My Projects Report Program Area: Escambia County RESTORE Name: David Musselwhite Application Closing Date: 30 Sep 2015 My Project Summary Project Locations The following map shows the locations of your projects in the site area. Escambia County Florida RESTORE Program - My Projects Project Title Project Status Date Saved or Submitted Primary Qualifying Eligible Activity Secondary Qualifying Eligible Activites One.Net - Pensacola Broadband Submitted 9/29/2015 Planning assistance Workforce Development Infrastructure projects for local economy Planning assistance Page 1 of 1 Printed on 9/29/2015 4:59:21 PM

Transcript of RESTORE – OneNet-PBB Submitted Application - · PDF fileand provide dedicated...

Page 1: RESTORE – OneNet-PBB Submitted Application - · PDF fileand provide dedicated fiber-optic lines to anchor institutions including ... and function of upland, coastal, bays, bayous,

My Projects ReportProgram Area: Escambia County RESTORE

Name: David MusselwhiteApplication Closing Date: 30 Sep 2015

My Project Summary

Project Locations

The following map shows the locations of your projects in the site area.

Escambia County Florida RESTORE Program - My Projects

Project Title Project Status Date Saved orSubmitted

Primary Qualifying Eligible Activity Secondary Qualifying EligibleActivites

One.Net - Pensacola Broadband Submitted 9/29/2015 Planning assistance Workforce Development

Infrastructure projects for local economy

Planning assistance

Page 1 of 1 Printed on 9/29/2015 4:59:21 PM

Page 2: RESTORE – OneNet-PBB Submitted Application - · PDF fileand provide dedicated fiber-optic lines to anchor institutions including ... and function of upland, coastal, bays, bayous,

Project DetailsTitle: One.Net - Pensacola Broadband

The following map and table show the details of the project.

Escambia County Florida RESTORE Program - Project Details

Page 1 of 5 Printed on 9/29/2015 5:01:13 PM

Page 3: RESTORE – OneNet-PBB Submitted Application - · PDF fileand provide dedicated fiber-optic lines to anchor institutions including ... and function of upland, coastal, bays, bayous,

Escambia County Florida RESTORE Program - Project Details

Notes:

1. The reference to points shown on each question are themaximum points allocated to that question from the Project

Selection Criteria that will be used in scoring each project.2. Aproject Name and Location are required for each project and are

entered interactively on the Portal.

Section A - Requirements and Eligibility

1. Qualifying Primary Eligible Activity (select only one): Planning assistance-

2. Qualifying Secondary Activities (Check all that apply): Workforce Development-

3. Was this activity included in a claim paid out of the Oil SpillTrust Fund? Note: If the activity was previously paid out of anOil Spill Trust Fund Claim, it is NOT eligible for funding underRESTORE Direct Component Pot 1. If you answer 'Yes" to this

question, please stop here and do not submit your project.

No

4. Provide a short narrative describing how the work associatedwith the proposed project will be performed in the Gulf Region.

(250 words maximum)

This project will provide for the planning, design, and engineering ofan open access fiber broadband network to be built in EscambiaCounty, FL. It is anticipated that the network will consist of over 250miles of fiber optic backbone fiber covering the entire County fromCentury to Perdido Key and Walnut Hill to Pensacola Beach. Thenetwork will be designed for interconnection with other providers,community anchor institutions, national broadband projects, anddistribution broadband to under-served residential and businessresidents.

5. Provide a short narrative describing how the proposed projectwill conform to all applicable federal, state, and local laws andcodes including, but not limited to American's with Disabilities

Act, Rehabilitation Act of 1973, U.S. Access Board, NationalEnvironmental Policy Act, National Historic Preservation Act,

Davis-Bacon Act, Florida Building Code, and Escambia CountyLand Development Code. (250 words maximum)

Part of the engineering design deliverable will be identification of allFederal, State and Local governmental permitting requirements.

