Connected Load
2.0TR 1.5TR 2.0TR 2.6TR 3.0TR Total Load in Watts Utilization Factor Effective Load
0 0 0 0 0
2200 1650 2200 2800 3300
0 0 0 0 0 950 0.7 665
0 0 0 0 0
2200 1650 2200 2800 3300
0 0 0 0 0 3800 0.8 3040
1 0 0 2 0
2200 0 0 2800 0
2200 0 0 5600 0 11350 0.9 10215
0 0 1 0 2
2200 1650 2200 2800 3300
0 0 2200 0 6600 8800 0.9 7920
2 0 0 0 0
2200 1650 2200 2800 3300
4400 0 0 0 0 9850 0.5 4925
2 2 0 0 0
2200 1650 2200 2800 3300
4400 3300 0 0 0 10300 0.65 6695
0 0 0 0 0
2200 1650 2200 2800 3300
0 0 0 0 0 8050 0.8 6440
0 0 0 0 0
2200 1650 2200 2800 3300
0 0 0 0 0 1650 0.25 412.5
53100 40312.5
Cassette
-
8/13/2019 Revisd Load Calculations Orchid Hospital
3/11
30000
-
8/13/2019 Revisd Load Calculations Orchid Hospital
4/11
Floor Wattage
Basement 900
Ground Floor 900
Ground Floor Exterior Lighting 750
First Floor 900Second Floor 900
Third Floor 900
Fourth Floor 900
Fifth Floor 900
Terrace Floor 500
Total Lighting Load 7550
Lighting Load Calculations
-
8/13/2019 Revisd Load Calculations Orchid Hospital
5/11
Description of Load Nos. Load in Watts
Bore Pump 5HP 1 3750
Water Pump 3HP 1 2250
Motors for Medical Gases 3HP 2 4500
6 Passanger Lift 6HP 1 4500Stretcher Lift 12HP 1 9000
Illuminated Signages 1 1500
Fire Detection and Alarm Panel 1 250
RO Plant on Terrace 1 750
EPABX 1 150
Music System / PA System 1 250
Computer Networking Rack 1 1000
Xerox Machine 1 1600
CCTV System 1 250
Kitchen Equipment - Oven 1 1500
Kitchen Equipment - Refrigerator 1 500
Kitchen Dish Washer 1 2000
Kitchen Vending Machine 1 2200
Kitchen Juicer / Mixer 1 750
Drug Store Refrigerator Basement 2 750
Pharmacy Store Refrigerator 1 250
Autoclave Unit 1 15000
Suction Pump 1HP Operation Theatre 1 750
Operation Theater Lights 1 500
Ventilator 1 1750
Water Cooler 1 500
Pressure Pump / Booster Pump 1 0
Total Load in Watts 56200
Load Calculati
-
8/13/2019 Revisd Load Calculations Orchid Hospital
6/11
Utilization Factor Effective Load Type of Supply Type of Supply
0.2 750 Normal Normal
0.2 450 Normal Normal
0.75 3375 DG Normal/DG
0.8 3600 DG Normal/DG0.6 5400 DG Normal/DG
0.25 375 Normal Normal
1 250 DG NORMAL/UPS/DG
1 750 DG Normal/DG
1 150 DG NORMAL/UPS/DG
0.5 125 DG NORMAL/UPS/DG
1 1000 DG NORMAL/UPS/DG
0.1 160 Normal Normal
1 250 DG NORMAL/UPS/DG
0.25 375 Normal Normal
1 500 Normal Normal
0.2 400 Normal Normal
0.2 440 Normal Normal
0.2 150 Normal Normal
1 1500 Normal Normal
1 250 Normal Normal
0.2 3000 Normal Normal
0.25 187.5 DG Normal/DG
0.25 125 DG NORMAL/UPS/DG
0.3 525 DG Normal/DG
1 500 Normal Normal
0.5 0 Normal Normal
24587.5
n Common Services
-
8/13/2019 Revisd Load Calculations Orchid Hospital
7/11
Computer Wattage Total Printers Wattage Total Fans Wattage Total
Basement 8 125 1000 4 165 660 6 55 330
Ground Floor 1 125 125 1 165 165 6 55 330
First Floor 7 125 875 1 165 165 3 55 165
Second Floor 3 125 375 2 165 330 6 55 330
Third Floor 1 125 125 3 165 495 10 55 550Fourth Floor 1 125 125 1 165 165 7 55 385
Fifth Floor 10 125 1250 1 165 165 10 55 550
Terrace 0 125 0 0 165 0 1 55 55
Total 31 3875 13 2145 49 2695
3875 2145
I
-
8/13/2019 Revisd Load Calculations Orchid Hospital
8/11
Exhaust Fans Wattage Total Geyser Wattage Total LCD TV Wattage Total
0 45 0 0 2000 0 0 100 0
1 45 45 0 2000 0 0 100 0
1 45 45 1 2000 2000 4 100 400
3 45 135 1 2000 2000 1 100 100
1 45 45 0 2000 0 1 100 1004 45 180 4 2000 8000 5 100 500
2 45 90 1 2000 2000 1 100 100
1 45 45 1 2000 2000 0 100 0
13 585 8 16000 12 1200
/ Electrical Devices
-
8/13/2019 Revisd Load Calculations Orchid Hospital
9/11
Floorwise Total Wattage
1990
665
3650
3270
13159355
4155
2100
26500
10500
-
8/13/2019 Revisd Load Calculations Orchid Hospital
10/11
Summary of Connected Load Watts
AC Installations 53100
Lighting Load 7550
Common Load 56200
Computers/ Printers /Fans/ LCD etc. 10500
Geysers 16000Total Load in Watts 143350
Add Load of 6A Receptacles - 12 Nos X 6 Floors 7200
Add Load of 16A Receptacles - 3 Nos X 6 Floors 18000
Add Fire Pump 0
Total Load 168550
Total Load after 90% Diversity 151695
1) 2 Nos. of Lifts, 1 No. for Bore and 1 No. Water Pump
2) Remainimg Load / ( Maximum Possible )
Rating of Probable Equipment Sizing
UPS - 15KVA Minimum - 20KVA Maximum with 3Phase Input and Single
DG Set - 100KVA Minimum - 125KVA Maximum with AMF Panel
Try Two Separate Connections for
-
8/13/2019 Revisd Load Calculations Orchid Hospital
11/11
Effective Load
40312.5
5662.5
24587.5
6300
400080862.5
1440
1800
0
84102.5
75692.25
20HP
85KW / 90KW
Phase Output