER

OAD

WAY

PORTION OF NEW SHAREDPARKING EASEMENT

PORTION OF EX SHAREPARKING EASEMENT

D.B. 5641 PG. 933(HEREBY VACATED)

11' T

RAV

EL11

' TR

AVEL

5' B

IKE

8' P

ARKI

NG

24.0

'

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL BTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTL BTL BTL BTL BTL BTL BTL BTLBTL

BTLBTL

BTLBTL

BTL

BTL

BTL

BTLBTLBTLBTLBTLBTLBTLBTL

BTLBTL

BTL

BTLBTL

BTL

20.0

'28

.0'

20.0

'

16.0'23.0'16.0'

65'±

90.0

20.0'

46.0'±

7.4'

54.0'±

21.6'

21.6'

21.6'

23.0'

24.2

'

26.1

'

32.0

32.0

53.0

45.0

24.0

'

24.0

'

52.0'±

36.0

8.0'±35.0'

59.0'

15.0

'

15.0

'

15.0

'15

.0'±

15.0'

28.0

'

28.6

'

24.0'

20.7

'

20.0

'28

.0'

65'±

110.

0'±

46.0'±

7.4'

54.0'±

21.6'

21.6'

21.6'

23.0'

24.2

'

26.1

'

32.0

32.0

53.0

45.0

24.0

'

24.0

'

52.0'±

36.0

8.0'±

12' TRAVEL

12' TRAVEL

11' T

RAV

EL11

' TR

AVEL

5' B

IKE

8' P

ARKI

NG

12' TRAVEL

12' TRAVEL

11.5

' TR

AVEL

11.5

' TR

AVEL

35.0'59.0'

15.0

'

15.0

'

15.0

15.0'

28.0

'

24.0'

20.7

'

20.0

'

20.0'

EXISTING SHAREDPARKING EASEMENT

D.B. 5641 PG. 933

EXISTING SHAREDPARKING EASEMENT

D.B. 5641 PG. 933

INTERIM VESPERTRAIL BY OTHERS

BUILDING S4LIMITS OF DOMINION

SPRING HILLSUBSTATION (BY OTHERS)

DOMINION SERVICEPRIVATE ACCESS

DRIVE

PROPOSED CURBTO TIE INTO EXISTING

PROPOSED CURBTO TIE INTO EXISTING

EXISTING CURBTO REMAIN

PROPOSED CURBTO TIE INTO EXISTING

12,826 SF OR 0.29444 ACTO BE DEDICATED FORSUBSTATION PURPOSES

FUTURE BOONEBOULEVARD EXTENSION

(BY OTHERS)

2 STORY PARKINGGARAGE BELOW GRADE

PROPOSED INTERIM WALL2'-3' HEIGHT ALONG

PROPERTY LINE

PENTHOUSE

PENTHOUSE FUTURE BOONE

BOULEVARD

BY OTHERS

INTERIM VESPERTRAIL BY OTHERS

BOONE BLVD. STREETDEDICATION TO PROPERTY LINE

PEN

THO

USE

EXISTINGSPACES

ENCUMBEREDBY THE

SUBSTATION TOBE RELOCATED

TRAVEL AISLE TO REMAIN INPLACE WHILE THE SHARED

PARKIKNG EASEMENT EXISTS

16.0'23.0'16.0'APPROX. LOC.UNDERGROUNDTRANSFORMERVAULTS

245'±

240'

±

195'±

187'

±

165'±

20.0

'26

.0'

65'±

110.

0'±

46.0'±

9.4'

54.0'±

21.6'

21.6'

21.6'

23.0'

24.2

'

26.1

'

32.0

32.0

53.0

45.0

24.0

'

24.0

'

52.0'±

36.0

8.0'±

BOONE BOULEVARD(PUBLIC AVENUE)

INTERIM TWO LANE SECTION

SPR

ING

HIL

L R

OAD

RO

UTE

#68

470

' R/W

(PU

BLIC

AVE

NU

E)

11' TRAVEL

11' TRAVEL

11' T

RAV

EL11

' TR

AVEL

5' B

IKE

8' P

ARKI

NG

11' TRAVEL

11' TRAVEL

BOONE BOULEVARD

(PUBLIC AVENUE)

INTERIM TWO LANE SECTION

11.5

' TR

AVEL

11.5

' TR

AVEL

35.0'59.0'

15.0

'

15.0

'

15.0

15.0'

26.0

'

24.0'

20.7

'

20.0

'

20.0'