Section B - Baseline Criteria

1a. Project Justification - Provide an overall description of theproposed project. Include references to the specific needsaddressed, goals to be achieved, performance metrics and

benefits provided by the project. (500 words maximum - 3 pointsmaximum (combined with Question 1b below))

This project will design and install a county-wide fiber-optic networkand provide dedicated fiber-optic lines to anchor institutions includingthe local governmental entities, school district, higher education andhospitals and medical facilities. The creation of this network willimprove the network connectivity of each of these institutions whilereducing their operating costs. This network will also provide theinfrastructure for an enhanced intelligent transportation system andhelp make the community ready for the future First ResponderBroadband network (FirstNet). In addition this network will providededicated fiber-optic lines for use as an open-access network tosupport initiatives to bring fiber-to-the-home to residences and smallbusinesses for gigabit Internet service. Providing the community withgigabit Internet access will enable our community to competenationally with other communities which have gigabit Internet now orare undertaking initiatives to deploy gigabit Internet service. Theopen-access network can be utilized by a community network toimprove broadband adoption in the under served urban and ruralareas and to targeted populations. This network will support the costeffective deployment of public access wireless corridors throughoutthe County as a citizen service.

1b. Project Budget - Provide total budget costs and leveragingwithin each of the following categories as applicable. Provide

sufficient detail in the budget narrative to justify the feasibility ofthe proposed project. Additional budget breakdown information

can be provided as a PDF attachment. Please address thefollowing minimum categories in the proposed project budget:

Planning, Design, Construction, and Monitoring. Please enter(See attached) here if you are submitting a budget as an

attachment (250 words maximum - 3 points maximum(combined with Question 1a above))

The total requested funding is: $240,000. This funding request is forphase 1(Design) of the overall project and includes a full-time projectmanager at a fully loaded cost of $100,000, Professional services fora cost of $75,000 for an engineering plan consisting of the followingelements: 1)Determination of areas to be served, 2) Determination ofservices to be provided, 3) Determination of key technology (PassiveOptical) or active Ethernet, 4) Determination of aerial or buried fiberrouting, 5) Design/layout of routes and fiber sizes, 6) Design andlayout of serving areas, 7) Placement of huts and/or cabinet sites, 8)Creation of overall cost to build estimate, 9) Mapping likelysubscribers and anchor institution connection points. These elementswill provide a plan that can be staked, permitted and built in a futurephase. Additional professional services for a cost of $65,000 for anEconomic Impact and Sustainability plan. All funds would be awardedto the Board of County Commissioners and any procurement willutilize the County's procurement process.

2. Timing - Provide a brief project development scheduleshowing that the proposed project can be implemented and

benefits realized within a reasonable and acceptable timeframe.At a minimum please address Planning, Design, Construction,

and Monitoring time frames. (250 words maximum - 3 pointsmaximum)

This request is to fund a detailed engineering design and financialplan which will be completed within 90-120 days after award ofcontract. It is anticipated that construction funding will we soughtthrough both Public, Private and or Public Private Partnershipsources including Trimuph Gulf Coast.

3. Public Interest - Provide a short narrative describing how theproposed project is in the public interest. (250 words maximum -

3 points maximum)

This project is in the public interest because it helps to strengthen theanchor institutions by providing a more cost efficient high-speednetwork for their locations, promotes greater broadband adoption inunder served populations which will increase the workforcereadiness, it will provide high-speed broadband Internet service tothe under served and un-served rural areas of the county and it willprovide gigabit Internet infrastructure that will enable the County tocompete with leading high-technology cities in the US.

Page 2 of 5 Printed on 9/29/2015 5:01:13 PM

Page 4: RESTORE – OneNet-PBB Submitted Application - · PDF fileand provide dedicated fiber-optic lines to anchor institutions including ... and function of upland, coastal, bays, bayous,

Escambia County Florida RESTORE Program - Project Details

4. Monitoring Plan - Provide a short narrative describing thecomprehensive monitoring and success measurement plan for

the proposed project. (250 words maximum? 3 pointsmaximum)

This funding will provide for a full-time information technologyprofessional project manager accountable to the Escambia CountyBCC with the responsibility to manage the engineering contractor.Success will be the receipt of a detailed engineering designspecification and engineering cost to construct estimate.

Section C1 - Environmental Criteria

1. Habitat Restoration - Provide a short narrative on how theproposed project improves, enhances, or restores the structureand function of upland, coastal, bays, bayous, wetlands, rivers,

lakes, streams, or marine natural systems, benefiting nativeflora and fauna (Examples include: Restoration, improvement,

or enhancement of ecological function such as naturalhydrological function, tidal connections, soil composition,

vegetation diversity and renewal; Restoration, improvement, orenhancement of community structure such as increased native

vegetation, biodiversity, or beneficial substrate; removal of non-native species; removal of fish passage barriers; or benefits

threatened and endangered fish or wildlife). (500 wordsmaximum - 5 points maximum)

While this project will not provide habitat restoration, it will have aminimal impact on the environment due to the use of existing righs-of-way.

