Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in...

15
Barts Square, London EC1 | Retail 6 Information Pack 6 December 2019 Volume 1 Retail 6 First Issue: 15 August 2016 Revision A: 22 November 2019 Revision B: 06 December 2019

Transcript of Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in...

Page 1: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

Barts Square, London EC1 | Retail 6 Information Pack6 December 2019

Volume 1Retail 6First Issue: 15 August 2016

Revision A: 22 November 2019

Revision B: 06 December 2019

Page 2: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space
Page 3: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

Contents

1. DESIGN CRITERIA 61.1 THE DEVELOPMENT 6

1.2 STRUCTURE 7

1.3 FIRE 7

1.4 ACOUSTICS 7

2. BUILDING ENVELOPE 112.1 PERFORMANCE 11

2.2 EXTERNAL WINDOWS AND WALLS 11

2.3 FACADE ACCESS 11

2.4 EXTERNAL DOORS 11

2.5 SIGNAGE 1

3. BUILDING INTERIOR AND FIT-OUT 153.1 INTERIOR BASE BUILD 15

3.2 TOILETS 15

4. SERVICES 184.1 SERVICES PROVISION 18

4.2 HEATING VENTILATION AND AIR CONDITIONING (HVAC) 18

4.3 ELECTRICAL AND DATA INSTALLATIONS 19

4.4 WATER SUPPLY AND DRAINAGE 19

4.5 FIRE AND SECURITY

5. FACILITIES MANAGEMENT 255.1 SERVICE CHARGE 25

5.2 MAINTENANCE STRATEGY 25

5.3 CLEANING STRATEGY 25

5.4 DELIVERY STRATEGY 25

5.5 WASTE DISPOSAL AND COLLECTION STRATEGY 25

6. DRAWINGS AND TECHNICAL DATA

APPENDIX A: AS-BUILT DRAWINGS

APPENDIX B: EON TECHNICAL DATA

APPENDIX C: BRITISH GYPSUM SPECIFICATION

NOTE ON CONTENTSThis document provides guidance information for the Retail Tenant. The plans are provided for information. It is expected that the Retail Tenant will carry out their own conditions inspection and instruct their own survey on which to base their fit out.

BARTS SQUARE, LONDON EC1 - RETAIL 6 INFORMATION PACK 3

Page 4: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

1. Design Criteria1.1 THE DEVELOPMENT

1.1.1 BARTS SQUARE

Retail 6 forms part of the Barts Square development that lies within the City of London and the ward of Farringdon. It covers approximately 1.29 hectares (by reference to the red line site boundary) that encompassed a range of buildings on Little Britain and Bartholomew Close. The majority of the site lies within the Smithfield Conservation Area.

Retail 6 is a double aspect retail unit at the ground floor of a six storey brick clad residential block. Retail 6 is entered from Little Britain close to Bartholomew Close.

1.1.2 AREA

Retail 6 provides approximately 107.8 sqm (1160 sqft) of gross internal area (including columns), located at ground level. Final area to be confirmed subject to measured area survey post completion.

1.1.3 PLANNING CONDITIONS AND RESTRICTIONS

Retail 6 has planning permission for A1 use noting that the doors and windows of each unit are to be kept closed except for entrance and exit use.

1.1.4 OPERATING HOURS

The permitted operating hours for all retail units on the estate are 7:00 - 0:00 Monday to Sunday.

1.1.5 PREMISES LICENCE

All premises licensing is subject to separate planning application by Retail Tenant.

1.2 STRUCTURE

1.2.1 SUPERSTRUCTURE

The superstructure is an in-situ reinforced concrete frame.

1.2.2 STRUCTURAL SLAB LOADING

SDL = 2.50kN/m², where SDL refers to “Superimposed Dead Load” and encompasses floor finishes and suspended ceiling loads.

LL = 5.00kN/m², where LL refers to “Live Load” and is the variable load related to occupation.

Maximum deflection of any slab inclusive of Super Imposed Load deflection + remaining dead load deflection = 15mm.

1.2.3 STRUCTURAL TOLERANCES

The as built survey information provided by Site Engineering Surveys Ltd is included in Appendix A. Refer to survey drawings for slab and threshold levels

1.3 FIRE

1.3.1 OCCUPANCY

A risk profile of B1 has been allocated to the retail space based on an occupancy of 2 sqm/person.

2. Building Envelope2.1 PERFORMANCE AND TESTING

The windows and ground floor door are modern systems that provide improved thermal performance, to achieve the requirements set in Part L2A.

The ground floor external walls are designed to achieve a U-value of 0.27 W/m2K.

The ground floor shopfront glazing and doors are designed to achieve a U-value of 5.5 W/m2K.

In order to mitigate the occurrence of condensation either localised control measures (such as heat curtain) or space wide (general heating and humidity control) should be considered as typically adopted in retail outlets in London..

2.2 EXTERNAL WALLS, WINDOWS AND DOORS

Shopfront screens are enclosed by projecting bronze anodised aluminium picture frames with frameless single glazed window units. Window surrounds are custom fabricated, insulated, bronze anodised aluminium casings, mechanically fixed and sealed to the surrounding concrete structure to maintain thermal and weathertight continuity to all edges.

