Results from the 2011-12 Tripod Survey Pilot, Project Update

24
Results from the 2011- 12 Tripod Survey Pilot, Project Update WSFCS Board of Education February 12, 2013 Slides courtesy of Cambridge Education and NCDPI Compiled by Marty Ward, WSFCS Research and Evaluation

description

Results from the 2011-12 Tripod Survey Pilot, Project Update. WSFCS Board of Education February 12, 2013 Slides courtesy of Cambridge Education and NCDPI Compiled by Marty Ward, WSFCS Research and Evaluation. 2011-12 Tripod Survey Pilot . - PowerPoint PPT Presentation

Transcript of Results from the 2011-12 Tripod Survey Pilot, Project Update

Page 1: Results from the 2011-12 Tripod Survey Pilot, Project Update

Results from the 2011-12 Tripod Survey Pilot, Project Update

WSFCS Board of EducationFebruary 12, 2013

Slides courtesy of Cambridge Education and NCDPI

Compiled by Marty Ward, WSFCS Research and Evaluation

Page 2: Results from the 2011-12 Tripod Survey Pilot, Project Update

2011-12 Tripod Survey Pilot • Purpose was to test interest in and feasibility of using a

Student Classroom Survey as part of our balanced system to measure Teacher Effectiveness

• One year state mandate• The survey selected for pilot was the Tripod, which is part of

the Gates-funded MET Project

Page 3: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 4: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 5: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 6: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 7: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 8: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 9: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 10: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 11: Results from the 2011-12 Tripod Survey Pilot, Project Update

Regional Tripod Survey Training January 2013

WSFCS represented by– Steve Oates– Rusty Hall (Old Town)– Old Town teacher– Sara Cook (Speas/Middle Fork)– Speas teacher– Marty Ward

Page 12: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 13: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 14: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 15: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 16: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 17: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 18: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 19: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 20: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 21: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 22: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 23: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 24: Results from the 2011-12 Tripod Survey Pilot, Project Update

Tripod Survey

Questions?