EXISTING SHAREDPARKING EASEMENT

D.B. 5641 PG. 933

EXISTING SHAREDPARKING EASEMENT

D.B. 5641 PG. 933

INTERIM VESPERTRAIL BY OTHERS

BUILDING S4LIMITS OF DOMINION

SPRING HILLSUBSTATION (BY OTHERS)

DOMINION SERVICEPRIVATE ACCESS

DRIVE

TO TIE INTO EXISTING

EXISTING CURBTO REMAIN

PROPOSED CURBTO TIE INTO

EXISTING

12,826 SF OR 0.29444 ACTO BE DEDICATED FORSUBSTATION PURPOSES

FUTURE BOONEBOULEVARD EXTENSION

(BY OTHERS)

2 STORY PARKINGGARAGE BELOW GRADE

PROPOSED INTERIM WALL2'-3' HEIGHT ALONG

PROPERTY LINE

PENTHOUSE

PENTHOUSE FUTURE BOONE

BOULEVARD

BY OTHERS

INTERIM VESPERTRAIL BY OTHERS

BOONE BLVD. STREETDEDICATION TO PROPERTY LINE

PEN

THO

USE

EXISTINGSPACES

ENCUMBEREDBY THE

SUBSTATION TOBE RELOCATED

TRAVEL AISLE TO REMAIN INPLACE WHILE THE SHARED

PARKIKNG EASEMENT EXISTS

16.0'23.0'16.0'APPROX. LOC.UNDERGROUNDTRANSFORMERVAULTS

245'±

240'

±

195'±

187'

±

165'±

SER

VIC

E AL

LEY

(PR

IVAT

E)

INTE

RIM

RO

ADW

AY

ULT

IMAT

ER

OAD

WAY

PORTION OF NEW SHAREDPARKING EASEMENT

PORTION OF EX SHAREPARKING EASEMENT

D.B. 5641 PG. 933(HEREBY VACATED)

11' T

RAV

EL11

' TR

AVEL

5' B

IKE

8' P

ARKI

NG

24.0

'

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL BTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTL BTL BTL BTL BTL BTL BTL BTLBTL

BTLBTL

BTLBTL

BTL

BTL

BTL

BTLBTLBTLBTLBTLBTLBTLBTL

BTLBTL

BTL

BTLBTL

BTL

43'±

20.0

'

20.0

'

16.0'23.0'16.0'

63.0

80.0

20.0' 54.0'±

21.6'

21.6'

23.0'

24.0

'

54.9

32.0

53.0

52.0

24.0

'

24.0

'

52.0'±

64.0

35.0'59.0'

28.6

'

24.0'

20.0

'

45.0

'

43'±

63.0

80.0

20.0' 54.0'±

21.6'

21.6'

23.0'

24.0

'

24.0

'

24.0

'

52.0'±

35.0'59.0'

24.0'

20.0

'

20.0

'28

.0'

7.4'

32.0

32.0

53.0

45.0

36.0

28.0

'

52.0

BUILDING S4LIMITS OF DOMINION

SPRING HILLSUBSTATION (BY OTHERS)

FUTURE BOONEBOULEVARD EXTENSION

(BY OTHERS)

PROPOSED INTERIM WALL2'-3' HEIGHT ALONG

PROPERTY LINEBOONE BLVD. STREET

DEDICATION TO PROPERTY LINE

FUTURE BOONE

BOULEVARD

APPROX. LOC.UNDERGROUNDTRANSFORMERVAULTS

43'±

63.0

80.0

20.0' 54.0'±

21.6'

21.6'

23.0'

24.0

'

24.0

'

24.0

'

52.0'±

35.0'59.0'

24.0'

20.0

'

20.0

'28

.0'

7.4'

32.0

32.0

53.0

45.0

36.0

28.0

'

BUILDING S4LIMITS OF DOMINION

SPRING HILLSUBSTATION (BY OTHERS)

FUTURE BOONEBOULEVARD EXTENSION

(BY OTHERS)

PROPOSED INTERIM WALL2'-3' HEIGHT ALONG

PROPERTY LINEBOONE BLVD. STREET

DEDICATION TO PROPERTY LINE

FUTURE BOONE

BOULEVARD

APPROX. LOC.UNDERGROUNDTRANSFORMERVAULTS

52.0

43'±

63.0

80.0

20.0' 54.0'±

21.6'

21.6'

23.0'

24.0

'

24.0

'

24.0

'

52.0'±

35.0'59.0'

24.0'

20.0

'

20.0

'28

.0'

7.4'

32.0

32.0

53.0

45.0

36.0

28.0

'

BUILDING S4LIMITS OF DOMINION

SPRING HILLSUBSTATION (BY OTHERS)

FUTURE BOONEBOULEVARD EXTENSION

(BY OTHERS)