Solid external walls are brick faced precast panels lined with insulation and a vapour barrier. The Retail Tenant will install the finishing wall lining, ensuring that the junction with the shopfront glazing follows the dashed line on the retail unit drawing in Section 6.

No changes are to be made to the facade by the Retail Tenant without the written permission of the Landlord.

2.3 FACADE ACCESS

Facade access and maintenance is proposed to take place at pavement level with periods and operations to be confirmed by the Estate Management.

2.4 EXTERNAL DOORS

Bronze anodised aluminium framed double glazed, 2200mm tall single leaf, shopfront doors with solid bottom panels and polished bronze vertical pull handles.

The doors are manually operated, with no power assistance system provided. The doors are however capable of having a power assistance system added as part of the Retail Tenant fit-out. Suitable automated door gear is available from Tormax, Dorma or Geze. Refer to door detail drawing in Appendix A.

2.5 SIGNAGE

The Tenant may install retail signage internally behind the glazed panel over the entrance doors. The extent of this zone is indicated on the retail elevation drawing in Section 6.

The Tenant can add retail graphics, subject to Landlord’s approval, to the external illuminated sign provided by the Landlord. Wiring for illumination of the sign is provided into the retail unit. Details of the external sign are provided in Section 6.

Additional seasonal signage may be applied to shop front glazing, if desired, subject to Landlord approval.

1.3.2 FIRE STRATEGY

Retail units shall evacuate in isolation on confirmed fire detection within their demise.

The Retail Tenant will be responsible for installing their own separate stand-alone fire detection and alarm systems, which will interface and communicate with the Landlord’s main fire alarm system in the event of a fire. An interface from the Landlord System will be provided.

The Retail Tenant is required to provide sprinkler protection with the retail unit. Refer section 4.5.2.

The Retail Tenant can request a copy of the Fire Strategy, prepared by the project fire engineer, for further detailed information.

1.4 ACOUSTICS

1.4.1 DESIGN CRITERIA

The operation of the retail units should not be audible in the apartments or any adjoining noise sensitive residential use area.

Practically this is achieved when the noise from the retail unit is sufficiently below the background noise level within the adjoining space and free of attention catching acoustic features, such as impulsivity or tonality. The acoustic criteria is set at a level below the background noise level generated by the building services, limits the maximum noise levels (impulsivity) and sets low frequency limits (tonality) through considering the sound insulation provided by the party floor.

In order to achieve the limits within the adjoining space it will be necessary to limit the noise produced in the retail unit and also enhance the sound insulation.

The Acoustic Design Criteria, prepared by the project acoustic engineer, is included in Section 6.

1.4.2 NR LEVEL

Internal building services noise rating levels are to be determined by the Retail Tenant.

1.4.3 SUBMISSIONS

Details of the tenancy are to be provided to the Landlord’s acoustician for assessment prior to installation. The following details are to be provided by the Tenant’s acoustician.

• The proposed use of the tenancy, eg restaurant, shop etc

• Operating hours of tenancy

• Details of amplified sound systems and any control measures to be adopted (if any)

Drawings illustrating the designs to be adopted for enhancing the sound insulation (if any)..

BARTS SQUARE, LONDON EC1 - RETAIL 6 INFORMATION PACK4

Page 5: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

3.1 INTERIOR BASE BUILD

3.1.1 STRUCTURAL SLAB LEVEL (SSL) TO CONCRETE SOFFIT LEVEL (CSL)

Retail 6a: 3865 mm excluding structural tolerances, finished floor build up and soffit thermal insulation.

Retail 6b: 3865 mm excluding structural tolerances, finished floor build up and soffit thermal insulation. e

Note Landlord’s services distribute at high level. For design levels refer to SES engineers high level drainage drawing in Appendix A. Installation levels subject to final measured survey.

3.1.2 RETAIL TENANT FLOOR FINISHES ZONE

Retail 6 has a flat floor slab but the threshold levels of the entrances to Retail 6a and Retail 6b are different (to align with the external paving) as shown on 5295-PH3-20-326.

Retail 6a: A floor finishes zone of 215mm has been allowed, that includes 15mm structural tolerance, to establish the finished floor level (FFL) for the Retail Tenant floor finishes fit-out.

Retail 6b: A floor finishes zone of 65mm has been allowed, that includes 15mm strcutural tolerance, to establish the finished floor level (FFL) for the Retail Tenant floor finishes fit-out.

3.1.3 SOFFIT/CEILING

Unfinished structural concrete slab with applied thermal insulation. Access around Landlord’s permanent high level services by agreement with Landlord. Services may not be used for any fixings by Retail Tenant.

Detail for fixing to concrete soffit through insulation is provided, subject to any particular acoustic requirements, in Appendix C. Retail Tenant to advise Landlord if different details are proposed.

3.1.4 WALLS

Unfinished structural concrete, unfinished blockwork or the unfinished back face of the the external envelope. Fixings must not be made into external window frames and insulated panels. Tenant must ensure no damage or modifications occur to the vapour control layer or EPDM surrounding the windows during installation.

British Gypsum recommendations for wall linings are provided in Appendix C. Retail Tenant to advise Landlord if different details are proposed.

3.1.5 FLOOR

Unfinished structural concrete slab. Trowelled finish is unsealed and rough in appearance.

