Al Falah Community Development, Abu Dhabi Responsibility Matrix
Concept Design (CD)
AL
DA
R
LE
AD
DE
SIG
N
CO
NS
UL
TA
NT
Pro
jec
t
Ma
na
ge
men
t
Co
ns
ult
an
t
Co
st
Co
ns
ult
an
t
Design Management S P S N
Design Administration S P N -
Value Engineering S S S P
ALDAR and team coordination P S N -
ALDAR Conferences P S N S
Special Presentations P S S S
Planning and Zoning analysis S P N N
Develop architectural designs, layouts and
forms
S P N N
Preparation of CD documents N P N N
Coordinate other Project consultants S S P N
Coordinate special photos, rendering,
models
P S N -
Collate complete CD documents S P N -
Prepare Concept Design presentation
documents
N P N -
Key:
N = No Responsibility
S = Support Responsibility
P = Primary Responsibility
![Page 2: Responsiblity Matrix](https://reader035.fdocuments.in/reader035/viewer/2022081817/5695d1ef1a28ab9b02987f5b/html5/thumbnails/2.jpg)
Al Falah Community Development, Abu Dhabi Responsibility Matrix
Detail Design (DD)
AL
DA
R
LE
AD
CO
NS
UL
TA
NT
P
roje
ct
Ma
na
ge
men
t
Co
ns
ult
an
t
Co
st
Co
ns
ult
an
t
Project Management P S P N
Project Administration P N P S
Value Engineering S S S P
Participate in ALDAR and team coordination P S S S
Update project schedule , phasing approach P S P S
Develop detail designs N P N N
Develop Landscape and site design S P N N
Selection of exterior and interior materials N P N N
Coordinate engineer services (SE, MEP) S P S N
Coordinate other consultant services S P S N
Prepare and monitor interim Cost Plan P S S P
Preparation of DD documents N P N N
Coordinate and collate DD documents N P S N
Select DD materials, finishes and colours S P N N
Review DD construction cost estimate P S S P
Review DD documents with state and local agencies S S S N
Key:
N = No Responsibility
S = Support Responsibility
P = Primary Responsibility
![Page 3: Responsiblity Matrix](https://reader035.fdocuments.in/reader035/viewer/2022081817/5695d1ef1a28ab9b02987f5b/html5/thumbnails/3.jpg)
Al Falah Community Development, Abu Dhabi Responsibility Matrix
Construction Documents (CD)
AL
DA
R
LE
AD
CO
NS
UL
TA
NT
Pro
jec
t
Ma
na
ge
men
t
Co
ns
ult
an
t
Co
st
Co
ns
ult
an
t
Management of overall CD process S P S S
Prepare and package drawings and specification N P S S
Preparation and co-ordination of all CD technical N S P S
Selection of proposed Consultants + Contractors S S P S
Prepare total RFP pack, issue and manage N N S P
Manage + respond to all TQ’s and RFI’s during RFP S S S P
Issue tender addenda S S S P
Call and manage post tender clarification meetings S S S P
Call and manage post tender negotiation meetings S S S P
Review and cost check tender submissions S N S P
Assess and prepare recommendation for award S S S P
Update project schedule/ refine construction schedule P S P S
Prepare and issue all contract documents N S S P
Update Cost Plan with value of awarded contracts N S S P
Key:
N = No Responsibility
S = Support Responsibility
P = Primary Responsibility
![Page 4: Responsiblity Matrix](https://reader035.fdocuments.in/reader035/viewer/2022081817/5695d1ef1a28ab9b02987f5b/html5/thumbnails/4.jpg)
Al Falah Community Development, Abu Dhabi Responsibility Matrix
Contract Administration (CA)
AL
DA
R
LE
AD
CO
NS
UL
TA
NT
Pro
jec
t
Ma
na
ge
men
t
Co
ns
ult
an
t
Co
st
Co
ns
ult
an
t
Management of Project cash flow N S S P
Preparation of Work Breakdown Structure (WBS) N S S P
Management of the Cost Plan N S S P
Assess validity/entitlement of all Contractor delay
claims N S P S
Assess + make recommendation on Variations N S S P
Assess + make recommendation on all claims N S S P
Assess + make recommendation on escalation N S S P
Assess and advise PM on time issues of Variations N S S P
Prepare budgets for all work packages N S S P
Provide reports on all variances in Cost plan to PM N S S P
Prepare, review and validate baseline and ongoing
revisions of BoQ’s N S S P
Provide recommendation on LD’s/ and Set Off’s N N S P
Prepare and recommend Contractors Final Account N N S P
Attend procurement strategy meetings + outcomes N N P S
Monitor Contract adherence with Contract terms N N P S
Review and comment on all IFC drawings and data N N P S
Risk and Opportunity analysis reviews/actions S N P S
Prepare and administer Project Procurement Plan S N P S
Prepare and administer Project Programme S N P S
Report all progress against Programme N N P S
Review + approve all Contractor work method
statements S S P S
Coordinate, chair + minute all Site meetings N N P S
Develop and administer all HSSE programs/systems N N P S
Coordinate, chair + minute all value engineering
meetings N S S P
Develop + ensure programme of permits + consents S S P S
Attend and administer all “hold and witness” tests S S P S
Administer correction of all defects S S P S
Manage + monitor all commissioning S S P S
Coordinate with Authorities for Handover S S P N