ITB 2021-003793 Research Wy Bldg Library Archive Add 2.docx 6/4/2019 Page 1 of 5
RESEARCH WAY BUILDING LIBRARY ARCHIVE PROJECT NUMBER: 2225-20
ITB #2021-003793
ADDENDUM NO. TWO (2)
ISSUE DATE: August 7, 2020
CONTRACT ADMINISTRATOR:
Matt Hausman, Construction Contracts Officer Construction Contracts Administration
Email: [email protected]
This Addendum is hereby issued to inform you of the following revisions and or clarifications to the above-referenced ITB and/or the Contract Documents for the Project, to the extent they have been modified herein. Any conflict or inconsistency between this Addendum and the Solicitation Document or any previous addenda will be resolved in favor of this Addendum. Bids shall conform to this Addendum. Unless specifically changed by this Addendum, all other requirements, terms and conditions of the Solicitation Document and or Contract Documents, and any previous addenda, remain unchanged and can be modified only in writing by OSU. The following changes are hereby made: PLANS AND SPECIFICATIONS: Item 1 Included with this addendum are the following items:
Attachment A: Additional attendee contact information Attachment B: Substitution request response Attachment C: Revisions to the plans and specifications as provided by Rowell Brokaw Architects dated 8/7/2020.
QUESTIONS AND ANSWERS: Item 2 Q: It appears there is conduit that runs parallel to and use to tie into the bus duct, is the
conduit also getting demoed? A: All conduit and wiring associated with equipment fed off bus duct shall be removed.
Item 3 Q: Are there record drawings for where all the wire that is sticking out of the floor is being fed from?
A: Record drawings shows previous equipment in those areas. Wiring is no longer in use. These are possibly fed from panels on west walls being demoed.
Item 4 Q: Partition gates - How many user keys and control keys will be needed?
ITB 2021-003793 Research Wy Bldg Library Archive Add 2.docx 6/4/2019 Page 2 of 5
A: Contractor to provide Best cores and the keys; cores to be uncombonated; each core to come with 2 keys; "L" key-way.
Item 5 Q: Partition gates - 2. Do they need to be keyed alike?
A: No. Keying will be: Anthropology gate - 005B-1; Library - (2) man-door gates and (1) slider gate - 005D-1, 005D-2, 005D-3 ; (1) Facilities Services Mechanical gate - 005C-1
Item 6 Q: Wire Mesh Partition fencing - 1. On A-110 Note2, it states that the height is 11’-6”. After
measurements for the ceiling beam to the floor I measured 12’. 11’-6” are special order and 12’ are regular sized panels. What height would you like?
A: 11'-6" to avoid conflict with spray foam insulation application. Item 7 Q: Wire Mesh Partition Fencing - If partitions are 11’6” or 12’ tall that leaves 18” from the beam to the
ceiling. Does that need to be enclosed as well? A: No. The OSU Library confirmed during design that the partitions do not need to extend into the 18" beam-to-ceiling pocket.
Item 8 Q: Sheet E101, Note #1 – The sheet note states to remove Bus Duct and Bus Duct Disconnects. There are
large homerun conduits and pull boxes fed from the bus duct disconnects. Should these conduits and pull boxes be removed as well? Reference attached Pic.01, Pic.02, and Pic.03
A: All conduit and wiring associated with equipment fed off bus duct shall be removed. Item 9 Q: Sheet E101 – The demo sheet does not call out or note removing existing wires coming out of the
Southwest floor. Please clarify if these wires are to be made safe, removed, and conduits cut flush with the floor and filled. Reference attached Pic.04 and Pic.05.
A: Existing floor wiring to be removed and conduits to be cut flushed with floor. Item 10 Q: Sheets E101, E111, E121, and A110 – These sheets show shelving located along Gridlines A/2.5 thru
A/3.5. There are (3) existing panels and (1) existing transformer mounted to the exterior wall (NOT SHOWN) along Gridline A/3 thru A/3.5 where new shelving is to be located. These are different panels and transformer from the ones shown along Gridline A/1.5 for Bid Alternate #1. Please clarify if these panels are to remain or be removed to accommodate the shelving. If they remain, there will be 36” clearance in front of the panels required per code. Reference attached Pic.06 and Pic.07.
A: Panelboards and transformer are no longer in use and shall be demolished. Item 11 Q: Are we demoing just the busduct, transformers and panels or are we demoing their feeder conduits
also? A: All equipment and feeders shall be demolished. Feeders to bus duct have already been removed.
Item 12 Q: If we are demoing the feeder conduits as well, where are they coming from? A: Feeders to bus duct have already been removed. Item 13 Q: What size are the busducts, panels and transformers that are being demolished? A: Bus ducts are 1600A. 480V panels are 400A and 120V panels are 225A. Item 14 Q: E101 notes 5, 6 &7 say to remove all electrical connections but it doesn't state where these items are
fed from. Are we removing conduit back to panel? Where are these panels located? A: Mechanical equipment is fed from Main distribution board and panelboards in main electrical room.
Item 15 Q: What manufacturer of switchboard is SDA 480/277 1200A? There are breakers in this switchboard that
have to be replaced and I need to know what manufacturer it is. A: Cutler Hammer
ITB 2021-003793 Research Wy Bldg Library Archive Add 2.docx 6/4/2019 Page 3 of 5
Item 16 Q: Are as-builts for the space available?
A: Yes, we have some archival information based on past projects in the building. Archival information can be made available to the successful bidder as necessary.
Item 17 Q: What are the working hours and noise requirements?
A: Work can occur during normal working hours. Work will be communicated to building managers and contacts and any special or unusual circumstances will be coordinated accordingly. This will also be the case for noise, shut downs, dust control measures, etc.
Item 18 Q: Will on site parking be permitted?
A: Allowed, yes; permitted no. We have access to the south end of the Research Way Building parking lot. OSU parking permits or space-out-of-service fees are not required in this off-campus parking lot location. As a courtesy, we need to communicate to other building users the amount of space we use, however. Overflow, if necessary, could happen across the street at the Research Way Lab Building.
Item 19 Q: Who is the building fire alarm contractor?
A: Assuming this is the contractor's sub. OSU Facilities doesn’t/won't contract this work out separately. They will manage/maintain the system after install however. Johnson Controls was the most recent fire alarm subcontractor to work in the building for the Marine and Geology Repository project.
