restructuring in power systems

46
Restructuring of Electrical Power systems Dr M S R Murty

description

usefull for both ug and pg courses

Transcript of restructuring in power systems

Page 1: restructuring in power systems

Restructuring of Electrical Power systems

Dr M S R Murty

Page 2: restructuring in power systems

Vertically Integrated Structure

GENERATION

TRANSMISSION

DISTRIBUTION

Page 3: restructuring in power systems

Horizontal Structure

COORDINATOR

GENERATION TRANSMISSION DISTRIBUTION

Page 4: restructuring in power systems

Unbundled Parts

• Generation Company GENCO: generation and ancillary services

• Transmission Company TRANSCO: transmission facilities

• Distribution Company DISTCO: to supply power to consumers

Page 5: restructuring in power systems

• The GENCO would try to minimize cost of production and maximize profits by reducing operating and maintaining costs.

• TRANSCO would reduce transmission losses and operate efficiently to justify delivery fees.

• DISTCO would also similarly reduce costs and negotiate with best possible GENCO.

Page 6: restructuring in power systems

COORDINATOR

GENERATION(GENCO)

TRANSMISSION(TRANSCO)

DISTRIBUTION(DISTCO)

ANCILLARY(ANCILCO)

Page 7: restructuring in power systems

Market Operations Money Flow Power Flow

GENCO

TRANSCO

DISCO

Marketer

Retailer

Aggregator

Broker

Customer

Page 8: restructuring in power systems

Optional Energy bids, Ancillary ServicesRequest Bilateral Contracts Payments

Optional Load Bids Request Bilateral Contracts Payments Payments

Optional Energy Bids Load Bids Request Bilateral Contracts

Self-Scheduling by LSEs

ISO Energy Spot Market Real-time Market Ancillary Services Secu rity Constrained UC Con gestion Management: Hourly LMPs Reliabil ity & Securi ty Coordination of Transmission Plann ing

Generators Retailers LSE

End-usersCustomers

Power Marketers

OASIS

Page 9: restructuring in power systems

7/18/2010 EE533F05Lecture4b.ppt 3

Automatic Generation Control

Net Interchange from area

Control Area

Page 10: restructuring in power systems

AGC

• Controls MW Generation to maintain(Regulate) Frequency l and assist entire system irrespective of cause.

• Regulate Contractual Interchange• Technical Criteria set by reliability Council

Page 11: restructuring in power systems

AGC in multiple areas

• Various aspects that are to be considered by AGC in multiple areas are:

• Net Actual Interchange• Net Scheduled Interchange• Interchange Deviation 

Page 12: restructuring in power systems

System Operator (SO)

• THE SO DOES NOT OWN ANY GENERATION BUT IS RESPONSIBLE FOR MAINTAINING THE QUALITY, RELIABILITY, AND SECURITY OF ELECTRIC SERVICE

• TO CARRY OUT ITS RESPONSIBILITY EFFECTIVELY AND EFFICIENTLY, THE SO SHOULD HAVE REAL‐TIME CONTROL OF BOTH GENERATION & TRANSMISSION

• THIS REQUIRES SCADA LINKS BETWEEN POWER PLANT RTUs AND A CENTRAL MASTER

• POWER PLANT RTUs SHOULD BE A EQUIREMENT FOR OPEN ACCESS

Page 13: restructuring in power systems

RESTRUCTUREDELECTRICITY SECTOR

• A STATE‐OWNED ELECTRICITY SECTOR IS RESTRUCTURED AS FOLLOWS:

• GENERATION IS PRIVATIZED INTO SEVERAL GENCOs; IPPs HAVE OPEN ACCESS

• TRANSMISSION IS PRIVATIZED INTO A SINGLE TRANSCO; DISTRIBUTION IS PRIVATIZED INTO SEVERAL DISCOs

• GENCOs and IPPs OWN GAS TURBINES, FOSSIL‐FIRED UNITS, AND HYDRO UNITS

• MARKET INCLUDES BILATERAL CONTRACTS, LONG‐TERM CONTRACTS, PURCHASED POWER AGREEMENTS, ANCILLARY SERVICES MARKET, AND A SPOT MARKET

