REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa...

30
S.No Name of the employee Designati on / Station Mutual transfer with Receipt of application SOUGHT TO Remarks 1 BH.B.V.P.Raju LP(G)/D/B ZA Y Govinda Reddy, LP (G)/ VSKP/E C Rly 18.04.2012 E C0 Rly Sent to CPO/SC on 03.01.2014 2 V.Venkatesan LP(G)/BTT R K Kalyan Rao, LP (G), Jolarpetti, S Rly 11.12.2012 S Rly Sent to to CPO/SC on 27.05.2014 3 V.Phanimadhav LP(G)/RJY B Srinivasu, LP G/VSKP. E Co Rly 18.03.2013 E Co Rly Memorandum received from HQrs 4 B.Ramesh LP(G)/RJY Y Harikrishna, LP (G), VSkP 08.01.2014 E Co Rly file put up to DRM 5 D Suryaprasad LP (G) RJY PV Ramu, LP /G/ DYD/VSKP 18.03.2014 E Co Rly file put up to DRM S.No Name of the employee Designatio n / Station Mutual transfer with Receipt of application SOUGHT TO Remarks 1 Sri Mool Chandra Kushwaha ALP/RJY G.Ravi kumar 19.04.2011 C.RLY Memorandum from CPO/SC awaited 2 Sri Lakhan Lal Meena ALP/BTTR Sukanth kumar mehra 10.11.2011 W. RLY Memorandum from CPO/SC awaited 3 Sri N.Uma Shnakar Rao Sr.ALP/BZ A K.Srinivas 18.05.2012 Eco RLY CA’s approval has been advised to CPO/SC on 4 Sri Ram Prakash ALP/BTTR P.S.Kumar raja 27.06.2012 C.RLY CPO not agreed for mutual 5 Sri K.Diwakar Rao Sr.ALP/T/B ZA B.padagayy a 24.09.2012 Eco RLY Relieved to WAT Divn. 6 B.Srinivasa rao Sr ALP/RJY T.Chinna Rao 28.09.2012 Eco RLY O.O.Issued 7 Ramji Kumar Sr.ALP/RJ Y Md.Ahmad Alisha 15.09.2013 Eco RLY Cpo/Sc Memorandum not received REQUEST TRANSFERS OF MECHANICAL BRANCH - AS ON 15.09.2014 INTER RAILWAY - MUTUAL TRANSFER CASES

Transcript of REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa...

Page 1: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

S.NoName of the

employee

Designati

on /

Station

Mutual

transfer

with

Receipt of

application

SOUGHT

TORemarks

1 BH.B.V.P.RajuLP(G)/D/B

ZA

Y Govinda

Reddy, LP

(G)/ VSKP/E

C Rly

18.04.2012 E C0 RlySent to CPO/SC on

03.01.2014

2 V.VenkatesanLP(G)/BTT

R

K Kalyan

Rao, LP (G),

Jolarpetti, S

Rly

11.12.2012 S RlySent to to CPO/SC

on 27.05.2014

3 V.Phanimadhav LP(G)/RJY

B Srinivasu,

LP G/VSKP.

E Co Rly

18.03.2013 E Co RlyMemorandum

received from HQrs

4 B.Ramesh LP(G)/RJY

Y

Harikrishna,

LP (G),

VSkP

08.01.2014 E Co Rly file put up to DRM

5 D SuryaprasadLP (G)

RJY

PV Ramu,

LP /G/

DYD/VSKP

18.03.2014 E Co Rly file put up to DRM

S.No Name of the employeeDesignatio

n / Station

Mutual

transfer with

Receipt of

application

SOUGHT

TORemarks

1Sri Mool Chandra

KushwahaALP/RJY

G.Ravi

kumar19.04.2011 C.RLY

Memorandum from

CPO/SC awaited

2 Sri Lakhan Lal Meena ALP/BTTR

Sukanth

kumar

mehra

10.11.2011 W. RLYMemorandum from

CPO/SC awaited

3Sri N.Uma Shnakar

Rao

Sr.ALP/BZ

AK.Srinivas 18.05.2012 Eco RLY

CA’s approval has

been advised to

CPO/SC on

30.08.2012.4 Sri Ram Prakash ALP/BTTR

P.S.Kumar

raja27.06.2012 C.RLY

CPO not agreed for

mutual

5 Sri K.Diwakar RaoSr.ALP/T/B

ZA

B.padagayy

a24.09.2012 Eco RLY

Relieved to WAT

Divn.

6 B.Srinivasa raoSr

ALP/RJY

T.Chinna

Rao28.09.2012 Eco RLY O.O.Issued

7 Ramji KumarSr.ALP/RJ

Y

Md.Ahmad

Alisha15.09.2013 Eco RLY

Cpo/Sc

Memorandum not

received

REQUEST TRANSFERS OF MECHANICAL BRANCH - AS ON 15.09.2014

INTER RAILWAY - MUTUAL TRANSFER CASES

Page 2: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

8 B Papa raoSr.ALP/BZ

A

P.Subba

Rao31.10.2013 Eco RLY

Cpo/Sc

Memorandum not

received9 A.Ram Babu ALP/RJY

Kumar

Mogili4.12.2013 Eco RLY

Cpo/Sc

Memorandum not

received10 R.Ravi babu ALP/BZA

M.Venkates

wara rao19.3.2014 Eco RLY

DRM Approved to

forward

11 G.Sreenu ALP/BZAP.Srikanth

reddy19.3.2014 Eco RLY

DRM Approved to

forward

12Santhosh Kumar

TripatiALP/RJY

V.V.N.G.Raj

u21.04.2014 Eco RLY

DRM Approved to

forward

13 Abhilasha Prajapati ALP/BZABonthu

Sudhakar01.07.2014 C.RLY

Application

forwarded to

CPO/SC

Sl

no

Name of the

employee

S/Shri/Smt

Designatio

n/ UnitIRMT with Appln Rcd Divn/Rly Appln. Status

1 B.BHIMA RAOHELPER

GR II/

C&W/COA

R.N.V.N.De

vi30.10.12 E.Co.Rly

O.O.Issued on

02.04.14

2 R.ANIL KUMAR

HELPER

GR

II/C&W/C

D/BZA

K.Srinu 28.11.12 S.Rly

Approval of CA

obtained on

17.06.14

3 G.SUKUMARAN

HELPER

GR

II/C&W/G

DR

T.Prasad 29.01.13 PGT/S.RlySR&GL-14 sent to

CPO on 30.04.14

4PRAKASH CHANDRA

MAHANKUDO

HELPER

GR

II/C&W/C

OA

D.Vijaya

Kumar11.02.13 E.Co.Rly

CA's approval

communicated to

CPO/SC on 07.11.13

5 K.N.SHAJIMON

HELPER

GR

II/C&W/NS

K.Dattatrey

a01.04.13

Salem

Divn/S.Rly

Expired on

07.08.14

6 S.S.JENA

HELPER

GR

II/C&W/C

OA

V.V.Srinivas

u23.07.13 VSKP/E.CoRly

SR&GL14 sent to

CPO/SC on

22.07.14

7 G.SUNDARI

HELPER

GR

II/C&W/W

D/BZA

M.Durga

rao16.09.13

BBQ/CEN/

S.Rly

Unwilling

Submitted

8 B.KAMA RAJU

HELPER

GR

II/C&W/C

OA

D.R.Krishna

Babu07.10.13

VSKP/

E.C.Rly

SR & GL14 sent to

CPO/SC on

22.07.14

9 M.GANESH

HELPER

GR

II/C&W/C

OA

P.Anand

Kumar18.12.13

VSKP/

E.C.Rly

SR&GL-14 sent to

CPO on 30.04.14

PRIORITY LIST OF INTER RAILWAY MUTUAL TRANSFERS OF ERSTWHILE GROUP 'D'

STAFF-

Page 3: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

10 K.KRISHNA

HELPER

GR

II/C&W/C

OA

M.nageswar

a rao18.12.13

VSKP/

E.C.Rly

SR&GL-14 sent to

CPO on 30.04.14

11 V.KALAISELVIHELPER

II/C&W

/WD/BZA

R.Ravi 31.12.13 CEN/S.RlySR&GL-14 sent to

CPO on 30.04.14

12 P.ELANCHEZHIANHELPER

II/C&W

/CD/BZA

S.Majji Babu 18.02.14 ICF/S.RlySR&GL-14 sent to

CPO on 19.05.14

13 G.SUNDARIHELPER

II/C&W

/WD/BZA

V.Narayana

rao11.03.14

BBQ/CEN/

S.Rly

SR&GL-14 sent to

CPO on 30.04.14

14 B.KUMARHELPER

II/C&W

/RJY

G.Swarna

Latha11.03.14

SCMN/S.C.

Railway

SR&GL-14 sent to

CPO on 19.05.14

15T.S.SANKARAN

KUTTY

HELPER

II/C&W

/BTTR

Sidharth

Bajro31.04.14 TVC/S.Rly

SR & GL14 sent to

CPO/SC on

05.08.14

16 R.KOTESWARA RAOHELPER

II/C&W/C

D/ BZA

M.BALA

SWAMY02.07.14 E.CO.Rly

SDGM Cls received

on 25.07.14

17 Arun Kumar Singh

Helper-

II/C&W/CD

/BZA

M.Rama

Rao22.07.14

Alipurduar,

NF Railwaycancelled

18 Sk ImranHelper-

II/MTM

Ch.Surendr

a Kumar02.08.14

Raipur,

S.E.C.Rly

SDGM clearance

sought

S.NoName of the

employee marks

Designati

on /

Station

Date of

Receipt of

application

REQUEST

SOUGHT

TO

1 Ashok kumar Gupta ALP/BTTR 21.06.2011 GKP/NE Rly

2 Bishnu Deo Paswan ALP/BTTR 24.06.2011PATNA/EC

R

3Manoj Kumar(IG

110108)ALP/RJY 25.08.2011 SEE/ECR

4 Sumanth raj Meena ALP/BTTR 07.09.2011AGRA/NC

RLY.