Item 20 Q: Please confirm that existing furnishings in areas that work occurs for this project will be removed by
Owner. A: Some items remaining in the 'Library's boundary' are being removed by OSU Surplus Property. This will be done before the project starts. The rest of the items will remain. This space is storage for College of Earth, Ocean, and Atmospheric Sciences and for Anthropology. Items in the storage facility can be shifted and should be protected from messy overhead work (and/or an option of some items temporarily moving to onsite secured accessible conex containers could be considered). There is no other place to store these departmental materials. This will be for the contractor to do in coordination with our user group representatives who have materials stored here. The drawing storage archive boxes in room 108 are not regularly accessed and can be moved within 109 to make room for the work at the south end.
Item 21 Q: Where will laydown be located?
A: The south end of the Research Way Building parking lot is available for a laydown area, dumpster location, etc. etc. As a courtesy, we need to communicate to other building users the amount of space we use, however.
Item 22 Q: Will space be provided for a jobsite trailer?
A: Yes, if necessary, a jobsite trailer can be located in the parking lot by the loading dock. There is an interior room off the dock area that can also be used as a jobsite office.
Item 23 Q: Will background checks and badging be required? If so, what is the time commitment and cost
associated? A: There is no badging or background check requirements. Adherence to OSU COVID-19 protocols and standard jobsite PPE is required as necessary.
Item 24 Q: Will phasing be required? If so, is there a desired phasing plan. A: There is not a phasing requirement, nor is phasing desired. Item 25 Q: Will contractors be required to pay a parking fee? If so, what will the fee be?
ITB 2021-003793 Research Wy Bldg Library Archive Add 2.docx 6/4/2019 Page 4 of 5
A: No, OSU parking permits or space-out-of-service fees are not required in this off-campus parking lot location. As a courtesy, we need to communicate to other building users the amount of space we use, however.
Item 26 Q: Please confirm that the Owner will retrieve and store salvaged items. A: Any items noted as salvage to owner will be retrieved by owner. Item 27 Q: Will the spaces that work will be occurring be occupied during construction?
A: No, this is designated storage space with no occupants doing regular work in it directly. People may need to access their stored materials periodically. We do have 2 research labs outside and adjacent to this space, however. (Rms 001 & 002). These labs are operating 24/7; they are very sensitive to dust as well as to vibration; instruments cannot be shutdown because of electrical outages; PLANNED shutdowns with advance notification will be required; generators may need to be utilized to keep them operational. One of these labs will have their mass-spectrometers relocated out of the building in an October/November time frame. It should be noted in addition, the unique collections above this storage space, in the OSU-MGR frozen core facility on the first floor, have refrigerated and frozen storage units. These cannot be jeopardized and go without power as they need to stay cooled/frozen.
Item 28 Q: Where will construction access be located?
A: Contractor will have access to and can use of the loading dock area, overhead doors, etc. Item 29 Q: Detail 9 on sheet A-601 notes mechanical unit pad extension and M131 notes to reference
architectural for pad, however the extents of the pad are note shown in the architectural plans. Please advise. A: 1/A-110 architectural plan revised to show mechanical unit pad. Dimensions to be verified with mechanical unit selection. See Addendum 2 documents.
Item 30 Q: Please provide details for the exterior fence post footings/mounting. A: Refer to specified reference standards for chainlink fence installation. Item 31 Q: Please provide elevations for the wire partitions.
A: Per Specification Section 10 2213, wire mesh partition elevations will be vendor-specific and are to be provided in shop drawings per manufacturer's standard frame and support configurations.
Item 32 Q: Please provide elevations for the wire partition footing/mounting.
A: Per Specification Section 10 2213, wire mesh partition details will be vendor-specific and are to be provided in shop drawings per manufacturer's standard details.
Item 33 Q: Keynote 2 on sheet E101 does not indicate demo, however the plan looks like they're to be removed.
Please clarify. A: These are to be removed. Equipment shown with dashed lines are to be demoed. See sheet E101 under General symbols.
Item 34 Q: Will the section of bus duct to remain require a new feeder connection to energize this section? A: No. Bus duct is not operational. Bus duct feeder has already been removed. Item 35 Q: There are no exit lights shown. Are exit lights not required in this area? Please advise. A: No new exit lights are included.
ITB 2021-003793 Research Wy Bldg Library Archive Add 2.docx 6/4/2019 Page 5 of 5
Item 36 Q: Sheet A-110 shows a new storage room 005B and mechanical room 005C. The electrical drawings don’t have any lighting or power shown in these room. The existing lighting is to be demolished in this area. Please advise.
A: See revised drawings for new layout. Item 37 Q: Sheet A-110 shows a new storage room 005B and mechanical room 005C. Will access control be
required on those gates/doors? A: Access control is not required for these gates. See door schedule and specifications for gate hardware requirements.
Item 38 Q: The location of electrical switchboard SDA is not shown. Please advise. A: SDA is shown in E121. Item 39 Q: Please advise which electrical panel is feeding the chiller, chiller tank, and exhaust fan that are to be
removed. A: Mechanical equipment is fed from Main distribution board and panelboards in main electrical room.
Item 40 Q: The sheet note states to remove Bus Duct and Bus Duct Disconnects. There are large homerun
conduits and pull boxes fed from the bus duct disconnects. Should these conduits and pull boxes be removed as well?
A: Feeders from bus duct to equipment shall be removed. Item 41 Q: The demo sheet does not call out or note removing existing wires coming out of the Southwest floor.
Please clarify if these wires are to be made safe, removed, and conduits cut flush with the floor and filled. A: Existing floor wiring to be removed and conduits to be cut flushed with floor. Item 42 Q: These sheets show shelving located along Gridlines A/2.5 thru A/3.5. There are (3) existing panels and
(1) existing transformer mounted to the exterior wall (NOT SHOWN) along Gridline A/3 thru A/3.5 where new shelving is to be located. These are different panels and transformer from the ones shown along Gridline A/1.5 for Bid Alternate #1. Please clarify if these panels are to remain or be removed to accommodate the shelving. If they remain, there will be 36” clearance in front of the panels required per code.
A: Panelboards and transformer are no longer in use and shall be demolished. Item 43 Q: E101 notes 5,6 & 7 it says to remove all electrical connections but it doesn’t state where these items
are fed from. Are we removing conduit and wire also? A: Mechanical equipment is fed from Main distribution board and panelboards in main electrical room.