3.2 TOILETS

The toilet provision for the unit is to be calculated, designed and installed by the Retail Tenant. There is no toilet provision in the base build.

The provision must meet statutory requirements, lease requirements and be in accordance with the services infrastructure described in Section 4.

3. Building Interior and Fit-Out4.1 SERVICES BASE BUILD

4.1.1 GENERAL

The retail unit will be provided as a shell to be fully fitted-out by the Retail Tenant.

Incoming services are provided as a mix of Landlord connections and Utility connections. These are described further in later sections of this guide.

Where Landlord connections are provided, the necessary infrastructure for demarcation between Landlord and Retail Tenant has already been installed within the retail unit.

Where direct Utility connections are required, the Retail Tenant must make these applications directly with the Utility Supplier.

4.1.2 TENANT PLANT SPACE

All Tenant plant shall be fitted within the retail unit. No external plant space has been allocated.

4.1.3 TENANT EQUIPMENT INSTALLATION

The Retail Tenant will be expected to supply as a minimum;

• Toilet extract ventilation

• Space heating to a minimum temperature of 18°C*

• Space cooling to limit the environment to 26°C*

• Suitable acoustic treatment of Mechanical, Electrical & Public Health (MEPH) systems

• Fire detection linked to the Landlord site wide system

• Sprinklers linked to the Landlord site wide system

• Other MEPH systems as required by the Retail Tenant

All MEPH services proposals shall be approved by the Landlord’s consultant prior to construction.

* The Retail Tenant is responsible for proving no adverse heat loss or gain is transferred to other parts of the development. This can be done by providing adequate space heating and cooling to the retail unit, or by showing through calculation that no adverse effects will occur. Appropriate CIBSE weather data is to be agreed with the Consultant prior to carrying out calculations.

4.2 HEATING, VENTILATION AND AIR CONDITIONING (HVAC)

4.2.1 HEATING

There is a Heating Interface Unit (HIU) installed within the retail unit. This is owned by E.ON and cannot be moved or disconnected. It is provided to allow the Retail Tenant to connect their heating system to the Citigen District Heating Network.

The HIU has a capacity of 20 kW and includes an energy meter, variable speed pump and expansion vessel.

The energy meter allows E.ON to bill the Retail Tenant for the energy that has been used. It is not possible to change the supplier as the Citigen District Heating System is owned and operated by E.ON. Standing charges may be applicable regardless of energy use.

The variable speed pump has an approximate capacity of 582 l/hr @ 25 kPa.

The heating system within the retail unit is to be designed at a limiting temperature of 70°C flow and 40°C return, so is suitable for heat emitters such as fan convectors, fan coil units, radiators and trench heaters, as well as domestic hot water generators such as calorifiers.

The Retail Tenant is responsible for arranging an Energy Supply Contract from E.ON prior to having the HIU energised.

The HIU will be energised by E.ON when they are invited to visit site to commission the HIU. This process must be coordinated with the commissioning of the Retail Tenant’s heating system and is the responsibility of the Retail Tenant to arrange.

The HIU location is indicatively shown on Sweco drawing 115380-C-8706.

As-built details of the HIU installation are shown on SES drawing in Retail 6 Appendix A.

E.ON will provide technical details of the HIU equipment once the Retail Tenant has engaged with E.ON to obtain an Energy Supply Contract. Details of the HIU are provided in Appendix B.

4.2.2 COOLING

There is a Cooling Interface Unit (CIU) installed within the retail unit. This is owned by E.ON and cannot be moved or disconnected. It is provided to allow the Retail Tenant to connect their cooling system to the Citigen District Cooling Network.

The CIU has a capacity of 20 kW and includes an energy meter, variable speed pump and expansion vessel.

The energy meter allows E.ON to bill the Retail Tenant for the energy that has been used. It is not possible to change the supplier as the Citigen District Cooling System is owned and operated by E.ON. Standing charges may be applicable regardless of energy use.

The variable speed pump has an approximate capacity of 2867 l/hr @ 60 kPa.

The cooling system within the retail unit is to be designed at a limiting temperature of 9°C flow and 15°C return, so is suitable for fan coil units and chilled beams.

The Retail Tenant is responsible for arranging an Energy Supply Contract from E.ON prior to having the CIU energised.

The CIU will be energised by E.ON when they are invited to visit site to commission the CIU. This process must be coordinated with the commissioning of the Retail Tenant’s cooling system and is the responsibility of the Retail Tenant to arrange.

The CIU location is indicatively shown on Sweco drawing 115380-C-8706.

As-built details of the CIU installation are shown on SES drawing in Retail 6 Appendix A.

E.ON will provide technical details of the CIU equipment once the Retail Tenant has engaged with E.ON to obtain an Energy Supply Contract. Details of the CIU are provided in Appendix B.

4.2.3 VENTILATION

Louvres have been provided within the retail unit to allow the Retail Tenant access to external air for general ventilation and toilet extract purposes.

Louvres for general ventilation provide a total of 2.20 m2 free area.

The Retail Tenant will agree suitable discharge velocities with the Landlord’s consultant to adequately disperse odour and prevent noise issues.

The design of the ventilation system within the retail unit is the responsibility of the Retail Tenant.

