RESUME- PREETAMRAI
-
Upload
preetam-rai -
Category
Documents
-
view
15 -
download
1
Transcript of RESUME- PREETAMRAI
PREETAM RAI
Date of Birth : September 12, 1991Nationality : IndianMarital Status : Single
Career Objective :“Aspiring for a challenging and growth oriented career in engineering, where i can use, develop my skills and knowledge and contribute to the growth of the organization.’’
Professional Experience :Professional Experience :
1. Currently working Under Project Management Group,Defence at L&T, Powai.Organization :- Larsen & Toubro Ltd. Powai. On contract through Ashish Enterprise. (From 1st January 2014 till Date)Designation :- Project Engineer
Project :- Defence. Ensure that the performance of the work is in accordance with
the customer specification, within budget & maintaining projectschedules in accordance with agreed milestones.
Planning and co-ordination of Fabrication, Machining andAssembly activities as per the client requirement & within theSpecified time frame of the project.
Preparing all assembly activities with assembly procedure andAssembly video using Unigraphics NX and verifying all itemsare in place.
Skilled in co-ordinating with all the departments and clients to resolve issue and expedite work progress to achieve the agreedmilestone.
Coordinating constantly with shop floor team & Subcontractorsfor timely execution of the project.
Handling the logistics and material movement related activitiesefficiently.
To check and inspect the incoming material as per the approvedDrawings to ensure they meet the project specification require-ments. Also Fullkitting to be kept ready as per the BOMs.
Educational
Qualification:B.E Mechanical– 63.21% year-2013
HSC - 65.50% year – 2009
SSC – 77.53% year – 2007
Software Proficiency:
Auto-CadUnigraphics NXSolid Edge V19/20Microsoft office
Total Work Experience:
1 .9 years
2. Graduate Engineer Trainee (Quality dept.) Ganesh multi-tech engineering Pvt. Ltd., vasai from Aug. 2013 – Dec. 2013.
Inspection(stagewise & Final) of manufactured materials as per the drawing using mechanical measurement tools.
Handling and ensuring proper welding and priming processes. Quality check of Paint after the priming process.
3. Undergone Internship at L&T, Hydrocarbon, Powai under the guidance of Mr. D.S.Kumar, General manager, FSBU.
Achievements :- Bagged Silver medal in Maharashtra State level atheletic event(4x400m race) held at
Aurangabad, 2008. I have actively participated in “FEEL EMPLOYABLE” pre-placement training program held by
CLHRD.
Project details :- Title : Exhaust gas treatement using limestone (Sponsored by Karnataka State Council for Science and Technology, Bangalore)
This project aims at developing an exhaust system with minor manipulations and added agents, which is installed in a vehicle thereby reducing the amount of pollutants coming out. A simple arrangement using limestone that will help decrease the pollution and enhance the quality of air, which is the major cause of global warming.
Personal Information :-
Languages Known : English, Hindi, Marathi and Tulu.
Hobbies : Reading books, coin collection, cycling etc.
References : Will be provided upon request.
Contact Details : Mumbai – India
Email : [email protected]
Mob : +91 7030346434
DECLARATION:-I hereby declare that all the details furnished above are true to the best of my knowledge.
Thanking you,
Date : Yours faithfully, Place : (Preetam Rai)