Item 44 Q: What is the anticipated start date for this project?
A: Work can begin as soon as the contract is in place and planning, logistics, and schedule are worked out. Ideally, sometime mid-September/early Fall.
END OF ADDENDUM NO. TWO (2)
Construction Contracts Administration, Procurement Contracts & Materials Management (PCMM) Oregon State University 644 SW 13th Ave. Corvallis, Oregon 97333
P 541-737-4261 oregonstate.edu
Page __1__ of __1___
Attendee List
Project: RESEARCH WAY BUILDING LIBRARY ARCHIVE Project Manager: AMY KEENE
Name Mark McGee Email [email protected] Prime
□Sub
□
Company Harvey & Price Phone 541-543-8597Supplier
□Other
□
Name Email Prime
□Sub
□
Company Phone Supplier
□Other
□
Name Email Prime
□Sub
□
Company Phone Supplier
□Other
□
Name Email Prime
□Sub
□
Company Phone Supplier
□Other
□
Name Email Prime
□Sub
□
Company Phone Supplier
□Other
□
Name Email Prime
□Sub
□
Company Phone Supplier
□Other
□
ATTACHMENT A
Models XD and XB are square in-line centrifugal fans designed
to eliminate costly round to square ductwork transitions with the
flexibility of any angle operation. XD is direct driven and XB is
belt driven. Model XD is available in five sizes with capacities
up to 5445 CFM and up to 1 3/4” static pressure. Model XB is
available in eight sizes with capacities up to 28,332 CFM and up
to 2 1/2” static pressure. AMCA “B”
spark resistant construction is
standard on both models. The XD
is suitable for airstream
temperatures up to 140°F and the
XB up to 200°F.
Construction Features
Housing• Heavy duty galvanized steel construction
• Removable side panels on both sides for easy access and
serviceability
• Fully gasketed and bolted access panels provide weather
protection
Centrifugal Wheel• Aluminum construction with backward curved hollow airfoil
blades
• Non-overloading design for safe operation
• Precision balanced for smooth vibration free operation
Bearings• Permanently lubricated in Acme D.S. pillow block housing
• Bearings are resiliently mounted in neoprene rings
• Rated at L50 life of 200,000 hours
• 5 year limited warranty on Acme D.S. pillow block bearings
• Pillow block bearings are standard on XB425
Drive Assembly• Located out of the airstream
• Cast iron drives sized for 150% of drive horsepower
• Static free, oil and heat resistant belts
Motors• Continuous duty motors located outside the airstream
• Prelubricated ball bearings
Options/Accessories
• Aluminum Housing
• Solid State Speed Controllers
• Dampers
• Coatings
• Guards/Covers
• Isolators
• Filter box
• Side Discharge Flange
• Insulated Housing
Belt and Direct Drive In-Line CentrifugalsModels XB and XD
DIMENSIONS
Fan
ModelA B
C
Max.
D
Max.
XB090 14.00 18.56 12.12 14.06
XB120 17.88 24.88 11.19 15.25
XB137 20.50 28.13 11.19 15.25
XB161 24.25 32.69 13.69 18.50
XB200 30.00 39.75 13.69 18.50
XB245 36.75 48.06 13.69 18.50
XB300 45.00 58.31 16.38 20.00
XB365 54.75 71.06 16.38 20.00
XB425 63.88 72.75 13.88 17.68
XD100 14.00 18.62 NA NA
XD120 17.88 24.88 NA NA
XD137 20.50 28.12 NA NA
XD161 24.25 32.63 NA NA
XD200 30.00 39.75 NA NA
Dimensions are shown in inches.
Acme Engineering & Manufacturing Corporation certifiesthat the models shown herein are licensed to bear theAMCA seal. The ratings shown are based on tests andprocedures performed in accordance with AMCAPublication 211 and AMCA Publication 311 and complywith the requirements of the AMCA Certified RatingsProgram.
U.L. 705 Listed
Consult your Acme representative for availability.
Page 48
Inline
Centr
ifugalFans
Page 49
PERFORMANCE DATA
Fan
ModelRPM HP
.000" .125" .250" .375" .500" .625" .750" 1.000" 1.250" 1.500" 1.750"Max.
BHP
Est.
Ship
Wt.CFM Sones CFM Sones CFM Sones CFM Sones CFM Sones CFM Sones CFM Sones CFM Sones CFM Sones CFM Sones CFM Sones
XD100
860
1/10
380 5.3 220 3.8 .012
41
1050 460 7.0 350 5.6 .022
1300 570 9.4 480 8.0 380 7.5 230 9.6 .042
1550 680 12 610 11.0 530 10.0 430 10.0 290 9.2 .070
XD120-7
825
1/20
770 4.4 665 3.5 .033
72955 890 5.2 805 4.8 650 4.4 .052
1050 980 6.4 900 5.6 800 5.5 440 5.2 .069
XD120F4 1750 1/3 1635 15 1590 15.0 1540 15.0 1490 14.0 1440 14.0 1375 14.0 1290 14.0 860 13.0 .322 86
XD137B8 860 1/12 1022 6.5 822 6.2 618 5.7 .060 114
XD137E6 1160 1/4 1379 9.7 1230 9.7 1082 9.7 929 9.9 789 10.2 .150 116
XD137H4 1750 3/4 2081 17.1 1982 16.9 1882 16.6 1784 16.0 1687 16.0 1586 15.5 1485 15.1 1282 14.9 1126 14.4 .530 130
XD161D8 860 1/6 2040 8.6 1925 8.1 1770 7.6 1545 7.1 775 6.7 .184 150
XD161G6 1160 1/2 2750 14 2670 13.0 2580 12.0 2475 12.0 2330 12.0 2170 12.0 1960 12.0 .452 171
XD161K4 1750 11/2 4145 25 4095 25 4040 24 3960 23.0 3925 23 3865 22 3800 21 3630 21 3420 20 3200 19.0 2870 19.0 1.547 181
XD200K6 1160 11/2 5445 16 5280 16.0 5115 16.0 4950 16.0 4780 15.0 4605 15.0 4425 15.0 4045 15.0 3190 15.0 1.295 279
Performance certified is for Installation Type A: Free Inlet, Free Outlet. Performance ratings do not include the effects of appurtenances (accessories).