5 Veer Bhan Meena ALP/BTTR 02.05.2012KOTA

DIV/WC

6 Ram Singh Meena ALP/BTTR 05.06.2012 DELHI/NR

7 Vinod Kumar Meena ALP/BTTR 07.06.2012 DELHI/NR

8 Shrimohan Meena ALP/BTTR 21.06.2012 DELHI/NR

9 Shish Ram Meena ALP/BTTR 21.06.2012 DELHI/NR

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

INTER RAILWAY - REQUEST TRANSFER CASES (ONE SIDE)

RUNNING STAFF

REMARKS

Page 4: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

10 Giridharlal Meena ALP/BTTR 25.08.2012KOTA

DIV/WC

11LAKSHMAN

PRASADSHAH

ALP/DSL/B

ZA29.08.2012

HAJIPUR/E

C

12 Gajendra Kumar ALP/BTTR 25.09.2012MGS

DIV/ECR

13 SANJEETH KUMAR ALP/RJY 16.10.2012MGS

DIV/ECR

14 Hajarilal Meena ALP/BTTR 16.10.2012 DELHI/NR

15 Ashish Kumar Rao. ALP/BTTR 16.10.2012MGS

DIV/ECR

16 Harish kumar sr.ALP/BT

TR18.06.2013 N.RLY

17 Sanjib kumarsr.ALP/BT

TR09.07.2013 E.C.RLY

18 BINAY KUMAR ALP/RJY 18.09.2013DHANPUR

DIVN/ECR

19 Sanjeev Kumar ALP/RJY 18.9.2013MGS

DIV/ECR

20 AVINASH KUMAR ALP/RJY 28.10.2013DHANBAD/

ECR

21 SHUBAM KUMAR ALP/RJY 28.10.2013HAJIPUR/E

CR

22 RAJHANS ALP/RJY 28.10.2013PATNA/EC

R

23 MUNNA KUMAR ALP/RJY 28.10.2013 GAYA/ECR

24 RAM PRAKASHsr.ALP/BT

TR30.10.2013 N.C.RLY

25 RAJESH KUMARsr.ALP/BT

TR30.10.2013 N.C.RLY

26 GAURAV PATEL ALP/BZA 30.10.2013 E.R.RLY

27RAKESH KUMAR

SINGHALP/BZA 05.11.2013 E.C.RLY

28 RAJNISH KUMAR ALP/BZA 21.11.2013 N.C.RLY

29 Ashok Kumar ALP/BZA 21.11.2013 ECR

30 DEEPAK KUMAR ALP/RJY 03.12.2013 E.C.RLY

31 ALOK KUMAR ALP/RJY 21.01.2014 E.RLY

32 ASHRAD ALI ALP/BTTR 21.01.2014 E.C.RLY

33 Heera lal kushwaha ALP/BZA 21.01.2014 NC.RLY

34 Md.Shamsher ALP/BTTR 20.02.2014 ECR

35 Meethalal Meena ALP/BTTR 20.02.2014 N.R

36 Santosh Kumar ALP/RJY 20.02.2014 ECR

37 Vijay Kumar ALP/RJY 20.02.2014 ECR

38 M.K. Singh ALP/RJY 20.02.2014 NCR

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

Page 5: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

39 Abhit Kumar ALP/RJY 20.02.2014 NER

40 Sunil Kumar Sahu ALP/RJY 20.02.2014 ECR

41 Ramawatar Kumar ALP/RJY 20.02.2014 ECR

42 Sikandar Kumar ALP/RJY 20.02.2014 ECR

43 Awadesh Kumar ALP/RJY 20.02.2014 ER

44Gowtam Kumar

prajapathiALP/RJY 20.02.2014 ECR

45 Raj Kumar ALP/RJY 20.02.2014 ECR

46 Umesh Kumar ALP/RJY 20.02.2014 ECR

47Sushil Kumar

KushwahALP/RJY 20.02.2014 ER

48 Sudhir Kumar Yadav ALP/RJY 20.02.2014 NCR

49 Ravi Kumar ALP/RJY 20.02.2014 ECR

50 Arun Kumar ALP/RJY 20.02.2014 ECR

51 Manoj Kumar ALP/RJY 20.02.2014 ER

52 Sashi Kumar Sharma ALP/RJY 20.02.2014 ER

53Sanjeev

Kumar,T.no.2958ALP/RJY 20.02.2014 ECR

54 Satish Kumar ALP/RJY 20.02.2014 ECR

55 Vijay Kumar ALP/RJY 21.02.2014 ECR

56 Manoj Kumar ALP/RJY 21.02.2014 SER

57 Md.Kashif Reza ALP/RJY 21.02.2014 ER

58 Santosh Kumar Nirala ALP/RJY 21.02.2014 ECR

59 Dharmendra Kumar ALP/RJY 21.02.2014 ECR

60 Rajan Kumar ALP/BZA 25.02.2014 ECR

61 Vijay Kumar ALP/BZA 25.02.2014 ECR

62 Sarvotam Kumar ALP/BZA 25.02.2014 ECR

63 Priyaranjan Kumar ALP/RJY 25.02.2014 ECR

64Mukesh Kumar

MeenaALP/RJY 25.02.2014 WCR

65 Ram Nihal ALP/RJY 25.02.2014 N.Rly

66 Sujit Kumar ALP/RJY 07.03.2014 ECR

67 Ajay Kumar ALP/RJY 07.03.2014 ECR

68 Arun Kumar ALP/RJY 07.03.2014 NCR

69 Dinesh Kumar ALP/RJY 07.03.2014 NCR

70 Manish Kumar ALP/RJY 17.3.2014 E.C.Rly

71 Ganesh Debnath ALP/RJY 17.3.2014 E.Rly.

72 Amarjeet Kumar ALP/RJY 17.3.2014 ECR

73 Ram Dayal ALP/RJY 17.3.2014 E.C.Rly

74 Umarsankar Singh ALP/RJY 17.3.2014 E.C.Rly

75 Pankaj Kumar ALP/RJY 17.3.2014 E.Rly.

76 Arun Kumar ALP/RJY 17.3.2014 E.Rly

77 Rahul Kumar ALP/RJY 17.3.2014 E.C.Rly

78 Chandan Kumar ALP/RJY 17.3.2014 E.Rly.

79 Kumar Gaurav ALP/RJY 17.3.2014 E.C.Rly App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

SDGM(V/SC CLEARNCES IS Received)

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

SDGM(V/SC CLEARNCES IS Received)

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

App.Fowarded to CPO/SC

Page 6: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

80 Gyan Ranjan Sahoo ALP/RJY 18.3.2014 E.Co.Rly

81 Pankaj Kumar ALP/RJY 18.3.2014 GAYA/ECR

82Bhupendra Kumar

PrasadALP/RJY 18.3.2014 E.Rly

83 Surendra Kumar ALP/RJY 18.3.2014 N.Rly

84 Nilesh prakash ALP/RJY 18.3.2014 E.Rly.

85 Ajeet Kumar Verma ALP/RJY 18.3.2014 E.C.RLY

86 Sujit KUmar ALP/RJY 18.3.2014 E.Rly

87 V.K.Saxena ALP/RJY 18.3.2014 E.C.RLY

88 Rajeev Kumar ALP/BTTR 19.3.2014 E.C.RLY

89 Mani Ranjan ALP/BTTR 19.3.2014 E.C.RLY

90 Rishikesh Meena ALP/BTTR 19.3.2014AGRA/NC

RLY.

91 Sunil Kumar Thakur ALP/BTTR 19.3.2014Howrah/SE

Rly.

92 B.MohanALP/DSL/B

ZA20.03.14 E.C.Rly

93 Ajay kumar Singh ALP/BZA 21.3.14 SE Rly.

94 Debashisha Sahoo ALP/BZA 21.3.14 E.Co.Rly

95 Ajeet Kumar ALP/BZA 21.3.14 E.C.Rly

96 Raushan Kumar ALP/BZA 21.3.14 ER

97 Badri narayan Panda ALP/RJY 24.03.14 E.Co.Rly

98 Dilip padhan ALP/RJY 24.03.14 E.Co.Rly

99 Chandan Kumar jha ALP/RJY 24.03.14 ECR

100 Sudhir Kumar ALP/RJY 24.03.14 ECR

101Sanjeet

Kumar(T.No.2897)ALP/RJY 24.03.14 ECR

102 Abhilasaha Prajapathi ALP/BZA 25.3.14 N.C Rly

103 Brajesh Kumar ALP/BZA 25.3.14 E.C.Rly

104Sandeep kumar

SimhadriALP/BZA 25.3.14 E.Co.Rly.

105 Shashikanth Singh ALP/BZA 28.3.2014 ECR

106 Ravindra Kumar ALP/BZA 28.3.2014 ECR

107 Gautam Kumar ALP/BZA 28.3.2014

108 Jodhraj Bairwa ALP/BZA 28.3.2014 ECR

109 RAKESH KUMAR ALP/BZA 28.3.2014 ECR

110 Pramod Kumar ALP/BZA 28.3.2014 ECR

111Manoj Kumar

T,No,1813ALP/BZA 01.4.2014 ECR

112 Vinay Kumar ALP/RJY 01.4.2014 ECR

113 Suryakanta Mishra ALP/RJY 01.4.2014 S.E.R.

114 Pravin Kumar varma ALP/RJY 01.4.2014 ECR

115 Kamalesh Kumar ALP/RJY 01.4.2014 ECR File Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forward

File Putup to DRM(Cancelled)

File Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forwardSDGM(V/SC CLEARNCES IS Received)

File Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forward

Page 7: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

116Prakash Kumar

RanjanALP/RJY 01.4.2014 ECR

117 Kamaljeet Kumar ALP/RJY 01.4.2014 ECR

118 Munna Kumar ALP/RJY 01.4.2014 ECR

119 Brijesh Kumar ALP/RJY 01.4.2014 ECR

120 Rajeev Ranjan Kumar ALP/BTTR 03.4.2014 ECR

121Rajanish

KumarT.No.2050ALP/BZA 03.4.2014 E.R.RLY

122Sumantha Kumar

RayALP/BZA 03.4.2014 ECR

123 Upendra Kumar ALP/BZA 03.4.2014 ER

124 Sridhar Katta ALP/BZA 03.4.2014 E.Co.Rly

125 Bibhor Kumar ALP/BZA 03.4.2014 ECR

126 E.Srinivasu ALP/BZA 03.4.2014 E.Co.Rly

127 Anuraj Kumar Patel ALP/RJY 15.4.2014 ECR

128 Y.Vasudev ALP/RJY 15.04.2014 SER

129 Rahul Kumar ALP/RJY 15.04.2014 ECR

130 S.Srinivasa Rao ALP/RJY 15.04.2014 E.Co.Rly

131 Saket Sharan ALP/RJY 21.04.2014 NC Rly

132 Vishram Meena ALP/RJY 21.04.2015 NR

133 Harish Chowbey ALP/RJY 21.04.2016 NCR

134 Umesh Kumar Soni ALP/RJY 21.04.2017 NCR

135 Ajay Kumar Verma ALP/RJY 21.04.2018 ECR

136 Sathya Paul Singh ALP/RJY 21.04.2019 NER

137 Manikesh Kumar ALP/RJY 21.04.2020 ECR

138 B.Prasad Yadav ALP/RJY 12.5.14 N.E.RLY

139Dinesh

Kumar(2)T.No.3137ALP/RJY 12.5.14 E.C.Rly

140 Raj Kumar Meena ALP/BTTR 12.5.14 N.Rly

141 S.Asok Kumar ALP/BTTR 12.5.14 E.Co.Rly

142 K.Ravi Kumar ALP/BTTR 12.5.14 E.Co.Rly

143 J.Naveen Kumar ALP/BZA 12.5.14 E.Co.Rly

144 Shridhar Kumar ALP/RJY 12.5.14 E.C.Rly

145 Jodhraj Meena ALP/BTTR 12.5.14 W.C.Rly

146 Nirmal Kumar ALP/BTTR 12.5.14 N.C.Rly

147Ramesh Chand

MeenaALP/BTTR 28.5.14 W.C.Rly

148Rajendra Prasad

MeenaALP/BTTR 28.5.14 W.C.Rly

149 Dharm Raj Meena ALP/BTTR 28.5.14 W.C.Rly

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Awaited)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

File Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forward

File Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forwardFile Putup to DRM&Approved to

forward

Page 8: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

150Rajendra Kumar

MeenaALP/BTTR 28.5.14 N.C.Rly

151 Chetram Meena ALP/BTTR 28.5.14 W.C.Rly

152 Sushant Kumar Jena ALP/BZA 28.5.14 E.Co.Rly

153 y.Malli BabuALP/DSL/B

ZA30.05.14 E.Co.RLY

154 K.PrasadALP/DSL/B

ZA30.5.14 E.Co.RLY

155 Nawin Kumar ALP/RJY 01.07.14 E.RLY

156Pratap Ranjan

DehuryALP/RJY 01.07.14 E.Co.RLY

157 Mritunjay Kumar ALP/RJY 01.07.14 E.C.Rly

158 Bhambulal Meena ALP/BTTR 01.07.14 W.C.Rly

159 Vishram Singh ALP/BTTR 01.07.14 N.C.Rly

160 Raj Kumar ALP/BZA 01.07.14 E.C.Rly

161 K.Parameswara Rao ALP/BZA 01.07.14 E.Co.Rly

162 N.Siva Kumar ALP/BZA 01.07.14 E.Co.Rly

163 P.Murali ALP/BZA 01.07.14 E.Co.Rly

164 Ashutosh Kumar ALP/RJY 01.07.14 E.C.Rly

165 Rakesh Kumar ALP/BTTR 01.07.14 E.C.Rly

166 Bhajanlal Meena ALP/BTTR 01.07.14 N.W.Rly

167 J.SrinivasALP/DSL/B

ZA01.07.14 E.Co.Rly

168Vijendra Kumar

MeenaALP/BTTR 01.07.14 W.C.Rly

169 Rishi Raj Meena ALP/BTTR 01.07.14 W.C.Rly.

170 Channga ram Meena ALP/BTTR 09.07.14 W.C.Rly.

171 Umesh Chand Meena ALP/BTTR 18.07.14 N.Rly

172 Balia Bisoyi ALP/RJY 11.8.14 E.Co.Rly

173 G.Sreenu ALP/BZA 11.8.14 E.Co.Rly

174 P.Rambabu ALP/RJY 21.8.14 E.Co.Rly

175 Ganesh Chandra SahooALP/RJY 21.8.14 E.Co.Rly

176 Rama Krishna YaduvakaALP/T/BZA 25.8.14 E.Co.Rly

PRADHAN

SAWAIYAN

SR.CLERK/

DLS/O/BZA5.4.12

CKP DIV/

SERLY

APPLICATION

FORWARDED TO

CPO/SC

SDGM(V/SC CLEARNCES IS AWAITING)

SDGM(V/SC CLEARNCES IS AWAITING)

PRIORITY LIST OF INTER RAILWAY REQUEST TRANSFERS OF ERSTWHILE GROUP 'D'

STAFF-

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS AWAITING)

SDGM(V/SC CLEARNCES IS AWAITING)

SDGM(V/SC CLEARNCES IS AWAITING)

SDGM(V/SC CLEARNCES IS AWAITING)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS awaited)

SDGM(V/SC CLEARNCES IS awaited)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

SDGM(V/SC CLEARNCES IS Received)

Page 9: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

Sl

no

Name of the

employee

S/Shri/Smt

COMDesignation

/ UnitAppln recd

Request

transfer

sought to

REMARKS

1 M. SENTHILHelper II/

C&W/CD/BZ

A

24.11.2011 TPJ Divnforwarded to

CPO/SC on

17.04.13

2MAKINUL

HUSSAIN

Helper II/

C&W/CD/BZ

A

27.06.2012HOWRAH

Divn/

Eastern Rly

Unwilling

submitted

3 SMT P. INDRAHelper II/

C&W/GDR01.07.2012

CEN

Dvision/ S.

Forwarded to

CPO/SC on

4 G.SUKUMARANHelper II/

C&W/GDR01.07.2012

PALAKKAD

Divn/ S.Rly

Unwilling

submitted

5T.V.SAHEESH

KUMAR

Helper II/

C&W/GDR01.07.2012

PALAKKAD

Divn/ S.Rly

Forwarded to

CPO/SC on

6 S.S.JANAHelper II/

C&W/COA14.12.2012

PALAKKAD

Divn/ S.Rly

Unwilling

submitted

7 ASHOK KUMAR SAHAHelper II/

C&W/COA29.01.2013

SHEALDAH

A Divn/

Eastern Rly

Approval of CA

obtained on

03.06.14

8 V.KALAISELVIHelper II/

C&W/WD/B

ZA

20.02.2013ICF/CEN/S.Rly Unwilling

submitted

9 R.ANIL KUMARHelper II/

C&W/CD/BZ

A

30.10.13Trivandrum DivnUnwilling

submitted

10 SHEIK IMRANHelper II/

C&W/MTM02.04.14 E.C.Railway

Approval of CA

obtained on

11 ARUN KUMAR SINGHHelper II/

C&W/MTM02.04.14Eastern railway

Approval of CA

obtained on

12 RUDAL SINGHHelper II/

C&W/NS02.04.14 EC Railway

Approval of CA

obtained on

13 CHINMOY JANAHelper II/

C&W/NS02.04.14 S.E.Railway

Approval of CA

obtained on

Diesel Shed

1 Dinesh Kumar MeenaHelper

II/Mech/DLS26.06.14 N W Rly

Forwarded to

CPO/SC

2 Ravi kumarHelper

II/Mech/DLS9.7.14 E.Rly

Forawrded to

CPO/SC

3 G.RajuHelper

II/Mech/DLS9.7.14 E.Rly

Forawrded to

CPO/SC

4 Sukantha Kumar PatiHelper

II/Mech/DLS9.7.14 E.COR

Forawrded to

CPO/SC

Page 10: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

S.No

.

Name of the

employee

Designati

on /

Station

Mutual

transfer

with

Receipt of

application

SOUGHT

TORemarks

1 Sri. S.BalajiSr.ALP/BT

TR

1B.Ravi

Kumar22.06.12 GTL Divn

Relieved to GTL

Division

2 Sri V. BalajiSr.ALP/BT

TRB.Arjanudu 28.06.2012 GTL.Divn

Relieved to GTL

Division

3 Kum Y.Sirisha ALP/BZAL.Naveen

babu11.07.2012 GTL Divn O.O. Issued

4 Sri A.Ravi ALP/T/BZAB.Nagendra

singh06.08.2012 GTL Divn

SR called for from

DRM/GTL.

5 Dileep kumar meena ALP/BTTRV.Krishna

Rao11.11.2012 NED Divn

DRM/P/NED

Divison approval

not received

6 Kirodilal Meena ALP/BTTRR.Venkata

Ramana16.12.2012 NED Divn

DRM/P/NED

Divison approval

not received

Memorandum not 7 A.Viswanadha babu ALP/BTTR

K.Srinivasa

Rao15.02.2013 GTL Divn

Waiting for

DRM/GTL Approval

8 V.Surya narayana ALP/BTTRR.Venkata

Ramana25.02.2013 GTL Divn

Waiting for

DRM/GTL Approval

9 S.Hanumantha Rao ALP/BZAY.V.Raman

a09.06.2013 SC DIVN

DRM/P SC

APPROVAL IS

AWAITED10 Y.Babi Kumar ALP/BZA

Y.G.Murali

mohan21.09.2013 GNT DIVN

Waiting for

DRM/GTL Approval

11 T.Venkatesh ALP/BTTRA.Karun

Kumar30.10.2013 SC DIVN O.O issued

12 T.Yadagiri ALP/BZAB.Mallikarju

na Rao5.11.13 SC DIVN

Relieved to SC

Division

13 J.SudhakarALP/DSL/B

ZA

K.Rajeev/AL

P/KCG14.2.14 SC DIVN

Waiting for

DRM/HYB

Approval14 M.Naresh ALP/BZA

Nookaraju.

M.12.5.14 SC DIVN

forwarded to

DRM(P)SC

15 Bandla Chandraiah ALP/BTTRV.Sambasiv

a Rao01.07.2014 GTL Divn

Waiting for

DRM/GTL Approval

Sl

no

Name of the

employee

S/Shri/Smt

Designatio

n/ UnitIRMT with Appln Rcd Divn/Rly Appln. Status

1 S.SRINUHELPER I/

C&W/CD/B

ZA

Smt.G.Sune

etha30.01.14 SC

Approval of CA

obtained on

17.06.2014

2Smt.K.B.L

PRASANNA

HELPER I/

C&W/NSS.G.S.Narayana 26.03.14 SC

SR&GL-14 sent to

CPO/SC on

3Satya Kumar Raj,

IG130572

Helper-

II/CD/BZA

S.Ram

Babu17.07.14 NED

SDGM cls sought

on 28.05.14

INTER DIVISIONAL MUTUAL TRANSFERS OF RG.STAFF OF BZA DIVN AS ON 15.09.2014

PRIORITY LIST OF INTER DIVISIONAL MUTUAL TRANSFERS OF ERSTWHILE GROUP 'D'

STAFF -

Page 11: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

4G.Sudhakar

IG110226

Helper-

II/CD/BZA

Bada

Kumari17.07.14 SC

SDGM cls sought

on 28.05.14

5Ajit Kumar

IG131019

Helper-

II/CD/BZA

B.Srihari

Naidu17.07.14 NED

SDGM cls sought

on 28.05.14

6 A.RameshHelper-

II/CD/BZAP.Sateesh 02.08.14 HYB SDGM cls sought

7 Mustak AhmedHelper-

II/CD/BZA

D.Eswara

Rao14.08.14 NED SDGM cls sought

8 G.Srinivasa RaoHelper-

II/CD/BZA

M.Mohan

Babu18.08.14 RYP SDGM cls sought

S.NoName of the

employee

Designati

on /

Station

Receipt of

application

SOUGHT

TO

1 A.Anil Kumar ALP/BTTR 16.04.2014 GNT Div

2 T.Ravi Kiran ALP/RJY 12.5.14 GNT Div

Sl

no

Name of the

employee

S/Shri/Smt

ComDesignation

/ UnitAppln Recd

Request

to REMARKS

1 E.Praveen Kumar

Helper I/

C&W/NS 14.09.05 HYBUnwilling

submitted

2 N.Narasinga Rao

Helper I/

C&W/NS 14.09.05 SCUnwilling

submitted

3 S.Srinu

Helper I/

C&W/CD/BZ

A 27.09.05 SC

Unwilling

submitted

4 A.Ramesh

Helper II/

C&W/CD/BZ

A 26.10.05 SC

Unwilling

submitted

5 M.Naga Raju

Helper II/

C&W/CD/BZ

A 26.10.05 SC

6 M.S.Bhavani Prasad

Helper II/

C&W/NS 02.11.05 SC

7 A.Venu

Helper II/

C&W/CD/BZ

A 01.11.06 SC

8 M.Devendar

Helper II/

C&W/CD/BZ

A 30.07.10 SC

9 P.RAMESH

Helper II/

C&W/CD/BZ

A 10.11.11 LGD

Forwarded to

WPO/LGD ON

10.01.12

10 R.SRINIVASA RAOHelper II/

C&W/CD/BZ

A

29.01.13 LGDUnwilling

submitted

Remarks

Sent to DRM/P/GNT

Sent to DRM/P/GNT

PRIORITY LIST OF INTER DIVISIONAL REQUEST TRANSFERS OF ERSTWHILE GROUP

'D' STAFF- MECHANICAL C&W DEPARTMENT-BZA DIVISION AS ON 26.05.2014

All the Request

transfer

applications were

forwarded to

respective

Divisions for

Registration in the

Request transfer

Register as per the

CPO/SC LR No:

