Turnkey Project
In-service Turnkey Retrofit
advice on ballast water treatment system selection with respect to suitability for the vessel in terms of available space
objective overview of costs, timeline and work scope involved.
Operating for over 30 years and established in 16 countries, we can complete the installation whilst the vessel is in-service or during dry-dock on a 24/7 basis. As one of the leading figures in the marine engineering industry, Harris Pye utilises its proven experience and expertise in the retrofitting of Ballast Water Treatment Systems.
Su
For further information, contact us:Harris Pye DMCCPO Box 127969, 12th Floor Mazaya BB1 JLTDubai, United Arab Emirates
Email: [email protected]: +971 4 324 1535Fax: +971 4 324 3585www.harrispye.com
Completing installation of the BWTS whilst the vessel remains in-service should be strongly considered as this o�ers alevel of flexibility and assurance for the shipowner that cannot be achieved within a dry-dock.
Our Services
Carried out by our eight 3D laser scanning units and laser scanning arms. These provide accurate measurements to ensure a tie-in with existing systems.
All installations are handled by a dedicated project managment team liasing and coordinating with the owner on a daily basis. This safeguards a streamlined installation process and greatly minimizes
through fully certified technicians and third party companies.
production. Owners will benefit from local and globally discounted supply chain costs and a reduction in installation time during service.
High level project planning, pipe isometrics, 3D modeling of installation, power system upgrades and an in-depth analysis of potential pipe routes ensure final design is ergonomically friendly and easy to maintain.
Project fundamentals should be in place prior to a small initial survey being carried out. This allows for abudgetary estimation as well as gaining a general understanding of the vessel layout for planning a detailed survey.
Prefabrication
Installation
Detailed Engineering
Detailed Survey
Deskop Survey