The sound ratings shown are loudness values in hemispherical sones at 1.5 m (5ft) in a hemispherical free field calculated per AMCA Standard 301. Values are
shown are for Installation Type A: Free Inlet hemispherical sone levels.
Power rating (BHP) does not include transmission losses. The brake horsepower capability of an exhauster motor is dependent on the degree of cooling the motor
receives from the air moving through the motor. The above motor loadings do not overheat the motor and are in accordance with the motor manufacturer's
recommendations. It is, therefore, not detrimental to the motor and economically desirable. Maximum RPM shown obtained with the standard one speed motor; for
all other RPM's add solid state speed controller. Performance is based on actual speed of test.
DIRECT DRIVE
Outlet Velocity
XD100: Outlet Velocity = CFM x 1.000
XD120: Outlet Velocity = CFM x .571
XD137: Outlet Velocity = CFM x .421
XD161: Outlet Velocity = CFM x .291
XD200: Outlet Velocity = CFM x .184
PERFORMANCE DATA
Fan
Model
Min.
Max.
RPM
HP
Sones
@
.125"
.125" .250" .375" .500" .625" .750" 1.000" 1.250" 1.500" 1.750" 2.000" 2.250" 2.500"Max.
BHP
Est. Ship
Wt.CFM CFM CFM CFM CFM CFM CFM CFM CFM CFM CFM CFM CFM
XB090E11583
21771/4
7.0
12.4
608
879
510
830
405
766
280
682 604 532 338
.07
.1848
XB090E21847
24921/4
9.2
15.6
730
1019
663
978
568
931
479
872
382
799
254
729 599 433
.11
.2749
XB090F1920
27171/3
9.9
18.5
764
1118
702
1081
613
1041
524
993
437
936
326
867 742 619 463
.12
.3556
XB090G2333
31961/2
13.9
25
949
1327
904
1296
850
1264
780
1229
701
1191
630
1147
480
1039
274
928 828 719 587 436
.22
.5664
XB120E1910
13751/4
5.6
10.0
755
1225
545
1160 1090 645 965 645
.06
.18105
XB120E21070
15701/4
7.0
14.5
920
1415
825
1360
520
1305 1235 1135 930
.09
.27106
XB120F1140
17251/3
7.3
15.9
995
1565
910
1515
730
1465 1410 1345 1250 760
.11
.35110
XB120G1400
20601/2
11.7
21
1250
1885
1190
1845
1115
1805
1010
1760
740
1720 1670 1545 1285 740
.19
.57116
XB120H1590
23353/4
15.0
23
1435
2145
1380
2110
1325
2075
1260
2040
1165
2005
980
1965 1880 1770 1580 1210 720
.27
.81124
XB120J1935
25701
18.9
27
1765
2370
1725
2340
1680
2305
1635
2275
1585
2240
1530
2210
1350
2135
875
2055 1955 1800 1535 1075 680
.47
1.07130
XB137F930
13651/3
7.0
12.4
1205
1920
990
1790
815
1635 1490 1380 1275
.12
.34136
XB137G1060
16051/2
8.9
14.5
1430
2300
1230
2195
1075
2080
885
1945 1815 1705 1530 930
.16
.54142
XB137H1325
18303/4
11.7
20
1860
2645
1720
2560
1560
2465
1420
2360
1310
2240
1180
2120 1930 1775 1500
.31
.78146
XB137J1400
20601
13.2
23
1980
3000
1850
2920
1700
2840
1555
2755
1440
2660
1345
2555 2350 2180 2045 1895 1350
.36
1.11153
XB137K1675
23101 1/2
15.3
26
2405
3380
2310
3310
2200
3245
2075
3170
1945
3090
1830
3010
1655
2825
1395
2640 2485 2355 2240 2090 1550
.80
1.55164
XB137L1955
24902
20
29
2840
3650
2760
3590
2670
3530
2575
3460
2470
3390
2360
3320
2155
3155
2000
2980
1850
2815
1435
2675
745
2555 2445 2325
.95
1.94173
BELT DRIVE
Outlet Velocity = CFM x .421
Outlet Velocity = CFM x 1.00
Inlin
eC
entrifu
galFans
Outlet Velocity = CFM x .571
Power rating (BHP) does not include transmission losses. Performance certified is for installation type A: Free inlet, free outlet. Performance ratings do not include the
effects of appurtenances (accessories). The sound ratings shown are loudness values in hemispherical sones at 1.5 m (5ft) in a hemispherical free field calculated per
AMCA Standard 301. Values are shown for Installation Type A: Free Inlet hemispherical fan sone levels.
The brake horsepower capability of an exhauster motor is dependent on the degree of cooling the motor receives from the air moving through the motor. The motor
loading beyond the motor nameplate rating does not overheat the motor and is in accordance with the motor manufacturer's recommendations. It is, therefore, not
detrimental to the motor and economically desirable.
Page 50
PERFORMANCE DATA
Fan
Model
Min.
Max.
RPM
HP
Sones
@
.125"
.125" .250" .375" .500" .625" .750" 1.000" 1.250" 1.500" 1.750" 2.000" 2.250" 2.500"Max.
BHP
Est.
