Eco friendly
building materials
Conference on Green Homes
Member SecretaryLaurie Baker Centre
for Habitat Studies (LBC)
Green Building Congress,
1st November , 2012
Ar. PB SajanJt. Director
COSTFORD&
Residence of
Ar. P B Sajan & Ar. Shailaja Nair
Page 2
SITE PLAN
• Sloping site on
top of a hill
• 8.5 cents
(345 sqm)
Mud (without stabilisers)
Coconut tree
Kattadi (Casuarina) Poles
Bamboo
Country burnt Brick
Reused Wood
Reused Roof Tiles
Mango tree Wood
Random Rubble
MATERIALS USED
Page 3
TREATMENT OF MATERIALS
Bamboo
Kattadi (Casuarina) Poles
Coconut Tree
Mango tree wood
LOCAL BAMBOO
Page 4
Treatment tank
Preservative preparation
Page 5
Holes in nodes for proper preservative
penetration
Smoothening of nodes
Page 6
KATTADI (CASUARINA) POLES
Preparation of Kattadi poles
Page 7
Treated Kattadi pole
COCONUT TREE
Page 8
Clearing of outer layer of coconut trunk
Coconut trunks are immersed in
preservative
Page 9
Treated Coconut Trunks
In Construction
Page 10
R.R. masonry in mud mortar
FOUNDATION
WALL
Mud :Cob construction
Page 11
MUD WALL
MUD WALL -Interior
Page 12
BAMBOO
Bamboo Beam & Floor
Page 13
Finishing of bamboo floor
Bamboo Beam & Floor
Page 14
Bamboo in Openings
Bamboo in Openings
Page 15
COCONUT TREE TRUNKS
Smoothened coconut trunk
Page 16
Coconut Trunk Pillar
Coconut Trunk Pillar
Page 17
Coconut Beam
KATTADI (Casuarina) POLE
Page 18
Kattadi Poles - Roof
Kattadi Poles - Roof
Page 19
Kattadi Poles - Roof
REUSED WOOD
Page 20
Reused Windows
Reused ceiling planks as floor finish
Page 21
Floor
Reused wood - Beam
Page 22
Reused Wood
Reused Doors
Page 23
Mango wood - stair planks
Mango wood - stair planks
Page 31
Comparison of Material Consumption
Material Source KM
Diesel/
Trip
(Ltr)
QuantityMaterial
Saved
Qty of
Diesel
Saved
(Ltr)
Brick Tamilnadu 174 34.8 5000 24317 169.25
Sand Tamilnadu 174 34.8 6 90 522
20mm and 40mm
broken stoneVarkala 80 16 6 55 146.67
Steel Coimbatore 920 184 16000 3866 44.459
Cement Thirunalveli 320 64 200 1099 351.68
Total 1234
Diesel saving
Page 32
Energy Saving
ITEMEnergy saved
per no.Total Nos.
TOTAL ENERGY
SAVED (MJ)
BRICK 3.75 (MJ/NOS) 24317.00 91188.75
CEMENT 5.85 (MJ/KG) 54950.00 321457.50
STEEL42 (MJ/KG)
3866.00 162372.00
TOTAL 575018.25 MJ
Walking the Talk… Ar. PB SajanCOSTFORD & LBC