PROPOSED INTERIM WALL2'-3' HEIGHT ALONG

PROPERTY LINEBOONE BLVD. STREET

DEDICATION TO PROPERTY LINE

FUTURE BOONE

BOULEVARD

APPROX. LOC.UNDERGROUNDTRANSFORMERVAULTS

52.0

43'±

63.0

80.0

20.0' 54.0'±

21.6'

21.6'

23.0'

24.0

'

24.0

'

24.0

'

52.0'±

35.0'59.0'

24.0'

20.0

'

20.0

'28

.0'

7.4'

32.0

32.0

53.0

45.0

36.0

28.0

'

BUILDING S4LIMITS OF DOMINION

SPRING HILLSUBSTATION (BY OTHERS)

FUTURE BOONEBOULEVARD EXTENSION

(BY OTHERS)

PROPOSED INTERIM WALL2'-3' HEIGHT ALONG

PROPERTY LINEBOONE BLVD. STREET

DEDICATION TO PROPERTY LINE

FUTURE BOONE

BOULEVARD

APPROX. LOC.UNDERGROUNDTRANSFORMERVAULTS

52.0

FUTURE ROSELINESTREET EXTENSION

(BY OTHERS)

FUTURE BOONEBOULEVARD EXTENSION

(BY OTHERS)

PROPOSED INTERIM WALL2'-3' HEIGHT ALONG

PROPERTY LINEBOONE BLVD. STREET

DEDICATION TO PROPERTY LINE

FUTURE BOONE

BOULEVARD

APPROX. LOC.UNDERGROUNDTRANSFORMERVAULTS

FUTURE ROSELINESTREET EXTENSION

(BY OTHERS)

BUILDING S4LIMITS OF DOMINION

SPRING HILLSUBSTATION (BY OTHERS)

43'±

63.0

80.0

20.0' 54.0'±

21.6'

21.6'

23.0'

24.0

'

24.0

'

24.0

'

52.0'±

35.0'59.0'

24.0'

20.0

'

20.0

'

32.0

32.0

53.0

36.0

52.0

NOT PART OF THISAPPLICATION

RZ-2011-HM-012

26.0

'9.

4'

45.0

26.0

'

SPR

ING

HIL

L R

OAD

RO

UTE

#68

470

' R/W

(PU

BLIC

AVE

NU

E)

CO

MM

ON

WEALTH

STREET

(PUBLIC

LOC

AL)

ROSELINE STREET(INTERIM PRIVATE LOCAL)

BUILDING S1RESIDENTIAL

270' (26 FLOORS)416,800 GSF

BUILDING S2RESIDENTIAL

270' (26 FLOORS)430,370 GSF

BUILDING S3RESIDENTIAL

270' (26 FLOORS)515,200 GSF

SKYPARK5 FLOORS

60' HT.

BOONE BOULEVARD

(PUBLIC AVENUE)

INTERIM TWO LANE SECTIONBOONE BOULEVARD(PUBLIC AVENUE)

INTERIM TWO LANE SECTION

PAR

KIN

G /

LOAD

ING

SKYPARK4 FLOORS

50' HT.

PAR

KIN

G /

LOAD

ING

SER

VIC

E AL

LEY

(PR

IVAT

E)

BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTLBTLBTLBTLBTLBTLBTL

BTLBTL

BTLBTL

BTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL BTL BTL BTL BTL BTL BTL BTL

12' TRAVEL

12' TRAVEL

BUILDING S4LIMITS OF DOMINION

SPRING HILLSUBSTATION (BY OTHERS)

FUTURE BOONEBOULEVARD EXTENSION

(BY OTHERS)BOONE BLVD. STREET

DEDICATION TO PROPERTY LINE

FUTURE BOONE

BOULEVARD

BY OTHERS

APPROX. LOC.UNDERGROUNDTRANSFORMERVAULTS

PROPOSED INTERIM WALL2'-3' HEIGHT ALONG

PROPERTY LINE

28.0

'

43'±43'±

20.0

'

20.0

'

70.0

'

16.0'23.0'

63.0

16.0'

80.0

20.0' 54.0'±

21.6'

21.6'

23.0'

20.0

'

52.0

53.0

35.0'

32.0

24.0

'

24.0

'

59.0'

52.0'±

24.0'

54.9

'±24

.0'

64.0

28.6

'

46.0

43'±

24.0

'

24.0

'

43'±52.0'±

35.0'59.0'

63.0

24.0'

80.0

20.0' 54.0'±

20.0

'

21.6'

21.6'

23.0'

24.0

'

20.0

'28

.0'

7.4'