P(R)676/II dated

INTER DIVISIONAL REQUEST TRANSFERS OF RG.STAFF OF BZA DIVN

Page 12: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

11 E.PRAVEEN KUMAR

Helper II/

C&W/CD/BZ

A 17.05.13 LGD

Approval of CA

obtained on

03.06.14

12 N.NARASINGA RAO

Helper II/

C&W/CD/BZ

A 17.05.13 LGD

Approval of CA

obtained on

03.06.14

13 A.RAMESH

Helper II/

C&W/CD/BZ

A 17.05.13 LGD

Approval of CA

obtained on

03.06.14

14 G.SUDHAKAR

Helper II/

C&W/CD/BZ

A 07.10.13 LGD

Unwilling

submitted

15 D,KHADER BASHA

Helper II/

C&W/CD/BZ

A 02.04.14 GNT

Approval of CA

obtained on

03.06.14

16 A.NASARAIAH

Helper II/

C&W/CD/BZ

A 02.04.14 GNT

Approval of CA

obtained on

03.06.14

17A.VITTAL YADAV

SPORTS QUOTA

Helper II/

C&W/CD/BZ

A

02.04.14 LGDApproval of CA

obtained on

17.06.14

Diesel Shed

1 K.Raj kumarTech-

III/DLS/BZA22.07.14 GNT Divn.