Page 14: restructuring in power systems

• The Network Has Radial Ties to External Systems 

• IT IS DECIDED THAT THERE WILL BE AN ISO • The TRANSCo has an existing 10‐year old SCADA/EMS control hierarchy consisting of a National Control Center (NCC) and several Regional Control Centers (RCCs)

• The ISO is a non‐profit entity; the TRANSCo is a for‐profit company 

Page 15: restructuring in power systems

THE ISO CONTROL CENTER(ISOCC)

• Perform Power System Operation (PSO)  • Support Market Operations (MO)• Perform Settlements (ST)• Perform Operation Data Management (ODM

Page 16: restructuring in power systems

• SUPERVISE, CONTROL, & DIRECT MAINTENANCE OF THE TRANSMISSION NETWORK

• EXECUTE NETWORK CONTROL COMMANDS ISSUED BY THE ISOCC

• (TRANSCO RESPONSIBLE FOR NETWORK EXPANSION)

Page 17: restructuring in power systems

• GENERATION SCHEDULING: Performed by Generators

• OBTAIN RESOURCES FOR SECURITY CONTROL• REAL‐TIME MONITORING & CONTROL• SCADA • EMS• OPERATION RECORDING: Inputs to ODM Operation Reports

Page 18: restructuring in power systems
Page 19: restructuring in power systems

November 1999 DY-LIACCO 19

ENABLING TECHNOLOGIES FOR OPERATION AND REAL-TIME CONTROL

IN A LIBERALIZED ENVIRONMENT

EPRIThe Second European Conference:Enabling Technologies & Systems

for the Business-Driven Electric Utility Industry

Page 20: restructuring in power systems

November 1999 DY-LIACCO 20

THE WINDS OF CHANGE

FREE MARKET

PRIVATIZATION

GLOBALIZATION

more competition leads to CONSOLIDATION leads to less

competition

state-owned monopoly could become a private monopoly or an oligopoly

independent power producers

Page 21: restructuring in power systems

November 1999 DY-LIACCO 21

THE ENGINEERING CHALLENGE DANCING TO CHANGE

• Adapt System Operation to the Liberalized, Restructured Environment

• Redesign Operation and Real-Time Control Functions

• Develop New Approaches to Control System Design Using Advanced Technologies

Page 22: restructuring in power systems

November 1999 DY-LIACCO 22

THE SO DOES NOT OWN ANY GENERATION BUT IS RESPONSIBLE FOR MAINTAINING THE QUALITY, RELIABILITY, AND SECURITY OF ELECTRIC SERVICE

TO CARRY OUT ITS RESPONSIBILITY EFFECTIVELY AND EFFICIENTLY, THE SO SHOULD HAVE REAL-TIME CONTROL OF BOTH GENERATION & TRANSMISSION

• THIS REQUIRES SCADA LINKS BETWEEN POWER PLANT RTUs AND A CENTRAL MASTER

• POWER PLANT RTUs SHOULD BE A REQUIREMENT FOR OPEN ACCESS

THE SYSTEM OPERATOR ( _SO )IN A RESTRUCTURED UTILITY

Page 23: restructuring in power systems

November 1999 DY-LIACCO 23

AN EXAMPLE OF A RESTRUCTUREDELECTRICITY SECTOR

• A STATE-OWNED ELECTRICITY SECTOR IS RESTRUCTURED AS FOLLOWS: GENERATION IS PRIVATIZED INTO SEVERAL

GENCOs; IPPs HAVE OPEN ACCESS TRANSMISSION IS PRIVATIZED INTO A SINGLE

TRANSCO; DISTRIBUTION IS PRIVATIZED INTO SEVERAL DISCOs

GENCOs and IPPs OWN GAS TURBINES, FOSSIL-FIRED UNITS, AND HYDRO UNITS

MARKET INCLUDES BILATERAL CONTRACTS, LONG-TERM CONTRACTS, PURCHASED POWER AGREEMENTS, ANCILLARY SERVICES MARKET, AND A SPOT MARKET

