Response & Feedback-TSC

1
Customer Requested for urgent feedback on following Issues Customer Issue Request by Customer Feed back from TSC No. of days Pending Result JBM TL1550 HC220(CR) Provide Minimum Yp band range against give spec Result Received 32 working days Brembo Dent and scratch marks in STS-410DB Waiting 23 working days Pending Ratnesh Dent and scratch marks in STS-410DB CAPA -report Waiting 12 working days Pending Hyundai C&E Waviness issue in Plates POSCO-Plate Manufacturing flow diargam Waiting 23 working days Pending FIAT For New project Steel requirement POSCO-Comparative equivalent grade details as per FIAT-Chr Result Received 31 working days Gestamp Sample analysis report for Yp issue Result Received 26 working days OETIKER Grain size & Stain mark sult Received for grain size iss 22 working days DATSONS/Brembo Line crack Sample analysis report for Crack issue Waiting 13 Working days Pending Tata Motors Crack and folding issue in rear wheel arch inner Grade IFHS-EDD 17.3.2015 Pending Tata Motors Powdering/Flasking issue- Grade IFHS-EDD 17.3.2015 Pending go together with IPPC suggest the POSCO HQ Feed back on Yp issue band gap Provide: 1- FEMA, 2-Quality control measures for STS-410DB 3-Root causes for dent/scratch 4-Sample test result(lamination defects) at DATSONS/Brembo(5.3.2015) CR-HC260LA,(Yp value higher than MTC-during UTM- test at customer end will be discussed the test result with GAI on Friday(27th mar 15) Provide:actual Grain size value from OETIKER Canada & India at POSCO HQ. & Stain mark Discussion pending with technical review meeting with OETIKER

description

dsadw

Transcript of Response & Feedback-TSC

pendingCustomer Requested for urgent feedback on following IssuesCustomerIssueRequest by CustomerFeed back from TSCNo. of days PendingResultJBMTL1550 HC220(CR)Provide Minimum Yp band range against give specResult Received32 working daysgo together with IPPC suggest the POSCO HQ Feed back on Yp issue band gapBremboDent and scratch marks in STS-410DBProvide: 1- FEMA, 2-Quality control measures for STS-410DB 3-Root causes for dent/scratch 4-Sample test result(lamination defects) at DATSONS/Brembo(5.3.2015)Waiting23 working daysPendingRatneshDent and scratch marks in STS-410DBCAPA -reportWaiting12 working daysPendingHyundai C&EWaviness issue in PlatesPOSCO-Plate Manufacturing flow diargamWaiting23 working daysPendingFIATFor New project Steel requirementPOSCO-Comparative equivalent grade details as per FIAT-ChryslerResult Received31 working daysGestampCR-HC260LA,(Yp value higher than MTC-during UTM-test at customer end Sample analysis report for Yp issueResult Received26 working dayswill be discussed the test result with GAI on Friday(27th mar 15) OETIKERGrain size & Stain markProvide:actual Grain size value from OETIKER Canada & India at POSCO HQ. & Stain markResult Received for grain size issue22 working daysDiscussion pending with technical review meeting with OETIKERDATSONS/BremboLine crackSample analysis report for Crack issueWaiting13 Working daysPendingTata MotorsCrack and folding issue in rear wheel arch inner LH/RHGrade IFHS-EDD17.3.2015PendingTata MotorsPowdering/Flasking issue-Grade IFHS-EDD17.3.2015Pending

Sheet2

Sheet3