pending due to

revised instructions

S.No.Name of employee DISG. TICKET NO.Date of

ApplicationFrom TO

1 N.SWAMY NATH ALP 2906 5.8.13 RJY BZA Transferred

2 AJAY KUMAR ALP 3798 23.8.13 BTTR BZA

3 R.RAVI BABU ALP 3785 23.8.13 BTTR BZA

4 S.ASHOK KUMAR ALP 2632 26.8.13 RJY D/BZA

5N.N.K.SRINIVASA

RAOSR.ALP 1677 26.8.13 BZA D/BZA

6 K.SRINIVASU SR.ALP 1626 28.8.13 BZA D/BZA

7 V.SURESH KUMAR SR.ALP 1672 29.8.13 BZA D/BZA

8 K.RAMESH BABU SR.ALP 1583 29.8.13 BZA D/BZA

9LAXMAN PRASAD

SAHALP 309 02.9.13 D/BZA T/BZA

10S.KANAKA DURGA

RAOALP 1998 03.9.13 BZA D/BZA

11 A.VASU SR.ALP 1639 03.9.13 BZA D/BZA

12 CH.ASHOK KUMAR SR.ALP 1580 03.9.13 BZA D/BZA

13 G.VIJAYA BABU ALP 356 3.9.13 D/BZA RJY

14 BHANU PRAKASH SR.ALP 1703 05.09.13 BZA D/BZA

15 M.VEERA SWAMY SR.ALP 1684 05.09.13 T/BZA D/BZA

REQUESTS PENDING AS ON 15.09.2014 - WITHIN THE DIVISION

Page 13: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

16V.VENKATESWARA

RAOSR.ALP 1708 05.9.13 T/BZA D/BZA

17D.S.S.G.V.R.KESAV

A RAOALP 1728 06.9.13 T/BZA D/BZA

18 V.HARISH ALP 1666 06.9.13 T/BZA D/BZA

19 J.RAVI KUMAR ALP 355 07.09.13 D/BZA RJY

20 N.V.RAMANA .E ALP 3880 16.9.13 BTTR RJY Transferred

21 M.RAMA KRISHNA ALP 3805 16.9.13 BTTR RJY

22 MAHESH GANE ALP 3713 16.9.13 BTTR RJY

23MURAPAKA

SREENUALP 3720 16.9.13 BTTR RJY

24 D.MOHANA KUMAR ALP 3706 16.9.13 BTTR RJY

25E.PRAVEENA

KUMARALP 3717 16.9.13 BTTR RJY

26 V.SIVA NAGA RAJU ALP 3801 16.9.13 BTTR BZA

27 P.CHANDU ALP 3729 16.9.13 BTTR BZA

28 K.VENKATA RAO SR.ALP 1591 17.9.13 BZA D/BZA

29 N.ADI NARAYANA ALP 1859 21.9.13 BZA RJY

30 D.B.V.V.PRASAD ALP 1878 21.9.13 BZA RJY

31 K.SATISH ALP 1988 21.9.13 BZA RJY

32 CH.MADHAVA RAO ALP 1886 21.9.13 BZA RJY

33 P.UDAY KIRAN ALP 1779 21.9.13 T/BZA D/BZA

34T.SIVA KISHORE

YADAVALP 3881 23.9.13 BTTR

T/BZA(19.09.13)&

D/BZA(21.09.13) Transferred

35 ARSHAD ALI ALP 3774 23.9.13 BTTR RJY

36 I.VARADA RAJU ALP 3886 23.9.13 BTTR RJY

37 P.KAKA RAJU ALP 3887 23.9.13 BTTR RJY

38 D.VIJAY KUMAR ALP 3844 23.9.13 BTTR BZA Transferred

39AMAN KUMAR

GUPTAALP 3884 23.9.13 BTTR RJY

40 N.NARENDRA BABU ALP 3840 23.9.13 BTTR BZATransferred

41 I.NAGESWARA RAO ALP 3804 23.9.13 BTTR RJY

42K.V.PRASAD

GUDURUALP 3818 23.9.13 BTTR BZA

Transferred

43

NAYUDU

MANEENDRA

KUMAR

ALP 3838 23.9.13 BTTR RJY

Transferred

44 CH.CHINA BABU ALP 3814 23.9.13 BTTR RJY Transferred

45 Y.SURESH BABU ALP 3841 23.9.13 BTTR BZA

46 T.RAMU ALP 3815 23.9.13 BTTR RJY Transferred

47 A.NARESH KUMAR ALP 3839 23.9.13 BTTR BZA Transferred

48 G.UPENDRA ALP 3836 23.9.13 BTTR RJY Transferred

49 M.BALA SOWRI ALP 3842 23.9.13 BTTR RJY Transferred

50 S.SRINIVASA RAO ALP 3827 23.9.13 BTTR BZA

51 D.ASHOK BABU ALP 3823 23.9.13 BTTR BZA

52 K.NEHRU ALP 3816 23.9.13 BTTR BZA

Page 14: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

53 M.VENKATESH ALP 3822 23.9.13 BTTR BZA

54 J.SIMHACHALAM ALP 3702 23.9.13 BTTR BZA

55 K.SYAM BABU ALP 1911 23.9.13 BZA D/BZA

56A.VENKATESWARA

RAOALP 1906 23.9.13 BZA D/BZA

57 M.NAGA RAJU ALP 1907 23.9.13 T/BZA D/BZA

58 J.RAJESH ALP 1972 24.9.13 BZA RJY

59D.SATYA KIRAN

RAJUALP 1885 3.10.13 BTTR BZA

Transferred

60 K.RAJESH ALP 3878 3.10.13 BTTR BZA Transferred

61 SHAIK REHMAN ALP 3877 3.10.13 BTTR BZA Transferred

62 L.SIVA ALP 3876 3.10.13 BTTR RJY

63R.PEDA NOOKA

RAJUALP 3875 3.10.13 BTTR RJY

Transferred

64 A.ANIL KUMAR ALP 3873 3.10.13 BTTR T/BZA,D/BZATransfe

rred to

T/BZA65 S.SATYANARAYANA ALP 3872 3.10.13 BTTR T/BZA,RJY

66 K.G.RAJA SEKHAR ALP 3871 3.10.13 BTTR T/BZA,RJYTransfe

rred to

RJY67 G.SIVA SANKAR ALP 3888 3.10.13 BTTR RJY

68 G.S.MANYAM ALP 3869 3.10.13 BTTR RJY Transferred

69K.G.S.DURGA

PRASADALP 3867 3.10.13 BTTR RJY

Transferred

70 HARI VENKAT IRIGI ALP 3865 3.10.13 BTTR BZA Transferred

71 S.RAMA RAO ALP 3863 3.10.13 BTTR RJY Transferred

72N.VENKATA

RAMANAALP 3861 3.10.13 BTTR RJY

73CH.V.SEKHARA

RAOALP 3860 3.10.13 BTTR RJY

Transferred

74 V.V.NAGA SANKAR ALP 3859 3.10.13 BTTR RJY

75B.SARVESWARA

RAOALP 3858 3.10.13 BTTR RJY

Transferred

76 M.R.PRAKASH ALP 3857 3.10.13 BTTR RJY

77 K.APPALA RAJU ALP 3853 3.10.13 BTTR RJY Transferred

78K.NAGESWARA

RAOALP 3852 3.10.13 BTTR RJY

Transferred

79 V.NARESH BABU ALP 3851 3.10.13 BTTR RJY Transferred

80 G.ANAND BABU ALP 3849 3.10.13 BTTR BZA Transferred

81U.G.V.SRINIVASA

RAOALP 3848 3.10.13 BTTR RJY

Transferred

82 J.SUBBA RAO ALP 3846 3.10.13 BTTR BZA

83 K.SRINIVASU ALP 3845 3.10.13 BTTR BZA

84 P.DANTESWAR ALP 2977 3.10.13 RJY BZA

85 K.JAGANADHA RAO ALP 3892 12.10.13 BTTR RJY Transferred

86 K.APPA RAO ALP 3891 12.10.13 BTTR RJY Transferred

87 B.RAJESH ALP 3890 12.10.13 BTTR RJY Transferred

88 A.HARI BABU ALP 3854 12.10.13 BTTR BZA

Page 15: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

89 D.HEMADRI ALP 3889 12.10.13 BTTR BZA Transferred

90 L.SRINIVASULU ALP 3883 12.10.13 BTTR BZA Cancelled

91 K.RAVI KUMAR ALP 3893 12.10.13 BTTR RJY

92 V.MAHESH ALP 3850 13.10.13 BTTR RJY

93 U.RAJU ALP 1966 17.10.13 BZA RJY

94 P.THILAK SR.ALP 318 21.10.13 D/BZA RJY

95 A.RADHA KRISHNA ALP 3022 2210.13 RJY BZA

96 S.SRNIVASA RAO ALP 3827 28.10.13 BTTR D/BZA

97 P.BALAJEE RAO ALP 2022 04.11.13 BZA RJY

98GOLA

SUBRAMANYAMALP 2023 5.11.13 BZA RJY

99 R.SRINIVASA RAO ALP 2009 5.11.13 BZA RJY

100 N.SURESH ALP 3748 25.11.13 BTTR BZA Transferred

101 Y.VENKAIAH ALP 3847 25.11.13 BTTR BZA

102 SHAIK ZAHEER ALP 3727 25.11.13 BTTR BZA Transferred

103 K.PRASAD ALP 3722 25.11.13 BTTR RJY Transferred

104 M.SRINIVASA RAO ALP 3707 25.11.13 BTTR BZA Transferred

105 V.ARUN KUMAR ALP 3793 6.12.13 BTTR BZA

106 P.RAKESH ALP 3763 6.12.13 BTTR BZA

107 T.SIVA PRAKASH ALP 373 9.12.13 D/BZA RJY

108 B.VENKATA SWAMY ALP 387 9.12.13 D/BZA RJY

109 V.TARKESH ALP 2041 14.12.13 BZA RJY

110NARENDRA KUMAR

REDDYALP 1858 14.12.13 BZA RJY

111 S.SATTI BABU ALP 1853 14.12.13 BZA RJY

112 ASISH KUMAR RAO ALP 3789 18.1.14 BTTR BZA

113V.N.LAXMANA

RAO.KOLUSUALP 3716 18.1.14 BTTR BZA

114 B.GURU MURTHY ALP 3714 18.1.14 BTTR RJY

115 J.PREMA KUMAR ALP 3709 18.1.14 BTTR BZA

116 S.ASHOK KUMAR ALP 3705 18.1.14 BTTR RJY

117B.MURALIDHARA

RAOALP 3783 18.1.14 BTTR BZA

118 P.PREM CHAND ALP 3784 18.1.14 BTTR BZA

119 M.SRINIVASA RAO ALP 3704 18.1.14 BTTR RJY

120 MD.SAMSHER ALP 3721 18.1.14 BTTR BZA

121 M.DURGA PRASAD ALP 3703 18.1.14 BTTR RJY

122V.SIVA RAMA

KRISHNAALP 1963 24.1.14 BZA RJY

123ASHOK KUMAR

GUPTASR.ALP 3629 4.2.14 BTTR BZA

124 P.SRINIVASU ALP 3742 4.2.14 BTTR BZA

125P.K.CHAKRAVARTH

YALP 2014 4.2.14 BZA RJY

126 Rajeev Rajan Kumar Sr.ALP 3637 18.2.14 BTTR BZA

127 Harish Kumar Sr.ALP 3632 18.2.14 BTTR BZA

Page 16: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

128 Ram Prakash Sr.ALP 3633 18.2.14 BTTR BZA

129 Sanjeeb Kumar Sr.ALP 3631 18.2.14 BTTR BZA

130 P.Venkataeswara RaoSR.ALP 1761 28.2.14 T/BZA D/BZA

131 S.A.Thalli Naidu ALP 3797 16.3.14 BTTR RJY

132 P.Stephen Babu ALP 400 24.3.14 D/BZA RJY

133 B.V.V.Prasad Dasari ALP 1878 10.4.14 BZA RJY

134 S.Ashok Kumar ALP 2632 30.4.14 RJY BZA

135 K.Yedu Kondalu ALP 3158 12.5.14 RJY BZA

136 B.Sankara Rao ALP 3718 12.5.14 BTTR RJY

137 N.Venkata Ratnam ALP 3724 17.5.14 BTTR RJY

138 K.Krushna ALP 392 28.5.14 D/BZA RJY

139 N.Prakash ALP 3100 4.6.14 RJY BZA

140 K.Mangapathi ALP 404 4.6.14 D/BZA RJY

141 Dukka.Ramesh ALP 402 18.6.14 D/BZA RJY

142 K.Vasu ALP 391 20.6.14 D/BZA RJY

143 K.Suresh ALP 3708 8.7.14 BTTR BZA

144 M.Nageswara Rao ALP 3701 8.7.14 BTTR BZA

145 T.Ravi Kiran ALP 2883 9.7.14 RJY BTTR

146 B.Bhaskara Rao ALP 3703 25.7.14 BTTR RJY

S.NoName of the

employee S/Sri

Designatio

n

Presnt

station

Date of

request

received by

Sr.DPO's

office

Request

sought forRemarks

1A.RAVI CHANDRA

RAO

LP(SHG)G

R.IKAPT 04.02.2014 BTTR

1 J.KASI VISWANATHLP(SHG)G

R.IIT/BZA 19.07.2012

1.RJY

2.COA

2D.SANTHOSH

KUMAR REDDY

LP(SHG)G

R.IIT/BZA 13.09.2012

1.RJY

2.COA

3 I.APPALA RAJULP(SHG)G

R.IICOA 10.09.2012 RJY

4 M.VISWANATHAMLP(SHG)G

R.IICOA 10.09.2012 RJY

5 A.MURALI KRISHNALP(SHG)G

R.IICOA 20.09.2012 RJY

6 P.GOVINDA RAJULP(SHG)G

R.IIT/BZA 05.11.2012

1. RJY 2.

COA

SPOUSE

WORKING AS

HINDI PANDIT IN

MANDAL PRAJA

PARISHAD

SCHOOL AT

REQUEST TRANSFER PRIORITY LIST LOCO PILOT (SHUNTING) Gr.I IN SCALE PB-2, Rs.9300-

REQUEST TRANSFER PRIORITY LIST LOCO PILOT (SHUNTING) Gr.II IN SCALE PB-1, Rs.5200-20200+2400 GP

Page 17: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

7 B.GANESH KUMARLP(SHG)G

R.IIMTM 03.01.2013 D/BZA

8CH.SRINIVASA

RAJU

LP(SHG)G

R.IIT/BZA 04.02.13 RJY

9 KR JAGAN MOHANLP(SHG)G

R.IICOA 14.03.2013 RJY

10 V.SURESH BABULP(SHG)G

R.IIKAPT 06.03.2013

1.BTTR

2.T/BZA

11 L.NARASINGA RAOLP(SHG)G

R.IIT/BZA 08.03.2013

1.RJY

2.COA

12K.VENKATESWARA

RAO

LP(SHG)G

R.IIKI 07.03.2013

1.RJY

2.COA

13 P.GANGA RAJULP(SHG)G

R.IIKI 12.03.2013 T/BZA

14 D.VISHNUMURTHYLP(SHG)G

R.IIKI 07.03.2013

1.RJY

2.COA

15 K.VENKATA RAOLP(SHG)G

R.IIKI 07.03.2013

1.RJY

2.COA

3.T/BZA16 A.KALI KUMAR

LP(SHG)G

R.IICOA 15.04.2013 RJY

17 P.V.V.S.N.MURTHYLP(SHG)G

R.IICOA 15.04.2013 RJY

18 B.RAMANALP(SHG)G

R.IICOA 03.04.2013 RJY

19 V.BRAHMAJILP(SHG)G

R.IIKAPT 16.04.2013

RJY /T-

BZA /KI

/COA20 V.SIVA PAMULU

LP(SHG)G

R.IIKAPT 16.04.2013 T-BZA / KI

21M.V.NARENDRA

KUMAR

LP(SHG)G

R.IIKAPT 16.04.2013

RJY /T-

BZA /KI

/COA22 P.SAI SRINIVAS

LP(SHG)G

R.IIKAPT 16.04.2013

RJY /T-

BZA /KI

/COA23 J.KANTHA RAO

LP(SHG)G

R.IIKAPT 16.04.2013 T-BZA / KI

24 M.NAGA RAJULP(SHG)G

R.IIKAPT 16.04.2013 T-BZA / KI

25 K.RAVILP(SHG)G

R.IIKAPT 16.04.2013 T-BZA / KI

26 KALYANI RAJULP(SHG)G

R.IIKAPT 16.04.2013

T-BZA / KI

/ RJY

27K.UDHAYA

BHASKAR

LP(SHG)G

R.IIT/BZA 24.06.2013 RJY

28 D.BALAKRISHNALP(SHG)G

R.IIT/BZA 24.06.2013 RJY

29T.SURYA

KRISHNAMURTHY

LP(SHG)G

R.IIRJY 27.08.2013 COA

30 P.VADDIKASULULP(SHG)G

R.IIT/BZA 05.09.2013 D-BZA

Page 18: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

31 N.RAVI KUMARLP(SHG)G

R.IIT/BZA 06.09.2013 D-BZA

32 CH.A.MANGA RAOLP(SHG)G

R.IIKAPT 17.10.2013

D-BZA /

RJY / COA

Drivers

Goods Drivers

S.NO NAME STNRequested

to

Date of

appl.

