Reservoirs
-
Upload
nolan-copeland -
Category
Documents
-
view
54 -
download
0
description
Transcript of Reservoirs
![Page 1: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/1.jpg)
ReservoirsReservoirs
Mehmet Özger, PhD
Associate Professor,Department of Civil Engineering, I.T.U
![Page 2: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/2.jpg)
A reservoirs has two categories:
1- Storage (conservation) [i.e., Atatürk dam]
2- Distribution (service) [for emergencies & fire fighting]
![Page 3: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/3.jpg)
Reservoir: Collects water behind a dam or barrier
Reservoirs are constructed for: Drinking water, Irrigation, Hydropower, Flood mitigation During a specified time interval;
S (supply) < D (demand)
Need for “water storage”
![Page 4: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/4.jpg)
Reservoir
Dam body SpillwayUpstream
Downstream
Spillway crest
![Page 5: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/5.jpg)
Area-elevation curve:
is obtained by measuring the area enclosed within each contour in the reservoir site using a planimeter.
Usually a 1/5000 scaled topographic map Elevation-storage curve:
is the integration of an area-elevation curve.
The storage between any two elevations can be obtained by the product of average surface area at two elevations multiplied by the difference in elevation.
Elevation-Area-Volume Curves Elevation-Area-Volume Curves
![Page 6: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/6.jpg)
Elevation-Area-Volume Curves Elevation-Area-Volume Curves
To determine reservoir volume with given location & dam height
Typical reservoir elevation-area-volume curves
Zero Pool
Minimum Operating Level
Spillway Crest
Max. Operating Level
VOLUME (106 m3)
AreaVolume
![Page 7: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/7.jpg)
Total reservoir storage components:Total reservoir storage components:
a) Normal pool level
b) Minimum pool level
c) Active storage
d) Dead storage
e) Flood control storage
f) Surcharge storage
![Page 8: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/8.jpg)
Storage zones in a reservoir
Dead storage
Sluiceway
Spillway crest
Active storage or Useful storage
Minimum pool level
Normal pool level
Flow
Flood control storage
Maximum pool level
Surcharge storage Retarding pool level
Sediment accumulation
![Page 9: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/9.jpg)
Normal pool level is the maximum elevation to which the reservoir surface will rise for ordinary reservoir operations.
Minimum pool level is the lowest allowable elevation to which the reservoir surface level can fall.
Dead storage is located below minimum pool level. The top elevation is dictated by amount of sediment accumulation at the end of the life time of reservoir.
![Page 10: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/10.jpg)
Therefore, the elevation of the lowest sluiceway must be located at least at minimum pool level. Water stored below this level is not available for any use.
The storage between minimum and normal pool levels is named as useful or active storage.
The flood control storage occupies between the retarding and normal pool levels.
The surcharge storage stays between retarding and maximum pool level.
![Page 11: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/11.jpg)
General guidelines for a reservoir location:General guidelines for a reservoir location:
Cost of the dam Cost of real estate Topographic conditions to store water Possibility of deep reservoir Avoiding from tributary areas Quality of stored water Reliable hill-slopes
![Page 12: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/12.jpg)
Reservoir Yield Reservoir Yield
Yield: Amount of water that reservoir can deliver in a prescribed interval of time.
The yield is based on inflow capacity
Firm (safe) yield: Amount of water that can be supplied during a critical period.
Can be never determined by certainty
![Page 13: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/13.jpg)
Target yield: specified for a reservoir based on the estimated demands in most cases.
Secondary yield: Water available in excess of safe yield during high flow periods
![Page 14: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/14.jpg)
Selection of Capacity of a Storage Reservoir
Designing the capacity of a storage reservoir involves with determination of the critical period during Inflow < Demand
![Page 15: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/15.jpg)
There are 4 approaches to determine the capacity
1) Mass curve (Ripple diagram) method;
2) Sequent-peak algorithm;
3) Operation study;
4) Optimization analysis
![Page 16: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/16.jpg)
Features of Mass CurveFeatures of Mass Curve
Cumulative plotting of net reservoir inflow. Slope of mass curve gives the value of inflow
(S) at that time. Slope of demand curve gives the demand
rate (D) or yield.
1) Mass curve (Ripple diagram) method
![Page 17: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/17.jpg)
The difference between the lines (a+b) tangent to the demand line (∑D) drawn at the highest and lowest points (A and B, respectively) of mass curve (∑S) gives the rate of withdrawal from reservoir during that critical period.
The maximum cumulative value between tangents is the required storage capacity (active storage).