Ship
Wt.CFM CFM CFM CFM CFM CFM CFM CFM CFM CFM CFM CFM CFM
XB161F695
10551/3
5.1
10.9
1500
2410
1235
2310 2170 2000 1770 970
.10
.35182
XB161G825
12101/2
6.7
14.6
1840
2790
1660
2710
1410
2610 2485 2330 2165
.17
.53188
XB161H930
13653/4
8.4
16.7
2100
3165
1970
3095
1780
3020
1500
2930 2815 2680 2375 1285
.24
.76193
XB161J1070
15701
10.9
19.9
2450
3660
2350
3600
2220
3540
2045
3470
1840
3390
1140
3300 3070 2820 2160
.37
1.14199
XB161K1330
17101 1/2
16.2
26
3080
4000
3010
3940
2930
3885
2830
3825
2710
3760
2565
3690
2210
3510 3290 3055 2480 1445
.70
1.47208
XB161L1405
18652
17.6
28
3265
4370
3195
4320
3120
4270
3035
4215
2930
4160
2805
4100
2525
3960
1715
3780 3580 3365 3030 2110 1155
.82
1.90210
XB161M1735
22103
24
39
4060
5195
4005
5150
3950
5110
3890
5065
3826
5020
3755
4975
3585
4880
3370
4770
3145
4640
2760
4485
1720
4310 4140 3950
1.53
3.16227
XB200H670
9853/4
7.0
14.4
2860
4430
2555
4235
2195
4035 3830 3610 3375 1890
.26
.80288
XB200J730
10551
7.8
16.3
3165
4770
2890
4590
2600
4405
1960
4215 4020 3815 3160
.33
.98294
XB200K860
125011/2
12.6
20
3815
5715
3590
5560
3355
5410
3105
5250
2790
5095
1785
4930 4590 4205 3155
.54
1.64304
XB200L1020
14102
15.3
25
4600
6485
4415
6350
4220
6215
4020
6080
3815
5940
3600
5800
2565
5510 5210 4885 4380 3030
.89
2.34299
XB200M1195
15253
19.5
31
5450
7035
5290
6910
5130
6785
4965
6660
4800
6530
4625
6400
4260
6140
3740
5870
2070
5590
5290 4870 3765 2305 1.42
2.97325
XB200N1570
18855
32
44
7250
8750
7130
8645
7005
8545
6885
8445
6760
8340
6635
8240
6380
8035
6120
7825
5855
7610
5570
7395
5240
7175
4525
6950
3255
6710
3.24
5.57339
XB245H440
6453/4
5.5
10.9
3595
5600
2925
5315 5010 4550 2710
.22
.69402
XB245J500
7351
7.3
14.8
4195
6455
3790
6210
2115
5955 5675 5295 4130
.32
1.01407
XB245K590
85511/2
9.3
17.2
5075
7585
4760
7375
4375
7160
2925
6940 6705 6435 5060
.52
1.58416
XB245L665
9652
11.7
21
5790
8610
5515
8425
5225
8235
4840
8045
3495
7850
1230
7645 7160 5095
.75
2.28418
XB245M860
11003
17.6
29
7630
9865
7420
9700
7210
9540
6990
9370
6760
9205
6495
9035
5255
8680 8260 7600 5330
1.60
3.39440
XB245N1050
12955
27
35
9400
11665
9230
11530
9055
11390
8885
11250
8710
11110
8530
10970
8140
10680
7630
10385
6315
10070
3365
9700 9180 8055 5615
2.95
5.534.48
XB300J355
5201
6.5
11.4
4735
7560
3640
7025 6375 5640 3835
.31
.96608
XB300K410
59511/2
7.4
13.8
5715
8780
4910
8340
3400
7830 7255 6625 5560
.47
1.42620
XB300L485
6702
9.7
16.6
6980
9990
6380
9610
5660
9195
4505
8720 8205 7665 5570
.77
2.01622
XB300M610
7753
14.6
20
9025
11660
8600
11340
8110
11000
7550
10640
6960
10240
6145
9800 8880 7470 3870
1.53
3.09638
XB300N710
8755
18.5
25
10603
13245
10270
12960
9890
12670
9470
12370
8995
12045
8505
11700
7280
10925
3715
10110 9080 6715
2.40
4.47654
XB300P825
101071/2
22
32
15370
12455
12150
15125
11840
14875
11510
14625
11155
14365
10765
14090
9925
13500
8980
12835
7060
12150 11410 10470 8630 5665
3.75
6.85719
XB300R925
113510
26
40
14030
17325
13765
17110
13490
16890
13210
16670
12915
16445
12600
16215
11900
15730
11150
15200
10340
14615
9150
14005
6520
13385 12710 11880
5.25
9.72739
XB365K310
45011/2
6.2
14.2
7615
11945
6265
11140 10280 9335 7785 3915
.54
1.63865
XB365L365
5052
8.8
16.1
9360
13580
8310
12885
7000
12140 11360 10510 9300
.88
2.29873
XB365M435
5553
13.3
19.2
11495
15050
10655
14430
9755
13770
8715
13075
6520
12360 11585 8705
1.48
3.03891
XB365N550
6755
18.6
25
14905
18545
14275
18040
13610
17525
12905
16990
12185
16430
11385
15855
8225
14665 13200 10210
2.96
5.47894
XB365P620
76071/2
22
30
16950
21000
16400
20555
15830
20105
15225
19640
14600
19165
13965
18670
12530
17650
9685
16590 15375 13505 9680
4.24
7.78970
XB365R680
81510
25
34
18690
22580
18190
22165
17680
21750
17150
21325
16595
20885
16025
20435
14845
19500
13430
18540
10685
17520
4860
16355 14600 11275 6155
5.59
9.60990
XB425K255
38011/2
5.2
12.4
9157
14928
7290
13891 12742 11493 9917
.50
1.681240
XB425L300
4152
7.4
14.2
11301
16477
9862
15550
8098
14537 13451 12263 10766
.83
2.191248
XB425M355
4753
10.1
17.6
13811
19100
12674
18311
11411
17473
9941
16574
7503
15629 14631 3.28
1.36
3.281266
XB425N445
5655
15.6
24
17792
22987
16941
22335
16024
21644
15037
20961
13999
20221
12838
19448
8815
17825 15963
2.66
5.621270
XB425P525
64571/2
21
32
21265
26413
20559
25846
19824
25269
19046
24677
18223
24063
17368
23424
15515
22076
13026
20662 19124 17272 14659
4.34
8.211346
XB425R545
69010
23
37
22127
28332
21449
27803
20748
27268
20009
26721
19230
26159
18416
25578
16695
24355
14589
23065
10794
21721 20249 18499 16160 10392
4.95
10.051395
Power rating (BHP) does not include transmission losses. Performance certified is for installation type A: Free inlet, free outlet. Performance ratings do not include the
effects of appurtenances (accessories). The sound ratings shown are loudness values in hemispherical sones at 1.5 m (5 ft) in a hemispherical free field calculated per
AMCA Standard 301. Values are shown for Installation Type A: Free Inlet hemispherical sone levels.
The brake horsepower capability of an exhauster motor is dependent on the degree of cooling the motor receives from the air moving through the motor. The motor loading
beyond the motor nameplate rating does not overheat the motor and is in accordance with the motor manufacturer's recommendations. It is, therefore, not detrimental to the
motor and economically desirable.