2. Habitat Conservation and Preservation - Provide a shortnarrative on how the proposed project improves, enhances, or

restores the structure and function of upland, coastal, bays,bayous, wetlands, rivers, lakes, streams, or marine natural

systems, benefiting native flora and fauna (Examples include:Establishing conservation easement or wildlife corridors,reducing unnatural disturbances, implementing a habitat

management plan or other best practice). (500 words maximum -5 points maximum)

Not Applicable

3. Water Quality Improvement - Provide a short narrative on howthe proposed project reduces point and nonpoint sources of

pollutants entering local waterways, provides treatment toimprove water quality, or proposes other measures which will

improve water quality (Examples include: Reduces pollutantloading from point sources, installation of Best ManagementPractices (BMP's); reduces pollutant loading from nonpointsources such as impervious surface coverage, implements

stormwater Best Management Practices such as bioretention,vegetated buffer preservation, etc. to reduce sedimentation or

provides treatment for nutrients or legacy contaminants;Improves impaired waterway). (500 words maximum - 5 points

maximum)

Not Applicable

4. Natural Systems Resiliency - Provide a short narrative on howthe proposed project increases ability of natural systems to

withstand disasters and adapt to changing environmentalconditions due to climate change, associated sea level rise, and

other factors (Examples include: Stabilizes shoreline/providesnatural wave attenuation, increase species and/or ecosystem

adaptability to changing conditions, provide for naturalsuccessional progression, or improve air quality). (500 words

maximum - 5 points maximum)

One of the drivers for high-speed (gigabit Internet) networks is toprovide the necessary connectivity for Internet-of-things (IoT)devices. Currently most environmental logging devices and sensorsuse custom communication systems which limit their deployability.Having an abundant fiber-optic network supporting wirelesstechnologies will support using IoT sensors and other devices forautomated monitoring, reporting and notification of changes inenvironmental conditions.

Section C2 - Economic Criteria

1. Tourism and Tourism Opportunities - Provide a shortnarrative on how the proposed project provides for increases in

tourism activity through new or additional marketing efforts,improvements to existing attractions, or addition of newdestinations or attractions. (Examples include: Provides

increased or additional public access to the waterfront or othertourism destinations, Enhances existing attractions or

destinations, Increases total annual visitor count, Increasesaccess to cultural tourism or local historical assets, Promotes

tourism destinations through marketing or promotional efforts).(500 words maximum - 4 points maximum)

This project will analyze the effects of extending broadbandinfrastructure to the businesses engaged in tourism and evaluate theapplications that could increase their capabilities. Applicationsinclude but are not limited to: Wifi, interactive points of sale, cloudbased image management, and live video streaming.

2. Recreational Fishing and Local Seafood - Provide a shortnarrative on how the proposed project provides for increases intourism activity or encourages the consumption of Gulf seafood

through new or additional marketing efforts, improvements toexisting attractions, or addition of new destinations or

attractions (Examples include: Improves opportunities throughaddition of artificial reefs, oyster reefs, Submerged AquaticVegetation (SAV); increases access to fishing opportunities

through addition of fishing piers, boat ramps; or promotesrecreational fishing and/or local seafood consumption throughmarketing and promotional activities) (500 words maximum - 4

points maximum)

Not Applicable

3. Job Creation - Provide a short narrative on how the proposedproject provides for new seasonal, temporary, part time, full

time, and/or higher wage jobs within the County. If applicable,explain how the proposed project can provide jobs that meet or

exceed the Escambia County average annual median wageand/or are within local targeted industries or supporting

infrastructure industries. (500 words maximum - 4 pointsmaximum)

This project will evaluate the long term economic impact thatbroadband infrastructure will have on the County’s ability toparticipate in regional economic development initiatives as well ashow to best attract, retain, and develop employees and employerswho want to live and work within Escambia county.

