Revision ActivityLog on to
www.socrative.com
1. Click on
‘student log in’
2. Enter room number 884712
Can use PC or mobile!
![Page 2: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/2.jpg)
AAT Level 3Costs & Revenues
![Page 3: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/3.jpg)
AAT Level 3 – Costs & Revenues
Objectives:
1.Correctly explain what is meant by a budget. 2.Compare budget costs with actual costs, identifying variances.3.Correctly identify when variances are significant.4.Be able to suggest possible causes of variances.5.Discuss the two different types of budgets (fixed and flexible).6.Correctly calculate flexed budgets and analyse variances for management reports.7.Prepare a full variance analysis using a fixed budget.
![Page 4: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/4.jpg)
AAT Level 3Costs & Revenues
Fixed & Flexible Budgets & Variance Analysis
![Page 5: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/5.jpg)
A financial plan .. that is prepared in advance
Budget
![Page 6: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/6.jpg)
BudgetA financial plan .. that is prepared
in advance
Used to monitor costs and income
Allows managers to control costs/incomeCutting down on wasteEliminating unnecessary costsChanging suppliersChasing debtors
Why bother?
![Page 7: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/7.jpg)
Adverse
(Bad for business)
What is a variance?
Favourable
(Good business)
The difference between the comparative value and the actual
value
![Page 8: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/8.jpg)
Variance - The difference between the comparative value and the
actual value
Profit for the year 2013 averaged at £25,000 per weekProfit for the year 2012 averaged at £55,000 per week
Corresponding periodPrevious period
Budget
![Page 9: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/9.jpg)
VariancesAdverse or Favourable?
Adverse/Favourable results depend on the variance being considered
Budget Actual Variance£120,000 £125,000 £5,000
Budget Actual Variance£120,000 £125,000 £5,000
Costs
Income
![Page 10: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/10.jpg)
Calculating Variances
To calculate £ variance = A - B
Where A = Actual figure
B = Comparative figure
(Budget, Previous, Corresponding)
![Page 11: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/11.jpg)
Question 1: September
8000
3000
1600
0
3400
F
F
A
A
0
![Page 12: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/12.jpg)
Question 2: OctoberAnswer
![Page 13: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/13.jpg)
Question 2: October
![Page 14: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/14.jpg)
Variances – The Golden Rules
To calculate £ variance = A - B
To calculate the % variance = A – B X 100
B
Where A = Actual figure
B = Comparative figure
(Budget, Previous, Corresponding)
Remember!!! Never divide by the Actual figure!!!!!
Hint: Identify & label your columns
A & B first!!!
![Page 15: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/15.jpg)
TolerancesAn acceptable percentage variance
from the comparative
The business will only investigate variances outside the tolerance levels
e.g. variances of 10% +
Significant Not Significant
![Page 16: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/16.jpg)
BudgetsYou should now be aware that the f ollowing cycle should take place:
Set budget amount
Compare budget amounts with actual amounts
Calculate total variance
Analyse total variance
Explain reasons f or variance
Take action
What may cause a variance?
![Page 17: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/17.jpg)
Colman ToysColeman Toys make traditional wooden toys for the overseas market.
![Page 18: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/18.jpg)
Colman ToysColeman Toys make traditional wooden toys for the overseas market.
At the beginning of the year they estimated that their Direct Material costs would be £150,000 and their Direct Labour Costs £400,000.
![Page 19: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/19.jpg)
Colman ToysColeman Toys make traditional wooden toys for the overseas market.
At the beginning of the year they estimated that their Direct Material costs would be £150,000 and their Direct Labour Costs £400,000.
It is now year end and they have actually spent £180,000 on materials and £375,000 on labour.
![Page 20: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/20.jpg)
Colman ToysColeman Toys make traditional wooden toys for the overseas market.
At the beginning of the year they estimated that their Direct Material costs would be £150,000 and their Direct Labour Costs £400,000.
It is now year end and they have actually spent £180,000 on materials and £375,000 on labour.
What may have caused these variances?
![Page 21: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/21.jpg)
Causes of Variances
Direct Materials
DirectLabour
FixedOverheads
SalesRevenue
What factors may effect these costs?
![Page 22: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/22.jpg)
Causes of Variances
Direct Materials
DirectLabour
FixedOverheads
SalesRevenue
QualityWastageCostTheftSpecification change
Pay risePoor supervisionSkill levelMachines-Breakdown-Increase speed–Decrease speed
InflationSupplier changeStepped cost
Price increase or decreaseVolume sold
![Page 23: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/23.jpg)
Causes of Variances
Direct Materials
DirectLabour
FixedOverheads
SalesRevenue
QualityWastageCostTheftSpecification change
Pay risePoor supervisionSkill levelMachines-Breakdown-Increase speed–Decrease speed
InflationSupplier changeStepped cost
Price increase or decreaseVolume sold
Solutions?