4. Services

BARTS SQUARE, LONDON EC1 - RETAIL 6 INFORMATION PACK 5

Page 6: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

Louvre locations are indicatively shown on Sweco drawing 115380-C-8706.

As-built details of the louvres are provided on Colorminium drawings COL-13657-L-DT-XX-3655, COL-13657-L-DT-XX-3658, COL-13657-L-DT-XX-3666 and COL-13657-L-DT-XX-3673 in Retail 6 Appendix A.

As-built details of Landlord services installations within the retail unit at high level are provided on SES drawing in Retail 6 Appendix A.

4.3 ELECTRICAL AND DATA INSTALLATIONS

4.3.1 ELECTRICAL SUPPLY AND METERING

A 3-phase electrical supply has been brought into the retail unit with a capacity of 100 A / 40 kVA, terminating within the retail unit with an isolator, meter and 200A 8-way TPN distribution board.

The supply is live and metered to the Landlord. At legal handover the Retail Tenant will take over payment responsibilities and will be billed directly by the Utility supplier.

A distribution board has been provided by the Landlord so that the Retail Tenant can commence fit-out, commissioning and trading as soon as possible. A number of connections have been made, including;

Circuit 1 – External Retail Signage

Circuit 2 – Temporary Retail Lighting

Circuit 3 – Power to HIU / CIU

Circuit 1 & 3 are to be retained. Circuit 2 can be removed.

The Retail Tenant will provide all secondary distribution through the retail unit.

Details of the distribution board location are indicatively shown on Sweco drawing 115380-C-8706.

As-built details of the electrical installation are shown on SES drawing in Retail 6 Appendix A.

4.3.2 LIGHTING

Temporary lighting has been provided by the Landlord. It is basic and intended to provide lighting for initial viewings and to commence fit-out.

Should the Retail Tenant wish to use this lighting, they can adapt or enhance the circuit with prior agreement from the Landlord Consultant.

There are spare ways provided on the distribution board for additional lighting circuits. This allows the Retail Tenant to provide additional lighting to suit their own requirements.

External signage lighting is provided by the Landlord, which is to be powered and controlled by the Retail Tenant. The tenancy agreement will include details of when external signage lighting is to operate.

Details of the temporary lighting installation are indicatively shown on Sweco drawing 115380-C-8706.

As-built details are shown on SES drawing in Retail 6 Appendix A.

4.3.3 TELECOMS

Ducts have been provided through the structure to allow the Telecoms connections to be made directly from the Highway.

The Retail Tenant will be responsible for arranging their own supply agreement with a Telecoms provider.

The Retail Tenant should make themselves aware of the Telecom providers installation programme and be aware that works need to be coordinated with the Landlord. It is recommended that the Telecoms application is made as soon as possible.

Any excavations of roads or pathways are to be excavated shall be reinstated by the Retail Tenant.

Details of incoming ducts are indicatively shown on Sweco drawing 115380-C-8706.

As-built details are shown on SES drawing in Retail 6 Appendix A.

4.4 WATER SUPPLY AND DRAINAGE

4.4.1 SUPPLY

A 25mm diameter Thames Water mains water connection has been provided complete with external Utility Meter located in the pavement.

A temporary bib tap has been fitted to allow water to be drawn off during vacant tenancies. The Retail Tenant will isolate and remove this before extending water though the retail unit.

At legal handover the Retail Tenant will take over payment responsibilities and be billed directly by the Utility supplier.

Details of incoming water is indicatively shown on Sweco drawing 115380-C-8706.

As-built details are shown on SES drawing in Retail 6 Appendix A.

4.4.2 SANITARY DRAINAGE

Capped foul sanitary drainage connections have been provided within the retail unit. Each is sized at 100mm diameter and can accept a total discharge of 5.2 l/s.

A 100mm diameter vent pipe is also provided to allow the Retail Tenant to vent their system. The Retail Tenant is responsible for ensuring their system is adequately vented.

Note that drainage from other parts of the development may pass through the retail unit. These cannot be altered by the Retail Tenant.

Details of sanitary drainage and venting provisions are indicatively shown on Sweco drawing 115380-C-8706.

As-built details are shown on SES drawing in Retail 6 Appendix A.

4.5 FIRE AND SECURITY

4.5.1 LIFE SAFETY SYSTEM

A temporary addressable fire alarm and smoke detection system will be installed whilst the retail unit is unoccupied, which will be linked to the main Landlord’s fire alarm system to meet the requirement of Building Regulations.

The Retail Tenant will install their own separate stand-alone fire detection and alarm systems, which will interface and communicate with the Landlord’s main fire alarm system in the event of a fire.

A 6-way fire alarm box installed within the retail unit as part of the base build will provide a fire alarm interface within the Retail Tenant’s fire detections and alarm systems, as required under the building’s fire strategy.

Details of the temporary fire alarm and smoke detection system and the Fire Alarm Interface are indicatively shown on Sweco drawing 115380-C-8706.

As-built details are shown on SES drawing in Retail 6 Appendix A.

4.5.2 SPRINKLERS

A capped sprinkler supply will be provided at ground floor, fed from the Landlord site wide system. The connection will include a zone valve with monitored alarm, which will be linked back to the main building fire alarm system.

