RESUME

4
RESUME STORES / MATERIALS / WAREHOUSE MANAGEMENT Personal Information Name :- Rajnish Kumar Mishra Fathers Name :- Kedar Nath Mishra Address: - 501, E Tower, Vrundalay Residency, Opp. Podar World School, Abhilasha-Canal Road, Vadodara, Gujarat 390024 Date of Birth:- 09/08/1970 Mobile Number:- +91-9974114238 E-Mail ID:- [email protected] Educational Qualification:- 10 th (S.S.C) G.S.E.B.Gandhinagar-(Gujarat) 1986 Diploma In Engineering (D.C.E) Nov.1989 Govt. Polytechnic , Bangalore Additional Qualification:- MS office Suites: Word, Excel, Power point, SAP, eALPS (L&T Store management Sotware). WORK EXPERIENCE 1. LARSEN & TOUBRO, EPC POWER FROM 11/02/2011 TO 18/08/2016 Nature of Work Efficiently managed /coordinate to material management and project sites stores (2x660MW jaypee Nigrie Power Plant Singrauli MP, 225 MW CCPP Sikalbaha Bangladesh). 1. Planning and execution of infrastructures for streamline and smooth execution of project deliver target within define lead period. 2. Monitoring the receipt/Issue of materials at site as per PO/Requisition. 3. Monitoring and coordination to forwarding of bills to accounts/business development depts. Within lead time. 4. Responsible to arranging documents for client billing,

Transcript of RESUME

Page 1: RESUME

RESUME

STORES / MATERIALS / WAREHOUSE MANAGEMENT

Personal Information Name :- Rajnish Kumar MishraFathers Name :- Kedar Nath MishraAddress: - 501, E Tower, Vrundalay Residency, Opp. Podar World  School,                      Abhilasha-Canal Road, Vadodara, Gujarat 390024Date of Birth:- 09/08/1970Mobile Number:- +91-9974114238E-Mail ID:- [email protected]

Educational Qualification:-10 th (S.S.C) G.S.E.B.Gandhinagar-(Gujarat)  1986Diploma In  Engineering (D.C.E)   Nov.1989Govt. Polytechnic , Bangalore

Additional Qualification:- MS office Suites: Word, Excel, Power point, SAP, eALPS (L&T Store management Sotware).

WORK EXPERIENCE 1.

LARSEN & TOUBRO, EPC POWER FROM 11/02/2011 TO 18/08/2016

Nature of Work

Efficiently managed /coordinate to material management and project sites stores (2x660MW jaypee Nigrie Power Plant Singrauli MP, 225 MW CCPP Sikalbaha Bangladesh).

1. Planning and execution of infrastructures for streamline and smooth execution of project deliver target within define lead period.2. Monitoring the receipt/Issue of materials at site as per PO/Requisition.3. Monitoring and coordination to forwarding of bills to accounts/business development depts.   Within lead time. 4. Responsible to arranging documents for client billing, monthly reports, collective MIS reports and stores ranking.5. Coordinate to project site for smooth execution/functioning/if any shortage/insurance claim (if any theft occurs). 6. Assist and Cooperate to management by providing detailed reports such as: material issue vs receipt /reconciliations, material disposals, transfers, and any report requested by Management.7. Monitoring /periodic physical inspection/preservation of stores with ensuring to transparent functioning in company norms and process.

Page 2: RESUME

WORK EXPERIENCE 2.

UNIVERSAL ERECTORS, FROM 20/11/2009 TO 05/02/2011

STG FOR 2 X 660 MW, 4X330 MW for Turbine and piping work at Adani Power Limited, SEPCO III ( CHINA) Mundra.

Efficiently managed /coordinate to project sites stores across country.• Plan and execute infrastructures, manpower recruit, training, and placement. Consequently liaising with authorities to associates for streamline and smooth execution of project deliver target within define lead period.• Monitoring the receipt/Issue of materials at site as per scope / BOQ.• Responsible to arranging documents for client billing/ monthly reports/ collective MIS reports /stores ranking.• Assist and Cooperate to management by providing detailed reports such as; material expenditures, issue Vs receipt /reconciliations, material disposals, transfers, BOQ changes, and any report requested by Management.• Monitoring /periodic physical inspection of stores with ensuring to transparent functioning in company norms and process. 

Handling additional assignments relating to administration, Security management, Housekeeping, Transport, access control and other allied issues. 

WORK EXPERIENCE 3.

J H PARABIA PVT LTD, FROM 01/03/2001 TO 15/11/2009

JOB PROFILEThe other Specialized functions were including survey roads, Escorting, Discharging / Loading at port etc. Also practically Reconciliation, R D (Revenue Deposit) Refund, The overall job responsibilities involved: I. Undertake feasibility studies & route surveys for all the projects.II. Selection of Logistics Service Providers.III. Selection of suitable port/ airport considering all the related factors such as availability of handling equipment & Handling Capacities of the ports.IV. Selection of trailers & prime movers, rail wagons, etc. On the basis of availability of resources/ transport equipment with Service Providers.

VI. Costing for the modifications/ civil work involved for the safe transportation of ODC up to project site.

VIII. Planning, handling & transportation of ODC’s/ OWC’s. IX. Ensure mobilization of resources, transport equipment, cranes, special wagons, etc.X. Liaison with Heavy Lift Operators, concerned Govt. authorities for necessary permissions to overcome hurdles en route.XI. Actual transport management, monitoring & cost control.XII. Assist in developing strategic plan for loading & off-loading operations, Erection & Jacking plans 

Page 3: RESUME

modification of existing equipment, etc.XIII. Implementation of various methods/ schemes to minimize profit leakage in “Handling & I was involved in handling all the Major Heavy Lift Shipments for the projects being executed at Chennai, Mumbai, Kandla, Bangalore. First Time in the History of Kandla Port of such heavy consignments 510 MT Vessel on to the Hydraulic Axle Trailers.First Time In the History of Inland Transportation: The consignment of such weight & dimension was transported by road over such a long distance on a side-by-side combination of hydraulic axle trailers. With the movement over 5 By-Passes (constructed to avoid weak & multiple span bridges) inclusive of 1 Pontoon Bridge at SEZ to Kandla Port transportation of Project Cargo”.

Bulk materials handling of new power plant by cranes, manually loading, unloading, stacking, preservation, issue, recordkeeping for SLPP, UKAI THERMAL POWER PLANT etc.

WORK EXPERIENCE 3.

MASCON MSC PVT LTD, FROM 01/08/1995 TO 28/02/2001

As a territory in charge for route & detailed survey  ROU / ROW, Obtaining of statutory permission and Land Acquisition ,Liaoning with Collect orate and Govt. Authorities, Railways, Irrigation, Public Works Department, Forest, Telecom Departments for BORL,HPCL, IOCL,GAIL,BPCL  etc. . Across All India for Detailed, Cadastral, Mapping, Soil Investigation, ROW/ ROU AS PER PMP ACT.