Date

receivedRemarks

1 N.CHALAPTHI RAO BTTR TR/BZA 28.6.10 15.7.10

2 D.RAMA RAO BTTR TR/BZA 28.6.10 15.7.10 cancelled

3 CH.R.V.S.REDDY BTTR TR/BZA 28.6.10 15.7.10

4 M.SURESH BABU BTTR TR/BZA 28.6.10 15.7.10 TLC/BZA

5 G.SRINIVAS RJY TR/BZA 9.7.10 20.7.10

6 D.V.S.RAMALINGAM RJY TR/BZA 10.7.10 20.7.10

7 B.P.CHENNAIAH D/BZA RJY 28.7.10 4.8.10

8 B.P.CHENNAIAH D/BZA COA 28.7.10 4.8.10

9 R.ANIL KUMAR RJY TR/BZA 6.9.10 20.9.10 cancelled

10V.MALAKONDA

RAYUDURJY TR/BZA 6.9.10 20.9.10

11HARIPRASAD

TIWARYRJY TR/BZA 11.11.10 20.7.11

12G.SRINIVASA

REDDYBTTR TR/BZA 21.2.2011 24.2.11

13G.SRINIVASA

REDDYBTTR DSL/BZA 21.2.2011 24.2.2011

14 K.BHIKNA BTTR TR/BZA 21.2.2011 24.2.11

15 E.SRINIVASA RAO RJY TR/BZA 21.7.11 26.7.11

16 K.RAMAKRISHNA RJY TR/BZA 8.8.11 5.9.11

17 SK.FAYAZUDDIN RJY TR/BZA 8.8.11 5.9.11

18 K.KIRAN RJY TR/BZA 8.8.11 5.9.11

19 B.NARENDRA BABU BTTR TR/BZA 8.8.11 16.8.11 cancelled

20 K.SRIDHAR BTTR TR/BZA 8.8.11 16.8.11 cancelled

21 V.SAMBASIVAIAH BTTR TR/BZA 8.8.11 16.8.11 cancelled

22 A.PAUL RAJ BTTR TR/BZA 10.8.11 16.8.11

23D.VENKATA

RAMANABTTR TR/BZA 22.8.11 6.9.11 cancelled

24V.PANAKALA

RAYUDUBTTR TR/BZA 3.9.11 6.9.11 cancelled

25 R.ASHOK SINGH BTTR TR/BZA 7.9.11 9.9.11

26CH.S.CHAKRADHAR

IRJY TR/BZA 13.12.11 20.12.11

27 K.DURGA PRASAD RJY TR/BZA 9.2.12 14.2.12

28 G.V.NARAYANA RJY TR/BZA 11.2.12 14.2.12

29 CH.GANESH RJY TR/BZA 15.2.12 1.3.12

30K.V.KAMESWARA

RAORJY TR/BZA 15.2.12 1.3.12

Page 19: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

31 P.V.V.S.PRASAD RJY TR/BZA 15.2.12 1.3.12

32 S.VIJAYA RAJU RJY TR/BZA 15.2.12 1.3.12

33 K.SRINIVAS RJY TR/BZA 22.2.12 30.1.12

34 G.VIJAYA KUMAR RJY TR/BZA 7.5.12 21.5.12

35 A.V.V.R.SRINIVAS RJY TR/BZA 8.5.12 18.5.12

36 A.S.SURYAKUMAR BTTR TR/BZA 15.5.12 18.5.12

37 P.SRINIVASA RAO BTTR TR/BZA 15.5.12 18.5.12 Sports account

38 A.YESU RAJU BTTR TR/BZA 8.6.12 20.6.12

39P.VENUGOPALA

RAOBTTR RJY 8.6.12 20.6.12

40 V.SRINIVASU RJY TR/BZA 11.6.12 13.6.12

41 K.GOPALAKRISHNA RJY TR/BZA 11.6.12 13.6.12

42 K.PRAKASH RJY TR/BZA 18.6.12 25.6.12 CANCELLED

43 D.V.RAMANA RJY TR/BZA 19.6.12 25.6.12

44 G.V.S.N.PRASAD RJY TR/BZA 19.6.12 25.6.12

45 K.SREEDHAR RJY TR/BZA 25.6.12

46V.PANAKALA

RAYUDURJY TR/BZA 28.6.12 29.6.12

47 P.EMMANUEL BZA RJY 5.7.12 19.7.12

48Y.MADHUSUDANA

RAORJY TR/BZA 6.7.12 9.7.12

49 K.SITHA RAM RJY TR/BZA 6.7.12 9.7.12

50 D.SRIKANTH YADAV BTTR TR/BZA 9.7.12 10.7.12

51 D.SRIKANTH YADAV BTTR RJY 9.7.12 10.7.12 CANCELLED

52 M.BAPUNAIDU BTTR RJY 11.7.12 13.7.12

53 G.GANGA RAJU BTTR RJY 11.7.12 13.7.12

54 T.KONDA BABU BZA RJY 4.8.12 22.8.12 TLC/BZA

55 K.SUDHAKARA RAO BZA RJY 11.8.12 22.8.12

56 R.SRINIVAS BTTR TR/BZA 13.9.12 24.9.12

57T.V.V.POSHIYYA

RAOBTTR TR/BZA 13.9.12 24.9.12 Transferred

58 B.NAGENDRAM BTTR TR/BZA 13.9.12 24.9.12

59P.GNANESWARA

RAOBTTR TR/BZA 13.9.12 24.9.12

60 S.SRINIVASA RAO BTTR TR/BZA 13.9.12 24.9.12

61 K.SRINIVASA RAO BTTR TR/BZA 13.9.12 24.9.12

62 S.ESWARA RAO BTTR TR/BZA 13.9.12 24.9.12

63 S.JANAKINATH BTTR TR/BZA 13.9.12 24.9.12

64 N.RAMA RAO BTTR TR/BZA 13.9.12 24.9.12

65 G.ADINARYANA BTTR TR/BZA 13.9.12 24.9.12

66 B.THAVITAYYA BTTR RJY 13.9.12 24.9.12

67 G.SUBRAMANYAM BTTR RJY 13.9.12 24.9.12

68L.NAGABHUSHANA

RAOBTTR RJY 13.9.12 24.9.12

Page 20: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

69P.GNANESWARA

RAOBTTR RJY 13.9.12 24.9.12

70 K.SATYANARAYANA BTTR RJY 13.9.12 24.9.12

71 M.V.RAMA RAO BTTR RJY 13.9.12 24.9.12

72 V.RAMBABU BTTR RJY 13.9.12 24.9.12

73 P.PEDDI RAJU BTTR RJY 13.9.12 24.9.12

74 T.SATYANARAYANA BTTR RJY 13.9.12 24.9.12

75 K.RAMA RAO BTTR RJY 13.9.12 24.9.12

76 S.ESWARA RAO BTTR RJY 13.9.12 24.9.12

77 Y.SUBRMANYAM BTTR RJY 13.9.12 24.9.12

78 V.MOSHE DIAN BTTR RJY 13.9.12 24.9.12

79 P.L.APPALA NAIDU BTTR RJY 13.9.12 24.9.12

80 A.S.SURYAKUMAR RJY TR/BZA 18.9.12 24.9.12

81 P.SURESH BABU RJY TR/BZA 21.9.12 25.9.12

82 V.SIVA KUMAR RJY TR/BZA 21.9.12 25.9.12

83N.VENKATESWARA

RAORJY TR/BZA 26.9.12 27.9.12

84 V.V.RAGHAVULU RJY TR/BZA 26.9.12 27.9.12 cancelled

85K.SAMBASIVA

REDDYRJY TR/BZA 27.9.12 4.10.12 cancelled

86 P.V.V.NAGA MOHAN BTTR RJY 1.10.12 4.10.12 cancelled

87 P.BABU RAO BTTR RJY 29.10.12 31.10.12

88 CH.GIRISH DUTT TR/BZA RJY 2.11.12 8.11.12 cancelled

89 Y.S.N.V.V.PRASAD RJY TR/BZA 7.11.12 12.11.12

90 K.BALAJI BABU BTTR TR/BZA 15.12.12 21.12.12

91 G.SUBBA RAO RJY TR/BZA 25.1.13 31.1.13

92M.NARENDRA

KUMARBTTR RJY 6.6.13 19.6.13 Transferred

93M.NARENDRA

KUMARBTTR TR/BZA 6.6.13 19.6.13 Transferred

94 P.SIVASANKAR BTTR RJY 6.6.13 19.6.13

95 P.SIVASANKAR BTTR TR/BZA 6.6.13 19.6.13

96N.K.HASAVESWA

RAOBTTR RJY 6.6.13 19.6.13

97 CH.VENKATA RAO BTTR RJY 6.6.13 19.6.13

98 M.DHANA SEKHAR BTTR RJY 6.6.13 19.6.13

99 J.D.V.PRASAD BTTR RJY 6.6.13 19.6.13

100 B.RAJARATNAM BTTR RJY 29.6.13 4.7.13

101 G.GANGA RAJU BTTR TR/BZA 20.8.13 23.8.13

102 M.BAPUNAIDU BTTR TR/BZA 20.8.13 23.8.13

103P.VENUGOPALA

RAOBTTR TR/BZA 20.8.13 23.8.13

104M.NARENDRA

KUMARRJY TR/BZA 24.8.13 27.8.13

105 CH.GIRISH DUTT BZA RJY 20.9.13 27.9.13 MUF

106 P.V.V.NAGA MOHAN BTTR TR/BZA 26.10.13 5.11.13

Page 21: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

107 B.NARENDRA BABU BTTR TR/BZA 26.10.13 5.11.13

108 D.RAMA RAO BTTR TR/BZA 28.10.13 5.11.13

109 V.SURESH BABU KAPT BTTR 02-03-2014 02-04-2014

110 S.NARASIMHA RAO KAPT BTTR 02-03-2014 02-04-2014

111 V.V.RAGHAVULU RJY BZA 02-06-2014 02-07-2014

112 D.Srinivasa Rao BTTR RJY 05-09-2014 28-5-2014

113 V.S.ARAVI KUMAR BTTR BZA 05-09-2014 28-5-2014

114 K.PULLAIAH BTTR BZA 05-09-2014 28-5-2014

115 M.VISWESWARA RAO BTTR BZA 05-09-2014 28-5-2014

116 M.PRABHA KARA RAO BTTR RJY 05-09-2014 28-5-2014

117 C.PARAMESU KUMAR BTTR BZA 05-09-2014 28-5-2014

118 K.SYAMSUNDAR BABU BTTR RJY 05-09-2014 28-5-2014

119 N.RAVIKUMAR BTTR BZA 05-09-2014 28-5-2014

120 K.V.S.NARAYANA BTTR RJY 05-09-2014 28-5-2014

121 R.NAGIREDDY BTTR BZA 05-09-2014 28-5-2014

122 D.SITHA RAM BTTR BZA 05-09-2014 28-5-2014

123 Ch.KRISHNA RAO BTTR BZA 05-09-2014 28-5-2014

124 P.S.S.KAMAL NATH BTTR RJY 05-09-2014 28-5-2014

125 P.CHANDRA SEKHAR BTTR BZA 05-09-2014 28-5-2014