The Retail Tenant is required to provide sprinkler protection with the retail unit. The sprinkler system must be designed as Ordinary Hazard 3 (OH3) as a minimum and installed generally in accordance with the LPC rules incorporating BS EN 12845.

The Retail Tenant is required to appoint the specialist sprinkler contractor responsible for the Landlord system to carry out the installation within the retail unit.

The specialist sprinkler contractor is Argus Fire.

Details of the incoming sprinkler connection are indicatively shown on Sweco drawing 115380-C-8706.

As-built details are shown on Argus drawing in Retail 6 Appendix A.

4.5.3 SECURITY

The Retail Tenant is responsible for providing their own security system installations within the retail unit.

The security alarm shall be designed to avoid sound nuisance to nearby residences. A “Silent Alarm” linked to an Alarm Receiving Centre (ARC) should be proposed.

Use of bell boxes shall not be provided unless by prior agreement with the Landlord’s Consultant.

BARTS SQUARE, LONDON EC1 - RETAIL 6 INFORMATION PACK6

Page 7: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

5.1 SERVICE CHARGE

For details of service charge for Retail Unit 6 refer to Landlord.

5.2 MAINTENANCE STRATEGY

Please refer to the terms of your lease for precise details. The exterior of the building, excluding window cleaning, will be maintained by the landlord and the interior by the Retail Tenant.

Maintenance is proposed to take place at pavement level with periods and operations to be confirmed by the Contractor.

5.3 CLEANING STRATEGY

Access to the facade for cleaning is proposed to be carried out by the Retail Tenant via direct hand access with “Window Vac” or “Squeegee” from street level. This must take place outside core business hours.

5.4 DELIVERY STRATEGY

The consented development does not include off-street vehicular access for servicing and refuse collection – all deliveries and waste collection are to be provided via on-street vehicular access as discussed and agreed with the City.

Retail deliveries are likely to presented via the retail entrance at ground floor.

The primary goods in route will be from Little Britain.

5.5 WASTE DISPOSAL AND COLLECTION STRATEGY

A waste storage room is provided for Retail Unit 6 (6a/6b) located at ground floor on Bartholomew Close. Please refer to drawings 5294-PH3-20-350 and 5294-PH3-20-351.

All waste from the retail unit will be segregated at source into:1 x 660 litre bin for recyclables and 1 x 660 litre bin for residual.

Once in the retail waste storage room, the waste will be managed by the Barts Square FM team. The CoL council do not currently offer collection of commercial waste. It is therefore assumed that all commercial waste from the development will be collected by a licensed private waste contractor. On the designated collection days, the FM team will move waste bins to the service lobby area, where they will be temporarily retained. Waste contractors will then access the service lobby from Bartholomew Close and service all the required bins.

5. Facilities ManagementThe following drawings are included in this section. For as-built drawings refer to Appendix A.

• Architectural drawing 5294-PH3-20-320

• Architectural drawing 5294-PH3-20-326

• Waste Disposal Strategy drawing 5294-PH3-20-350

• Waste Collection Strategy drawing 5294-PH3-20-351

• Signage drawing 5294-PH3-70-602

• Engineering drawing 115380-C-8706

• Sandy Brown Acoustic Design Criteria

6. Drawings and Technical Data

BARTS SQUARE, LONDON EC1 - RETAIL 6 INFORMATION PACK 7

Page 8: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

Architectural drawing 5294-PH3-20-320

BARTS SQUARE, LONDON EC1 - RETAIL 6 INFORMATION PACK8

Page 9: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

Architectural drawing 5294-PH3-20-326

BARTS SQUARE, LONDON EC1 - RETAIL 6 INFORMATION PACK 9

Page 10: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

Waste Disposal Strategy drawing 5294-PH3-20-350

BARTS SQUARE, LONDON EC1 - RETAIL 6 INFORMATION PACK10

Page 11: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

Waste Collection Strategy drawing 5294-PH3-20-351

BARTS SQUARE, LONDON EC1 - RETAIL 6 INFORMATION PACK 11

Page 12: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

Signage drawing 5294-PH3-70-602

BARTS SQUARE, LONDON EC1 - RETAIL 6 INFORMATION PACK12

Page 13: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

14

C

D

E

15 16 17 18

LOUVRE

LOUVRE

S SA E

A

A

A

A

A

A E

A

HIUCIUFAI

2LOUVRE

LOUVRE LOUVRE LOUVRE

LANDLORD CHW F PIPEWORK

LANDLORD CHW R PIPEWORK

CONDENSATE TO DRAIN

INTEGRAL PUMP SET

ELECTRICAL AND DATACONNECTIONS NOT SHOWN

SECONDARY CHW SYSTEMTO COOLING EMITTERS TOBE DESIGNED ANDINSTALLED BY THE TENANT

COOLING INTERFACE UNIT (CIU)DIAGRAMATIC

LANDLORD LTHW F PIPEWORK

LANDLORD LTHW R PIPEWORK

CONDENSATE TO DRAIN

INTEGRAL PUMP SET

ELECTRICAL AND DATACONNECTIONS NOT SHOWN

SECONDARY LTHW SYSTEMTO HEAT EMITTERS TO BEDESIGNED AND INSTALLEDBY THE TENANT

HEATING INTERFACE UNIT (HIU)DIAGRAMATIC

A E24 W LED BATTEN LUMINAIREE - BATTERY EMERGENCY

00 AUG'16 - STAGE E ISSUE KPB MW AP

TITLE

PROJECT

ELEMENT

COPYRIGHT

CLIENT

DISCIPLINE

REVDRAWING No.