BELT DRIVE
Outlet Velocity = CFM x .291
Outlet Velocity = CFM x .119
Outlet Velocity = CFM x .038
Outlet Velocity = CFM x .184
Outlet Velocity = CFM x .082
Outlet Velocity = CFM x .054
Inline
Centr
ifugalFans
For more information on this product contact your sales support.
07 August 2020
OSU Research Way Building Library Archive
ADDENDUM #2
1 GENERAL ITEMS
1. Not applicable.
2 CHANGES AND CLARIFICATIONS TO THE PROJECT MANUAL
1. Replace Section 01 1100 SUMMARY OF WORK: Added paragraphs 1.03-D. and E.
3 CHANGES AND CLARIFICATIONS TO THE DRAWINGS
1. Replace Sheet A-110: Mechanical pad outline and dimensions added to fencedequipment area.
2. Replace Sheet E101: Sheet notes revised to describe and clarify demolitionrequirements. Plan revised to clarify light fixture requirements and show existingequipment on west wall not previously shown.
3. Replace Sheet E111: Sheet note added to clarify light circuit connection. Plan revised toshow light fixtures in Anthro Storage 005B and Mechanical Rm 005C.
4 DRAWINGS AND ATTACHMENTS
- Section 01 1100 - (ADD-2 Aug 6, 2020)- Sheets A-110, E101, and E111 - ADD-2 2020-08-07
End of Addendum #2
ATTACHMENT C
SUMMARY OF WORK
01 1100 -1
OSU Library Archive
July, 2020 – (ADD-2 Aug 6, 2020)
SECTION 01 1100
SUMMARY OF WORK
PART 1 GENERAL
1.01 SUMMARY OF WORK
A. The Work Contract consists of partial renovation of the basement of the OSU Research
Way Building at 4700 Research Way, Corvallis, Oregon. The renovation includes but is
not limited to the demolition of existing abandoned MEP distribution, installation of
new HVAC equipment, spray-applied insulation, wire partitions, etc. to create a new
storage area for the Valley Library archive.
B. Work shall be started within ten (10) calendar days after signing of Contract on behalf
of Oregon State University. The Contract may not be signed prior to approval of the
Contractor's Certificate of Insurance by Construction Contract Administration (CCA),
Oregon State University. Work shall be completed within 270 calendar days of date of
executed Contract. The targeted final completion date is on or before May 30, 2021.
1.02 CONTRACTORS USE OF PREMISES
A. Contractor shall limit use of the Premises for work and storage to allow for:
1. Owner occupancy, day and night.
2. Public use, day and night.
3. Security.
4. Safe entry and exit for vehicles and pedestrians.
5. Fire egress.
B. Coordinate all operations with the Owner's Authorized Representative during the
construction period. A 96 hour notification is required prior to scheduled utility
shutdowns or street closures, but more lead time is often required to schedule around
other critical activities.
C. Limit Contractor's employee parking to locations designated at the Pre-construction
Conference.
1.03 OWNER OCCUPANCY
A. The Owner will occupy the Premises during the entire period of construction for the
conduct of normal operations. Cooperate with Owner's Authorized Representative in
construction operations to minimize conflict and to facilitate the Owner's usage
especially in the following areas:
1. Restricted access and parking.
2. Use of stairs.
3. Storage space availability.
B. The Owner will be utilizing a portion of the project area for active storage purposes for
SUMMARY OF WORK
01 1100 -2
OSU Library Archive
July, 2020 – (ADD-2 Aug 6, 2020)
the duration of construction. Contractor is to assume that the majority of storage
items will not be able to be relocated during construction and will need to be
protected accordingly. For items that must be relocated to facilitate construction
activities, Contractor to coordinate with Owner’s Authorized Representative to
facilitate temporary relocation.
C. Conduct operations in such a way to ensure the least inconvenience to the general
public, including:
1. Limitations and easements.
2. Emergency vehicle access.
3. Building access to the public, day and night.
D. Laboratories directly adjacent and partially included in the project boundary (Rooms
001, 002 and 003) contain sensitive research equipment that is in continuous
operation.
1. Electrical shutdowns that will impact this equipment will be prohibited.
2. Dust and debris will need to be managed such that there is no impact to the
equipment within these spaces.
3. Vibration from construction related tools and machinery will need to be tested
and coordinated with OSU staff to avoid impact to ongoing research. Specific
measures (such as the use of low-impact tools, etc.) to avoid vibrations at the
research equipment may be necessary.
4. Some of the equipment can also be affected by the use of nearby electric motors
and stray magnetic fields. Review of the proposed construction equipment and
proximities to the research equipment will be required prior to construction
activities.
E. The Marine and Geology Repository (MGR), located on the second floor of the
building, includes walk-in freezers that house irreplaceable ice core samples.
1. Although power to the freezers can be transferred to an existing backup
generator, close coordination will be necessary if electrical power to the MGR
facility may be affected by the project to guarantee the protection of the
collection.
1.04 ASBESTOS AND OTHER HAZARDOUS MATERIAL
A. The Owner has made a reasonable attempt to locate and identify asbestos or other
hazardous material that may be encountered during the course of the Work.
B. If the Contractor observes or suspects the existence of asbestos, polychlorinated
biphenyl (PCB) or other hazardous materials in the structure or components of the
building, the Contractor shall immediately stop work and notify the Owner’s
Authorized Representative.
C. The Owner will arrange for the removal of asbestos, polychlorinated biphenyl (PCB) or
other hazardous materials as required by Facilities Services personnel or by separate
contract.
SUMMARY OF WORK
01 1100 -3
OSU Library Archive
July, 2020 – (ADD-2 Aug 6, 2020)
D. Schedule ten (10) days of slack or "down" time for the removal of hazardous materials
without penalty to Owner for the delay of the Contract.
1.05 LEAD BASED PAINT
A. The Owner may have tested existing paint in the project area and if levels are found
the following conditions apply.
B. Contractor shall remove paint as specified for surface preparation and capture
removed material for disposal.
C. Contractor shall follow OSHA guidelines involving exposure to workers.
D. Owner will provide containers for Contractor’s use at project site.
E. Contractor shall comply with the requirements of DEQ and EPA and shall submit a lead
abatement plan.