Page 24: restructuring in power systems

November 1999 DY-LIACCO 24

OTHER CONDITIONSFOR THE EXAMPLE

• The Network Has Radial Ties to External Systems • IT IS DECIDED THAT THERE WILL BE AN ISO • The TRANSCo has an existing 10-year old

SCADA/EMS control hierarchy consisting of a National Control Center (NCC) and several Regional Control Centers (RCCs)

• The ISO is a non-profit entity; the TRANSCo is a for-profit company

Page 25: restructuring in power systems

November 1999 DY-LIACCO 25

DESIGN REQUIREMENTSFOR THE EXAMPLE

• DESIGN AN ISO CONTROL CENTER (ISOCC) AND A TO CONTROL CENTER (TOCC)

• THE ISOCC WILL BE NEW & WILL HAVE SCADA LINKS TO RTUs AT GENCO & IPP POWER PLANTS

• THE TOCC WILL BE A MODERNIZATION OF THE EXISTING EMS HIERARCHY

• LINK THE ISOCC WITH THE TOCC• PROVIDE A BACKUP ISOCC (B-ISOCC)

Page 26: restructuring in power systems

November 1999 DY-LIACCO 26

THE ISO CONTROL CENTER(ISOCC)

THE ISO CONTROL CENTER(ISOCC)

Perform Power System Operation (PSO)

Support Market Operations (MO)Perform Settlements (ST)Perform Operation Data

Management (ODM)

Page 27: restructuring in power systems

November 1999 DY-LIACCO 27

THE TO CONTROL CENTER(TOCC)

THE TO CONTROL CENTER(TOCC)

• SUPERVISE, CONTROL, & DIRECT MAINTENANCE OF THE TRANSMISSION NETWORK

• EXECUTE NETWORK CONTROL COMMANDS ISSUED BY THE ISOCC

• (TRANSCO RESPONSIBLE FOR NETWORK EXPANSION)

Page 28: restructuring in power systems

November 1999 DY-LIACCO 28

POWER SYSTEM OPERATIONFUNCTIONS

• GENERATION SCHEDULING Performed by Generators

• OBTAIN RESOURCES FOR SECURITY CONTROL

• REAL-TIME MONITORING & CONTROL SCADA EMS

• OPERATION RECORDING Inputs to ODM Operation Reports

Page 29: restructuring in power systems

November 1999 DY-LIACCO 29

RESOURCES FOR SECURITY CONTROLANCILLARY SERVICES

NORMAL & PREVENTIVE CONTROL• MUST-RUN UNITS• LOAD-FOLLOWING RESERVE • SPINNING & READY RESERVES • REACTIVE RESERVE

EMERGENCY & RESTORATIVE CONTROL• CURTAILABLE GENERATION• DISPATCHABLE LOADS• BLACK-START CAPABILITY

Page 30: restructuring in power systems

November 1999 DY-LIACCO 30

EMS INNOVATIONS• AUTOMATIC GENERATION CONTROL (AGC) --

THE LOAD-FOLLOWING CONTROL (The New LFC)

• SECURITY-CONSTRAINED OPTIMAL DISPATCH (SCOD)

• DYNAMIC SECURITY ANALYSIS (DSA) ON-LINE AUTOMATIC LEARNING DSA

(ALDYSA)• DYNAMIC OPERATOR TRAINING SIMULATOR

(DOTS)

Page 31: restructuring in power systems

November 1999 DY-LIACCO 31

AUTOMATIC GENERATION CONTROL(AGC)

• THE AGC FUNCTION WILL TAKE CARE OF: LOAD-FOLLOWING CONTROL SETPOINTS FOR

GENERATING UNITS COMPLIANCE MONITOR

• THE UNIT SETPOINT VALUES WILL BE THE SUM OF THE UNIT REGULATION PARTICIPATION PLUS THE UNIT BASEPOINT

• UNIT BASEPOINTS GIVEN BY SCOD, BASE LOAD SCHEDULES, FIRM POWER CONTRACTS

Page 32: restructuring in power systems

November 1999 DY-LIACCO 32

SECURITY-CONSTRAINED OPTIMAL DISPATCH (SCOD)