32.0

32.0

53.0

45.0

36.0

28.0

'

20.0

'

52.0

43'±

24.0

'

52.0'±

24.0

'

35.0'59.0'

21.6'

24.0'

63.0

20.0

'

20.0'

54.0'±

21.6'

23.0'

24.0

'

20.0

'28

.0'

7.4'

32.0

32.0

53.0

45.0

36.0

12' TRAVEL

12' TRAVEL

28.0

'

20.0

'

BUILDING S4LIMITS OF DOMINION

SPRING HILLSUBSTATION (BY OTHERS)

FUTURE BOONEBOULEVARD EXTENSION

(BY OTHERS)BOONE BLVD. STREET

DEDICATION TO PROPERTY LINE

FUTURE BOONE

BOULEVARD

BY OTHERS

APPROX. LOC.UNDERGROUNDTRANSFORMERVAULTS

PROPOSED INTERIM WALL2'-3' HEIGHT ALONG

PROPERTY LINE

52.0

11.5

' TR

AVEL

11.5

' TR

AVEL

80.0

FUTURE ROSELINESTREET EXTENSION

(BY OTHERS)

12' TRAVEL

12' TRAVEL

SPR

ING

HIL

L R

OAD

RO

UTE

#68

470

' R/W

(PU

BLIC

AVE

NU

E)

CO

MM

ON

WEALTH

STREET

(PUBLIC

LOC

AL)SKYPARK4 FLOORS

50' HT.

BUILDING S1RESIDENTIAL

270' (26 FLOORS)416,800 GSF

BUILDING S2RESIDENTIAL

270' (26 FLOORS)430,370 GSF

SKYPARK3 FLOORS

33' HT.

BUILDING S3OFFICE

225' (19 FLOORS)454,000 GSF

ROSELINE STREET(INTERIM PRIVATE LOCAL)

BOONE BOULEVARD

(PUBLIC AVENUE)

INTERIM TWO LANE SECTIONBOONE BOULEVARD(PUBLIC AVENUE)

INTERIM TWO LANE SECTION

PAR

KIN

G /

LOAD

ING

PAR

KIN

G /

LOAD

ING

BUILDING S4LIMITS OF DOMINION

SPRING HILLSUBSTATION (BY OTHERS)

FUTURE BOONEBOULEVARD EXTENSION

(BY OTHERS)BOONE BLVD. STREET

DEDICATION TO PROPERTY LINE

FUTURE BOONE

BOULEVARD

BY OTHERS

APPROX. LOC.UNDERGROUNDTRANSFORMERVAULTS

PROPOSED INTERIM WALL2'-3' HEIGHT ALONG

PROPERTY LINE

11.5

' TR

AVEL

11.5

' TR

AVEL

SER

VIC

E AL

LEY

(PR

IVAT

E)

FUTURE ROSELINESTREET EXTENSION

(BY OTHERS)

12' TRAVEL

12' TRAVEL

NOT PART OF THISAPPLICATION

RZ-2011-HM-012

43'±

24.0

'

52.0'±

24.0

'

35.0'59.0'

21.6'

24.0'

63.0

20.0

'

20.0'

54.0'±

21.6'

23.0'

24.0

'

20.0

'

32.0

32.0

53.0

36.0

20.0

'

52.0

80.0

26.0

'9.

4'

45.0

'±11' TRAVEL

11' TRAVEL

11' TRAVEL

11' TRAVEL26.0

'

BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTLBTLBTLBTLBTLBTLBTL

BTLBTL

BTLBTL

BTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTLBTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL

BTL BTL BTL BTL BTL BTL BTL BTL

SCALE: 1" = 60'

N O

RT

H

INTERIM PLAN - OPTION BBINTERIM PLAN - OPTION AA

SPRI

NG

HIL

L RD

.

BOONE BLVD.

ELEVATED PRIVATEAMENITY SPACE

SEPARATEAPPLICATION

SEPARATEAPPLICATION

SEPARATEAPPLICATION

SEPARATEAPPLICATION

REV

ISIO

NS:

DA

TE:

DES

IGN

ED B

Y:

DR

AW

N B

Y:

CH

ECK

ED B

Y:

Q.C

. BY

:

SHEE

T N

UM

BER

:

SCA

LE:

PRO

JEC

T #

:20

0 S.

Pey

ton

St.,

Ale

xand

ria,

VA

223

14V

: 70

3.54

9.77

84

F: 7

03.5

49.4

984

ww

w.L

andD

esig

n.co

m

TM

Aug 24, 2017 - 9:38am G:\2016\2016065\Cad\Exhibits\Zoning Plans\CDP\ 6065-CDP_Overall Illustrative.dwg

06/2

7/20

16

OV

ERA

LL IL

LUST

RA

TIV

E

AP

AP K

GSP 1"=6

0' 2016

065

L1-0

00

Sunb

urst

at

Spri

ng H

ill M

etro

CD

P--

--

SPRI

NG

HIL

L RD

.