F. Contractor shall separate lead contaminated material from effluent and water.
G. Owner will dispose of lead paint and effluent resulting from stripping operation.
H. Soil contaminated by stripping operations shall be replaced with topsoil.
END OF SECTION
11.522.533.544.555.566.577.58
A A
A.5 A.5
B B
B.5 B.5
C C
D D
C.5 C.5
22
' -
2"
22
' -
4"
24
' -
0"
24
' -
0"
18
' -
6"
18
' -
4"
3' -
9 3
/4"
20
' -
0"
3' -
6"
3' -
0"
3' -
0"
5' -
0"
12' - 7 1/2"
6"
7' -
9 1
/2"
6"
8' -
0"
A-6011
1' - 0"
ALIG
N
VFY
10' - 9"
A 001
3' - 0"
6' - 6"
3' - 0"
3' -
6"
ARCHIVE
STORAGE
005D
SCANNER
ROOM
19
MECHANICAL
005C
ANTHRO
STORAGE
005B
STORAGE
005A
VACUUM
PUMP
112
DATA
8
HALL
H1
ELEV MECH
001A
KOPPERS
RESEARCH
002
STONER
RESEARCH
001
OFFICE
003
EQUIPMENT
006
EQUIPMENT
STORAGE
110
CLEANING
111
MECHANICAL
108
MAINTENANCE
109
Room
17
ELECTRICAL
107
STAIR
S002
STAIR
S001
ELEV
E001
005D-1005D-3
005C-1
005B-1
005D-2
A 001
A 002
A 002
A 002
4' - 8"
WIRE PARTITION OUTSIDE FACE
WIRE PARTITION OUTSIDE FACE
2' - 11"
EQ EQ
7' - 6"
2' - 6"2' - 0"
WIRE PARTITION OUTSIDE FACE
WIRE PARTITION OUTSIDE FACE
WIRE PARTITION OUTSIDE FACE
WIRE PARTITION OUTSIDE FACE
15' - 10" 16' - 0" 16' - 0" 16' - 0" 16' - 0" 16' - 0" 16' - 0" 16' - 0" 16' - 0" 16' - 0" 16' - 0" 16' - 0" 16' - 0" 15' - 10"
A 005
A 005
A 005
A 005
A 005
A 003
WP
WP
WP
WP
WP
WP
WP
A 004
A 004A 004
EX
T-1
A 007
A 007
KEEP AREA CLEAR FOR DEMOLITION AND INSTALLATION AS REQUIRED.
KEEP AREA CLEAR FOR DEMOLITION AND INSTALLATION AS REQUIRED.
KEEP AREA CLEAR FOR DEMOLITION AND INSTALLATION AS REQUIRED.
9A-601
TYP
A 008
A-601
7
6
FENCE EXTENSION
35' - 11"
VF
Y
17
' - 1
0"
A 003
A 009A 009
ADD-2
VF
Y
10
' -
6"
VFY
6' - 10"
1. ALL DIMENSIONS TO FACE OF FRAMING / MASONRY / CONCRETE U.N.O.2. WIRE PARTITION (WP) HEIGHT IS 11'-6" AFF U.N.O.3. SEE WIRE PARTITION SHOP DRAWINGS FOR POST / PANEL SPACING AND GATE DETAILS4. EXISTING COMPACTOR SHELVING INVENTORY IS PROVIDED FOR GENERAL COORDINATION ONLY.
OWNER SHALL VERIFY TYPE AND QUANTITY OF EXISTING SHELVING AND COORDINATE THE NEED FOR ADDITIONAL UPRIGHTS OR OTHER PARTS FOR FINAL INSTALLATION WITH COMPACTOR VENDOR.
5. CONTRACTOR TO COORDINATE ACCESS FOR INSTALL AROUND EXISTING OSU STORAGE MATERIALS INCLUDING PROVISIONS FOR PROTECTION, RELOCATION, OR TEMPORARY STORAGE OF OSU MATERIAL WITHIN THE LIBRARY ARCHIVE PROJECT AREA.
GENERAL NOTES: FLOOR PLAN
RBA #:
SET ISSUE
P.I.C:
PM / PA:
DATE
STAMP
REV. DATE
REVISIONS TO THIS SHEET
Owner
Project Name
Project Address
PROJECT TRACKING
100% CD 2020-07-10
DESCRIPTION
8/6
/20
20 9
:40:0
4 A
M
A-110
BASEMENT - FLOORPLAN
4700 SW RESEARCHWAYCORVALLIS, OR 97333
OSU RWB - LIBRARYARCHIVE
GREG BROKAW
AUSTIN BAILEY
1924
1/8" = 1'-0"1BASEMENT FLOOR PLAN - LIBRARY ARCHIVE
SHELVING - EXISTING COMPACTOR INVENTORY
Type Width Height Depth
DoubleSided Shelving
36" 3' - 0" 10' - 1 1/4" 24"
260
42" 3' - 6" 10' - 1 1/4" 24"
10
48" 4' - 0" 10' - 1 1/4" 24"
34
SingleSided Shelving
36" 3' - 0" 10' - 1 1/4" 12"
18
42" 3' - 6" 10' - 1 1/4" 12"
3
48" 4' - 0" 10' - 1 1/4" 12"
3
KEYNOTE LEGEND
A 001 EXISTING MECHANICAL UNIT
A 002 PALLET RACK, OFCI. NOTE MAX STORAGE HEIGHT: 12' - 0"
A 003 EXTEND EXISTING FENCE AROUND NEW OUTDOORMECHANICAL UNIT. MATCH EXISTING DETAILING ANDCONSTRUCTION. REUSE MATERIAL PER DEMO PLAN.
A 004 COMPACTOR SHELVING SYSTEM, OFOI
A 005 EXISTING SHELVING INSTALLED ONTO NEW COMPACTORCARRIAGE SYSTEM, OFOI
A 007 NEW MECHANICAL UNIT. SEE MECHANICAL.
A 008 PROVIDE (2) 3" DIAMETER CORE DRILLS THROUGHEXISTING CONCRETE WALL FOR REFRIGERANT LINES.PROVIDE (2) 2" DIAMETER CORE DRILLS THROUGHEXISTING CONCRETE WALL FOR CONDUIT AND CONTROLWIRING. SPACE HOLES AT 6" O.C. MIN. DO NOT CUTTHROUGH REBAR. FIELD VERIFY REBAR LOCATION. SEALAROUND PIPES WITH BACKER ROD AND SEALANT.