Page 3 of 5 Printed on 9/29/2015 5:01:13 PM

Page 5: RESTORE – OneNet-PBB Submitted Application - · PDF fileand provide dedicated fiber-optic lines to anchor institutions including ... and function of upland, coastal, bays, bayous,

Escambia County Florida RESTORE Program - Project Details

4. Industry and Business Growth - Provide a short narrative onhow the proposed project directly contributes to expansion of

existing industry/business or siting of a new industry/businessin local targeted industries. Provide evidence of a measurable

Gross Domestic Product (GDP) increase if possible. (500 wordsmaximum - 4 points maximum)

Providing abundant and affordable gigabit Internet to the communitywill provide a significant economic impact as evidenced by the fiber-to-the-home project by the Electric Power Board in Chatanooga, TN.In a recent study conducted by the University of TN at Chattanoogashows that the fiber-optic infrastructure has generated between $865million to $1.3 billion in economic and social benefits while creatingbetween 2,800 to 5,200 new jobs.

5. Workforce Development - Provide a short narrative on howthe proposed project provides innovative higher education, jobtraining, or other workforce training/career development which

increases the total skilled workforce pool and advancesopportunities for higher wage employment (Examples include:

Providing industry focused training resulting in certification fortrainees, addressing workforce gaps in specific target

industries, development or expansion of youth employment andtraining opportunities in STEM fields, job training targeting "at-

risk" groups). (500 words maximum - 4 points maximum)

This project will analyze the feasibility of technologies such asdistance learning which will provide residents and employers accessto technology training curriculum so they can develop the skillsneeded to compete in today’s economy.

Section C3 - Infrastructure Criteria:

1. Transportation Network Improvements - Provide a shortnarrative on how the proposed project improves components of

existing transportation network or adds new features totransportation network such as roads, sidewalks, bike lanes,

greenway trails, streetlights, and urban/street landscaping(Examples Include: Use of "complete streets" design including

street lighting, traffic calming, and pedestrian safety;improvements to the multimodal transportation network

including waterways, ports, railways, and mass transit). (500words maximum - 6 points maximum)

Having abundant network connectivity throughout the entire Countywill allow the expansion of an intelligent transportation system, it willallow the deployment of active digital signage along the roadways, itcan support intelligent street lighting where new street lights could beconnected to the network allowing programmatic control of a lightsintensity where for example late at night the light's intensity could bereduced but immediately increased by 911 if an incident is reported inthe area.

2. Flooding Improvements - Provide a short narrative on how theproposed project provides structural improvements or additions

which will reduce flooding to homes and businesses, therebyreducing overall disaster costs and increasing economic

resilience. (Examples include: decreasing the frequency and/orintensity of flooding events through impervious surface

reduction or increased storage/retention or retrofit, repair orreplace existing stormwater management infrastructure to

improve drainage). (500 words maximum - 7 points maximum)

The connectivity provided by the fiber-optic network will support thewide area deployment of water level sensors to gather real time dataon water levels and ground water sources that can provide hyper-local anticipation of flood incidents and notify residents in affectedareas. Fiber optic cable is less susceptible to degradation andenvironmental conditions such as flooding and electromagneticinterference.

3. Community Resiliency - Provide a short narrative on how theproposed project increases community resiliency by

strategically retrofitting, upgrading, or replacing criticalinfrastructure to reduce community vulnerability to natural andmanmade disasters; utilizes renewable energy; or implements

other disaster preparatory mechanisms such as additionalimproved planning, shelters or evacuation routes. (500 words

maximum - 7 points maximum)

This project will evaluate the impact of broadband infrastructure oncommunity resiliency. Broadband enables the life savingcommunication technologies such as digital signage linked to realtime traffic management systems, weather conditions, evacuationsand emergency notification applications.

Section D - Bonus Points

1. Benefits Traditionally Underserved Persons or Areas -Provide a short narrative on how the proposed project improves

opportunities for disadvantaged or traditionally underservedpersons or areas, such as low-income areas, areas of minority

concentration, persons with disabilities, persons with limitedEnglish proficiency, etc. (Examples Include: Project is located in

low income, very low income, or primarily minorityneighborhood (as defined by U.S. Census tract); Project

incorporates universal or creative ADA design beyond theminimum requirements providing increased access for persons

with disabilities; Training and job creation benefits fordisadvantaged or traditionally underserved persons; Project

benefits disadvantaged or traditionally underserved groups inother ways) (250 words maximum - 2 points maximum)

Federal standards for broadband recently increased from 4Mbps to25Mbps. This open access network will provide affordablebroadband access to business corridors as well as residential areasthat are under served as it relates to broadband. Serving theselocations will help to close the digital divide by increasing theopportunities for education – from digital learning to digital literacyskills that are critical for developing an educated workforce.

