    System Process DocumentResolving Resource Overloaded Exception

    Message

    Department

    Responsibility/Role

    File Name 27637137.doc

    Revision

    Document Generation Date 15/01/2010 09:49:00

    Date Modified 1/15/2010 09:49:00 AM

    Last Changed by

    Status

    Resolving Resource Overloaded Exception MessageTrigger:

    Concept

    In this topic, you will resolve Resource overloaded exception message.

    Required Field(s) Comments

    Output - Result(s) Comments

    Additional Information

    Last changed on: 1/15/2010 09:49:00 AM Page 1

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    2/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Procedure

    Step Action

    1. Begin by navigating to the Exception Details page.

    Click the Workbench link.

    Page 2 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    3/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    2. Use the Organizations page to select an instance:organization.

    Last changed on: 1/15/2010 09:49:00 AM Page 3

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    4/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    3. Find organization TST:M1 TST:Seattle Manufacturing.

    Click the vertical scrollbar.

    Step Action

    4. Click the TST:M1 TST:Seattle Manufacturing list item.

    Page 4 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    5/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    5. Click the OKbutton.

    orPress [Alt+O].

    Last changed on: 1/15/2010 09:49:00 AM Page 5

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    6/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    6. Click the Plans tab.

    Page 6 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    7/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    7. Use the Navigator page, Plans tab to view and act on results from the

    material/capacity plan.

    Step Action

    8. Click the View By list.

    Last changed on: 1/15/2010 09:49:00 AM Page 7

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    8/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    9. Click the Actions list item.

    Page 8 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    9/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    10. Click the Plans tree item.

    Step Action

    11. Find plan Unconstrnd.

    Click the vertical scrollbar.

    Last changed on: 1/15/2010 09:49:00 AM Page 9

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    10/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    12. Click the Uncnstrnd tree item.

    Page 10 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    11/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    13. Click the (current) tree item.

    Step Action

    14. Find Material and Resource Capacity.

    Click the scrollbar.

    Last changed on: 1/15/2010 09:49:00 AM Page 11

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    12/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    15. Click the Material and Resource Capacity tree item.

    Page 12 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    13/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    16. Click the Resource overloaded tree item.

    Step Action

    17. Click the TST:S1 tree item.

    Last changed on: 1/15/2010 09:49:00 AM Page 13

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    14/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    18. Click the SURF MOUNT tree item.

    Page 14 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    15/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    19. Click the CHIPMOUNT1 tree item.

    Step Action

    20. Right-click the CHIPMOUNT tree item.

    Last changed on: 1/15/2010 09:49:00 AM Page 15

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    16/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    21. Click the Exceptions menu.

    Page 16 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    17/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    22. Click the Detail menu.

    Step Action

    23. Use the Exception Details page to view exception details.

    Last changed on: 1/15/2010 09:49:00 AM Page 17

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    18/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    24. Find field Start Constraint Date.

    Click the horizontal scrollbar.

    Page 18 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    19/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    25. Click in the Start Constraint Date field.

    Step Action26. Right-click in the Start Constraint Date field.

    Last changed on: 1/15/2010 09:49:00 AM Page 19

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    20/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    27. Click the Resource Availability menu.

    Page 20 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    21/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    28. Use the Resource Capacity page to view resource capacity.

    Step Action

    29. View the resource capacity for the day referenced in the exception message.

    Click the Minimize object.

    Last changed on: 1/15/2010 09:49:00 AM Page 21

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    22/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    30. Right-click in the Start Constraint Date field.

    Page 22 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    23/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    31. Click the Resource Requirements menu.

    Step Action

    32. Use the Resource Requirements page to view resource requirements.

    Last changed on: 1/15/2010 09:49:00 AM Page 23

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    24/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    33. Find the resource requirement row that you are researching.

    Click in the Serial Number field.

    Page 24 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    25/41

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    26/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    36. Click the Maximize button.

    Page 26 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    27/41

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    28/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    39. Continue to expand and review the pegging tree.

    Click the tree item.

    Page 28 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    29/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    40. Continue to expand and review the pegging tree.

    Click the tree item.

    Last changed on: 1/15/2010 09:49:00 AM Page 29

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    30/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    41. Continue to expand and review the pegging tree.

    Click the tree item.

    Page 30 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    31/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    42. Continue to expand and review the pegging tree.

    Click the tree item.

    Last changed on: 1/15/2010 09:49:00 AM Page 31

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    32/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    43. Continue to expand and review the pegging tree.

    Click the tree item.

    Page 32 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    33/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    44. Click the Minimize object.

    Last changed on: 1/15/2010 09:49:00 AM Page 33

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    34/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    45. Click the Minimize object.

    Step Action

    46. Click the Minimize object.

    Page 34 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    35/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    47. Right-click the CHIPMOUNT1 tree item.

    Last changed on: 1/15/2010 09:49:00 AM Page 35

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    36/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    48. Click the Horizontal Plan menu.

    Step Action

    49. Click the Detail menu.

    Page 36 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    37/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    50. Use the Horizontal Plan page to view plan information in a horizontal format.

    Last changed on: 1/15/2010 09:49:00 AM Page 37

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    38/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    51. Click the Maximize object.

    Step Action

    52. Find and review the horizontal plan column that corresponds to the exceptionmessage that you are researching.

    Click the horizontal scrollbar.

    Page 38 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    39/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    53. To resolve the exception message, consider these options and execute at least oneof them:

    Adjusting sales order line schedule date

    Increasing hours available per unit (overtime)

    Increasing the resource assigned units

    Increasing work days (overtime) Changing shift pattern

    Using an alternate resource

    Using an alternate routing

    Modifying the sourcing rules

    Subcontracting

    Using substitute items (with different resources)

    Adjusting the exception set Over-utilization

    Last changed on: 1/15/2010 09:49:00 AM Page 39

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    40/41

    System Process DocumentResolving Resource Overloaded ExceptionMessage

    Step Action

    54. Click the Minimize object.

    Page 40 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Resource Overloaded Exception Message_SPD

    41/41

    System Process DocumentResolving Resource Overloaded Exception

    Message

    Step Action

    55. You have successfully resolved Resource overloaded exception message.