ARCHITECT

1 Bath RoadMaidenheadBerkshireSL6 4AQ UK

T: +44(0)1628 623 423F: +44(0)1628 639 860E: [email protected]: www.sweco.co.uk

PROJECT No.

DRAWN

DATE DATE

ORIGINATED

DATE DATE

SCALE SHEET SIZE

CHECKED APPROVED

This drawing should not be relied on or used in circumstances other thanthose for which it was originally prepared and for which Sweco UK wascommissioned. Sweco UK accepts no responsibility for this drawing toany party other than the person by whom it was commissioned.This drawinghas been prepared for the titled or named part thereof and should not be reliedupon or used for any other project without an independent check being carriedout as to its suitability and prior written authority of Sweco UK beingobtained.Sweco UK accepts no responsibility or liability for theconsequences of this drawing being used for a purpose other than thepurposes for which it was commissioned. Any person using or relying on thisdrawing for such other purpose agrees, and will by such use or reliance betaken to confirm his agreement, to indemnify Sweco UK for all loss ordamage resulting therefrom.

CHK' APP'REV BYDATE/DESCRIPTION

Sweco UKRegistered Office: Grove House, Mansion Gate Drive, Leeds LS7 4DNRegistered in England: No 2748664

Altrincham, Bristol, Edinburgh, Glasgow, Leeds,London, Maidenhead,Newcastle,Peterborough,Solihull,Wrexham.

F:\115380\Data Transfer\Outgoing\2019\2019-09-13 Revised Retail Drawings\C8706.dwg

13/9/

2019

12:2

2PM

by W

illiam

s, Mi

chae

l

10.

8.9.

3.

NOTES

1.2.

4.

5.6.7.

THIS DRAWING SHALL NOT BE USED FOR CONSTRUCTION PURPOSES.DO NOT SCALE.THIS DRAWING TO BE READ IN CONJUNCTION WITH LATEST ARCHITECTURAL AND STRUCTURALDRAWINGS.THIS DRAWING SHALL NOT BE USED FOR DETAIL OR MEASUREMENT OF ARCHITECTURAL ORSTRUCTURAL WORKS.ALL DIMENSIONS IN MILLIMETRES UNLESS STATED OTHERWISE.ALL DATUM LEVELS IN METRES UNLESS STATED OTHERWISE.FOR STANDARD SYMBOLS AND NOTATIONS REFER TO DRAWING No. 115380/M/1000.FOR EQUIPMENT DETAILS REFER TO TECHNICAL SCHEDULES.THIS DRAWING TO BE READ IN CONJUNCTION WITH RELEVANT DRAWINGS AND TECHNICALSPECIFICATIONS.REFER TO RELEVANT SERVICES SCHEMATIC FOR SIZES.

11. THIS DRAWING SHALL ONLY BE USED FOR THE SPECIFIC SERVICE(S) INTENDED.

BARTS TWO INVESTMENT PROPERTIES LTD

SHEPPARD ROBSON

BARTS SQUAREPHASE 3

RETAIL UNIT 6MEP INTERFACES LAYOUT

COMBINED

115380 1:50 A0

KPB

AUG'16

PS

AUG'16

MW

AUG'16

AP

AUG'16

115380/C/8706 052016

KEY:

SHELL & CORE SERVICES ZONE (NOTE: HIGHLEVEL SERVICES NOT SHOWN - REFER TOMAIN CONTRACTOR DRAWINGS FOR DETAIL)

01 OCT'16 - STAGE E UPDATE ISSUEINCORPORATING DESIGN TEAM COMMENTS

KPB MW AP02 JAN'17 - STAGE F1 ISSUE KPB MW AP03 MAY' 18 - STAGE F1 CONTRACT ISSUE MR MG MW

RETAIL SIGNAGE LUMINAIRE WIRED TO RETAIL DISTRIBUTION BOARD(CIRCUIT 1)

TEMPORARY RETAIL LIGHTING WIRED TO RETAIL DISTRIBUTION BOARD(CIRCUIT 2)

COMBINED SMOKE DETECTOR & SOUNDER PROVIDED FOR TEMPORARYSHELL PROTECTION WHILST THE RETAIL UNIT IS UNOCCUPIED UTILISINGTHE FIRE ALARM LOOP CONNECTING THE FIRE ALARM INTERFACE

COMBINED SMOKE DETECTOR & SOUNDER PROVIDED FOR TEMPORARYSHELL PROTECTION WHILST THE RETAIL UNIT IS UNOCCUPIED UTILISINGTHE FIRE ALARM LOOP CONNECTING THE FIRE ALARM INTERFACE

CAPPED SPRINKLER CONNECTION

CONDUIT AT HIGH LEVEL WITH FIRE ALARM CABLE WIRED TO 6 WAY FIRE ALARM INTERFACE (FAI)

CLEAR SPACE TO BE RETAINED FOR ACCESS & MAINTENANCE

100A 8 WAY TPN DISTRIBUTION BOARD COMPLETE WITH METER & ISOLATOR.WIRING AT HIGH LEVEL FROM LANDLORD CORRIDOR.