126 K.V.R.K.RAJU BTTR RJY 05-09-2014 28-5-2014

127 B.RAMANA BTTR RJY 05-09-2014 28-5-2014

128 V.S.V.V.S. MURTHY BTTR RJY 05-09-2014 28-5-2014

129 KARRI SRINIVASA RAO BTTR BZA 05-09-2014 28-5-2014

130 SK.HUMAYOON BTTR BZA 05-09-2014 28-5-2014

131 K.V.R.MURTHY BTTR BZA 05-09-2014 28-5-2014

132 A.SRINIVASULU BTTR RJY 05-09-2014 28-5-2014

133 B.SOMESWARA RAO BTTR BZA 05-09-2014 28-5-2014

134 P.GOVINDA RAO BTTR BZA 05-09-2014 28-5-2014

135 B.SURESH BABU BTTR RJY 05-09-2014 28-5-2014

136 VOGGU BABU BTTR BZA 05-12-2014 28-5-2014

137 K.SUKUMAR BTTR BZA 05-12-2014 28-5-2014

138 M.RAMESH BABU BTTR BZA 05-12-2014 28-5-2014

139 M.V.SRINUVASA RAO BTTR BZA 05-12-2014 28-5-2014

140 P.SRINU BABU BTTR BZA 05-12-2014 28-5-2014

141 M.PEDDI RAJU BTTR RJY 05-12-2014 28-5-2014

142 P.GNANESWARA RAO RJY BZA 15-5-2014 26-5-2014

1 A.CHANDRASEKHARA RAODSL/BZA TR/BZA 8.8.12 22.8.12 CANCELLED

2 M.VASANTHA RAO DSL/BZA TR/BZA 18.9.12 24.9.12 CANCELLED

3 M.SUDHAKAR RAO DSL/BZA TR/BZA 29.10.12 31.10.12

Passenger Drivers

1K.KUMARESWARA

RAOT/BZA RJY 19.12.12 21.12.12 Transferred

DSL/BZA TO TR/BZA

Page 22: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

2 S.S.RAMAM RJY BZA 22.12.12 7.1.13 Transferred

3 S.B.V.S.N.MURTHY BZA RJY 28.12.12 7.1.13 Transferred

4 R.Babaji Rao BZA BTTR 21.10.13 29.10.13 Transferred

TR/BZA

1SYED ZAKEER

HUSSAINDSL/BZA TR/BZA 7.12.09 14.12.09

2 E.JAYA RAJU DSL/BZA TR/BZA 26.2.10 1.3.10 D.OR-8/14

3 H.SHANMUGAM DSL/BZA TR/BZA 1.3.10 3.3.10

4 SK.KHADER SAHEB DSL/BZA TR/BZA 16.3.10 19.3.10

5 J.D.R.KUMAR DSL/BZA TR/BZA 12.10.11 19.10.11

6 T.R.NAIDU DSL/BZA TR/BZA 12.10.11 19.10.11

7 K.YESOBU DSL/BZA TR/BZA 12.10.11 19.10.11 CANCELLED

8 S.RAMESH DSL/BZA TR/BZA 12.10.11 19.10.11

Mail Drivers

1 DSL/BZA TR/BZA 8.8.11 8.8.11

2 G.ANNA RAO DSL/BZA TR/BZA 5.9.11 9.9.11

3 B.KOTIA NAIK DSL/BZA TR/BZA 9.9.11 20.9.11

1 P.ZAKARAIAH TR/BZARJY(retentio

n16.4.13 30.4.13

2 G.HARNATH BABU RJYRJY(retentio

n14-5-13 17-5-13 on promotion

3 U.Krushna Mohan RJYRJY(retentio

n 24-5-1325-5-13 -do

4 V. VNKATESAN RJYRJY(retentio

n 24-5-1323-5-13 28-5-13 -do-

S.NoName of the

employee

Designati

on /

Station

Mutual

transfer

with

Receipt of

application

SOUGHT

TORemarks

Inter Railway/Divisional Mutual Transfers of C&W Supervisors -BZA Div as on 15.09.2014

Remarks

Sl.N

OName S/sri

Present

station

Requested

to

Date of

application

submitted

Date of

receipt of

application

Remarks

DSL/BZA To

Sl.N

OName S/sri

Present

station

Requested

to

Date of

application

submitted

Date of

receipt of

application

Page 23: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

1 B.N.SubrahmanyamSE/C&W/B

TTR

M.Sailender

SE/C&W/SC16.10.12

SC

Div./SCR

Rly

Application

forwarded to

DRM/P/SC on

22.8.13. Other Div.

employee's SR and

other details not

2 K.Kishore KumarJE/C&W/C

OA

M.J.Ramku

mar

JE/C&W/

koraput/WA

T. Div.

8.12.12WAT Div./

E.Co.Rly

O.O dt.18.07.14

issued accepting

the mutual

transfer.Rld. On

12.08.14

3 T.V.RamanjaneyuluSSE/C&W/

WD/BZA

J.Ramesh,

SSE/ Bay-

III,

WWS/GTPL

27.06.14

Div to

Workshop/

GTPL of

S.C.Rly

O.O. dt.19.08.14

issued rld on

20.08.14

S.NoName of the

employee

Designati

on /

Station

Mutual

transfer

with

Receipt of

application

SOUGHT

TORemarks

1K.Madhusudhana

Rao

ChOS/Mec

h/WD/BZA

B.Thirupathi

Naidu1.10.13

Comml.De

pt SC. Div/

S.C.Rly

O.O.issued on

19.6.14 and the

employee relieved

to SC Div. on

30.6.14. SC Div.

employee not yet 2 T.srinivasa Murthy

OS/SSE/C

&W /NS

G.Nageswar

a Rao5.6.14

GNT Div.,

S.C.Rly

SDGM clearance

received.

S.NoName of the

employee marks

Designati

on /

Station

Date of

Receipt of

application

REQUEST

SOUGHT

TO

1 Sujeet KumarSSE/C&W/

CD/BZA10.04.13

Danapur

Div. E.C.Rly

S.NoName of the

employee marks

Designati

on /

Station

Date of

Receipt of

application

REQUEST

SOUGHT

TO

1 Pradhan Sawaiyan

Sr.Clerk/

DLS/O/BZ

A

5.4.12CKP Div/

SE Rly

MECH. C&W SUPERVISORS REQUESTS AS ON 315.09.2014.

REMARKS

Application forwarded to

CPO/SC

Inter Railway/Divisional Mutual Transfers of Mech. Ministerial -BZA Div as on 15.09.2014

Inter Railway/Divisional Request Transfers of C&W Supervisors- BZA Div as on 31.08.14

REMARKS

SDGM clearance received and

file put up to SrDME

Inter Railway/Divisional Request Transfers of Mech. Ministerial staff- BZA Div as on 15.09.2014

Page 24: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

1 T.AshokJE/C&W/C

D/BZATEL 7.10.13

2 P.Sambasiva RaoJE/C&W/B

TTROGL 13.08.14

1 Ch.Balaji PrasadSE/C&W/N

SBZA,KI 8.7.14

MECH. MINISTERIAL STAFF REQUESTS AS ON 15.09.14.

Requests in the cadre of ChOS/OS.I of Mech. Department.

1 R.Samba siva RaoOS-

I/CDO/BZA

SrDME/O/B

ZA20.08.08

2 L.V.RavindranChOS/WD/

BZA

SrDME/O/B

ZA10.09.08

Requests in the cadre of Headclerks/OS-II of Mech. Department

Remarks

Sl.N

OName S/sri

Present

station

Requested

to

Date of

application

submitted

Date of

receipt of

application

Remarks

Sl.N

OName S/sri

Present

station

Requested

to

Date of

application

submitted

Date of

receipt of

application

STATEMENT SHOWING THE REQUESTS OF SE/SSE/C&W IN MECHANICAL DEPARTMENT

Sl.N

OName S/sri

Present

station

Requested

to

Date of

application

submitted

Date of

receipt of

application

Remarks

STATEMENT SHOWING THE REQUESTS OF JUNIOR ENGINEER /C&W IN MECHANICAL

Sl.N

OName S/sri

Present

station

Requested

to

Date of

application

submitted

Date of

receipt of

application

Remarks

Page 25: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

1 P.Subba RaoHC/CDO/B

ZARCD/BZA 16.09.11 ---

2 R.Ravi ShankarOS-II/

CDO/BZASrDME/O/B

ZA17.12.13

3 T.Srinivasa MurthyOS/C&W/

NS

SrDME/O/B

ZA or BZA28.02.14

Requests in the cadre of Sr.Clerks of Mech. Department.

1 P.Mahesh BabuSC/DME/D

sl/BZA

SrDME/O/B

ZA23.2.11 ---

2 A.HymavathiSC/WD/BZA

SrDME/O/B

ZA19.06.12

3 D.Siva PrasadSC/CCC/D

sl/ BZA

SrDME/O/B

ZA,WD/BZA

,DME/Dsl/B

ZA

1.4.13

4 Laxmi S.N.MurthySC/CDO/B

ZA

SrDME/O/B

ZA or RJY24.02.14 VH quota employee

Requests in the cadre of Jr.Clerks of Mech. Department.