Mass curve (Ripple diagram) method
![Page 18: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/18.jpg)
a b
a+b
t1 t2
S,D
t
Da+b
t1 t2t
ab
A
B
∑D ∑D
∑S
∑S,
Mass curve analysis
Mass curve method
![Page 19: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/19.jpg)
2)2) Sequent-Peak AnalysisSequent-Peak Analysis
The mass curve approach is easy to use when short periods of data are to be analyzed.
SPA is a modification of the Mass Curve analysis for lengthy time series and particularly suited to computer coding.
![Page 20: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/20.jpg)
The steps of sequent-peak analysis are as The steps of sequent-peak analysis are as follows:follows:
1)1) PlotPlot ∑ (Inflow-Withdrawal) : in symbolized ∑ (Inflow-Withdrawal) : in symbolized fashion fashion ∑(S-D) ∑(S-D)
Time
Sequent-peakSequent-peak Sequent-peak
Illustration of the sequent –peak algorithm
![Page 21: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/21.jpg)
2) Locate the initial peak and the next peak
3) Compute the storage required which is the difference between the initial peak and the lowest trough in the interval,
4) Repeat the process for all sequent peaks,
5) Determine the largest value of storages as “STORAGE CAPACITY
![Page 22: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/22.jpg)
Analytical solution to SPA is good for computer coding
Equations below are used: Vt = Dt – St + Vt-1 if positive
Vt = 0 otherwise
Vt : required storage capacity at the end of period t
Vt-1 : required storage capacity at the end of previous period t
Dt : release during period t
St : inflow during period t
![Page 23: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/23.jpg)
3)3) OPERATION STUDYOPERATION STUDY
It is presumed that the reservoir is adequate if the reservoir can supply all types of demands under possible losses such as seepage and evaporation.
The operation study is based on the solution of the continuity equation.
Where dV is differential storage during time dt I and Q are the instantaneous total inflow outflow,
respectively.
dVI Q
dt
![Page 24: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/24.jpg)
is used to
a) Determine the required capacity,
b) Define the optimum rules for operation,
c) Select the installed capacity for powerhouses,
d) Make other decisions regarding to planning.
![Page 25: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/25.jpg)
is carried out
1) only for an extremely low flow period and
presents the required capacity to overcome
the selected drought;
2) for the entire period and presents the
power production for each year.
![Page 26: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/26.jpg)
4) OPTIMIZATION ANALYSIS & STOCHASTIC MODELS
Reliability of Reservoir Yield
![Page 27: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/27.jpg)
Sediments eventually fill all reservoirs determine the useful life of reservoirs important factor in planning
■ River carry some suspended sediment and move bed load (larger solids along the bed).
■ Large suspended particles + bed loads deposited at the head of the reservoir & form delta.
■ Small particles suspend in the reservoir or flow over the dam.
![Page 28: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/28.jpg)
![Page 29: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/29.jpg)
■ Bed load ≈ 5 to 25 % of the suspended load in the plain rivers
≈ 50 % of the suspended load in the mountainous rivers
☻ Unfortunately, the total rate of sediment transport in Turkey > 18 times that in the whole Europe
(500x106 tons/year)
![Page 30: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/30.jpg)
Sedimentation stored behind a damSedimentation stored behind a dam
![Page 31: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/31.jpg)
“RESERVOIR SEDIMENTATION RATE”
▬ based on survey of existing reservoirs, containing * Specific weight of the settled sediments
* % of entering sediment which is deposited “TRAP EFFICIENCY”:
% of inflowing sediment retained in the reservoir
▬ function of the ratio of reservoir capacity to total inflow.
![Page 32: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/32.jpg)
![Page 33: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/33.jpg)
► “Prediction of sediment accumulation”
-- Difficult due to high range of variability in sediment discharge
► SOLUTION: “Continuous hydrologic simulation models”
-- used for prediction purposes
< But, at least, 2-3 years daily data are needed for calibration of the model. >
IMPORTANT NOTES:IMPORTANT NOTES:
![Page 34: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/34.jpg)
Relationship between discharge and sediment load
![Page 35: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/35.jpg)
Another formula for sediment load prediction
Y= mean sediment yield in m3A= drainage area in km2
![Page 36: Reservoirs](https://reader030.fdocuments.in/reader030/viewer/2022032607/56813060550346895d962b23/html5/thumbnails/36.jpg)
IMPORTANT NOTES:IMPORTANT NOTES:
► “To control amount of entering sediment”:
(a) Upstream sedimentation basins,
(b) Vegetative screens,
(c) Soil conservation methods (i.e., terraces),
(d) Implementing sluice gates at various levels.
(e) Dredging of settled materials, but not economical!