A 009 EXTEND GRAVEL AND MATCH EXISTING DEPTH. GRADEAND LANDSCAPE REPAIR AS REQUIRED.
ADD-2 2020-08-07
TTTTT
TT
11.522.533.544.555.566.577.5
A.4A.4
A.8A.8
B.2B.2
B.3B.3
B.4B.4
B.6B.6
C.2C.2
C.4C.4
C.8C.8
(R) PNL 120-1 (R) XFMR T1 (R) PNL 480-1R(R) PNL 120-2(R) PNL 480-2R(R) PNL 120-3(R) PNL 480-3R(R) PNL 240-1(R) PNL 120-4(R) PNL 480-4R (R) XFMR T2
(R) XFMR T3
(R) XFMR T21
(R) XFMR T4
(R) PNL 480-1L(R) PNL 480-2L(R) PNL 480-3L(R) PNL 480-4L
(E) (E) (E) (E) (E) (E) (E) (E)
1
1
3
2
4
44
4DF
2
DF
4
DF
3
DF
1
(RL)
(RL) (RL)
(RL)
DH
1
(E)
(E)
(E)
REMOVE BUS DUCTTRANSFORMER AND PANELBOARDS UNDER BID ALTERNATE #1
REMOVE TRANSFORMER PANELBOARDS ANDDISCONNECT UNDER BID ALTERNATE #1
5
6
7
ADD-2
8
8
8
(E)
(E)
ADD-2
REMOVE BUS DUCT AND BUS DUCT DISCONNECTS.
SUSPENDED LINEAR LUMINAIRE. TYPICAL.
EXISTING LUMINAIRE TO REMAIN, SHOWN FOR REFERENCE ONLY. TYPICAL.
RETAIN CEILING FAN FOR INSTALLATION IN NEW LOCATION. REFER TO 1/E121.
PROCESS CHILLER TANK ASSEMBLY. REMOVE ALL ELECTRICAL CONNECTIONS.
PROCESS CHILLER. REMOVE ALL ELECTRICAL CONNECTIONS.
EXHAUST FAN. REMOVE ALL ELECTRICAL CONNECTIONS.
DISCONNECT FIXTURE FROM EXISTING CIRCUIT.
R E F E R E N C E N O T E S :
1
2
3
4
5
6
7
8
1. ALL BUS DUCT, PANELBOARDS, AND TRANSFORMERS INDICATED FOR DEMOLITION SHALL BE REMOVED. REMOVE ALL CONDUIT AND CABLE CONNECTED TO
EQUIMENT.
2. REMOVE WIRING FROM CONDUIT FLOOR STUB UPS LOCATED WITHIN FUTURE FENCED AREA. CUT CONDIT FLUSH WITH FLOOR.
S H E E T N O T E S :
ADD-2
SYSTEMS WEST
ENGINEERS725 A Street
Springfield, OR 97477
541.342.7210
systemswestengineers.com
SWE Proj. No. W016.01
RBA #:
SET ISSUE
P.I.C:
PM / PA:
DATE
STAMP
REV. DATE
REVISIONS TO THIS SHEET
Owner
Project Name
Project Address
PROJECT TRACKING
100% CD 2020-07-10
DESCRIPTION
8/6
/20
20 3
:09:0
6 P
M
E101
DEMOLITION PLAN -BASEMENT
4700 SW RESEARCHWAY CORVALLIS, OR97333
OSU RWB - LIBRARYARCHIVE
1924
NORTH1/8" = 1'-0"1DEMOLITION PLAN - BASEMENT
© Systems West Engineers, Inc. 2020. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)
ADD-2 2020-08-07
ADD-2
E
X
P
I
R
ES :
1
2
-
3
1
-
2
0
M
A
Y
21, 2
0
1
4
DIGITALLY SIGNED
REGI
STERED PROFESSIONALENGINEER# 80,621
OREGONMAT
T HE W B. RE I CH
OS
OS
OS
OS
11.522.533.544.555.566.577.5
A.4A.4
A.8A.8
B.2B.2
B.3B.3
B.4B.4
B.6B.6
C.2C.2
C.4C.4
C.8C.8
TT
TT
A36
A16 A16 A16 A16 A16 A16
A20 A20 A20 A20 A20 A20
A8 A8
A8 A8
T
B B B B
B B
B
B
B
BB
B
B
(E) PNL L1-1
A12
T
T
ADD-2
PROVIDE OCCUPANCY SENSOR: WATSTOPPER CX-100-3. INSTALL AND AIM SO COVERAGE INCLUDES NORTH TO SOUTH AISLEWAY.
SAME AS NOTE 1 BUT INSTALS SO IT COVERS EAST TO WEST AISLEWAY.
CONNECT NEW LIGHTS TO PANEL L1-1, CIRCUIT 38, LOCATED IN MAIN ELECTRICAL ROOM. PROVIDE NEW 1-POLE, 20-AMP CIRCUIT BREAKER AT PANEL.
RECONNECT LIGHTS TO SAME CIRCUIT NOTED ON NOTE 3.
R E F E R E N C E N O T E S :
1
2
3
4ADD-2
SYSTEMS WEST
ENGINEERS725 A Street
Springfield, OR 97477
541.342.7210
systemswestengineers.com
SWE Proj. No. W016.01
RBA #:
SET ISSUE
P.I.C:
PM / PA:
DATE
STAMP
REV. DATE
REVISIONS TO THIS SHEET
Owner
Project Name
Project Address
PROJECT TRACKING
100% CD 2020-07-10
DESCRIPTION
8/6
/20
20 4
:05:1
7 P
M
E111
LIGHTING PLAN -BASEMENT
4700 SW RESEARCHWAY CORVALLIS, OR97333
OSU RWB - LIBRARYARCHIVE
1924
NORTH1/8" = 1'-0"1BASEMENT LIGHTING RCP
1
2 2
1
3
© Systems West Engineers, Inc. 2020. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)
ADD-2 2020-08-07
4
4
E
X
P
I
R
ES :
1
2
-
3
1
-
2
0
M
A
Y
21, 2
0
1
4
DIGITALLY SIGNED
REGI
STERED PROFESSIONALENGINEER# 80,621
OREGONMAT
T HE W B. RE I CH