SLIDE 1 RESOURCE STAGING & POINT OF DISTRIBUTION P LANNING THE OHIO DEPARTMENT OF PUBLIC SAFETY EMERGENCY MANAGEMENT AGENCY OCTOBER 2019

Transcript of RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre...

Page 1: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 1

RESOURCE STAGING & POINT OFDISTRIBUTION PLANNING

THE OHIO DEPARTMENT OF PUBLIC SAFETYEMERGENCY MANAGEMENT AGENCY

OCTOBER 2019

Page 2: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

•2014 – Toledo water incident

•2016 – Sebring water incident

•2015 – 2016 Flint, MI

•2017 – 2018 Hurricane Season

SLIDE 2

Resource Distribution

Page 3: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

May 2019 – Tornado Outbreak

•~200,000 in or near tornado tracks

•~58,000 gallons of water distributed

SLIDE 3

Resource Distribution

Page 4: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 4

Resource Distribution2019 EMPG requirement

Resource (commodity) Distribution Plan• Receipt• Temporary Storage/Staging• Distribution

Page 5: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 5

Resource DistributionResponsibilities

State• Acquisition/receipt, temporary

storage/staging, dispatch

County/municipal • Distribution

Page 6: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 6

State Staging Area

Page 7: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 7

STATE STAGING AREA

• 13.5 Acre concrete pad• 800 53-foot trailers • 450 Semi tractors and trailers• Throughput is limited to 100 – 200 due to

restricted check-in and check-out gates

Page 8: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 8

Staging and Commodity Distribution

Commodity Point of Distribution• State POD kit

• Procedures

Page 9: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 9

Points of Distribution

State POD kit• Type II minus forklifts• Can deploy as a state asset• Can be loaned to counties or other jurisdictions

Page 10: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 10

TRAINING AND EXERCISES

Staging area training•March 2019•OHMR

Page 11: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 11

TRAINING AND EXERCISES

Staging area training Eagle Rising, POD Exercise

•May 2019•OHMR, ODPS

Page 12: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 12

TRAINING AND EXERCISES

Vigilant Guard, POD and Staging•August 2019•Clark County

Page 13: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 13

POD Planning

POD Planning• Plan for 40% of impacted population

Example:• 144,500 X 40% = ~58,000 people

Page 14: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 14

POD Planning

POD Planning• Type III POD supports ~5,000

people per day• 140 vehicles per hour• Example requires 12 Type III PODs

Page 15: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 15

POD Planning

• “POD in a Can”• Forklift• Pallet Jack• Restrooms• Tent• Dumpster

POD Supplies

Page 16: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 16

POD Planning

Staff (Per POD)Type I - 80 – 85

Type II – 40 – 45

Type III – 20 - 25

Page 17: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 17

POD Planning

•Accessible•Secure

Type I – 100,000 sq ftType II – 75,000 sq ftType III – 50,000 sq ft

Location

Page 18: RESOURCE STAGING OINT OF D P · 2019-10-15 · S. LIDE. 7. S. TATE. S. TAGING. A. REA • 13.5 Acre concrete pad • 800 53-foot trailers • 450 Semi tractors and trailers • Throughput

SLIDE 18

POD Planning

Susan [email protected]

Phil [email protected]