Research Development and Innovation in Canal de Isabel...

24
1 Research Development and Innovation in Canal de Isabel II. Francisco Cubillo Deputy Director of Research, Development and Innovation Canal de Isabel II, Madrid, Spain 5 TH WORLD WATER FORUM ISTANBUL 16-22 MARCH 2009

Transcript of Research Development and Innovation in Canal de Isabel...

Page 1: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

1

Research Development and Innovation in Canal de Isabel II. Francisco CubilloDeputy Director of Research, Development and InnovationCanal de Isabel II, Madrid, Spain

5TH WORLD WATER FORUMISTANBUL16-22 MARCH 2009

Page 2: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

2

Madrid

CANAL DE ISABEL II

Supplies drinking water and sewerage services to 6 million people in the region of Madrid (Spain)

•177 municipalities

•16.000 km Distribution network•14 dams (946 million m³)•59 groundwater fields•13 water treatment plants•44 pumping stations•22 Big service reservoirs•258 Local reservoirs•139 Waste water treatment plants•5 Water reuse plants

Supplies drinking water and sewerage services to 6 million people in the region of Madrid (Spain)

•177 municipalities

•16.000 km Distribution network•14 dams (946 million m³)•59 groundwater fields•13 water treatment plants•44 pumping stations•22 Big service reservoirs•258 Local reservoirs•139 Waste water treatment plants•5 Water reuse plants

Page 3: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

3

Main R+D Guidelines (1/2)

Efficient copping with uncertainty.Holistic understanding of uses, resources and infrastructures.New solutions and analysis to improve effciciency and sustainability. Urban, Environment, agriculture. Virtual water. Improving integrated management of Water and Energy.Falliure management and adaptability.

Metering real uses. Accuracy and smartness

Page 4: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

4

INNOVATION (2/2)

Presure management foccussed on resources, assets and level of service. Economic options for nutrients removal in effluents. Reuse at the appropriate and cost effective scales. Sludge management Athmosferic phase of water cicle. Of course IT

Page 5: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

5

0

50

100

150

200

250

300

350

400

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

Dot

ació

n (li

tros

por

hab

itant

e y

día)

Derivado

Facturado

Doméstico

DivertedBilledDomestic

l/inh

./day

DROUGHT PERIOD

DEMANDS

Page 6: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

6

INDUSTRIAL

HIDDEN LOSSES

SHOWERSFAUCETS

TOILETS

DOMESTIC OUTDOOR USES

FRAUDULENT CONSUMPTION

METERED IRRIGATION

INSTITUTIONAL

COMMERCIAL

OPERATION USES (DRAINS)

UNBILLED METERED CONSUMPTION

METERS ERRORS

BILLED REGISTERED BURST

REGISTERED BURST

TREATMENT PROCESS

PREVIOUS TREATMENT LOSSES

UNMETERED BILLED (MUNICIPALITIES)

OTHERMETERED

USES

CLEANINGAND

DISINFECTIONNEW PIPES

ESTIMATED IRRIGATION, POOLS AND FOUNTAINS

(MUNICIPALITIES)STREET CLEANING (MUNICIPALITIES)

KITCHEN FAUCETS

DISHWASHER

WASHINGMACHINE

DOMESTICLEAKS

GLOBAL USES DISTRIBUTION

DEMANDS

Page 7: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

7

HIDDEN LOSSES

SHOWERSFAUCETS

TOILETS

DOMESTIC OUTDOOR USES INDUSTRIAL

DOMESTIC LEAKS

WASHINGMACHINE

DISHWASHER

KITCHEN FAUCETS

CLEANINGAND

DISINFECTIONNEW PIPES

OTHERMETERED

USES

PREVIOUSTREATMENT

LOSSES

UNMETERED BILLED (MUNICIPALITIES)

TREATMENTPROCESS

BILLEDREGISTERED BURST

REGISTERED BURST

STREET CLEANING (MUNICIPALITIES)

ESTIMATED IRRIGATION, POOLS AND FOUNTAINS

(MUNICIPALITIES)

UNBILLED METERED CONSUMPTION

OPERATION USES (DRAINS)

