Resume_JustinBrock

3

Click here to load reader

Transcript of Resume_JustinBrock

Page 1: Resume_JustinBrock

5 1 9 S T A L LI N G S B R I D G E RD T Y LE R T OW N , M S . 3 9 6 6 7 ( 6 0 1 ( 3 0 3 - 1 1 8 5 ( CE L L ) / ( 9 8 5 ) 7 7 3 - 7 3 7 3 ( W OR K )

• E M A I L J K N X @ C H E V R ON . C OME M A I L J B R O CK 8 5 @ L I V E . C OM

J U S T I N B R O C K

SUMMARY OF QUALIFICATIONS More than 6 years in the Instrumentation and Controls field. (Scada) PLC- Allen Bradley, GE, and Siemens Control Systems (Programming,

Maintenance and Trouble Shooting) HMI software applications- InTouch Wonderware, Allen Bradley RS

View, GE Proficy Quick Panel Extensive Networking Experience including: TCPIP, ControlNet,

Profibus, Modbus, and Satellite Communications, Gas Measurement RTU Experience including: Totalflow, Thermo

Scientific AutoMate, FlowBoss, Rosemount 3051SMV Project Management / Commissioning Team (CSRG) Document and Program Management (MOC) Management of Change, (CSRG) Document and Program

Management 3 years Mentor Leadership Experience

EDUCATION

August 2007 - December 2008 Pearl River Community College

Associate of Science Degree / Automation & Controls

Associate of Science Degree / Electronics

PROFESSIONAL EXPERIENCE

Chevron (985)773-7373 Covington, La.Automation Specialist Current Location: Chevron MP 299 March 2019 – Now Managed the implementation and support of Supervisory Control and

Data Acquisition systems (Scada) within Chevron (GOM) Organization. Perform installation, repair, maintenance and diagnostic work on a variety of oilfield electronic equipment.

OPS Rep; lead commissioning and installation of countless projects that includes; Wells Additions, Subsea Well, Control System upgrades,

Page 2: Resume_JustinBrock

and various other process equipment installations. Performed pre-commission of Instrumentation and Controls. Lead

initial setup of End-device and performed loop check calibrations. Initialized communications between various systems using Ethernet, ControlNet, and Modbus etc... Commissioning to verify Logic, HMI’s, Alarms Info, and Safety System shutdowns. During safety checks verified ESS system matched approved Safe Chart functions. During this control system upgrade I worked closely with our Engineering department to insure project was completed in a timely manner and IFO.

Projects: MP144A Wemco Project VK900 Raton South Upgrade ( addition of : Separators, Pigging

Pump, HPU and VRU) MP299BB Well Panel Upgrade WD109A ESS System Upgrade Siemens Profibus MP313A Treater ESS system Control Upgrade. VK900A Generator Upgrade

4-B Farms (601) 876-8887 Tylertown, MS.E&I ForemanAugust 2000- Feb 2009 Worked on farm equipment and operated farm equipment such as

tractors, hay cutters, hay bailers, dump trucks and combines.