Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014...
Transcript of Resort Management Update - Mt Buller · 2015. 3. 30. · • 2013/14 Summer Overview • 2014...
Community Forum 8 June 2014
Resort Management Update
Topics
• Board Appointments • Marketing Update
• 2013/14 Summer Overview • 2014 Winter Campaign Overview • 2014 Winter Events Calendar Overview
• Winter Initiatives & Operations • Capital Works Program Update • Questions
Capital Works Program 2013-14
PROJECT WATER & SEWERAGE
Water for Snow Making System Sun Valley Repairs
Water Other
Water Supply System (5 yr Plan) Additional Water Storage Facility
Sewerage
Sewerage Treatment Plant Upgrades (5 yr Plan) ASSET ENHANCMENT
Energy Saving Efficiencies (Annual Action Plan) Website rebuild Hard Waste Bunkers - Boggy Corner IT Systems
COMMUNITY FACILITIES / ARMB BUILDINGS
Alpine Central Renovations (5 yr Plan) RMB Buildings (5 yr Plan) Cow Camp Extension Mirimbah Park - Precinct Design Level 4 Conference Equipment
PRODUCT AND ACTIVITIES
Signage EPIC MTB Trail Development Mt Buller Cinema Technology Upgrade Automated Guided Walks Snow Play Area Development
ACCESS / TRANSPORT
Vehicle Access System (5 year Plan) MT STIRLING
Mt Stirling Hydro ROADS AND CAR PARKS
Road & Car parks (5 yr Plan) Link Road Culvert Replacements Spoon Drains, Sheeting, Windrows and Outflows Water Flow Redirection & Earth Works Roadside Slumping Stabilisation Works
Water Storage Project
Project Scope – What is to be delivered?:
Size: 100ML off-stream storage with potential provision for future expansion
Supply: Minimum of 10ML per 24hrs
Location: Assessment of identified sites to determine best location: (Assessment criteria; construction cost, planning approval, environmental, construction risk, supply, ski area impact, etc)
Water Storage Project
Water Storage Project
Water Storage Project
Project Scope – How is it to be delivered?: Stage 1
1. Finalise location 2. Draft and submit Planning Permit Application 3. Develop a Design & Construct Package for:
a) Construction of 100ML Dam b) Location (As per 1)
4. Investigation and resolution of ancillary items: a) Amendments to water drafting licenses b) Alternative water supplies c) Integration into current infrastructure
5. Develop Business Case
Stage 2 1. Construct & Commission
Complete
Draft Complete: Application to be lodged in June
In Progress,
In Progress,
Draft Complete, Funding Submission to be lodged in June
YTC
Progress Report as at 5 June
Cow Camp Refurbishment
Ground Level Current Floor Plan
Ground Level New Plan
New Mezzanine level
Cow Camp Refurbishment
Cow Camp Refurbishment
EPIC Mountain Bike Trail
• 40km cross country descending trail from Buller-Stirling, through Mansfield State Forest (DEPI) and Mt Russell Education Area (PV)
• Will be the first EPIC mountain bike trail in Australia endorsed by IMBA (International Mountain Biking Association)
• Attracted both State and Federal funding with Resort Management
as lead Agency and Project Manager • After 4 years of planning, construction commenced on December
2013, practical completion in May 2014.
Mt Buller - Mt Stirling Link Road
Mt Stirling
Mt Buller
Project Objectives:
• Primary: All weather, all vehicle alternative access for public and emergency management, access and egress.
• Secondary: Better link the two resorts: • Complementary activities & facilities, • Efficiencies, • Touring opportunities
Current Status: • Planning Application and Documentation lodged with Department of
Transport, Planning and Local Infrastructure (DTPLI). • Notice of Decision (NOD) Issued by Minister Guy (DTPLI) to grant a Planning
Permit. • Appeal to the NOD has been raised by VNPA. • Working through with the DTPLI as to the defence to the appeal
Mt Buller - Mt Stirling Link Road
Topics
• Marketing Update • 2013/14 Summer Overview • 2014 Winter Campaign – Overview • 2014 Winter Events Overview
• Winter Initiatives & Operations • Capital Works Program Update • Questions
Questions
?
Thank you