COOLING INTERFACE UNIT (CIU) AND HEATING INTERFACE UNIT (HIU) INSTALLED AND CONNECTEDTO LANDLORD LTHW & CHW PIPEWORK. PIPEWORK CONNECTIONS FROM HIGH LEVEL. DRAINAGECONNECTION TO NEAREST STACK WITHIN RETAIL UNIT. POWER SUPPLY FROM RETAIL DISTRIBUTIONBOARD (CIRCUIT 3).

MAINS WATER TERMINATED WITH TEMPORARY BIB TAP (FB TO LL)

CAPPED LOW LEVEL DRAINAGE CONNECTION

CAPPED HIGH LEVEL DRAINAGE VENT CONNECTION

CAPPED LTHW & CHW PIPEWORK TO ALLOWPOTENTIAL FUTURE SPLIT OF RETAIL UNIT

CAPPED LOW LEVEL DRAINAGE CONNECTION

DUCTS INSTALLED THROUGH STRUCTURE TO ALLOW FUTUREUTILITY AND TELECOMS CONNECTIONS. RETAILER TO BRINGCOMMS INTO RETAIL UNIT AS PART OF THEIR FITOUT

CAPPED SPRINKLER CONNECTION

CAPPED HIGH LEVEL DRAINAGE VENT CONNECTION

04 JUN' 19 - UPDATED TOINCORPORATE CLIENT COMMENTS

SA GG MW

RETAIL SIGNAGE LUMINAIRE WIRED TO RETAIL DISTRIBUTION BOARD(CIRCUIT 1)

05 SEP' 19 - ARCHITECTURAL BACKGROUNDUPDATED

MW GG MW

Engineering drawing 115380-C-8706

BARTS SQUARE, LONDON EC1 - RETAIL 6 INFORMATION PACK 13

Page 14: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

SANDY BROWN Consultants in Acoustics, Noise & Vibration

55 Charterhouse Street, London EC1M 6HA T: +44 (0)20 7549 3500 Piccadilly House, 49 Piccadilly, Manchester M1 2AP T: +44 (0)161 771 2020 2 Walker Street, Edinburgh EH3 7LB T: +44 (0)131 235 2020 [email protected] 35 St Paul’s Square, Birmingham B3 1QX T: +44 (0)121 227 5020 www.sandybrown.com

Sandy Brown Associates LLP Registered in England & Wales No. OC 307504 Registered Office: 55 Charterhouse Street, London EC1M 6HA

Memo: M011-A Date: 10 May 2019

Project: 15328 Pages: 4

From: Philip Owen Reviewer: Stephen Stringer

Barts Square Phase 3, London Retail pack – acoustic requirements

Sandy Brown have reviewed the level of sound insulation that is provided by the shell of Phase 3 of Barts Square in order to provide recommendations and guidance on the acoustic requirements between the retail units and adjacent noise sensitive spaces.

Proposed design Apartments are located above retail units in each residential block in Phase 3. The party floors in each instance are designed to achieve 5 dB better than the minimum required for compliance with the Building Regulation requirements, eg DnT,w + Ctr 50 dB.

The level of sound insulation achieved by the floor party floors above each retail unit will provide reasonable protection against typical retail or quiet cafe uses. However, if a prospective tenant is expected to have uses with higher noise levels (eg high levels of amplified music), it would be a requirement on them to enhance the sound insulation.

SANDY BROWN Consultants in Acoustics, Noise & Vibration

Page 2 of 4 15328-M011-A RETAIL PACK ACOUSTIC REQUIREMENTS

Design requirements The operation of the ground floor retail units should be practicably inaudible in the apartments above. To achieve this, it is recommended that the noise levels, when assessed or measured in the residential spaces are no greater than those outlined below:

• LAeq,1mins 20 dB

• LAFmax 25 dB

• Leq,1mins 35 dB at 63 Hz

• Leq,1mins 30 dB at 125 Hz.

Tenancy operational noise levels and airborne sound insulation enhancements

The above design targets for noise intrusion will be achieved through a combination of controlling noise levels in the tenancy and where appropriate enhancing the sound insulation. Guidance on the levels of noise allowable in the tenancy (to be controlled through means of an electronic sound limiter) and appropriate sound insulation enhancements are provided in Table 1.

Additional design requirements to mitigate impact/structure-borne noise

In addition to the guidance provided in Table 1, it will be necessary to consider the impact sound transmission from the retail units to the noise sensitive spaces in the building. It is recommended that the retail units are fitted out with a floor construction that provides a maximum impact sound insulation rating of L’nT,w 59 dB or lower.

Servicing of tenancies

It will be necessary for the tenant to appropriately manage all activities that could result in adverse noise effects being experienced by the nearby residents. This is likely to limit collections and deliveries to the daytime.

SANDY BROWN Consultants in Acoustics, Noise & Vibration

Page 3 of 4 15328-M011-A RETAIL PACK ACOUSTIC REQUIREMENTS

Use of outdoor spaces

It is recommended that the use of outdoor spaces during the evening/night time periods are considered in the tenant agreements. It is recommended that if there are expectations to use outdoor spaces that restrictions are incorporated into the agreement to control the noise emissions, such as limiting the number of spaces available outside and not allowing amplified music.

