Rev2 Elec EhabSaad 2015

7

Click here to load reader

Transcript of Rev2 Elec EhabSaad 2015

Page 1: Rev2 Elec EhabSaad 2015

Ehab Ahmed Mostafa Saad Al zahier front of Dyiafa Mall – Makkah – KSA GSM: +966 566 923 866, +966 543267934 E-mail: [email protected] Nationality: Egyptian Year of Graduation: 2003 Years of Experience: 12 years

Education Academic Education .

B.S.C. of Electrical Engineering from Cairo University Faculty of Engineering Electrical Communications & Electronics Department.

Personal DataDate of Birth 6th of January 1981Military Status ExemptedMarital Status Married.

Professional Experience: Oct.2012-Now Saudi Binladin Group (ABCD) Shamiyeh Project Makkah, KSA

Electrical Resident Engineer in the Expansion Haram Building.. Main responsibilities

o Supervising and monitoring the work of sub-contractors.o Solving technical difficulties that may arise during work.o Review and approve materials and equipment data sheet before purchase.o Ensure all work is carried out in accordance with the approved specification

and drawings. o Provide effective technical directions for all electrical constructions activities

across the site. o Review and approve method statement, particularly in relation to safe.o Attend regular meeting and review schedule impacts and work progress.o Responsible for technical negotiations with consultants.o Coordinating electrical milestones, time schedules with clients and

consultants for all activities.o Studying the contract specifications requirements drawings.o Reviewing tender with design drawings, load calculation, shop drawings, and

material submittals.o Studying suppliers offers and make selection for all systems as per project

specification.o Coordinating and supervising all Electrical activities with Mechanical and

Civil Building activities.o Managing Inspection with QA/QC’s and preparing snag lists.o Ensure HSE guidelines are adhered to throughout project execution.o Supervising and managing MEP subcontractors by:

Ehab Saad

1

Page 2: Rev2 Elec EhabSaad 2015

- Guiding the AutoCAD draftsman for preparing the Electrical Shop Drawings as per the consultant approval.

  - Supervision of site works and installation works. - Preparation of material submittals for consultant approval.

   -Coordinate with A/C works, pre-commissioning & commissioning of distribution boards & Make sure that all the relevant processing equipment & accessories are installed properly.

- Ensure that the work should complete in time with the given specifications.

  Feb. 2011-Sep.2012 Saudi Binladin Group (Advanced Vision Company) Shamiyeh Project Makkah, KSA

Electrical Site Engineer as a subcontractor in the Expansion Haram Building.

Main responsibilities:o Responsible to manage & supervise subordinate engineers

and technical office for executing works as per latest drawings & specification.

o Provide electrical design technical analysis and resolution for sit execution problems.

o Responsible for shop drawings production and materials review, ability to deliver project deliverables within the approved project execution plan.

o Responsible to coordinate with the consultant and client for all necessary drawings.

o Provide progress report to higher management.o Effectively manages the progress of the electrical works in order to meet

schedule.o Coordinate with all other trades on site.o Follow-up with all required parties for all necessary drawings (electrical,

mechanical, architecture layout, reflected ceiling, toilet details, etc.)o Provide feedback to Construction Manager for the completion of all "open"

Electrical works.o Ensure all the work is completed in a safe manner with highest quality.o Preparing the available drawings (Sketch or Shop drawing) and comparing

them With latest Design drawing and taking permission from consultant to perform then lead team of foremen and technicians to execute the drawing as per site conditions and Preparing As Built drawing for the electrical systems.

o Prepare Technical Evaluation reports.o Review daily work plan program and prepare progress reports.o Responsible for site installation of the following electrical systems :-

-Interior lighting and power system. -Cables network (embedded, exposed and trays). -L.V. Power station Distribution Boards. -Electric grounding network mat (earth mats Lattice & solid copper). -Installation of emergency (UPS) system (lighting and power). - Installation of building management system (BMS).

Ehab Saad

2

Page 3: Rev2 Elec EhabSaad 2015

Feb.2009-Feb.2011 LINKDOTNET ISP (Internet Service Provider) Cairo, Egypt

SE (Systems Engineer) in NOC (Network Operations Center) Department.