FRAUDULENT CONSUMPTION

METERS ERRORS

INSTITUTIONALMETERED IRRIGATION

COMMERCIAL

HIGH 23,82%MEDIUM 19,78%LOW 56,39%

END USES CLIMATE SENSIBILITY

DRINKING WATER

High sensibility 1,72%

Medium sensibility 19,55%

Low sensibility 40,15%

NOT DRINKING WATER

High sensibility 22,10%

Medium sensibility 0,23%

Low sensibility 16,25%

DEMANDS

Page 8: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

8

IMPACT OF RISING TEMPERATURES ON CONSUMPTION

For 1 Cº increase in average maximum temperatures

Increases of annual volumes 1,3 - 1,6%

Increases of monthly maximum volumes 2,1 - 2,2%

Increases of daily maximum flows 2,8 - 3,2%

Page 9: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

9

POTENTIAL DOMESTIC SAVING COST

SHOWERSFAUCETS

KITCHEN FAUCETS

TOILETS

DOMESTIC OUTDOOR USES

WASHING MACHINE

DISHWASHER

DOMESTIC LEAKS

15%

DEMANDS

DISHWASHER 5,4 €/m³ - 4 €/m³

FAUCETS FILTERS 1,4 €/m³

SHOWERS 3,4 €/m³

TOILETS 13,5 €/m³

Page 10: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

10

DISHWASHER POTENTIAL SAVING

SHOWERSFAUCETS

KITCHEN FAUCETS

TOILETS

DOMESTIC OUTDOOR USES

WASHING MACHINE

DISHWASHER

DOMESTIC LEAKS

DISHWASHER

KITCHENFAUCETS10%

DEMANDS

Page 11: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

11

HIDDEN LOSSES

SHOWERSFAUCETS

TOILETS

DOMESTIC OUTDOOR USES INDUSTRIAL

DOMESTIC LEAKS

WASHINGMACHINE

DISHWASHER

KITCHEN FAUCETS

CLEANINGAND

DISINFECTIONNEW PIPES

OTHERMETERED

USES

PREVIOUSTREATMENT

LOSSES

UNMETERED BILLED (MUNICIPALITIES)

TREATMENTPROCESS

BILLEDREGISTERED BURST

REGISTERED BURST

STREET CLEANING (MUNICIPALITIES)

ESTIMATED IRRIGATION, POOLS AND FOUNTAINS

(MUNICIPALITIES)

UNBILLED METERED CONSUMPTION

OPERATION USES (DRAINS)

FRAUDULENT CONSUMPTION

METERS ERRORS

INSTITUTIONALMETERED IRRIGATION

COMMERCIAL

HIGHMEDIUMLOW

CONSUMPTION POTENTIAL REDUCTION IN DROUGHTS

DEMANDS

Page 12: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

12

INDUSTRIAL

SHOWERSFAUCETS

TOILETS

DOMESTIC OUTDOOR USES

HIDDEN LOSSES

DOMESTICLEAKS

WASHINGMACHINE

DISHWASHER

KITCHEN FAUCETS

STREET CLEANING (MUNICIPALITIES)

ESTIMATED IRRIGATION, POOLS AND FOUNTAINS

(MUNICIPALITIES)

CLEANINGAND

DISINFECTIONNEW PIPES

OTHERMETERED

USES

UNMETERED BILLED (MUNICIPALITIES)

PREVIOUS TREATMENT LOSSES

TREATMENT PROCESS

REGISTERED BURST

BILLED REGISTERED BURST

METERS ERRORS

UNBILLED METERED CONSUMPTION

OPERATION USES (DRAINS)

COMMERCIAL

INSTITUTIONAL

METERED IRRIGATION

FRAUDULENT CONSUMPTION

HIDDEN LOSSES AND NOT METERED WATER

Metered and billedNot metered

Page 13: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

13

1,30%

0,01%0,01%

0,03%

-11,37%

-3,61%-0,56% -0,22%

-0,11%

0,00%

10,00%

20,00%

30,00%

40,00%

50,00%

60,00%

70,00%

80,00%

0-12 12-22 22-24 24-36 36-72 72-180 180-1500 1500-3000 >3000

Liters per hour

% REGISTERED VOLUME % METER MISTAKE

GLOBALDOMESTIC

ERROR12,93%

UNCERTAINTY METERS ERROR

ERROR CURVES

-100,00

-80,00

-60,00

-40,00

-20,00

0,00

20,00

40,00

60,00

80,00

100,00

10 100 1000 10000

FLOW RATE (l/h)

ERRO

R (%

)