1 A.Bose BabuJC/SSE/C

&W/ MTMBZA 31.07.13

LIST OF REQUEST TRANSFERS IN THE CATEGORY OF GROUP D STAFF –MECHANICAL C&W DEPARTYMENT AS ON 15.09.14

Name S/Sri Present

Stn

Request

Tfr sought

to

Date of

Applicatio

n

Remarks

1 K.Anjamma Chg/BZA WD/BZA 19.01.10 28.01.10 Considered on

25.03.142 K.Satyanarayana Chg/BZA COA 03.11.10 16.11.10

3 G.SATYAVATHI RJY COA 26.03.13 28.03.13 Unwilling

submitted

Name S/Sri Present

Stn

Request

Tfr sought

to

Date of

Applicatio

n

Remarks

1 CH.LAKSHMINARAYA

NA

CD/BZA OGL 14.11.11 07.12.11

Sl

No

Date of

receipt of

applicatio

n

Sl

No

Date of

receipt of

applicatio

n

Remarks

Sl.N

OName S/sri

Present

station

Requested

to

Date of

application

submitted

Date of

receipt of

application

Remarks

Sl.N

OName S/sri

Present

station

Requested

to

Date of

application

submitted

Date of

receipt of

application

Page 26: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

2 A.NARASAIAH CD/BZA OGL 14.06.13 16.07.13

3 K.VENKATA RAO CD/BZA OGL 24.06.13 16.07.13

4 D.KHADER BASHA CD/BZA OGL 16.07.13 19.08.13

5 P.SUBBA RAO CD/BZA OGL 27.02.14 10.03.14

Name S/Sri Present

Stn

Request

Tfr sought

to

Date of

Applicatio

n

Remarks

1 MANOJ KONIAL CD/BZA BTTR 21.09.13 09.10.13

Date of

receipt of

applicatio

Name S/Sri Present

Stn

Request

Tfr sought

to

Date of

Applicatio

n

Remarks

1 S.APPALASWAMY CD/BZA COA 22.05.13 24.05.13 Considered on

02.04.142 V.SIMHACHALAM NS COA 30.06.13 19.08.13

3 A.DURGA BABU CD/BZA COA 10.07.13 16.07.13 Reinstated on

21.05.134 K.CHIRANJEEVI

REDDY

OGL COA 18.07.13 19.08.13 Relieved to RYPS

as Tech III

5 K. SRIHARI CD/BZA COA 18.07.13 19.08.13

6 P.HEMASNDARA RAO RJY COA 24.07.13 19.08.13

7 D.S.V.S.KOTESWARA

RAO

MTM COA 18.10.13 22.10.13

8 K.CHANDRASEKHAR MTM COA 18.10.13 22.10.13

9 P. CHINNA

KESWARAO

MTM COA 31.10.13 20.11.13

10 PYLA VENU MTM COA 31.10.13 20.11.13

11 K.DHANESH MTM COA 31.10.13 20.11.13

12 D.LAKSHMINARAYAN

A

MTM COA 31.10.13 20.11.13

13 L.NAGAMANI WD/BZA COA 19.10.13 12.12.13

14 B.KUMAR RJY COA 23.11.13 16.12.13 Submitted

cancellation on

15 K.RAMESH NAIDU RJY COA 09.12.13 18.12.13

16 CH.Ramesh Kumar

Kuna

CD/BZA COA 23.01.14 17.02.14

17 P.KIRAN KUMAR WD/BZA COA 10.09.13 17.02.13

18 N.POTHU RAJU MTM COA 06.03.14 24.03.14 PH Quota( 100%

blind)19 S.L.N.REDDY NS COA 14.02.14 06.03.14

20 S.HARI PRASAD NS COA 16.02.14 06.03.14

21 I.VENKATESWARA

RAO

NS COA 17.02.14 06.03.14

22 M.LOKESH KUMAR NS COA 31.03.14 09.04.14

23 S.RAMA RAO NS COA 01.06.14 20.06.14

Sl

No

Sl

No

Date of

receipt of

applicatio

n

Page 27: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

Name S/Sri Present

Stn

Request

Tfr sought

to

Date of

Applicatio

n

Remarks

1 K.CHANDRA SEKHAR CD/BZA WD/BZA 05.04.13 22.04.13

Name S/Sri Present

Stn

Request

Tfr sought

to

Date of

Applicatio

n

Remarks

1 A.NARASAIAH CD/BZA TEL 14.06.13 16.07.13

2 P.SUBBA RAO CD/BZA TEL 24.06.13 16.07.13

3 D.SRINU CD/BZA TEL 05.07.13 16.07.13

4 G.SRINIVASA RAO CD/BZA TEL 06.07.13 16.07.13

5 D.KHADER BASHA CD/BZA TEL 16.07.13 19.08.13

6 V.RAJA MOHANA

RAO

BTTR TEL 04.05.14 19.05.14

Name S/Sri Present

Stn

Request

Tfr sought

to

Date of

Applicatio

n

Remarks

1 V.PREM KUMAR COA RJY 01.06.13 17.06.13

2 K.RAMESH KUMAR COA RJY 03.06.13 17.06.13

3 A.UDAY KIRAN COA RJY 04.06.13 17.06.13

4 J.SRINIVASU COA RJY 10.06.13 19.08.13

5 S.RAMBABU CD/BZA RJY 18.06.13 16.07.13 Unwilling

6 K.THRIMURTHULU COA RJY 04.07.13 19.08.13

7 D.ASHOK CD/BZA RJY 17.07.13 19.08.13

8 K.SRIHARI CD/BZA RJY 17.07.13 30.08.13

9 M.NAGESWARA RAO COA RJY 30.08.13 30.08.13

10 MD.ABDUL AZEEM CD/BZA RJY 30.08.13 30.08.13

11 S.APPALA SWAMY CD/BZA RJY 13.06.14 19.08.14

12 S.KANNA REDDY NS RJY 01.02.14 06.03.14 Tfd to NS on

Admn. Grounds on

13 S.RAMBABU CD/BZA RJY 04.04.14 07.04.14

Sl

No

Date of

receipt of

applicatio

Sl

No

Date of

receipt of

applicatio

n

Sl

No

Date of

receipt of

applicatio

n

Sl

No

Date of

receipt of

applicatio

n

Page 28: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

Name S/Sri Present

Stn

Request

Tfr sought

to

Date of

Applicatio

n

Remarks

1 N.Ramesh RJY BTTR 21.01.11 27.01.11

Considered but

could not be

relieved for want

Name S/Sri Present

Stn

Request

Tfr sought

to

Date of

Applicatio

n

Remarks

1 N.RAJESH BTTR BZA 03.06.14 10.06.14

TO TEL

1 A.JAYARAMULU BTTR TEL 17.08.14 01.09.14

1 A.JAYARAMULU BTTR KI 17.08.14 01.09.14

1 A.JAYARAMULU BTTR MTM 17.08.14 01.09.14

Sl.No Name

Present

Working

Station

Request Trf

to

Date of

application

Date of

receipt of

application Remarks

TO RJY

1 G.Chandra Sekhar COA RJY 1.6.13 17.6.13

TO TEL

1 CH.Krupa Rao CD/BZA RJY 09.09.14 15.09.14

Sl.No Name

Present

Working

Station

Request Trf

to

Date of

application

Date of

receipt of

application Remarks

TO TEL

1 M.Dhanunjaya Rao WD/BZA C&W/TEL 05.6.13 10.9.2013

TO RJY

1 G.SATYANARAYANA MTM RJY 17.02.14 18.02.14 Tfd to MTM ON Admn. Grounds

1 T.VENKATESWARA RAO NS COA 20.08.13 06.09.13

1 B.KISHORE KUMAR MTM BZA 21.03.14 26.03.14 Tfd to MTM on Pro on 8.3.14

Sl.No Name

Present

Working

Station

Request Trf

to

Date of

application

Date of

receipt of

application

Remarks

TO BZA

1 S.Sashi Bhushan COA BZA 19.10.12 6.11.12 cancelled

2 M.Naga Raju COA BZA 20.10.12 6.11.12

3 S.Gandhi MTM BZA 30.10.12 6.11.12

4 M.S.Bhavani Prasad MTM BZA 31.10.12 6.11.12

TO MTM

REQUEST TRANSFERS PRIORITY LIST IN THE CATEGORY OF TECHNICIAN Gr.I- MECHANICAL C&W-BZA

REQUEST TRANSFERS PRIORITY LIST IN THE CATEGORY OF TECHNICIAN Gr.II MECHANICAL C&W

TO COA

TO BZA

REQUEST TRANSFERS PRIORITY LIST IN THE CATEGORY OF TECHNICIAN Gr.III- MECHANICAL C&W

Sl

No

Date of

receipt of

applicatio

n

Sl

No

Date of

receipt of

applicatio

n

REQUEST TRANSFERS PRIORITY LIST IN THE CATEGORY OF Sr.TECHNICIAN [ MCM] - MECHANICAL C&W-

TO KI

Page 29: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

5 M.Muni Nayak NS BZA 31.10.12 8.11.12

6 J.Bala Swamy MTM BZA 08.11.12 4.12.12

7 G.Venkata Ratnam NS BZA 18.3.13 1.4.13

8 S.Venkateswarlu C&W/MTM BZA 05.11.13 11.11.13

TO WD/BZA

1 M.Srinivasulu OGL WD/BZA 10.4.13 22.4.13

TO CD/BZA

1 G.Pydi Raju WD/BZA CDO/BZA 20.5.2013 10.9.2013

2 M.Santha Kumari WD/BZA CD/BZA 15.04.14 06.06.14

3 T.Jayamma WD/BZA CD/BZA 15.04.14 06.06.14

TO GDR

1 A.Maheswar CCC/DSL GDR 13.06.14 18.06.14

TO TEL

1 K.Naga Sailaja OGL TEL 19.10.12 6.11.12

2 M.Muni Nayak NS TEL 31.10.12 8.11.12

3 B.RAJU MTM TEL 06.02.14 06.02.14

TO RJY

1 G.Venkata Surapa Raju COA RJY 1.6.13 17.6.13

TO GDR

1 G.Rajani Kumari CD/BZA GDR 23.10.13 24.10.13

TO KI

1 D.D.J.Murali Krishna WD/BZA KI 24.9.13 30.9.13

TO NS

1 P.PEDDI RAJU MTM NS 25.03.14 01.04.14

Sl.No Name of the Employee Com Desig/StationApplication

Received on

Transfer

sought toREMARKS

1 R.RajyaLakshmi ST Tech.III/CD/BZA03.01.2013 LGDS/SC VIG CLEARANCE AWAITED

2 M.Naga Raju SC Tech.III/C&W/COA10.1.2013 LGDS/SC VIG CLEARANCE AWAITED

3 Sk.Gouse Basha UR Tech.III/CD/BZA01.08.2013 LGDS/SC VIG CLEARANCE AWAITED

4 V.Sridhar OBC Tech.III/C&W/COA06.9.2013 LGDS/SC VIG CLEARANCE AWAITED

5 S.Sashi Bhushan SC Tech.III/C&W/COA06.9.2013 LGDS/SC Forwarded to WPO/LGDS

Sl.No Name of the Employee Com Desig/StationApplication

Received on

Transfer

sought toREMARKS

1 S.Dinesh Babu ST Tech.I/C&W/BZA19.1.2013LGDS/SC as

Tech.IIIVIG CLEARANCE AWAITED

Sl.No Name of the Employee Com Desig/StationApplication

Received on

Transfer

sought toREMARKS

1 B.Sudha Kiran UR Tech.III/CD/BZA 05.1.2013VSKP Divn.of

E.CO.RLYVIG CLEARANCE AWAITED

PRIORITY LIST OF TECH Gr III/MECH C&W FOR INTER DIVISIONAL REQUEST TRANSFER AS ON 15.09.14

PRIORITY LIST OF TECH Gr I /MECH C&W FOR INTER DIVISIONAL REQUEST TRANSFER AS ON 15.09.14

PRIORITY LIST OF TECH Gr I /MECH C&W FOR INTER RAILWAY REQUEST TRANSFERS AS ON 15.09.14

Page 30: REQUEST TRANSFERS OF MECHANICAL BRANCH …scr.indianrailways.gov.in/cris/uploads/files/...8 B Papa rao Sr.ALP/BZ A P.Subba Rao 31.10.2013 Eco RLY Cpo/Sc Memorandum not received 9 A.Ram

Sl.No Name of Employee Desig/StationIDMT with DivisionApplication

Received onAppl.Status

1 B.Pennual(UR)Tech.I/CD/B

ZA

K.Rajasekhar/

Tech.I/CD/TP

TY(UR)

GTL 06-06-2012

Appl. Forwarded to

DRM/P/GTL on

11.9.13

Sl.No Name of Employee Desig/StationIDMT with DivisionApplication

Received onAppl.Status

1 V.V.Kamble(SC)Tech.III/C&

W/CD/BZA

Ch.Balayogi/T

ech.III/DSL/K

ZJ(SC)

SC 27/2/2013Not accepted by SC

Division

2 A.Venu(OBC)Tech.III/CD/

BZA

P.Bheemula

Reddy/Tech.II

I/C&W/RDM(

UR)

SC 09-04-2013

Application

Forwarded to

DRM/P/SC

3 R.SANTHOSH KUMARTech.III/CD/

BZA

V.Pradeep

Kumar/Tech.I

II/C&WCD/SC

SC 01.07.14 File being put up

Sl.No Name of Employee Desig/StationIRMT with DivisionApplication

Received onAppl.Status

1 V.K.Rasheed(UR)Tech.III/WD

/BZA

K.Ramakrishn

aiah/Tech.III/

MAJN

Palghat of

S.Rly18/01/13 File being put up

PRIORITY LIST OF TECH Gr I /MECH C&W FOR INTER DIVISIONAL MUTUAL TRANSFERS AS ON 15.09.14

PRIORITY LIST OF TECH Gr III /MECH C&W FOR INTER DIVISIONAL MUTUAL TRANSFERS AS ON 15.09.14

PRIORITY LIST OF TECH Gr III /MECH C&W FOR INTER RAILWAY MUTUAL TRANSFERS AS ON 15.09.14