Reto M. Hummelshøj
Project coordinator
1 22 OCT. 2012ECO-CITY STATUS 2012
Coordinators meetingBrussels 22-24 Oct. 2012
2
ECO-CITY STATUS 2012
ECO-City project
Main project figures:› 22 project partners from › 5 countries› 3 Communities› Cost budget 28.7 mio. €› EU support 11.4 mio. €
› Project application 2003› Project period 2005-2012
22 OCT. 2012
3 ECO-CITY STATUS 2012
Main Components
› ECO-Buildings› ECO-dwellings: about 1500 dwellings in many forms of buildings
› Tertiary buildings: schools, offices, commercial, institution, cultural, sport
› 55% refurbishment
› Renewable energy:› Use of solar, biomass, biogas, heat pumps, waste, (wind) etc.
› Polygeneration› Biogas from organic household / industrial waste for transport, CHP and fertiliser
› Integrated free cooling concepts using river water, ground source heat pumps and district heating driving absorption cooling
› Integration› Whole building / community approach , monitoring & knowledge sharing, training,
dissemination
› Innovations› Intelligent metering. Use of waste / storage. Ground source simulation program.
22 OCT. 2012
5 ECO-CITY STATUS 2012
ECO-City Progress October 2012
22 OCT. 2012
Duration
Budget
RES el.
RES thermal
Solar space
New buildings
Refurb. buildings
Poly-generation
Other
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
~ € 11.4 Mio.
~ 258 kW
~ 9.451 kW
~ 297 m²
~ 123.341 m²
~ 101.126 m²
5.307 kW
Waste storage & metering
ECO-City
86 months
data as of: October 2012
ECO-CITY STATUS 20127
PeculiaritiesActual U-values in ECO-City
22 OCT. 2012
Measure Trondheim(Ranheimveien, passive house)
H+H(Björka Ödåkra passive house)
Tudela(New ECO-buildings)
Façade W/m²K 0.09 0.12 0.26
Roof W/m²K 0.065 0.07 0.17
Ground floor W/m²K 0.08 0.09 0.24
Windows W/m²K 0.8 0.9 1.4
Ventilation rate h-1 1.04 0.7 0.5
8
A few glimpses from Helsingborg and Helsingør
22 OCT. 2012 ECO-CITY STATUS 2012
ECO-CITY STATUS 20129
BEST table number Project Area Energy savings CO2 savingsEnergy cost
savings InvestmentSimple pay-back time
m2 kWh/year Ton/year EUR/year EUR
H+H 1. New Maria Park 23-24 6420 341.194 26 35.388 330.172 9
H+H 1. New Fronten 4591 368.431 36 49.615 465.904 9
H+H 1. New Laröd Östra, phase 1 1388 103.617 10 14.734 - -
H+H 1. New Laröd Östra, phase 2 6544 488.521 47 69.467 - -
H+H 1. New Björka Ödåkra 4003 288.105 25 25.313 524.364 21
H+H 1. New Portalen 11073 678.939 6 108.774 581.350 5
H+H 2. New ECO Light Maria Sofia 3-4 11842 1.055.872 75 121.127 310.210 4
H+H 2. New ECO Light Maria Sofia 1-2 7098 543.109 49 63.500 331.482 5
H+H 2. refurbished Parkkvarteret Norra Vallgatan 44-46 3800 71.381 -6 21.722 414.353 15
H+H 2. refurbished Parkkvarteret Norra vallgatan 48 3289 61.782 -5 19.268 215.913 11
H+H 2. refurbished Hamilton appartments 17250 - - - - -
H+H 2. refurbished Stattena 5600 - - - - -
H+H 2. refurbished Vattentårnet 2525 - - - - -
H+H 2. refurb. adm. Hamilton office 4073 - - - - -
H+H 5. Cultural Yard 13000 335.708 357 120.169 2.925.071 24
H+H 4. Grydemose School 11196 725.635 124 92.824 443.784 5
H+H 3. Prøvestenen 9615 684.354 102 80.307 744.767 9
Total community 123.307 5.746.647 409 822.210 7.975.281 11
Impact of ECO-City buildings in Helsingør/Helsingborg
22 OCT. 2012
ECO-CITY STATUS 201210 22 OCT. 2012
Example of CO2 emission (Grydemoseskolen)60% savings with 5-10 year pay-back
2008 2009 2010 2011 -
50
100
150
200
250
300
350
Annual CO2 emissionGrydemoseskolen
Natural gasDistrict heatingElectricity
Tons
COMMON ECO-CITY MEETING IN TUDELA11
Environmental impact of ECO-City
18 SEPTEMBER 2012
Without ECO-City
With ECO-City -
500
1,000
1,500
2,000
2,500
3,000
3,500
1,574
1,003
1,437
1,164
CO2-emission from H+H-buildings(2011 figures)
New buildingsRefurbished buildings
Tons/y
ear
28%
COMMON ECO-CITY MEETING IN TUDELA12
Overall reduction of energy consumption
18 SEPTEMBER 2012
Environmentao impact of ECO-City
Without ECO-City ECO-City -
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
7.2
4.9
10.4
6.6
Energy consumption of H+H-buildings(2011 figures)
New buildingsRefurbished buildings
GW
h/y
ear
35% (target: 25-35%)
COMMON ECO-CITY MEETING IN TUDELA13 18 SEPTEMBER 2012
Environmental impact of ECO-City
Before ECO-City (2002) Without ECO-City (2011) ECO-City (2011) -
2,000
4,000
6,000
8,000
10,000
12,000
14,000
-
2,000
4,000
6,000
8,000
10,000
12,000
14,000
- -
12,567
1,810 1,574 1,003
-
1,437
1,164
CO2 emission in Helsingør/Helsingborg
New buildingsRefurbished buildingsRenewable energy
Tons p
r. y
ear
775 households
Extra investment demand side 7.9 mio €vs. investment supply side 7.8 mio €
14 ECO-CITY STATUS 2012
First 62 og 300 passive house dwellings completed in Miljøbyen Granås in Trondheim
22 OCT. 2012
15 ECO-CITY STATUS 2012
100 ECO-dwellings in Tudela received 1st prize of best energy
efficiency and sustainable city development in Spain 17 Oct 2012
22 OCT. 2012
16 ECO-CITY STATUS 2012
Overall Objectives in ECO-City project - achieved
› Energy savings 4000 households equivalent in project and further impact of same magnitude
› Influencing 17.000 inhabitants
› Electricity savings of 20.2 GWh/y (incl waste storage and planned wind)
› Heat savings of 75.4 GWh/y
› CO2 savings of 26,500 ton/y
› Affordable pay-back periods of 10-12 years
› Being a pilot demo project as a ambassador for sustainable town development in the 3 regions from north to south in Europe
22 OCT. 2012