Page 14: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

14

0,10

0,30

0,50

1,00

0,20

IMMEDIATE HORIZON SHORT TERM HORIZON LONG TERM HORIZON

REC

UPE

RA

TIO

N C

OST

€/m

³A

NN

UA

L R

ECO

VER

ED V

OLU

ME

200 SECTORS

DROUGHT SCENARIO

PER

MA

NEN

T A

CO

UST

IC

OR

IEN

TED

SYS

TEM

ATI

C

BU

RST

S FL

OW

TIM

E R

EDU

CTI

ON

4

Economic Level

OR

IEN

TED

SYS

TEM

ATI

C

15

Wat

er R

ight

Tra

nsfe

r

Emer

genc

y re

sour

ces

PRES

SUR

E M

AN

AG

EMEN

T

PRES

SUR

E M

AN

AG

EMEN

T

Economic Level

Soci

oenv

ironm

enta

l

?R

ENO

VATI

ON

HORIZONTS, MARGINAL COSTS & FEASIBLE VOLUMES

Page 15: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

15

HYDROLOGIC FOOTPRINTMADRID REGION

Comunidad de Madrid6 million people

Hydrologic Footprint4566 l/inhab./day

Imported Virtual Water4043 l/inhab./day

Water from the region523 l/inhab./day

UNITARY CONSUMPTIONS

(l/inhab./day)Diverted 245Billed 196Domestic 135

Page 16: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

16

URBAN AND MAIN CLOSER AGRICULTURAL ZONES IN COMUNIDAD DE MADRID

Page 17: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

17

Investment in improvement of irrigation infrastructure systems

Water trade under normal conditions (with compensation)

Water trade under special conditions

Water interchange (Raw per Reused water)

ALL OF THEM WILL REQUIRE INFRASTRUCTURESTO CAPTURE, TRANSPORT AND TREAT

THIS NEW RESOURCES

SOLUTIONS FOCUSED ON NEARER IRRIGATED AGRICULTURAL AREAS

Page 18: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

18

Net increase forecast

0%

60%

120%

180%

240%

Current 5 years 10 years 15 years 20 years

Incr

ease

d %

rela

ted

to 2

007

Number of bursts increase

Volume of losses increaseProperties affection increase

PARAMETERS TO ASSESS INFRASTRUCTURES INVESTMENTPOLICIES

Net increase forecast for a non investment scenario

ASSETS

Page 19: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

19

MAIN REFERENCE PARAMETER SHOULD BE RISK EVOLUTION

HUMBERTO

Influence of Annual Renewal Rate

-50%

0%

50%

100%

150%

200%

250%

5 years 10 years 15 years 20 years

DIS

TUR

BS

INC

RE

ASE

(Pro

perti

es x

Hou

r)

0,0% 0,4% 0,8% 1,2% 1,6%

% Assets Value

Page 20: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

20

FAIL

UR

E TH

RES

HO

LD

AFFECTIONS

PROBABILITY

PHASE 1 PHASE 2 PHASE 3 NO SUPPLY

ESSENTIAL USES

BASIC NEEDS

STRUCTURAL EFFICIENCY COSTS INCREASE

USER TRANSFER COSTS

NON ESSENTIAL USES

OUTDOOR USES

INSTITUTIONAL ACTIVITIES

INDUSTRIAL ACTIVITIES

COMMERCIAL ACTIVITIES

DRINKIBLE CONSTRAINTS

ESTABLISHMENT OF SHARING COSTS AMONG ADMINISTRATION, MANAGERS AND USERS

Page 21: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

21

CONVENTIONAL WASTEWATER TREATMENT INVESTMENT

• Phosphorus reduction 2,5-17 €/m³

• Nitrogenous reduction 8,6-100 €/m³

• Tertiary treatment 0,15 €/m³

CONVENTIONAL WASTEWATER TREATMENT OPERATION

• Tertiary Treatment 0,16 €/m³

COST OF WATER ENVIRONMENT IMPROVEMENT

Page 22: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

22

ENERGY INTENSITIES IN THE WATER CYCLE

Page 23: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

23

La esfera hidrológicaUna distribución desigual de agua y energía

Page 24: Research Development and Innovation in Canal de Isabel II.foromundialagua.files.wordpress.com/2009/05/2009-03-16-stand-abastecimiento...Mar 16, 2009  · 2 Madrid CANAL DE ISABEL II

24

CONCLUSIONS

> Update planning procedures to integrate

“comprehensive” analysis of risks.

> Show options, costs, impacts and risks and ways

to recovery for different horizons.

> Integrate public participation for choosing

options, efficiency & sustainability & standards of

service/risks.

> Be prepare to cope with unfulfillment of targets.