SCOD REPLACES TRADITIONAL ECONOMIC DISPATCH

• Determines Optimal Basepoint of Each Generating Unit such that Total Generation Shall Meet Anticipated 10-minute Ahead System Base Load

• Uses Incremental Price Curves Provided by the GenCos and IPPs

• Uses the Optimal Power Flow (OPF)

Page 33: restructuring in power systems

November 1999 DY-LIACCO 33

DYNAMIC SECURITY ANALYSIS (DSA)

• NEEDED FOR PREVENTIVE AND EMERGENCY CONTROL AGAINST TRANSIENT OR VOLTAGE INSTABILITY

• CONSISTS OF TRANSIENT STABILITY ANALYSIS (TSA) & VOLTAGE STABILITY ANALYSIS (VSA)

• FOR TSA THE HYBRID METHOD USING SINGLE-MACHINE EQUIVALENT IS PREFERRED

Page 34: restructuring in power systems

November 1999 DY-LIACCO 34

REAL-TIME AUTOMATIC LEARNING DSA(ALDYSA)

• Automatic Learning in Real-Time Using Pattern Classification Approaches Artificial Neural Networks Decision Trees Hybrid Methods

• Training Set Derived Continuously in Real-Time

Page 35: restructuring in power systems

November 1999 DY-LIACCO 35

DYNAMIC OTS(DOTS)

• DYNAMIC POWER SYSTEM MODELLING USING EMBEDDED STABILITY PROGRAM Power Swings and Out-of-Step Tripping

Simulated Distance Relay Protection, Automatic High-

Speed Reclosing, Synchrocheck Reclosing, Out-of-Step Blocking, Loss-of-Excitation Protection

DOTS May be Performed in Real-Time & Linked with ALDYSA

• Off-line DOTS Trains the Human Operator• Real-Time DOTS Trains the Computer to be an

Operator

Page 36: restructuring in power systems

November 1999 DY-LIACCO 36

OPERATION DATA MANAGEMENTOPERATION DATA MANAGEMENT

• CENTRAL REPOSITORY (Data Warehouse) FOR MARKET OPERATIONS, SETTLEMENTS, AND POWER SYSTEM OPERATION DATA

• PUBLIC INFORMATION PUBLISHING VIA WEB SERVER ON AN EXTRANET

• DATA WAREHOUSE AVAILABLE FOR DATA MINING

Page 37: restructuring in power systems

November 1999 DY-LIACCO 37

CONCEPTUAL DESIGNTHE TCP/IP ENTERPRISE/CONTROL

NETWORKENTERPRISE (Business & Financial Processing) & SYSTEM CONTROL FUNCTIONS INTEGRATEDIN ONE INTERNET-BASED NETWORK

CONSISTING OF: SCADA INTRANET ISOCC TCP/IP LAN TOCC WAN INTRANET PUBLIC INFORMATION EXTRANET

Page 38: restructuring in power systems

November 1999 DY-LIACCO 38

MULTI-VENDOR INTEROPERABILITYDFS & OBJECT/COMPONENT TECHNOLOGIES• A SO-CALLED STANDARD IS A STANDARD ONLY IF

IT IS OR BECOMES A DE FACTO STANDARD (DFS) EPRI UCA/MMS/ICCP Internet Protocol Suite: HTTP; FTP; HTML; XML Java & Java-Enabled Web Browsers Interoperability Middleware for Distributed Components

• Common Object Request Broker Architecture (CORBA) with Internet InterORB Protocol (IIOP)

• Enterprise JavaBeans (EJB)• Distributed Component Object Model (DCOM)

• EMERGING DFS EPRI Common Information Model (CIM) for EMS, IEC

TC57 WG13

Page 39: restructuring in power systems

November 1999 DY-LIACCO 39

MULTI-VENDOR INTEROPERABILITYDISTRIBUTED MANAGEMENT

• WEB-BASED ENTERPRISE MANAGEMENT (WBEM) Distributed Management Task Force (DMTF) The Path to Interoperability