2. Community Health - Provide a short narrative on how theproposed project improves physical or mental health of the

community through health improvement programs or healtheducation (Examples include: Project provides for improved

affordable access to healthy food; project targets improvementof public health, disease, or mental health issues; or project

provides the public with opportunities for increased physicalactivity such as parks, greenways and community centers). (250

words maximum- 3 points maximum)

Broadband access enables applications such as telemedicine which,allows patients and doctors to interact virtually. Telemedicine hasbeen successful in helping rural communities implement earlydetection programs such as stroke detection and treatment. Seehttp://arsaves.uams.edu/ as an example.

3. Neighborhood Benefits - Provide a short narrative on how theproposed project provides neighborhood benefits such as

increased affordable housing; reduction in crime; located inCommunity Redevelopment Area (CRA), brownfields area, or

Enterprise Zone or provides significant aesthetic neighborhoodimprovements. (250 words maximum - 3 points maximum)

Making high-speed network connectivity widely deployed will supportvery high resolution video monitoring of high crime areas by lawenforcement, it will provide affordable and easily obtained high-speedInternet access to businesses locating in CRAs, brownsfields whereconnectivity might not otherwise be available.

4. Local Preference - Provide one or more specific examples onhow the proposed project can incorporate the use of local labor

forces or promotes local small businesses. (250 wordsmaximum - 3 points maximum)

The construction of the network will utilize local constructioncompanies. In addition, access to an open-access middle-milenetwork will lower the barrier to entry for small independent internetservice providers to start up and offer competitive services.

5. Education and Awareness - Provide one or more specificexamples on how the proposed project enhances education orearly childhood education programs or incorporates education

outreach. (250 words maximum - 2 points maximum)

Broadband access enables programs such as distance learningwhich allows K12 programs to access curriculum options. Theseprograms can be actual classes or virtual field trips - both of whichencourage innovation, critical thinking skills, and digital literacy.

Page 4 of 5 Printed on 9/29/2015 5:01:13 PM

Page 6: RESTORE – OneNet-PBB Submitted Application - · PDF fileand provide dedicated fiber-optic lines to anchor institutions including ... and function of upland, coastal, bays, bayous,

Escambia County Florida RESTORE Program - Project Details

6. Environmental Outreach - Provide one or more specificexamples of environmental outreach components included in

the proposed project (Examples include: Project engagescitizens in the active preservation, protection, or restoration of

natural resources or provides publicly accessible environmentaleducation signage at the project site). (250 words maximum - 2

points maximum)

This project will evaluate the opportunities to utilize digital signage atnatural resource locations and interactive information access atsignificant locations.

7. Cultural and Historic Resources - Provide one or morespecific examples of how the proposed project provides for

preservation, protection or restoration of cultural, historical, orarchaeological significant resources above and beyond

minimum regulatory requirements (Examples may includeadaptive reuse of buildings or other existing assets) (250 words

maximum - 2 points maximum)

Not applicable

8. Consistency with Local Plans - Provide one or more specificexamples of how the proposed project is consistent with or

implements existing adopted plans (Plans may include SurfaceWater Improvement and Management (SWIM) Program, BasinManagement Action Plan (BMAP), Comprehensive Economic

Development Strategy, Capital Improvement Plan (CIP), or otherCity, County, State, or Regional plan). (250 words maximum - 2

points maximum)

The FloridaWest economic development alliance lists InformationTechnology as one of our key industries. To support this industry ourcommunity needs to improve our high-technology infrastructure tocompete with US leading high-technology cities. Providing thiscomprehensive open access network will improve our nationalcompetitiveness.