![Page 24: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/24.jpg)
Budgets
Fixed Budget Flexible (Flexed) Budget
****Cost behaviours***
![Page 25: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/25.jpg)
Question 3: September flexed budget
I/D Fixed costs (Overheads)
31200 0
Selling price = 160000/4000 = £40Flexed = 4200 x £40 = 168000
168000
0
0
0
1560
Materials = 60000/4000 = £15Flexed = 4200 x £15 = £63000
63000
Labour = 32000/4000 = £8Flexed = 4200 x £8 = £38640
33600
38640
![Page 26: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/26.jpg)
Question 4: October flexed budget
I/D Fixed costs (Overheads)
35000 4500
260000
6500
52000 6500
78000 0
97500 7000
![Page 27: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/27.jpg)
Questions 5, 6 & 7
![Page 28: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/28.jpg)
Question 8
![Page 29: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/29.jpg)
Question 8a - Answer
Total materials variance = Budgeted cost for actual output - actual cost(4 kg x £26 x 22200) = 2308800 – 2010800 = 298000 F Total direct labour variance = Budgeted labour cost for actual output – actual cost(2 hrs x £9.40 x 22200) = 417360 – 413760 = 3600 F Total fixed overhead variance = Fixed overheads budgeted – actual(21400 units x 2 x £9.40) = 402320 – 398460 = 3860 F
![Page 30: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/30.jpg)
Question 8b
![Page 31: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/31.jpg)
Variance Reconciliation Statement
Fixed budget profit
Variances:
Sales volume (B Profit – F Profit)
Selling price (A Sales – F Sales)
Labour (A Labour – F Labour)
Materials (A Materials – F Materials)Fixed costs
Actual profit
![Page 32: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/32.jpg)
Fixed budget profit 105,000
Variances:
Sales volume (B Profit – F Profit) 105,000-95,000=10,000
Selling price (A Sales – F Sales)
Labour (A Labour – F Labour)
Materials (A Materials – F Materials)Fixed costs
Actual profit
Variance Reconciliation Statement
![Page 33: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/33.jpg)
Fixed budget profit 105,000
Variances:
Sales volume (B Profit – F Profit) 105,000-95,000=10,000
Selling price (A Sales – F Sales)
Labour (A Labour – F Labour)
Materials (A Materials – F Materials)Fixed costs
Actual profit
Variance Reconciliation Statement
![Page 34: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/34.jpg)
Fixed budget profit 105,000
Variances:
Sales volume (B Profit – F Profit) 105,000-95,000=10,000
Selling price (A Sales – F Sales) 266,500 – 260,000=6,500
Labour (A Labour – F Labour)
Materials (A Materials – F Materials)Fixed costs
Actual profit
Variance Reconciliation Statement
![Page 35: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/35.jpg)
Fixed budget profit 105,000
Variances:
Sales volume (B Profit – F Profit) 105,000-95,000=10,000
Selling price (A Sales – F Sales) 266,500 – 260,000=6,500
Labour (A Labour – F Labour) 78,000-78,000=0
Materials (A Materials – F Materials)Fixed costs
Actual profit
Variance Reconciliation Statement
![Page 36: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/36.jpg)
Fixed budget profit 105,000
Variances:
Sales volume (B Profit – F Profit) 105,000-95,000=10,000
Selling price (A Sales – F Sales) 266,500 – 260,000=6,500
Labour (A Labour – F Labour) 78,000-78,000=0
Materials (A Materials – F Materials)
58,500 – 52,000=6,500
Fixed costs
Actual profit
Variance Reconciliation Statement
![Page 37: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/37.jpg)
Fixed budget profit 105,000
Variances:
Sales volume (B Profit – F Profit) 105,000-95,000=10,000
Selling price (A Sales – F Sales) 266,500 – 260,000=6,500
Labour (A Labour – F Labour) 78,000-78,000=0
Materials (A Materials – F Materials)
58,500 – 52,000=6,500
Fixed costs 35,000 – 39,500= 4,500
Actual profit
Variance Reconciliation Statement
![Page 38: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/38.jpg)
Fixed budget profit 105,000
Variances:
Sales volume (B Profit – F Profit) 105,000-95,000=10,000
A
Selling price (A Sales – F Sales) 266,500 – 260,000=6,500
F
Labour (A Labour – F Labour) 78,000-78,000=0
0
Materials (A Materials – F Materials)
58,500 – 52,000=6,500
A
Fixed costs 35,000 – 39,500= 4,500
A
Actual profit
Variance Reconciliation Statement
![Page 39: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/39.jpg)
Fixed budget profit 105,000
Variances:
Sales volume (B Profit – F Profit) 105,000-95,000=10,000
A
Selling price (A Sales – F Sales) 266,500 – 260,000=6,500
F
Labour (A Labour – F Labour) 78,000-78,000=0
0
Materials (A Materials – F Materials)
58,500 – 52,000=6,500
A
Fixed costs 35,000 – 39,500= 4,500
A
(14,500)
Actual profit
Variance Reconciliation Statement
![Page 40: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/40.jpg)
Fixed budget profit 105,000
Variances:
Sales volume (B Profit – F Profit) 105,000-95,000=10,000
A
Selling price (A Sales – F Sales) 266,500 – 260,000=6,500
F
Labour (A Labour – F Labour) 78,000-78,000=0
0
Materials (A Materials – F Materials)
58,500 – 52,000=6,500
A
Fixed costs 35,000 – 39,500= 4,500
A
(14,500)
Actual profit 90,500
Variance Reconciliation Statement
![Page 41: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/41.jpg)
Question 9 – Green Ltd
![Page 42: Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649f575503460f94c7c79e/html5/thumbnails/42.jpg)
Practice Questions
Complete practice questions 10 – 18 in your Excel workbook.