Main Responsibilities: Servers’ installation configurations, Network Performance Monitoring, Datacenter and racking servers. June2007-Feb.2008 Elshehab for electronics systems (Sanyo, Texecom, Notifier and ION). Cairo, Egypt

Senior Projects Engineer and presale Engineer for Low Current Systems. Main responsibilities

o Plan the workflow for the installation of the network.o Supervising over a team of 3 engineers and 20 technicians. o Evaluating project s’ progress.o Training new engineers.

Oct.2003- June2007 ECEE (Panasonic Agency) for communications Equipment Cairo, Egypt Site and Executive engineer for CCTV system. Main responsibilities:

o Supervising the installation of the cameras to cover the all needed areas. o Programming of all the cameras + multiplexers + hard disk (DVR).o Testing any new products arrived to the company especially the IP systems

and the microwave linking wireless communication systems .

_____________________________________Technical Courses:

DEC 2014 Cadres Makers Cairo, EgyptElectrical Power System Distribution DiplomaContents:• Overview about consulting work / Understanding project levels and work flow• Autodesk AutoCAD 2d • Lighting Distribution- Types of lamps- Types of luminaires- IP of luminaire- Description of luminaire and catalogues- Lighting Design manually and using software such Relux, Dialux,..etc- Distribution of luminaires- Connection of lighting circuits (Wiring - Conduit)- Switches (Types of switches - Position of switch - Rating current)- Lighting Loads• Power Distribution- Types of (sockets, Power sockets, Heaters, Switch Fuse, Air Conditioning)- Distribution of (Sockets, P.Sockets, Heaters, A/C)- Connection of power circuits (wiring - Conduit)- Power Loads- Types of Panel Boards (BCP - SFD - MDB)- Load Panel Schedule-Circuit Breaker Selection (Types of C.B - Rating Current of C.B)- Diversity Factor and Balancing Loads- Power Single Line Diagram- Cables (Types of Cables - Cable Sizing) • Transformer Selection.• Generator Selection• U.P.S Selection.• Capacitor Bank (Power Factor Correction Unit)• Voltage Drop Calculations.

Ehab Saad

3

Page 4: Rev2 Elec EhabSaad 2015

• Short Circuit Calculations• Light Current System Design(Fire-Alarm, Telephone, Data, Sound System, Intercom, T.V system, and CCTV):- Types- Selection- Distribution- Connection- Details of Boards- Single Line Diagram • Street Lighting Design• Earthing System.• Bill of Quantities of the project 2008 Synergy Education Center Cairo, Egypt MCIT Scholarship:

oBerlitez American English (4 Levels).oSoft skills : supported by Dale Carnegie

- Effective Communication and Human Relations. -The Planning Process (Basic Project Management Skills). - High Performance Teams (Team Work). -Problem Solving & Decision Making.

oNetwork Management Systems (NMS) Use Microsoft Certified Systems Engineer (MCSE) consists of:

i. Network + , Server +ii. MCSE Courses Contents.

2008 Scientific Computation Center Cairo University

"CISCO Networking Academy Program" Track and successfully completed

CCNA 1 (Networking Basics), CCNA 2 (Routers and Routing Basics), CCNA 3 (Switching Basics and Intermediate Routing) , CCNA4 (WAN Technologies).

_____________________________________ International Certificates:

International Computer Driving License ( ICDL ).

CompTIA A+ Certified.

Cisco Certificate Network Associate CCNA Certified.

Microsoft Certified Systems Engineer: Messaging. MCSE (Messaging) Certified.

Language & Computer Skills

-Good in both written and spoken English.

-Good command of Microsoft Office and programming concepts .

Personal Skills:

Strong negotiation & interpersonal skills, hard worker, high energy level,

Ehab Saad

4

Page 5: Rev2 Elec EhabSaad 2015

Dependable, self-motivated, punctual, good team worker and an outgoing

personality.

Motivating and eager to work cooperatively .

Considering the success of the whole team is of my own success.

Hobbies & Interseted:

      -Reading and Writing

     -Searching the internet

       -Helping Others, Sport, Reading & Communications News.

___________________________________

*All Documents and Certificates will be furnished upon request

Ehab Saad

5