• Data Model: -- Common Information Model (CIM)*• Data Representation: -- Extensible Markup

Language (XML)• Data Transport: -- HTTP

*(not to be confused with EPRI CIM)

Page 40: restructuring in power systems

November 1999 DY-LIACCO 40

THE SCADA INTRANET• MASTER-RTU PROTOCOL: -- TCP/IP WITH EPRI

UCA-MMS/ICCP• THE NETWORK INTERFACE UNIT (NIU)

A Java-PoweredSingle-Board Unit with Web Server

THE REMOTE INTERNET UNIT (RIU) CONCEPT

NIU NIU NIU NIU

PROCESS BUS

STATION LAN

RTU PLC

Page 41: restructuring in power systems

November 1999 DY-LIACCO 41

ISOCC ETHERNET TCP/IP LAN

• Redundant:- Switching Hubs, Fiber Optic Links, Servers, & Interfaces

• Mix of RISC Workstations and PCs• Links to Metering System• Firewall and Web Server for ODM

Page 42: restructuring in power systems

November 1999 DY-LIACCO 42

TOCC INTRANET WAN

• REDUNDANT HIGH-SPEED BACKBONE LINKING THE NCC AND THE RCCs

• RCCs MAY BE PC-BASED SYSTEMS• DATA CONCENTRATORS MAY BE

CONNECTED TO THE WAN• WAN LINKED TO ISOCC LAN

Page 43: restructuring in power systems

HUB

MOSERVER

STSERVER

SWDEV

DACSERVER

PSOSERVER

ODMSERVER

TO RTUs

METERINGSYSTEMISOCC

DAC= Data Acquisition & Control

MO = Market Operations

ST = Settlements

PSO= Power System Operation

ODM= Operation Data Management

SW DEV = Software Development

WS1

WS2

WS3

WS4 FIREWALL

WEB SERVER

EXTRANET

WS 1 = Trading Coordinator

WS 2 = Settlements Operator

WS 3 = Power System Operator

WS 4 = Software Developer

INDUSTRIALLOADS

GENCOS IPPS DISCOS

INTRANETWAN

NCC

RCC RCC RCC RCC

TOCC

DY-LIACCO

9/1/99

TCP/IP

Page 44: restructuring in power systems

November 1999 DY-LIACCO 44

THE BACKUP ISOCC(B-ISOCC)

• INSTALL THE REDUNDANT SET OF ISO-CC SERVERS & INTERFACES IN A SEPARATE, DISTANT LOCATION

• USE THE B-ISOCC AS A TRAINING & SOFTWARE DEVELOPMENT CENTER

• ISO WORKLOAD MAY BE SHARED BETWEEN THE ISOCC AND THE B-ISOCC

Page 45: restructuring in power systems

November 1999 DY-LIACCO 45

SUMMARYENABLING TECHNOLOGIES FOR OPERATION &

CONTROL Load-Following Control via SCADA Security-Constrained Optimal Dispatch Dynamic Security Analysis Automatic Learning DSA (ALDYSA) Off-Line and Real-Time Dynamic Operator

Training Simulator (DOTS) TCP/IP Enterprise/Control Network Web Technologies Remote Internet Units & Web-Based SCADA DFSs & Object/Component Technologies for

Multi-Vendor Interoperability

Page 46: restructuring in power systems

November 1999 DY-LIACCO 46

CLOSING REMARKSONE CAN ONLY OPERATE WHAT ONE HAS

• A CONTROL SYSTEM NO MATTER HOW TECHNICALLY ADVANCED CAN DO LITTLE FOR SERVICE RELIABILITY & SECURITY IF GENERATION IS INADEQUATE OR TRANSMISSION IS WEAK OR CONTROLLABILITY IS LIMITED

• THE MAJOR NEGATIVE IMPACT OF RESTRUCTURING ON RELIABILITY IS THE LOSS OF RESPONSIBILITY FOR GENERATION-TRANSMISSION SYSTEM PLANNING & THE LACK OF INCENTIVES FOR SYSTEM EXPANSION