BOONE BLVD.

SEPARATEAPPLICATION

SEPARATEAPPLICATION

SEPARATEAPPLICATION

SEPARATEAPPLICATION

FULL BUILD-OUT PLAN - OPTION AA FULL BUILD-OUT PLAN - OPTION BB

S4

S3

S1

S2

S4DOMINION POWER

SUBSTATION

DOMINION POWERSUBSTATION

SPRI

NG

HIL

L RD

.

BOONE BLVD.

ELEVATEDPRIVATE AMENITY

SPACE

SER

VIC

E AL

LEY

(PR

IVAT

E)

SEPARATEAPPLICATION

SEPARATEAPPLICATION

SEPARATEAPPLICATION

SEPARATEAPPLICATION

SPRI

NG

HIL

L RD

.

BOONE BLVD.

SEPARATEAPPLICATION

SEPARATEAPPLICATION

SEPARATEAPPLICATION

SEPARATEAPPLICATION

S4

S3

S4DOMINION POWER

SUBSTATION

DOMINION POWERSUBSTATION

ROSELINE ST ROSELINE ST

SER

VIC

E AL

LEY

(PR

IVAT

E)SE

RVI

CE

ALLE

Y (P

RIV

ATE)

SER

VIC

E AL

LEY

(PR

IVAT

E)

(RESIDENTIAL)

(RESIDENTIAL) (RESIDENTIAL)

S3

S1

S2

(RESIDENTIAL)

(RESIDENTIAL) (RESIDENTIAL)

S1

S2

(RESIDENTIAL)

(RESIDENTIAL)

S1

S2

(RESIDENTIAL)

(RESIDENTIAL)

(OFFICE)

S3(OFFICE)

ELEVATEDPRIVATE AMENITY

SPACEELEVATED

PRIVATE AMENITYSPACE

ELEVATEDPRIVATEAMENITYSPACE

ELEVATEDPRIVATEAMENITYSPACE

ELEVATEDPRIVATE AMENITY

SPACE

ELEVATEDPRIVATE AMENITY

SPACE

06/2

7/20

16 R

ESU

BMIS

SIO

N09

/16/

2016

RES

UBM

ISSI

ON

01/1

7/20

17 R

ESU

BMIS

SIO

N03

/15/

2017

RES

UBM

ISSI

ON

05/0

4/20

17 R

ESU

BMIS

SIO

N08

/25/

2017

RES

UBM

ISSI

ON

RESTON TRANSIT STATION AREAS (TSAS) AND TYSONS URBAN CENTER CONTINUE TO EXPERIENCE SIGNIFICANT REDEVELOPMENT APPLICATIONS

Fairfax County Office of Community Revitalization

12055 Government Center ParkwaySuite 1048Fairfax, VA 22035

703.324.9300www.fcrevit.org

Fairfax County is committed to a policy of nondiscrimination in all County programs, services, and activities and will provide reasonable accommodations upon request. To request this information in an alternate format, call 703-324-9300 or TTY 711.

A significant number of redevelopment proposals have been submitted in the Reston TSAs since the adoption of the amendment to the Comprehensive Plan related to the extension of the Silverline Metrorail to Dulles and beyond. There are currently 21 zoning cases pending within the Dulles Corridor. These range in size from 1.5 acres to 47 acres. The majority of the requests are for mixed-use developments which, if approved, could result in more than 1,393,000 square feet of non-residential uses and 14,364,000 square feet of residential development.

In the past year in Tysons, Highgate at The Mile, a residential building in the North Central District, was delivered and is currently leasing. Three additional buildings are currently under construction, including the Capital One Headquarters and seven major zoning cases are pending within Tysons, which range in size from 1.29 acres to 38.83 acres. If approved, these applications could result in a 5,363,000 square feet of non-residential uses and 8,663,000 square feet of residential development.

OCR is a key member of the Reston and Tysons Core Teams that evaluate zoning proposals. OCR focuses its efforts on urban design and placemaking, which are key components to successful transit-oriented developments. In 2017, the Board adopted an update to the Tysons Urban Design Guidelines that was undertaken by OCR to reflect changes since they were first adopted in 2012.

Woodland Park East concept plan in Reston Midline - Reston Station Boulevard Rendering

Newly constructed Highgate at The Mile in Tysons Sunburst proposed concept plan in Tysons