Reverse Conducting Slides Mazurka Project Presentation Materials Version: 14 November 2005.

6
Reverse Conducting Slides Mazurka Project Presentation Materials Version: 14 November 2005

Transcript of Reverse Conducting Slides Mazurka Project Presentation Materials Version: 14 November 2005.

Page 1: Reverse Conducting Slides Mazurka Project Presentation Materials Version: 14 November 2005.

Reverse Conducting Slides

Mazurka Project Presentation Materials

Version: 14 November 2005

Page 2: Reverse Conducting Slides Mazurka Project Presentation Materials Version: 14 November 2005.

Learning Curves for 4 PerformancesMazurka in F Minor, Op. 7, No. 3

Rosen 1989 Friedman 1930

Mazurka in A Minor, Op. 7, No. 2Chiu 1999 Friedman 1930

0 5 10 15 20

50

55

60

65

70

75

0 5 10 15 20

54

56

58

60

62

64

0 5 10 15 2060

65

70

75

80

85

0 5 10 15 20

50

55

60

65

Page 3: Reverse Conducting Slides Mazurka Project Presentation Materials Version: 14 November 2005.

Average Displacement Errors

Mazurka in F Minor, Op. 7, No. 3Rosen 1989

0 5 10 15 20

50

55

60

65

70

75

millseconds

= individual trial average displacement errors= dropping more and more later trials= dropping more and more earlier trials

Page 4: Reverse Conducting Slides Mazurka Project Presentation Materials Version: 14 November 2005.

Average Displacement Errors (2)Mazurka in F Minor, Op. 7, No. 3

Rosen 1989 Friedman 1930

0 5 10 15 20

50

55

60

65

70

75

Mazurka in A Minor, Op. 7, No. 2Chiu 1999 Friedman 1930

0 5 10 15 20

50

52.5

55

57.5

60

62.5

65

0 5 10 15 2045

50

55

60

65

0 5 10 15 20

60

65

70

75

80

85

slowertempo

Page 5: Reverse Conducting Slides Mazurka Project Presentation Materials Version: 14 November 2005.

Correction Offsets

0 50 100 150 200 250 300 350

-200

-100

0

100

200

Mazurka in A Minor, Op. 7, No. 2Chiu 1999 Friedman 1930

-100 0 100 2000

0.2

0.4

0.6

0.8

1

1.2

1.4

49 ms avg correction; -12 ms overall shift

0 50 100 150 200 250 300

-200

-100

0

100

-100 0 100 2000

0.2

0.4

0.6

0.8

1

60 ms avg correction; -36 ms overall shift

The top plots show the amoutn of time in milliseconds between the corrected beat times and theaverage manually tapped beat times. The lower plots display a histogram of the data in the top plots.The spike at 0 in the histograms is due to audible corrections having a resolution of 10 ms.

Page 6: Reverse Conducting Slides Mazurka Project Presentation Materials Version: 14 November 2005.

Correction Offsets (2)

Mazurka in F Minor, Op. 7, No. 3Rosen 1989 Friedman 1930

48 ms avg correction; +5 ms overall shift 48 ms avg correction; -27 ms overall shift

The top plots show the amoutn of time in milliseconds between the corrected beat times and theaverage manually tapped beat times. The lower plots display a histogram of the data in the top plots.The spike at 0 in the histograms is due to audible corrections having a resolution of 10 ms.