9. Green Design - Provide one or more specific examples of howthe proposed project incorporates green design elements such

as Leadership in Energy & Environmental Design (LEED)principles or other energy and water efficiency/ conservation

measures (Examples include: Project integrates waterconservation design features beyond minimum standards; orProject includes renewable energy component, recycling andreuse of materials, or other sustainable or low impact design

features). (250 words maximum - 2 points maximum)

Not applicable

10. Leverages funds - Provide one or more specific examples ofhow the proposed project can provide for in-kind or other

supplemental funding, increasing fund leveraging (Examplesinclude: Project can include local/state/Federal grant matching

funds, Volunteer labor, Etc.) (250 words maximum - 7 pointsmaximum)

The cost for the detailed engineering design and planning will beused as a match for Triumph Gulf Coast or other construction fundingsources.

11. Sustainability and Efficiency - Provide one or more specificexamples of how the proposed project approach utilizes

efficiency measures and provides long term benefits (Examplesinclude: Project links outcomes, partners, or lands to leverage

overall impact; project provides long-term benefit(s) beyond lifeof funding period; project builds upon existing community

assets or proposed project avoids or minimizes negativeenvironmental impacts). (250 words maximum - 2 points

maximum)

Fiber optic broadband infrastructure has a longer effective lifecyclethan legacy networks for two main reasons: 1) It is physically moreresilient and 2) it can also scale exponentially (from 1Mbps to100Gbps).

12. Planning and Partnerships - Provide one or more specificexamples of how the proposed project includes beneficial

partnership or is complete and shovel ready. (250 wordsmaximum - 2 points maximum)

This funding request is for the planning and engineering necessary tobuild the anchor institution and open access network. The completionof this phase 1 activity will make this a shovel ready project.

13. Enhanced Tourism Opportunities - Provide one or morespecific examples of how the proposed project provides forenhanced tourism opportunities during the "off season" of

September 1 through March 31. (250 words maximum - 2 pointsmaximum)

Not applicable

Section E - Permitting and Ownership:

1. Are permits required to construct or implement the proposedproject?

Yes

If Yes, list specific required permits and status of each. If No,indicate 'N/A.' (100 words maximum - No Points)

One of the deliverables of this funded activity will be detailedinformation on the types and locations of required permits.

2. Is land acquisition required to construct or implement theproposed project? Yes-

If Yes, what legal rights will be acquired? (Select one or more) Easments-

If easements, what are the terms of the easement? Otherwise,indicate 'N/A.' (100 words maximum– No Points)

Yes - the construction phase of this project may require minimal landacquisition for the location of fiber huts and/or cabinets if not placedon existing rights-of-way.

3. Will the proposed project cause displacement of persons orbusinesses?

No

If Yes, provide a description of the displacement the proposedproject may cause including any known addresses that may be

impacted. If No, indicate 'N/A.' (100 words maximum – NoPoints)

No - the construction phase of this project will utilize existing rights-of-way and/or existing cable routing paths.

Page 5 of 5 Printed on 9/29/2015 5:01:13 PM

Page 7: RESTORE – OneNet-PBB Submitted Application - · PDF fileand provide dedicated fiber-optic lines to anchor institutions including ... and function of upland, coastal, bays, bayous,

Internet

Escambia County OnenetAnchor Institution /Open Access Network Concept

FirstNet

Government

Educa3onal

Apartments

OpenAccessNetwork

AnchorIns1tu1onNetworkCentralOffice

DedicatedFiberProvidedforITS

DedicatedFiberProvidedforPublicSafety

EncourageMDUstoincludeFTTHintothe

residence

PensacolaBroadband.com9-5-2015

MeetMeRoom

DedicatedFiberforEduca3on

DedicatedFiberforLocal

Government

FutureIns3tu3ons

LongHaulProviders

FiberReservedforFutureIns3tu3ons

&LargeBusinesses

RadioBackhaul

IntelligentTransporta3on

Community WiFi802.11ac

OfferedbyProvidersinDifferentAreas

Neighborhood

HomeofficeHouse1GbpsFTTHProvidedby

Competa3veProvider

Homeoffice

Neighborhood

House1GbpsFTTHProvidedby

CommunityNetwork

Neighborhoodsarebuiltintowhen“take”

rateismet.

Neighborhood

House Homeoffice1GbpsFTTHProvidedby

Competa3veProvider

Smallbusiness1GbpsFTTPOfferedby

Mul3pleProviders

Page 8: RESTORE – OneNet-PBB Submitted Application - · PDF fileand provide dedicated fiber-optic lines to anchor institutions including ... and function of upland, coastal, bays, bayous,