Community Forum 8 June 2014 Resort Management Update

Transcript of Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014...

Page 1: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Community Forum 8 June 2014

Resort Management Update

Page 2: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Topics

• Board Appointments • Marketing Update

• 2013/14 Summer Overview • 2014 Winter Campaign Overview • 2014 Winter Events Calendar Overview

• Winter Initiatives & Operations • Capital Works Program Update • Questions

Page 3: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Capital Works Program 2013-14

PROJECT WATER & SEWERAGE

Water for Snow Making System Sun Valley Repairs

Water Other

Water Supply System (5 yr Plan) Additional Water Storage Facility

Sewerage

Sewerage Treatment Plant Upgrades (5 yr Plan) ASSET ENHANCMENT

Energy Saving Efficiencies (Annual Action Plan) Website rebuild Hard Waste Bunkers - Boggy Corner IT Systems

COMMUNITY FACILITIES / ARMB BUILDINGS

Alpine Central Renovations (5 yr Plan) RMB Buildings (5 yr Plan) Cow Camp Extension Mirimbah Park - Precinct Design Level 4 Conference Equipment

PRODUCT AND ACTIVITIES

Signage EPIC MTB Trail Development Mt Buller Cinema Technology Upgrade Automated Guided Walks Snow Play Area Development

ACCESS / TRANSPORT

Vehicle Access System (5 year Plan) MT STIRLING

Mt Stirling Hydro ROADS AND CAR PARKS

Road & Car parks (5 yr Plan) Link Road Culvert Replacements Spoon Drains, Sheeting, Windrows and Outflows Water Flow Redirection & Earth Works Roadside Slumping Stabilisation Works

Page 4: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Water Storage Project

Project Scope – What is to be delivered?:

Size: 100ML off-stream storage with potential provision for future expansion

Supply: Minimum of 10ML per 24hrs

Location: Assessment of identified sites to determine best location: (Assessment criteria; construction cost, planning approval, environmental, construction risk, supply, ski area impact, etc)

Page 5: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Water Storage Project

Page 6: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Water Storage Project

Page 7: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Water Storage Project

Project Scope – How is it to be delivered?: Stage 1

1. Finalise location 2. Draft and submit Planning Permit Application 3. Develop a Design & Construct Package for:

a) Construction of 100ML Dam b) Location (As per 1)

4. Investigation and resolution of ancillary items: a) Amendments to water drafting licenses b) Alternative water supplies c) Integration into current infrastructure

5. Develop Business Case

Stage 2 1. Construct & Commission

Complete

Draft Complete: Application to be lodged in June

In Progress,

In Progress,

Draft Complete, Funding Submission to be lodged in June

YTC

Progress Report as at 5 June

Page 8: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Cow Camp Refurbishment

Ground Level Current Floor Plan

Ground Level New Plan

New Mezzanine level

Page 9: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Cow Camp Refurbishment

Page 10: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Cow Camp Refurbishment

Page 11: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

EPIC Mountain Bike Trail

• 40km cross country descending trail from Buller-Stirling, through Mansfield State Forest (DEPI) and Mt Russell Education Area (PV)

• Will be the first EPIC mountain bike trail in Australia endorsed by IMBA (International Mountain Biking Association)

• Attracted both State and Federal funding with Resort Management

as lead Agency and Project Manager • After 4 years of planning, construction commenced on December

2013, practical completion in May 2014.

Page 12: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Mt Buller - Mt Stirling Link Road

Mt Stirling

Mt Buller

Page 13: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Project Objectives:

• Primary: All weather, all vehicle alternative access for public and emergency management, access and egress.

• Secondary: Better link the two resorts: • Complementary activities & facilities, • Efficiencies, • Touring opportunities

Current Status: • Planning Application and Documentation lodged with Department of

Transport, Planning and Local Infrastructure (DTPLI). • Notice of Decision (NOD) Issued by Minister Guy (DTPLI) to grant a Planning

Permit. • Appeal to the NOD has been raised by VNPA. • Working through with the DTPLI as to the defence to the appeal

Mt Buller - Mt Stirling Link Road

Page 14: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Topics

• Marketing Update • 2013/14 Summer Overview • 2014 Winter Campaign – Overview • 2014 Winter Events Overview

• Winter Initiatives & Operations • Capital Works Program Update • Questions

Page 15: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Questions

?

Page 16: Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014 Winter Campaign Overview ... EPIC MTB Trail Development . Mt Buller Cinema Technology

Thank you