In order to determine the appropriate restrictions, it will be necessary for a separate acoustic assessment to be completed. The acoustic assessment could be completed by the prospective tenant, though it should provide adequate information to demonstrate that the proposed use agrees with the acoustic requirements outlined above.

SANDY BROWN Consultants in Acoustics, Noise & Vibration

Page 4 of 4 15328-M011-A RETAIL PACK ACOUSTIC REQUIREMENTS

Table 1 Retail use preliminary acoustic assessment

Use Typical internal ambient noise level (LAeq dB)

In-situ sound insulation performance required

(DnT,w+Ctr dB)

Typical enhancement required in tenancy

Operational constraints

Quiet retail/ restaurant/cafe

<70 ≥50 Not required No loud amplified sound (background only)

Busy retail/ restaurant/cafe

<80 ≥55 Sound insulating ceiling

Low level amplified sound (LAeq 80 dB) with low frequency limit of LAeq 70 dB in 63 and 125 Hz octave bands.

Bar <90 ≥65 Sound insulating ceiling and enhancement to flanking performance of the facade

Loud amplified sound (LAeq 90 dB) with low frequency limit of LAeq 80 dB in 63 and 125 Hz octave bands.

SANDY BROWN Consultants in Acoustics, Noise & Vibration

Page 3 of 4 15328-M011-A RETAIL PACK ACOUSTIC REQUIREMENTS

Use of outdoor spaces

It is recommended that the use of outdoor spaces during the evening/night time periods are considered in the tenant agreements. It is recommended that if there are expectations to use outdoor spaces that restrictions are incorporated into the agreement to control the noise emissions, such as limiting the number of spaces available outside and not allowing amplified music.

In order to determine the appropriate restrictions, it will be necessary for a separate acoustic assessment to be completed. The acoustic assessment could be completed by the prospective tenant, though it should provide adequate information to demonstrate that the proposed use agrees with the acoustic requirements outlined above.

SANDY BROWN Consultants in Acoustics, Noise & Vibration

Page 4 of 4 15328-M011-A RETAIL PACK ACOUSTIC REQUIREMENTS

Table 1 Retail use preliminary acoustic assessment

Use Typical internal ambient noise level (LAeq dB)

In-situ sound insulation performance required

(DnT,w+Ctr dB)

Typical enhancement required in tenancy

Operational constraints

Quiet retail/ restaurant/cafe

<70 ≥50 Not required No loud amplified sound (background only)

Busy retail/ restaurant/cafe

<80 ≥55 Sound insulating ceiling

Low level amplified sound (LAeq 80 dB) with low frequency limit of LAeq 70 dB in 63 and 125 Hz octave bands.

Bar <90 ≥65 Sound insulating ceiling and enhancement to flanking performance of the facade

Loud amplified sound (LAeq 90 dB) with low frequency limit of LAeq 80 dB in 63 and 125 Hz octave bands.

SANDY BROWN Consultants in Acoustics, Noise & Vibration

Page 4 of 4 15328-M011-A RETAIL PACK ACOUSTIC REQUIREMENTS

Table 1 Retail use preliminary acoustic assessment

Use Typical internal ambient noise level (LAeq dB)

In-situ sound insulation performance required

(DnT,w+Ctr dB)

Typical enhancement required in tenancy

Operational constraints

Quiet retail/ restaurant/cafe

<70 ≥50 Not required No loud amplified sound (background only)

Busy retail/ restaurant/cafe

<80 ≥55 Sound insulating ceiling

Low level amplified sound (LAeq 80 dB) with low frequency limit of LAeq 70 dB in 63 and 125 Hz octave bands.

Bar <90 ≥65 Sound insulating ceiling and enhancement to flanking performance of the facade

Loud amplified sound (LAeq 90 dB) with low frequency limit of LAeq 80 dB in 63 and 125 Hz octave bands.

Sandy Brown Acoustic Design Criteria

BARTS SQUARE, LONDON EC1 - RETAIL 6 INFORMATION PACK14

Page 15: Retail 6 - Barts Square · 1.3.1 into the retail unit. Details of the external sign are provided in Section 6.OCCUPANCY A risk profile of B1 has been allocated to the retail space

Sheppard Robson is the trading/brand name of Sheppard Robson Architects LLP, Sheppard Robson Ltd and Sheppard Robson International Ltd.

\\uk.sheppardrobson.com\panzura\Projects\5250

_etc\5294\Docum

ents\01 C

lient\01.14 C

lient's Letting Agents, Property A

dvisors\01.14.1_R

etail Information Pack\R

etail 6\5294-01.14.1_R

etail 6 Information Pack_R

evB.indd

77 Parkway London NW1 7PU T: +44 (0)20 7504 1700 F: +44 (0)20 7504 1701 [email protected]

City Tower Piccadilly Plaza Manchester M1 4BT T: +44 (0)161 233 8900 F: +44 (0)161 233 8901 [email protected]

78 St Vincent Street Glasgow G2 5UB T: +44 (0)141 285 3100 F: +44 (0)141 285 3101 [email protected]

Incubator Building Masdar City Abu Dhabi United Arab Emirates [email protected]

www.sheppardrobson.com