Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State
City of SacramentoSacramento State Facilities Management
![Page 2: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/2.jpg)
Project Background – Campus Storm Drain System
Drain Inlet - Campus Storm Drain Discharges into American River
![Page 3: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/3.jpg)
Project Background – American River
Outfall – Guy West Bridge Upstream Sample
Discharge Sample
![Page 4: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/4.jpg)
Project Background
1. Phase II Stormwater Permit
Requires Implementation of Low Impact Development
Kevin Perry - Urban Rain Design
![Page 5: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/5.jpg)
Project Background
1. Proposition 84 – Stormwater Grant Program
2. State Water Resources Control Board
3. Objectives:a) Prevent stormwater contamination of rivers,
lakes, and streams.b) Implement requirements of stormwater
permitsc) Implement Low Impact Development (LID)d) Monitoring and Education Outreach
City of Kirkland, WA
![Page 6: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/6.jpg)
Project Collaboration
State Water Resources Control Board
City of Sacramento
Office of Water Programs @ Sacramento State/UEI
Sacramento State Facilities Management
Design and Construction Contractors
Project ManagementDesign and Construction OversightStormwater Monitoring and EvaluationPublic Education and Outreach
![Page 7: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/7.jpg)
Project Funding - Summary
Project Total - $3.3MA. Prop 84 - $2.6MB. Local Match - $0.7M
i. Sacramento State FM - $500Kii. City of Sacramento - $112Kiii. Office of Water Programs – $31Kiv. Dry Creek Conservancy - $30Kv. Local LID Expertise - $25Kvi. County of Sacramento - $1K
![Page 8: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/8.jpg)
Project Benefits
1. Meet Stormwater Permit Requirements
2. Faculty/Student Involvement
3. High Visibility4. Protects the American
River5. Replenish Irrigation Wells6. Demonstration and
Training Facility for Northern CA
![Page 9: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/9.jpg)
Low Impact Development (LID)
1. Mimic Natural Hydrology (Infiltrate)
2. Protect Receiving Waters3. Reduce Flooding4. Groundwater Recharge5. Opportunities for Reuse
US EPA
![Page 10: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/10.jpg)
Types of Low Impact Development Devices
1. Bioretention Planters2. Rain Gardens3. Bioswales4. Porous Pavement5. Biostrips6. Road Narrowing (reduce impervious area)7. Cisterns or Rain Barrels8. Tree Box Filters9. Constructed Wetlands10. Green Roofs
![Page 11: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/11.jpg)
Rain Garden Profile and Function
11
Surface depth 6”
Amended Soil depth 18”
Native Soil
![Page 12: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/12.jpg)
Rain Gardens
Harford County, MDUS EPA
![Page 13: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/13.jpg)
Bioswale - Profile
Native Soil
6” heightAmended Soil: 6” – 18”
![Page 14: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/14.jpg)
Bioswales
Lake County, ILCaltrans
![Page 15: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/15.jpg)
Bioretention Profile and Function
15
Surface depth 6”
Amended Soil depth 18”
Underdrain storage depth 12”
Elevated Underdrain Discharge
Native soil
![Page 16: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/16.jpg)
Bioretention – Parking Lots
Scott Taylor, PERBF Consulting
![Page 17: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/17.jpg)
Bioretention – Streets
Scott Taylor, PERBF Consulting
![Page 18: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/18.jpg)
Porous Pavement - Profile
Native Soil
Porous Pavement
Gravel Filter Course
4”
12”
![Page 19: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/19.jpg)
Porous Pavement
![Page 20: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/20.jpg)
Project Location
![Page 21: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/21.jpg)
Campus Layout
![Page 22: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/22.jpg)
Ongoing LID Construction
1. 8 Bioretention Planters
2. 8 Rain Gardens (Street Side and Low Lying Lawn Drain Inlets)
3. 3 Rooftop Disconnects with Rain Gardens
4. 2 Bioswales
5. 1 Green Street (Porous Pavement and 6-10 Rain Gardens)
![Page 23: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/23.jpg)
Design Goals
Enhance InfiltrationA. Silty sands over gravels
B. No devices lined
C. 14 acre-feet per year infiltrated or treated
D. 13.2 acre-feet per year - infiltration alone
![Page 24: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/24.jpg)
Design Goals – Large Tributary Areas
Parking Lot 7 (South): Bioretention Planters and Bioswale
1.64 Acres1.82 Acres
![Page 25: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/25.jpg)
Design Challenges
1. Fitting into the existing drainage systema. Horizontalb. Vertical
2. Negotiating the removal of parking stalls3. Fitting into existing topography4. Existing infrastructure5. Interactions with buildings6. Subsurface soil?7. Timing8. Compatibility with Campus Master Plan
![Page 26: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/26.jpg)
LID Device MonitoringPerformance Monitoring
Evaluation and Reporting
![Page 27: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/27.jpg)
Education and Outreach
1. Signage, Website, Tours(Mobile App)
2. Brochures
3. Conferences and Papers
4. LID Conference
5. Campus Presentations
6. Public Affairs
Kitsap Conservation District Green Side Up
![Page 28: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/28.jpg)
Operation and Maintenance
1. Weed, Litter, and Debris Removal (As needed)
2. Infiltration Inspections (Runoff Infiltrating?) (Twice a year during storms)
3. Low or no Infiltration? Remove and Replace Topsoil (~ 5 to 10 years)
4. Use integrated pest management (IPM) techniques to minimize use of fertilizers, pesticides and herbicides. (As needed)
5. Inspect (~ 2 times per year – including once at end of wet season) for erosion and sediment buildup. Correct problems as needed.
Kevin PerryUrban Rain Design
![Page 29: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/29.jpg)
Project Funding - Summary
Project Total - $3.3MA. Project Admin: $0.2M
B. Planning and Design: $0.5M
C. Construction: $2.1M
D. Monitoring and Reporting: $0.3M
E. Education and Outreach: $0.3M
![Page 30: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/30.jpg)
Project Timeline
Spring 2015: Completed Design
Summer and Fall 2015: Construction
2015/2016: Post-Construction Monitoring
January 2017: Final Report
2016 – 2036: O&M
![Page 31: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/31.jpg)
Breaking Ground
• Next Year? Construction Challenges
![Page 32: Retrofitting Low Impact Development (LID) for Stormwater at … · 2015-08-12 · 2016 – 2036: O&M. Breaking Ground • Next Year? Construction Challenges. Funding for this project](https://reader033.fdocuments.in/reader033/viewer/2022042404/5f1c168207afd83adb5b09a6/html5/thumbnails/32.jpg)
Funding for this project has been provided in full or in part through an agreement with the State Water Resources Control Board. The contents of this document do not necessarily reflect the views and policies of the State Water Resources Control Board, nor does mention of trade names or commercial products constitute endorsement or recommendation for us.